1 2 3 4 5 7 6 8 10 9 20 15 14 16 19 18 17 13 12 23 24 22 21 11 25 26 31 30 29 27 28 FP Do Not scale drawings. Use figured dimensions only Copyright This document and the subject matter contained therein is proprietary and is not to be used or reproduced without the written permission of Felino Pascual and Associates sheet no: project no: notice: date: checked by: drawn by: job no./issue/revision date: sheet title: project location: project: client: seal: Farmington Hills, MI 48336 24333 Orchard Lake Rd, Suite G registered Landscape Architect Community Land Planner and and ASSOCIATES A ph. (248) 557-5588 fax. (248) 557-5416 FP FELINO A. PASCUAL 2017 The location and elevations of existing underground utilities as shown on this drawing are only approximate. no guarantee is either expressed or implied as to the completeness of accuracy. contractor shall be exclusively responsible for determining the exact location and elevation prior to the start of construction STONEY CREEK COVE 2001 CRYSTAL LAKE DRIVE SHELBY TOWNSHIP, MICHIGAN 48316 MIKE LOCHIRCO JP, KM, CS 3-19-2017 LS17.047.03 SPA 4-4-2017 Stoney Creek Drive Shelby Township, Michigan A planned multi-family residential community LS17.047.03 of 4 S T A T E O F M I C H I G A N A R C H I T E T C R E G I S E E T R L A N D S E A C P R LS-1 OVERALL PLANTING PLAN VIEW existing Cascades of Stoney Creek 80' scale: 20' 0' 160' 240' Shelby Township, Michigan Stoney Creek Cove landscape plan for: unless noted otherwise, numerical value on landscape quantities specified on plan take precedence over graphic representation. note: general landscape notes: -a planned multi-family residential community sheet index LS-1 LS-2 OVERALL PLAN VIEW LS-3 PLANTING DETAIL PLAN LS-4 PLANTING DETAIL PLAN PLANT MATERIALS & PLANT DETAILS Dante Canyon Drive Long Island Dr. Long Island Drive Durango Drive Stoney Creek Drive Stag Pass Drive Lobo Lane Dove Creek Drive existing Stoney Creek Village Stoney Creek Drive Macomb Orchard Trail Stoney Creek Metropark existing
4
Embed
Macomb Orchard Trail - Charter Township of Shelby Creek Cove.pdf · poor or severely disturbed soil or building rubble. use water to settle soil and remove air pockets and firmly
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
1
2
3
4
5
7
6
8
10
9
20
15
14
16
19
18
17
13
12
2324
22
21
11
25
26
31
30
29
27
28
FP
Do Not scale drawings. Usefigured dimensions only
Copyright
This document and the subject mattercontained therein is proprietary and isnot to be used or reproduced withoutthe written permission of Felino Pascualand Associates
sheet no:
project no:
notice:
date:
checked by:
drawn by:
job no./issue/revision date:
sheet title:
project location:
project:
client:
seal:
Farmington Hills, MI 4833624333 Orchard Lake Rd, Suite G
registered Landscape ArchitectCommunity Land Planner and
and ASSOCIATES
A
ph. (248) 557-5588fax. (248) 557-5416
FPFELINO A. PASCUAL
2017
The location and elevations of existingunderground utilities as shown on thisdrawing are only approximate. no guaranteeis either expressed or implied as to thecompleteness of accuracy. contractor shall beexclusively responsible for determining theexact location and elevation prior to the startof construction
STONEYCREEK COVE
2001 CRYSTAL LAKE DRIVESHELBY TOWNSHIP,MICHIGAN 48316
MIKELOCHIRCO
JP, KM, CS
3-19-2017
LS17.047.03 SPA 4-4-2017
Stoney Creek Drive
Shelby Township,Michigan
A planned multi-familyresidential community
LS17.047.03
of 4
STAT
EOF MICH IGA
N
ARCH
IT
ET
C
RE
GIS
E
ET
R
L ANDSEAC P
R
LS-1
OVERALL PLANTINGPLAN VIEW
existingCascades of Stoney Creek
80'scale:
20'0' 160' 240'
Shelby Township, Michigan
Stoney Creek Covelandscape plan for:
unless noted otherwise, numerical value on landscapequantities specified on plan take precedence overgraphic representation.
note:
general landscape notes:
-a planned multi-family residential community
sheet indexLS-1LS-2
OVERALL PLAN VIEW
LS-3
PLANTING DETAIL PLAN
LS-4
PLANTING DETAIL PLAN
PLANT MATERIALS & PLANT DETAILS
Dan
te C
anyo
n D
rive
Long
Isla
nd D
r.
Long
Isla
nd D
rive
Durango Drive
Sto
ney
Cre
ek D
rive
Stag Pass Drive
Lobo
Lan
e
Dove Creek Drive
existingStoney Creek Village
Stoney Creek Drive
Mac
omb
Orc
hard
Tra
il
Stoney CreekMetropark
existing
1
2
4
20
15
14
16
19
18
17
13
12
2324
22
21
11
25
26
31
30
29
27
28
FP
Do Not scale drawings. Usefigured dimensions only
Copyright
This document and the subject mattercontained therein is proprietary and isnot to be used or reproduced withoutthe written permission of Felino Pascualand Associates
sheet no:
project no:
notice:
date:
checked by:
drawn by:
job no./issue/revision date:
sheet title:
project location:
project:
client:
seal:
Farmington Hills, MI 4833624333 Orchard Lake Rd, Suite G
registered Landscape ArchitectCommunity Land Planner and
and ASSOCIATES
A
ph. (248) 557-5588fax. (248) 557-5416
FPFELINO A. PASCUAL
2017
The location and elevations of existingunderground utilities as shown on thisdrawing are only approximate. no guaranteeis either expressed or implied as to thecompleteness of accuracy. contractor shall beexclusively responsible for determining theexact location and elevation prior to the startof construction
STONEYCREEK COVE
2001 CRYSTAL LAKE DRIVESHELBY TOWNSHIP,MICHIGAN 48316
MIKELOCHIRCO
JP, KM, CS
3-19-2017
LS17.047.03 SPA 4-4-2017
Stoney Creek Drive
Shelby Township,Michigan
A planned multi-familyresidential community
LS17.047.03
of 4
STAT
EOF MICH IGA
N
ARCH
IT
ET
C
RE
GIS
E
ET
R
L ANDSEAC P
R
LS-2
OVERALL PLANTINGPLAN VIEW
detentionproposed
STAT
EOF MICH IGA
N
ARCH
IT
ET
C
RE
GIS
E
ET
R
L ANDSEAC P
R
landscape planting detail2A
pond
detentionproposed
pond
location map
2A enlargearea
Long
Isla
nd D
rive
Durango Drive
Ston
ey C
reek
Driv
e
Stag Pass Drive
Lobo
Lan
e
Dove Creek Drive
Dan
te C
anyo
n D
rive
existingStoney Creek Village
Mac
omb
Orc
hard
Tra
il
Stoney CreekMetropark
existing
1
2
3
4
5
7
6
8
10
9
20
15
FP
Do Not scale drawings. Usefigured dimensions only
Copyright
This document and the subject mattercontained therein is proprietary and isnot to be used or reproduced withoutthe written permission of Felino Pascualand Associates
sheet no:
project no:
notice:
date:
checked by:
drawn by:
job no./issue/revision date:
sheet title:
project location:
project:
client:
seal:
Farmington Hills, MI 4833624333 Orchard Lake Rd, Suite G
registered Landscape ArchitectCommunity Land Planner and
and ASSOCIATES
A
ph. (248) 557-5588fax. (248) 557-5416
FPFELINO A. PASCUAL
2017
The location and elevations of existingunderground utilities as shown on thisdrawing are only approximate. no guaranteeis either expressed or implied as to thecompleteness of accuracy. contractor shall beexclusively responsible for determining theexact location and elevation prior to the startof construction
STONEYCREEK COVE
2001 CRYSTAL LAKE DRIVESHELBY TOWNSHIP,MICHIGAN 48316
MIKELOCHIRCO
JP, KM, CS
3-19-2017
LS17.047.03 SPA 4-4-2017
Stoney Creek Drive
Shelby Township,Michigan
A planned multi-familyresidential community
LS17.047.03
of 4
STAT
EOF MICH IGA
N
ARCH
IT
ET
C
RE
GIS
E
ET
R
L ANDSEAC P
R
LS-3
OVERALL PLANTINGPLAN VIEW
STAT
EOF MICH IGA
N
ARCH
IT
ET
C
RE
GIS
E
ET
R
L ANDSEAC P
R
general landscape planting detail3A
location map
3Aenlargearea
Long
Isla
nd D
r.
Long
Isla
nd D
rive
Durango DriveDan
te C
anyo
n Driv
e
existingCascades of Stoney Creek
existingStoney Creek Village
Stoney CreekMetropark
existing
Details and PlantMaterial List
sheet no:
no scale
tree staking detail
FP
Do Not scale drawings. Usefigured dimensions only
Copyright
This document and the subject mattercontained therein is proprietary and isnot to be used or reproduced withoutthe written permission of Felino Pascualand Associates
sheet no:
project no:
notice:
date:
checked by:
drawn by:
job no./issue/revision date:
sheet title:
project location:
project:
client:
seal:
Farmington Hills, MI 4833624333 Orchard Lake Rd, Suite G
registered Landscape ArchitectCommunity Land Planner and
and ASSOCIATES
A
ph. (248) 557-5588fax. (248) 557-5416
FPFELINO A. PASCUAL
2017
The location and elevations of existingunderground utilities as shown on thisdrawing are only approximate. no guaranteeis either expressed or implied as to thecompleteness of accuracy. contractor shall beexclusively responsible for determining theexact location and elevation prior to the startof construction
STONEYCREEK COVE
2001 CRYSTAL LAKE DRIVESHELBY TOWNSHIP,MICHIGAN 48316
MIKELOCHIRCO
JP, KM, CS
3-19-2017
LS17.047.03 SPA 4-4-2017
Stoney Creek Drive
Shelby Township,Michigan
A planned multi-familyresidential community
LS17.047.03
of 4
STAT
EOF MICH IGA
N
ARCH
IT
ET
C
RE
GIS
E
ET
R
L ANDSEAC P
R
LS-4
detention basin seed mix:
annual cover:
A mix of sedges, grasses and wildflowers recommendedfor soils that are saturated during most of the growingseason. Use just above the normal waterline in thecapillary zone in our Lake Edge Enhancement System.
MIN. 2" DEPTH DOUBLE SHREDDEDHARDWOOD BARK. MULCH SHALLBE NEUTRAL IN COLOR
shrub planting detailno scale
subgrade
fold down or pull back string,burlap or plastic exposing rootball.remove all non-degradable materials.do not remove soil from the rootball
center rootball in planting hole.leave bottom of planting hole firm.do not amend soil unless planting inpoor or severely disturbed soil orbuilding rubble. use water to settlesoil and remove air pockets and firmlyset shrub. gently tamp if needed.
set top of rootball level with gradeor slightly above grade if in clay soil
mulch 2"-3" depth with shreddedhardwood bark.mulch shall beneutral in color.
break up (scarify) sides ofplanting hole.
evergreen planting detailno scale
set top of rootball level with gradeor slightly above grade if in clay soil.
stake with 2x2 hardwood stakes orapproved equal driven 6"-8" outsideof rootball.loosely stake tree trunk toallow for trunk flexing.stake trees justbelow first branch with 2"-3" wide belt-like,fabric straps (2 per tree on oppositesides of tree, connect from tree to stakehorizontally. do not use rope wire thru a hose.).remove all staking materials after 1 year.
mulch 2"-3" depth with shreddedhardwood bark. mulch shall beneutral in color. leave 3" circle ofbare soil at base of tree trunk.
fold down or pull back string,burlap or plastic exposing rootball.remove all non-degradable materials.do not remove soil from the rootball.
break up (scarify) sides ofplanting hole.
center rootball in planting hole.leave bottom of planting hole firm.do not amend soil unless plantingin poor or severely disturbed soil orbuilding rubble.use water to settlesoil and remove air pockets and firmlyset tree. gently tamp if needed.
do not prune terminalleader or branch tips.prune away dead orbroken branches only.
remove nursery appliedtree wrap, tape or stringfrom tree trunk and crown.
tree planting detailno scale
do not prune terminalleaderor branch tips.prune away dead orbroken branches only.
set top of rootball levelwith grade or slightlyabove grade if in claysoil.
prune suckers off.
center rootball in plantinghole.leave bottom of plantinghole firm.do not amend soilunless planting in poor orseverely disturbed soil orbuilding rubble.use water to settle soil and remove airpockets and firmly set tree.gently tamp if needed.
do not stake trees unless in heavyclay soil, windy conditions, 3" orgreater diameter tree trunk or largecrown. if staking is needed due tothese conditions:- stake with 2x2hardwood stakes or approved equaldriven 6"-8" outside of rootball.- looselystake tree trunk to allow for trunk flexing.- stake trees just below first branch with2"-3" wide belt-like, fabric straps (2 pertree on opposite sides of tree, connectfrom tree to stake horizontally. do notuse rope wire thru a hose.).- remove allstaking materials after 1 year.
fold down or pull back string,burlap or plastic exposing rootball.remove all non-degradable materials.do not remove soil from the rootball.
break up (scarify) sides ofplanting hole.
mulch 2"-3" depth with shreddedhardwood bark. mulch shall beneutral in color. leave 3" circle ofbare soil at base of tree trunk.
remove nursery applied tree wrap,tape or string from tree trunk andcrown. remove any tags or labels.