Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt and Bridget Beck
28

Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.

Mar 27, 2015

Download

Documents

Jessica Allen
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.

Making Greenways Greener: Developing a Sustainable Trail in

Ramsey County

Ramsey County 2007 Lower Afton Road Trail Project

 By Commissioner Victoria Reinhardt

andBridget Beck

 

Page 2: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.

Deciding to Build a Green TrailPolicy Background

• Citizens want a trail for Bike and Ped Safety

• Parks and Corrections own the land

• Segment is short and is a vital connection for the East Metro trail system.

Page 3: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.

Waste Shingles as a Resource

• Shingles are 15.2% of Construction and Demolition Waste (2006)

• 300,000 Tons of Roofing Waste per Year

• 20% of Demolition Landfill Space. (2004)

• 91% of Residential Roofing Waste is Asphalt Shingles

Page 4: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.

Collaboration for Results

• Recognizing the role that everyone plays

• Public health has the material

• Public Works has a potential market

• Parks has a project to help demonstrate the use of post consumer tear off shingles.

Page 5: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.

Project Overview

• Project Consisted of Utilizing Recycled Products– Tear Off Shingles in Bituminous Mix– Recycled Plastics in Retaining Wall – Recycled Plastic/Rubber Pavers– Class 7 Aggregate (“gravel”) base– Reuse of sand in Rain Gardens– Benches have recycled plastics– Utilizing natural soil erosion material– HDPE Pipe– Natural Products

Page 6: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.

Bituminous Pavement Design

• Project was State Aid approved

• Mn/DOT Engineered HMA Spec.– Early involvement of Mn/DOT– County required 5% tear off shingles!– Option to have RAP – Utilized type PG 58-28 virgin asphalt binder oil– Minimum of 70% virgin asphalt binder in mix

Page 7: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.

LAT Project RAS Spec

– Shingles shall be ½-inch minus– Free of nails, other metal, plastic, wood, glass,

other debris (less than 0.5 percent)– County to approved plans for:

• Where to source the tear-off shingles supplies

• How debris will be sorted out from shingles

Page 8: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.

LAT Project RAS Spec(continued)

– Suppilers written certification that the shingles are in compliance

– County and Mn/DOT staff shall inspect recycling operations

– Samples of final RAS product shall be provided to County and Mn/DOT

Page 9: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.

Source of Sorted Shingles

• 75% sorted on site at the roofing job– J Zac, Inc. roofing company– Hauled by Veit– Minor contamination

• 25% supplied from transfer station– Veit Industries– Minimal contamination

Page 10: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.
Page 11: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.
Page 12: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.
Page 13: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.

Omann’s Grinding Process: Phase I

• Ground to 8” minus

• Removed 95% of nails

• Removed most of the remaining contamination

Page 14: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.
Page 15: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.
Page 16: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.
Page 17: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.
Page 18: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.

Omann’s Grinding Process: Phases II and III

• Removed remaining nails• Removed all metallic material• Ground shingles to a very fine consistency

7/16 – inch minus• Provided very clean product

to Midwest Asphalt

Page 19: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.
Page 20: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.
Page 21: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.

• Utilized oil in shingles as partial replacement of virgin asphalt oil

• Used recycled shingles at 5% in place of recycled asphalt pavement (RAP)

Bituminous Supplier & Installer:Midwest Asphalt

Page 22: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.
Page 23: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.
Page 24: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.
Page 25: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.
Page 26: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.

Project Notes

• Normal request for bids– Multiple bidders

• Supports MN/DOT tear-off research

• Technical feasibility not economic costs and benefits– Savings on asphalt binder

Page 27: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.

Concerns/Lessons Learned With Tear off Shingles

• Warm weather• Wind• Ground Shingle stockpile - tacky• HMA – tacky

Page 28: Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.

Making Greenways Greener: Developing a Sustainable Trail in

Ramsey County

Presenters:Ramsey County Commissioner

Victoria Reinhart – 651-266-8363Bridget Beck – 651-266-7121