Neighborhood work Santa Clara Valley Water District Contact us If you have specific questions or concerns about this project, contact Ted Ibarra at (408) 265-2607, ext. 2067, or e-mail [email protected]. What: As part of the Lower Silver Creek Flood Protection Project, the Lyndale pedestrian bridge will be replaced beginning spring of 2012. The new bridge will be raised higher to accommodate the new flood walls on each creek bank. When: Spring through summer 2012. Work hours are 8 a.m. to 5 p.m. Lyndale bridge closure The Lyndale pedestrian bridge (shown inside the red circle) will be replaced during the spring-summer 2012 season.
1
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Lyndale pedestrian bridge closure

Neighborhood workSanta Clara Valley Water District

Contact usIf you have speci� c questions or concerns about this project, contact Ted Ibarra at (408) 265-2607, ext. 2067, ore-mail [email protected].

What: As part of the Lower Silver Creek Flood Protection Project, the Lyndale pedestrian bridge will be replaced beginning spring of 2012. The new bridge will be raised higher to accommodate the new � ood walls on each creek bank. When: Spring through summer 2012. Work hours are 8 a.m. to 5 p.m.

Lyndale bridge closure

The Lyndale pedestrian bridge (shown inside the red circle) will be replaced during the spring-summer 2012 season.