Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “My Woods”
SIX MONTHLY COMPLIANCE
REPORT
JUNE- 2015
Group Housing Complex “My woods”
AT
Plot no. GH-04, Sector -16 C, Noida Extension,
Greater Noida, U.P.
Being developed by
M/s Mahagun India Pvt. Ltd.
A-19, Sector-63, Noida, U.P – 201306
Prepared by
M/s Perfact Services
(ISO9001:2008& ISO14001:2004 Certified)
501-507, 5th Floor, NN Mall,
Mangalam Palace, Sector 3 Rohini, New Delhi
Ph No. 47528467, Fax No. 47528434
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “My Woods”
List of Annexure
Annexure Details
Annexure -I Copy of Granted Environmental Clearance
Annexure -II Monitoring reports of Air, Water , Soil, Noise & Stack
Annexure -III Health Certificates of few workers engaged during
construction work
Annexure -IV PUC certificates of few Vehicles Hired for Construction
Annexure - V Site Photographs showing compliance conditions
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “My Woods”
1. Introduction:-
The proposed Group Housing Complex “My woods” is located Plot no. GH-04, Sector -16 C, Noida
Extension, Greater Noida, U.P. Proposed project is being developed by M/s Mahagun India Pvt. Ltd.
Name of the project Group Housing Complex
“My Woods”
Site address Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, UP
Being Developed By M/s Mahagun India Pvt. Ltd.
Environment Clearance Letter No. 710/726/ SEAC/ 2011/ AA(S) dated 31.03.2012
Period of Compliance October, 2014 to March,2015 submission due in JUNE-15
Project Description Project involves construction of Group Housing complex on a total plot area of 133690 m2. Proposed built-up area is 663509.18 m2.
Construction Status Construction under progress.
Proposed Year of Commencement 2012
Proposed year of completion 2016
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “My Woods”
2. Project Description
The proposed Group Housing Complex “My woods” is located Plot no. GH-04, Sector -16 C, Noida
Extension, Greater Noida, UP. Proposed project is being developed by M/s Mahagun India Pvt. Ltd.
The total plot area is 133690.00 m2. The Complex has the following salient features :-
Particulars Details
Total Plot Area 133690 m2
Permissible Ground Coverage (40 %) 53476 m2
Proposed Ground Coverage (25.8%) 34558.87 m2
Permissible FAR (275) 367647.50 m2
Proposed FAR (274.99) 367645.80 m2
No. of Basement 2
Build up Area 663509.18 m2
Green Area 66868.13 m2
No. of Blocks 27
Max .no. of Floors 2B+ G + 22
Total Population 21036
Max .Height Of Building 72.55 m
Capacity of STP 800 KLD
No. & Capacity of DG sets 1x250KVA , 12x125 KVA,
2x85KVA & 2x 62.5 KVA
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “My Woods”
3. Construction Progress Status:
S No. Component Status as per JUNE-2015
1 Civil Construction (Structural
Work, Brick Work & Plaster
Work)
Structure:-67%, Brickwork:-
56%, Plaster :- 47%
2 Plumbing
20 % work completed
3 Electrical work
50% work completed
4 Fire Fighting
15% work completed
5 Sewage Treatment Plant
Not yet started
6 Rain Water Harvesting
Not yet started
7 Sewerage, Drainage etc.
Not yet started
8 Green Area Development Not yet started
9 Finishing Work Not yet started
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “My Woods”
4. Current Status of point– wise compliance of the stipulated environmental conditions/ safeguards.
S. No
SPECIFIC CONDITIONS: Reply
1. It shall be ensured that all standards related to
ambient environmental quality and the emission/
effluent standards as prescribed by the MOEF are
strictly compiled with.
We are complying with the standards related to ambient environment quality & emission / effluent standards prescribed by the MOEF.
Test reports are enclosed as Annexure-II.
2. It shall be ensured that obtain the no objection
certificate from the U.P. Pollution Control Board
before start of construction.
We have obtained NOC certificate from UP Pollution Control Board under Air & Water Act .
Copy of Consent to Establish is enclosed as Annexure - II
3. It shall be ensured that no construction work or
preparation of land by the project management
except for securing the land is started on the
project or the activity without the prior
environmental clearance.
We had obtained Environmental Clearance for our project before the starting of construction.
Copy of EC is enclosed as Annexure-I
4. The proposed land use shall be in accordance to
the prescribed land use. A land use certificate
issued by the competent authority shall be
obtained in this regards.
Land has been allotted by Greater Noida Development Authority.
Land papers have already been submitted.
5. All trees felling in the project area shall be as
permitted by the forest department under the
prescribed rules. Suitable clearance in this regard
shall be obtained from the competent authority.
Not applicable as no tree felling in the project area..
6. Impact of drainage pattern on environment should
be provided.
No impact on drainage pattern due to construction of the project.
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “My Woods”
7. A suitable plan for providing shelter, light and
fuel, water and waste disposal for construction
labour during the construction phase shall be
provided along with the number of proposed
workers.
The construction workers are from nearby area and no worker is allowed to stay at the site during night time.
Arrangement for temporary shelter and drinking water has been provided. Disposal of waste water by the septic tank followed by soak pit is being done.
8. It shall be ensured to obtain proper permission
from competent authorities regarding enhanced
traffic during and due to construction and
operation of project.
Necessary permission from competent authorities shall be taken regarding enhanced traffic during and due to construction and operation of project.
Traffic Circulation Plan in this regards has already submitted.
9. It shall be ensured to obtain necessary clearances
from the competent authority on the abstraction
and use of ground water during the construction
and operation phases.
During construction, water requirement is meeting through tanker water supplier.
We shall obtain necessary permission for the abstraction of ground water from the competent authority if required.
10. Hazardous/inflammable/ Explosive materials
likely to be stored during the construction and
operation phases shall be as per standard
procedure as prescribed under law, Necessary
clearances in this regards shall be obtained.
No hazardous waste is generated and Site. Only hazardous waste generated during construction phase is used oil from D.G sets which is being given to approved recyclers.
11. Suitable rainwater harvesting systems as per
designs of groundwater department shall be
installed. Complete proposals in this regard should
be submitted.
Rainwater harvesting & Ground water recharging shall be done with oil & Grease trap to remove oil & Grease from the surface runoff suspended matter will be removed in a settling tank before its utilization for rainwater harvesting.
12. The emissions and effluents etc. from machines,
Instruments and transport during construction and
operation phases should be according to the
prescribed standards. Necessary plans in this
Necessary care is being taken to control emissions & effluents etc from machines instruments & transport during construction phase & will be taken during
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “My Woods”
regard shall be submitted. operation phase also.
Vehicles involved in transportation is fully covered and is being washed after unloading. Photographs is enclosed as Annexure VI
13. Water sprinklers and other dust control measures
should be undertaken to take care of dust
generated during the construction and operation
phases. Necessary plans in this regard shall be
submitted.
Water sprinkling and other necessary dust control measures are being taken to control dust generated during the construction & will be taken during operation phase also.
Construction material stored at site is being covered with the cloth. Photographs Enclosed as Annexure- VI
Wheel wash arrangements have been provided for the Construction Vehicles.
14. Suitable noise abatement measures shall be
adopted during the construction and operation
phases in order to ensure that the noise emissions
do not violate the prescribed ambient noise
standards. Necessary plans in this regard shall be
submitted.
All suitable noise abatement measures are being adopted during construction phase. The DG sets being used during construction phase are acoustically enclosed according to Central Pollution Control Board norms.
15. Separate stockpiles shall be maintained for
excavated topsoil and the topsoil should be
utilized for preparation of green belt.
70,000 Cum excavated soil has been generated at the site.Top soil excavated during construction activities are being properly stored under tarpaulin cover and shall be used in horticulture/ landscape & road develop.
9000 Cum soil has been reused for filling. Remaining amount is being disposed off properly as per the norms.
16. Sewage effluents shall be kept separate from
rainwater collection and storage system and
separately disposed. Other effluents should not be
allowed to mix with domestic effluents.
Separate lines for sewage effluents & carrying storm water are being laying down. No other effluent shall be allowed to mix with Domestic effluent.
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “My Woods”
17. Hazardous/ Solid wastes generated during
construction and operation phases should be
disposed off as prescribed under law. Necessary
clearances in this regard shall be obtained.
Except the used oil from DG Sets, No hazardous waste is generated during construction. Used oil will be sold to the approve recycler.
18. Pavements shall be so constructed as to allow
infiltration of surface run-off of rain water. Fully
impermeable pavements shall not be constructed.
Construction of pavements around trees shall be as
per scientifically accepted principles in order to
provide suitable watering, aeration and nutrition to
the tree.
Pavements shall be constructed to allow infiltration of surface run off of rainwater. All necessary cares shall be taken.
19. The Green building Concept suggested by Indian
Green Building Council, which is a part of CII-
Godrej GBC, shall be studied and followed as far
as possible.
Green building concept suggested by Indian Green Building council, which is a part of CII – Godrej GBC is being followed as far as possible.
20. Compliance with the safety procedures, norms and
guidelines as outlined in National Building Code
2005 shall be compulsorily ensured.
We are complying with all safety procedures norms & and guidelines as per National Building Code 2005.
21. Ensure use of measures for reducing water
demand for landscaping and using xeriscaping,
efficient irrigation equipments & controlled
watering systems.
All necessary measures are being taken to reduce the water demand during construction phase.
22. Educate citizens and other stake-holders by
putting up hoardings at different places to create
environmental awareness.
Necessary hoardings have been provided at different places to create environmental awareness. For operational phase, provision for putting hoardings at different places to create environmental awareness shall be made.
23. Traffic congestion near the entry and exit points
from the roads adjoining the proposed project site
must be avoided. Parking should be fully
internalized and no public space should be
utilized.
Proper measures like road width, entry width etc have been taken care, so that there is no Traffic congestion near the entry and exit points from the roads adjoining the project site. Parking shall be fully internalized and no public space shall be utilized.
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “My Woods”
24. Fly ash should be used as building material in the
construction as per the provision of fly ash
notification of September, 1999 and amended as
on August, 2003 (The above condition is
applicable only if the project lies within 100 km of
Thermal Power Station).
30-40% fly ash mix material has been
used in the construction as per the
provisions of Fly ash Notification of
September, 1999 and amended as on 27th
August, 2003.
25. The DG sets to be used during construction phase
should use low sulphur diesel type and should
conform to E.P. rules prescribed for air and noise
emission standards.
Acoustically enclosed D.G sets of 3X125 KVA, 1X250 KVA have been installed during construction phase which use low sulphur diesel and conforms to E.P. rules prescribed for air and noise emission standards.
26. The green belt design along the periphery of the
plot shall achieve attenuation factor conforming to
the day and night noise standards prescribed for
residential land use. The open spaces inside the
plot should be suitably landscaped and covered
with vegetation of indigenous variety.
Green area of 66868.13 m2 is proposed to
be developed in and around the project.
Thick and dense green belt shall be raised
along the periphery of the plot to provide
protection against particulates and noise.
Presently green area development is in
process.
27. The construction of the building and the
consequent increased traffic load should be such
that the microclimate of the area is not adversely
affected.
Measures are being taken to ensure that microclimate of the area is not adversely affected.
28. The building should be designed so as to take
sufficient safeguards regarding seismic zone
sensitivity.
Adequate measures are being taken for structural stability of the building for seismic zone sensitivity.
29. It is suggested that literacy program for weaker
sections of society/ women/ adults (including
domestic help) and under privileged children
could be provided in a formal way.
We shall have literacy program for weaker section of society / Women /adults & under privileged children in a formal way.
30. Treated effluents shall be maximally reused to aim
for zero discharge. Where ever not possible, a
Treated effluents shall be maximally
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “My Woods”
detailed management plan for disposal should be
provided with quantities and quality of waste
water.
reused to aim for zero discharge.
31. Construction activities including movements of
vehicles should be so managed so that no
disturbance is caused to nearby residents.
Necessary care has been taken to ensure that no disturbance is caused to nearby residents. Movement of vehicles is being done during non-peak hours.
32. Parking areas should be in accordance with the
norms of MOEF, Government of India. Plans may
be drawn up accordingly and submitted.
Parking area shall be provided is in accordance with the norms of MOEF, GOI. Parking plan in this regard has already submitted.
33. The location of the STP should be such that it is
away from human habilitation and does not cause
problem of odor. Odorless technology options
should be examined and a report submitted.
STP shall be installed in an isolated place away from human habilitation, hence no odour problem will be expected.
34. The Environment Management plan should also
include the break up costs on various activities
and the management issues also so that the
residents also participate in the implementation of
the environment management plan.
Environment Management plan including break up costs on various activities has already been submitted.
35. Detailed plans for safe disposal of STP sludge
shall be provided along with ultimate disposal
location, quantitative estimates and measures
proposed.
STP sludge will pass though filter press & hence will be form in cakes. The cakes will be kept for drying & used for manure. In case of excess sludge the cakes will be given to solid waste disposal site.
36. Status of the project as on date shall be submitted
along with photographs from North, South, West
and East side facing camera and adjoining areas
should be provided.
Photographs showing the status of the project are enclosed as Annexure VI
37. The DG sets shall be so installed so as to conform
to prescribed stack heights and regulations and
also to the noise standards as prescribed. Details
should be submitted.
Acoustically enclosed D.G Sets shall be installed during operation phase with adequate stack height as per norms for construction purpose.
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “My Woods”
38. Dispensary for first aid shall be provided. First aid facility has been provided during construction phase and it will be provided at guard room during operational phase too. Photographs showing medical facility at the site is enclosed.
39. Ground Water downstream of Rain Water
Harvesting pit nearest to STP should be monitored
for bacterial contamination. Necessary Hand
Pumps should be provided for sampling. The
monitoring is to be done in pre and post monsoon,
seasons.
Ground water quality is being regularly monitored.
40. The green belt shall consist of 50% trees, 25%
shrubs and 25% grass as per MOEF norms.
Proper Green area shall be maintained.
GENERAL CONDITIONS
1. Internal roads should not be less than 9 mt wide. We will comply.
2. Explore the possibility of providing 10% EWS
houses in the project scheme.
We will comply with the requirement.
3. No ground water will be used. Noted. During construction phase, tanker water supply is being used.
4. STP should be installed at construction phase
also.
During construction phase, Waste water is being disposed off through septic tank followed by soak pit.
5. 100% waste water will be treated in STP. No
discharge to sewer line.
We will comply.
6. Stack height of D.G sets should be calculated on
basis of combined DG sets capacity and should
be higher than the tallest building.
Noted. Stack height shall be provided as per the CPCB norms.
7. Construction should be in conformity to Seismic
zone norms for the area.
We will comply.
8. Explore the use of LED in the common areas and We will use LED in common areas and
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “My Woods”
toilets. toilets.
9. Work out MGLC for combined capacity of DG
sets and submitted within 15 days.
Noted.
10. Project proponent will not start construction till
NCRPB clears the master plan.
Noted.
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “My Woods”
ANNEXURE -I
COPY OF GRANTED ENVIRONMENTAL CLEARANCE
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “My Woods”
ANNEXURE -II
MONITORING REPORTS OF AIR, WATER, SOIL, NOISE & STACK
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “My Woods”
ANNEXURE –III
HEALTH CERTIFICATES OF FEW WORKERS ENGAGED DURING CONSTRUCTION WORK
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “My Woods”
ANNEXURE -IV
PUC CERTIFICATES OF FEW VEHICLES HIRED FOR CONSTRUCTION
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “My Woods”
ANNEXURE - V
SITE PHOTOGRAPHS SHOWING COMPLIANCE CONDITIONS
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “My Woods”
4. Site Photographs:-
Covered Stock Material Vehicle wheel wash arrangement
Laborers working at the Site
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “My Woods”
Building covered with Green Air Barrier Net
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “My Woods”
Medical Facility Provided at the Site
Water Sprinkling Facility Covered transportation of Vehicles