LULA GREEN ROAD UNION, SOUTH CAROLINA Jerry A. Brannon, Sr. ,PE Union County Engineer
Feb 24, 2016
LULA GREEN ROADUNION, SOUTH CAROLINA
Jerry A. Brannon, Sr. ,PEUnion County Engineer
Project Description
Project Length – 2.8 MilesDirt and stone – 2.5 MilesAsphalt - 0.3 MilesDitches & shoulders - 5.6 MilesCrossline Pipe - 76 Feet 18 “Rip Rap - As NeededMacadam Stone - 2.5 MilesBituminous Surface - 2.5 Miles
Project Description
Re-grade 5.6 Miles of shoulders and ditchesRe-grade and reshape 2.3 miles of road bedSpread, shape and compact macadam stoneClean existing pipePlace new cross line pipesInstall erosion control
Project Description
Phase II – Install 18’ bituminous surface treatment
Total Project cost estimated at $125,000
Addition funds anticipated from CTC and Union County Forces providing most of labor