Top Banner
[email protected] Page 1 Of 5 Curriculum vitae NAME: Mohamed Adel Abu-Alnaga SUMMARY OF EXPERIENCE: Sixteen years’ experience in the engineering and construction industry working in construction projects both onshore and offshore with the petroleum & contractors Sectors in booth Egypt and Iraq. ACTIVITIES: Construction Engineer. Project manager. Technical Office Dep. Head. EMPLOYMENT HISTORY Egyptian Maintenance Company (EMC) (Iraq Branch Technical Office Dep. Head) Jan. 2013- present (Iraq Branch construction Dep. Head) May 2012-Dec.2012 (Fabrication W. Shop production Sec. Head) 2010 2012 (Suez Fabrication Work Shop) 2007 2010 Maria organization (Construction manager) 2000 2007.
11
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: M.adel_CV

[email protected] Page 1 Of 5

Curriculum vitae

NAME: Mohamed Adel Abu-Alnaga

SUMMARY OF EXPERIENCE:

Sixteen years’ experience in the engineering and construction industry working in

construction projects both onshore and offshore with the petroleum & contractors

Sectors in booth Egypt and Iraq. ACTIVITIES:

• Construction Engineer.

• Project manager.

• Technical Office Dep. Head.

EMPLOYMENT HISTORY

• Egyptian Maintenance Company (EMC)

(Iraq Branch Technical Office Dep. Head) Jan. 2013- present

(Iraq Branch construction Dep. Head) May 2012-Dec.2012

(Fabrication W. Shop production Sec. Head) 2010 – 2012

(Suez Fabrication Work Shop) 2007 – 2010

• Maria organization (Construction manager) 2000 – 2007.

Page 2: M.adel_CV

[email protected] Page 2 Of 5

Education &Training

• Faculty of Applied Arts-Industrial designs in Education-Helwan University (1995 – 2000).

• Training course in CORROSION AND PROTECTIVE COATINGS IN THEORY AND APPLICATION.

• Program of study in TIME MANAGEMENT.

• Program of study in EMPLYEE MOTIVATION.

• Program of study in ACCOUNTABILITY & ASSERTIVENESS.

Objective

Challenging opportunity in an environment that recognizes and rewards exceptional

performance.

Languages:-

• Arabic : As mother tongue.

• English: (Speaking - Reading - Writing / Excellent).

Computer Skills:-

• Windows 98 & XP.

• AutoCAD.

• Microsoft (Word & Excel). Microsoft project

Duties and responsibilities as Technical Office manager

Management, follow-up and the technical support of all operations activities at Iraq Branch

.Technical follow up for the projects related plus handling of all resources and facilities

support plan with the Iraq Branch manager in compliance with H.O coordination team

action plans

1. Development of scope of work execution plans, ensuring that the resources, the

organization, the project schedule, HSSE requirements and the contract strategies are

the appropriate ones.

2. Preparing proposals for the variation orders including methodology, scheduling and resource forecasting.

3. Acts as a traffic controller between clients and budget holders. 4. Develop new relations with client and update the company client’s registration

and portfolio. 5. Share all pricing models preparation with the proposals Dept. and the other

team members.

Page 3: M.adel_CV

[email protected] Page 3 Of 5

6. Performs routine daily activities and assists in gathering and distributing information to team members.

7. Follow up the required tasks daily for current Operations. 8. Manage job closeout and obtain all warranties required for final acceptance. 9. Review punch list with each project manager.

Duties and responsibilities as Construction manager

1. The fabrication of structures and installation in accordance with the relevant codes,

standards and client specifications.

2. Selecting and procuring of materials plant and equipment, and monitoring the progress of

materials, plant and equipment through all stages of projects.

3. To support construction activities including issues such as rigging, lifting, and transport.

4. To liaise with all members of the Project Team (Discipline engineers, construction personnel)

5. To work with the Proposals Department to develop bids including conceptual designs and

estimates.

6. To arrange the working schedule & plane (working under pressure).

Work Experience

PERIOD: Jan 2013 TO present

• Company : Egyptian Maintenance Company (EMC).

• Position : Iraq Branch Technical Office Department Head.

• Client : All

• Location : EMC Iraq Branch

PERIOD: MAY 2012 TO Dec.2012

• Company: Egyptian Maintenance Company (EMC).

• Position : Iraq Branch construction Dep. Head

• Client : All

• Project : Manage all construction activities

• Location : EMC Iraq Branch

PERIOD: APRIL 2011 TO May 2012

• Company: Egyptian Maintenance Company (EMC).

• Position: Production Manager

• Client : All

• Project: : Manage all piping construction activities

• Location: EMC Suez fabrication workshop

PERIOD: APRIL 2009 TO APRIL 2011

• Company: Egyptian Maintenance Company (EMC).

• Position: Production Section Head

• Client : ENPPI

• Project: TUNA, Denise B, Seth Dev. Projects

(Fabrication of Survival Module & Battery Shelter & Generator shelter)

• Location: EMC Suez fabrication workshop

Page 4: M.adel_CV

[email protected] Page 4 Of 5

PERIOD: JAN 2011

• Company: Egyptian Maintenance Company (EMC).

• Position: Production Section Head

• Project: Participate in workshop renewal for ASME certificates

(U, PP, S, R)Stamps

PERIOD: FEBRUARY 2008 TO MARCH 2009

• Company: Egyptian Maintenance Company (EMC).

• Position: Professional A Engineer

• Project: Participate in several projects (shelters, Tanks and piping)

• Location: EMC Suez fabrication workshop

PERIOD: OCTOBER 2007 TO JANUARY 2008

• Company: Egyptian Maintenance Company (EMC).

• Position: Production Engineer

• Project: Participate in workshop rehabilitation for ASME certificates

(U, PP, S, R)Stamps

PERIOD: JANUARY 2007 TO JULY 2007

• Project: Gupco Rehabilitation Project

(Badri EER Switchgear room)

• Client: British Petroleum. Contractor: ENPPI

• Company: Maria Organization

• Position: Construction manager

• Location: 10th of Ramadan (Maria Yard)

PERIOD: APRIL 2006 TO DECEMBER 2006

• Project: Gupco Rehabilitation Project.

• Client: British Petroleum.

• Contractor: ENPPI

• Company Maria Organization

• Position: Design team & Site Manager Location: Zeit Bay

(Petrojet Yard)

PERIOD: JUNE 2005 TO DEC 2005

• Project: Petronas Electrical Module

• Client: PETRONAS

• Contractor: Schneider Electric EGYPT

• Company: Maria Organization Position: Project Manager

PERIOD: JULY 2004 TO FEB 2005

Page 5: M.adel_CV

[email protected] Page 5 Of 5

• Project: Elhamd Power Module.

• Client: G.P.C

• Contractor: Schneider Electric EGYPT

• Company: Maria Organization

• Position: Design team & Construction MGR

PERIOD: JAN 2004 TO JULY 2004

• Project: Karama Power Module

• Client: QUARUN Petroleum co.

• Consultant: ENPPI

• Contractor: Schneider Electric EGYPT

• Company: Maria Organization

• Position: Design team & Construction MGR

PERIOD: OCT 2000 TO DEC2004

• Company: Maria Organization

• Position: Construction Engineer

• Client : All

• Project: : Participate in all construction activities

• Location: Maria Organization Yard in 10th of Ramadan City

Engineering programs

- AutoCAD till 2009

- Power point & paint brush

- Microsoft project

Safety Training Courses - Work

Permit System

- Risk Assessment

- Work on Heights

- Work in confined space

- Isolation, lockout, Tag out

- Fire protection and Fire Fighting

- Waste Management and Housekeeping

- Near miss Reporting

- Accident Investigation Procedure

Personal Information:

• Full Name: Mohamed Adel Ibrahim Abu-Alnaga

• Nationality: Egyptian

• Date of Birth: 17th of October 1978

• Marital State: Married + two Childs

• Military Status: Exempted

• Telephone: 02 – 24709116

Page 6: M.adel_CV

[email protected] Page 6 Of 5

• Mobile : 0122 - 3590748

• Email Address 1: [email protected] • Email Address 2: [email protected]

References

Available upon request

Thanks …

Mohamed Adel

Page 7: M.adel_CV
Page 8: M.adel_CV
Page 9: M.adel_CV

This Certificate has been awarded to

Because of completion 80 hours Theoretical and 20 hours Practical Grade 2

Training Course in:

CORROSION AND PROTECTIVE COATINCS Ii\

EORY

281r12006

Page 10: M.adel_CV
Page 11: M.adel_CV