Top Banner
Magellan Associate Director Report Personnel Observing Statistics Telescope Operations
21

Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.

Dec 18, 2015

Download

Documents

Corey Price
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.

Magellan Associate Director

Report

• Personnel

• Observing Statistics

• Telescope Operations

Page 2: Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.

Personnel

• Mechanical Engineer hired

• In late-July, Juan Gallardo was offered the job Mechanical Engineer in the Magellan Technical Group in Chile

• He accepted and began work on September 2

• Juan worked as a mechanical engineer at CTIO from 2000-2005, and for ALMA from 2006 to present

Page 3: Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.

Personnel (cont.)

• Frank Perez

• As of July 1, Frank Perez has taken on the position of “Magellan Technical Manager” in Pasadena

• As such, he will serve as the technical and logistics liaison for engineers and scientists at LCO in support of Magellan telescope operations

• During FY10/11, Frank’s effort will continue to be 80% for Magellan and 20% for Small Telescopes

• His Magellan effort will decrease to 50% in FY11/12 once the new Magellan Mechanical Engineer in Chile (Juan Gallardo) has come up to speed

Page 4: Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.

Personnel (cont.)

• Alan Uomoto

• As of July 1, Alan Uomoto’s title has changed to “Carnegie Observatories Technical Manager”

• He is supervising purchasing and shipping in Pasadena, and is also in charge of the Observatories’ shop and technical personnel

• In addition, Alan will continue to spend 30% of his effort working for Magellan (mostly overseeing instrument-related issues)

Page 5: Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.

Personnel (cont.)• New Instrument Engineer position

• This position was approved by the Council beginning in FY 2011/12

• Replacement for Magellan Fellow program

• Tasks will include:

• Engineering Run support

• Night on-sky testing of all instrument modes and monitoring of calibrated results

• Testing and maintenance of reduction pipelines

• Updates to exposure time calculators

• Refinement of observing cookbooks

• Implementation and testing of new observing scripts

• Full testing of various observing modes

Page 6: Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.

14 Aug-2010 – 28 Feb 2011:

Observing Statistics

2.3%

0.1%

0.8%

1.4%

11.2%

86.5%

Baade

2.3%

0.1%

0.9%

1.3%

9.9%

87.8%

Clay

% Lost to Computer

% Total Downtime

% Lost to Instrument

% Lost to Telescope

% Lost to Weather

% Open

Page 7: Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.

Observing Statistics: Baade Downtime

Page 8: Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.

Observing Statistics: Clay Downtime

Page 9: Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.

Baade Telescope Instrumentation Usage:

Observing Statistics

9

10 Feb 2010-13 Aug 2010

14 Aug 2010-28 Feb 2011

IMACS 69.2% 57.8%

FIRE 10.5% 32.6%

PANIC 20.3% 5.7%

FourStar -- 3.9%

Page 10: Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.

Clay Telescope Instrumentation Usage:

Observing Statistics

10

10 Feb 2010-13 Aug 2010

14 Aug 2010-28 Feb 2011

MIKE 43.0% 28.5%

MMIRS 14.1% 17.4%

MagE 18.2% 14.3%

PFS 10.8% 13.0%

MegaCam 7.7% 9.8%

MIKE Fibers 1.6% 9.5%

LDSS3 2.2% 4.1%

MagIC 2.4% 3.4%

Page 11: Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.

Observing Statistics: Instrument Usage

Page 12: Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.

Instrument Commissioning

Instrument First Light

PFS 2009 October

MegaCam 2009 October

MMIRS 2009 December

FIRE 2010 March

FourStar 2010 December

Page 13: Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.

Instrument Still To Come

Instrument First Light

IMACS Mosaic3 2011B

AO (VisAO, Clio2) 2012A?

AO (BLINC MIRAC4) ?

M2FS 2012B?

PISCO ?

Page 14: Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.

Telescope Operations• Primary mirrors:

• The planned re-aluminizing of the Baade primary mirror did not occur do to the failure of a bearing in the LCO frequency converter. The mirror was washed instead.

• A “rain event” on Feb 28 affected the primary mirrors of both telescopes. This was after the Baade mirror was washed, but before the Clay mirror washing. After washing of Clay mirror, patchy areas persisted.

• These events will have an impact on planning re-aluminizing and washing of mirrors next Chilean summer.

• Clay tertiary mirror:

• Coating of Clay M3 was damaged while in storage during last f/5 run (Oct-Nov 2010). Mirror will be re-coated during the current f/5 run.

Page 15: Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.

Telescope Operations• Earthquake Monitoring:

• Baade telescope is now outfitted with set of logging accelerometers

• Data are beginning to be taken and analyzed

• Preliminary data indicate significant amplification by the telescope structure

Page 16: Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.

Telescope Operations• Software issues:

• A long term problem with the encoders on the Cass and Folded port rotators was recently solved

• Non-sidereal tracking control software finally appears to be working well

• Guider and TCS software have been upgraded to deal more gracefully with the limited available field of the guide probes on FourStar

• Weather/Seeing facilities:

• New Vaisala weather station now functioning. A new weather web site is being developed

• Work is nearing completion on full automation of the Magellan DIMM

Page 17: Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.

End

Page 18: Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.

Extra Slides

Page 19: Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.

Magellan Telescopes Organizational Diagram

Page 20: Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.
Page 21: Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.

Instrument Downtime:

Observing Statistics

10 Feb 2010-13 Aug 2010

14 Aug 2010-28 Feb 2011

IMACS 0.5% 0.4%

MIKE 0.1% 0.5%

LDSS-3 0.0% 0.0%

PANIC 0.0% 0.0%

MagE 0.1% 0.1%

MIKE fibers 0.0% 0.0%

MagIC 0.0% 0.0%

PFS 0.0% 0.0%

MMIRS 1.8% 3.3%

MegaCam 0.0% 1.5%

FIRE 1.0% 1.6%