TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide ‹#› of 27 Major Points to Consider In order to compare reflectors the support has to be included. Hydroformed reflector cost is mostly material. Tooling cost gets lost in this project. An offset is 16% more area. 12m has not been done before. Previous 6m reflectors were 4.8mm thick, 12m will be 3.0mm
Major Points to Consider. In order to compare reflectors the support has to be included. Hydroformed reflector cost is mostly material. Tooling cost gets lost in this project. An offset is 16% more area. 12m has not been done before. Previous 6m reflectors were 4.8mm thick, 12m will be 3.0mm. - PowerPoint PPT Presentation
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide ‹#› of 27
Major Points to Consider
In order to compare reflectors the support has to be included.
Hydroformed reflector cost is mostly material.
Tooling cost gets lost in this project.
An offset is 16% more area.
12m has not been done before.
Previous 6m reflectors were 4.8mm thick, 12m will be 3.0mm
Hat Creek Assy
TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 3 of 27
SKA Assy
TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 4 of 27
Direct Unit PriceEasiest to Estimate
TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 5 of 27
Direct VariablePer Unit
Direct Fixed
Total Units
TotalUnit Cost
DirectUnit Cost
Unit Price
Raw materialIncoming freightDirect LaborConsumablesPackaging
EngineeringToolingProcess development
Total Unit CostBest for comparison