Top Banner
Id Number Title Year Organization Page 334851 1-003 Engineering Regulatory Notices - Issue A2 2011 LUL 0 334852 1-026 Topographical Surveys and Mapping - Issue A2 2011 LUL 0 334853 1-027 Site Hoarding, Fencing and Barriers - Issue A1 2011 LUL 0 334854 1-054 Civil Engineering - Earth structures - Issue A3 2010 LUL 0 334855 1-066 Lighting of London Underground Assets - Issue A3; Incorporating Written Notice: 9/17/2013 2011 LUL 0 334856 1-067 NULL 2011 LUL 0 334857 1-068 Mechanical Building Services, Utility Provision and Energy Management in London Underground - Issue A3 2011 LUL 0 334858 1-069 Low Voltage Electrical Installations - Issue A3; Incorporrating Written Notice: 5/20/2013, 7/16/2013 2011 LUL 0 334859 1-080 The application of fire safety engineering principles to London Underground premises - Issue A2 2011 LUL 0 334860 1-081 Design and installation of fire protection systems and compartmentation measures - Issue A2; Includes Written Notice 01313 and 01319: 1/12/2015 2011 LUL 0 334861 1-082 Active fire protection systems and portable fire equipment - Issue A2 2011 LUL 0 334862 1-083 Passive fire protection systems - Issue A2 2011 LUL 0 334863 1-084 Maintenance of fire protection systems and compartmention measures - Issue A2 2011 LUL 0 334864 1-085 Fire safety performance of materials - Issue A3; Incorporating Written Notice: 10/13/2014 2011 LUL 0 334865 1-107 Requirements for Electrical Track Equipment - Issue A3 2015 LUL 0 334866 1-122 Requirements for 750V Traction Power Supplies and Insulation Levels - Issue A1; Includes Written Notice 6/12/2015 2010 LUL 0 334867 1-123 Requirements for Matching Electrical Loads to Supplies when making changes to Low Voltage Infrastructure - Issue A2; Incorporating Written Notice: 03/15/2012, 7/16/2013 2010 LUL 0 334868 1-124 Low Voltage AC and DC Power Supply Parameters, Characteristics and Performance Requirements - Issue A1 2010 LUL 0 334869 1-133 Premises - stairways and ramps - Issue A8 2010 LUL 0 334870 1-142 Operational Information Systems - Issue A4; Incorporating Written Notice: 11/14/2011; 7/8/2013 2011 LUL 0 334871 1-150 Telecommunications - OPO CCTV - Issue A1; Incorporating Written Notice: 9/9/2011 2011 LUL 0 334872 1-164 Conductor Rail _ Dimensions and Tolerances - Issue A2; Incorporating Written Notice: 11/13/2013; 01/31/2014; 03/14/2014; 5/13/2015 2011 LUL 0 334873 1-169 Train Arrestors _ Performance, Design and Configuration - Issue A2; Incorporating Written Notice: 3/14/2014 2011 LUL 0 334874 1-170 Train Arrestors - Inspection and Maintenance - Issue A2; Incorporating Written Notice: 02/27/2014 2011 LUL 0 334875 1-321 Customer acceptance testing - Issue A3 2010 LUL 0 334876 1-551 Procuring and managing suppliers and contractors - HS&E requirements - Issue A4; Incorporating Written Notice: 1/11/2011 2010 LUL 0 334877 1-558 Formal Investigation of Incidents - Issue A8 2011 LUL 0 334878 1-566 Monitoring health, safety and environmental performance - Issue A5 2010 LUL 0 334879 1-691 Information - Issue A2 2010 LUL 0 334880 1-701 Business Case Development Manual 2014 LUL 0 334881 1-711D Guide to switching traction current on and off - central line - Issue 9.3 2010 LUL 0 334882 1-711E GUIDE TO SWITCHING TRACTION CURRENT ON AND OFF - DISTRICT LINE - Issue 9.2 2010 LUL 0 334883 1-711F GUIDE TO SWITCHING TRACTION CURRENT ON AND OFF - HAMMERSMITH AND CITY LINE - Issue 9.1 2010 LUL 0 334884 1-711H GUIDE TO SWITCHING TRACTION CURRENT ON AND OFF - METROPOLITAN AND CIRCLE LINES - Issue 9.2 2010 LUL 0 334885 1-711I GUIDE TO SWITCHING TRACTION CURRENT ON AND OFF - NORTHERN LINE - Issue 9.2 2010 LUL 0 334886 1-711J GUIDE TO SWITCHING TRACTION CURRENT ON AND OFF - PICCADILLY LINE - Issue 9.1 2010 LUL 0
25

LUL-London Underground Library

May 01, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: LUL-London Underground Library

Id Number Title Year Organization Page334851 1-003 Engineering Regulatory Notices - Issue A2 2011 LUL 0334852 1-026 Topographical Surveys and Mapping - Issue A2 2011 LUL 0334853 1-027 Site Hoarding, Fencing and Barriers - Issue A1 2011 LUL 0334854 1-054 Civil Engineering - Earth structures - Issue A3 2010 LUL 0334855 1-066 Lighting of London Underground Assets - Issue A3; Incorporating Written Notice: 9/17/2013 2011 LUL 0334856 1-067 NULL 2011 LUL 0334857 1-068 Mechanical Building Services, Utility Provision and Energy Management in London Underground -

Issue A32011 LUL 0

334858 1-069 Low Voltage Electrical Installations - Issue A3; Incorporrating Written Notice: 5/20/2013, 7/16/2013 2011 LUL 0334859 1-080 The application of fire safety engineering principles to London Underground premises - Issue A2 2011 LUL 0334860 1-081 Design and installation of fire protection systems and compartmentation measures - Issue A2;

Includes Written Notice 01313 and 01319: 1/12/20152011 LUL 0

334861 1-082 Active fire protection systems and portable fire equipment - Issue A2 2011 LUL 0334862 1-083 Passive fire protection systems - Issue A2 2011 LUL 0334863 1-084 Maintenance of fire protection systems and compartmention measures - Issue A2 2011 LUL 0334864 1-085 Fire safety performance of materials - Issue A3; Incorporating Written Notice: 10/13/2014 2011 LUL 0334865 1-107 Requirements for Electrical Track Equipment - Issue A3 2015 LUL 0334866 1-122 Requirements for 750V Traction Power Supplies and Insulation Levels - Issue A1; Includes Written

Notice 6/12/20152010 LUL 0

334867 1-123 Requirements for Matching Electrical Loads to Supplies when making changes to Low VoltageInfrastructure - Issue A2; Incorporating Written Notice: 03/15/2012, 7/16/2013

2010 LUL 0

334868 1-124 Low Voltage AC and DC Power Supply Parameters, Characteristics and Performance Requirements -Issue A1

2010 LUL 0

334869 1-133 Premises - stairways and ramps - Issue A8 2010 LUL 0334870 1-142 Operational Information Systems - Issue A4; Incorporating Written Notice: 11/14/2011; 7/8/2013 2011 LUL 0334871 1-150 Telecommunications - OPO CCTV - Issue A1; Incorporating Written Notice: 9/9/2011 2011 LUL 0334872 1-164 Conductor Rail _ Dimensions and Tolerances - Issue A2; Incorporating Written Notice: 11/13/2013;

01/31/2014; 03/14/2014; 5/13/20152011 LUL 0

334873 1-169 Train Arrestors _ Performance, Design and Configuration - Issue A2; Incorporating Written Notice:3/14/2014

2011 LUL 0

334874 1-170 Train Arrestors - Inspection and Maintenance - Issue A2; Incorporating Written Notice: 02/27/2014 2011 LUL 0334875 1-321 Customer acceptance testing - Issue A3 2010 LUL 0334876 1-551 Procuring and managing suppliers and contractors - HS&E requirements - Issue A4;

Incorporating Written Notice: 1/11/20112010 LUL 0

334877 1-558 Formal Investigation of Incidents - Issue A8 2011 LUL 0334878 1-566 Monitoring health, safety and environmental performance - Issue A5 2010 LUL 0334879 1-691 Information - Issue A2 2010 LUL 0334880 1-701 Business Case Development Manual 2014 LUL 0334881 1-711D Guide to switching traction current on and off - central line - Issue 9.3 2010 LUL 0334882 1-711E GUIDE TO SWITCHING TRACTION CURRENT ON AND OFF - DISTRICT LINE - Issue 9.2 2010 LUL 0334883 1-711F GUIDE TO SWITCHING TRACTION CURRENT ON AND OFF - HAMMERSMITH AND CITY LINE - Issue

9.12010 LUL 0

334884 1-711H GUIDE TO SWITCHING TRACTION CURRENT ON AND OFF - METROPOLITAN AND CIRCLE LINES -Issue 9.2

2010 LUL 0

334885 1-711I GUIDE TO SWITCHING TRACTION CURRENT ON AND OFF - NORTHERN LINE - Issue 9.2 2010 LUL 0334886 1-711J GUIDE TO SWITCHING TRACTION CURRENT ON AND OFF - PICCADILLY LINE - Issue 9.1 2010 LUL 0

Page 2: LUL-London Underground Library

334887 1-721 Bakerloo Line Supplement - Issue 2 2012 LUL 0334888 1-726 Metropolitan line supplement - Issue 2.3 intranet version 2014 LUL 0334889 1-727 Northern line supplement - Issue 2 2012 LUL 0334890 1-728 Piccadilly line supplement - Issue 2.1 intranet version 2014 LUL 0334891 1-729 Victoria line supplement - Issue 2 2012 LUL 0334892 5-258 Equality - Issue A2 2010 LUL 0334893 5-539 Verification of Assurance - Issue A2 2010 LUL 0334894 5-621 Standard for standards - Issue A9 2010 LUL 0334895 5-671 Consultation Response Management Process - Issue A3 2010 LUL 0334896 113 SG Walking Good Practice - Version 4 2012 LUL 0334897 114 SG Guidance on the Assessment of Pedestrian Guardrail - Issue 1 2012 LUL 0334898 117 SG GUIDANCE FOR SUBMISSION OF LIP MAJOR SCHEMES - Version 3 2012 LUL 0334899 120 SG Streetscape Guidance Consultation 2011 LUL 0334900 121 SG Streetscape Guidance: keep left bollards at traffic islands - Issue D3 2012 LUL 0334901 122 SG Streetscape Guidance: pedestrian guardrail at staggered crossings - Issue D1 2011 LUL 0334902 123 SG Streetscape Guidance: colour of street furniture - Issue D2 2012 LUL 0334903 124 SG Streetscape Guidance: tactile paving - Version 2 2012 LUL 0334904 BB001 FIRE PRECAUTIONS GUIDANCE DOCUMENT - Issue A1; Incorporating Written Notice 12/18/2014 2014 LUL 0334905 BB218 Fire Precautions Exemption Applications - Issue A3; Incorporating Written Notice: 10/06/2008,

12/18/20142014 LUL 0

334906 BB224 Fire Precautions Compliance With Fire Precautions And The Process For Change - Issue A3;Incorporating Written Notice: 03/07/2007, 10/27/2011, 12/18/2014

2014 LUL 0

334907 BB229 Fire Precautions Isolation Of Automatic Fire Detection And Protection Equipment - Issue A2;Incorporating Written Notice: 12/18/2014

2014 LUL 0

334908 BULLETIN 06-14-15

NULL 2014 LUL 0

334909 DLR-ENG-STD-ES610

E&M Systems - Lighting - Issue 1.0 2014 LUL 0

334910 G-008 Manual of Good Practice - Issue A2 2014 LUL 0334911 G0023 Infrastructure Protection - Special Conditions for Outside Parties Working On or Near the Railway -

Issue A42015 LUL 0

334912 G0024 Infrastructure Protection - Form of Indemnity to Access LU Land - Issue A2 2013 LUL 0334913 G0025 Infrastructure Protection - Licence to Carry Out Works on LU Land - Issue A2 2012 LUL 0334914 G0028 Division of Railway Companies' Property - Issue A1 2011 LUL 0334915 G042 Asset Condition Reporting (ACR) - Issue A4 2015 LUL 0334916 G0043 Obsolescence management - Issue A3 2015 LUL 0334917 G050 Civil Engineering - Common Requirements - Issue A4 2013 LUL 0334918 G0051 Civil Engineering _ Bridge Structures - Issue A5 2011 LUL 0334919 G0052 Civil Engineering - Gravity Drainage Systems - Issue A2 2012 LUL 0334920 G0053 Civil Engineering _ Building and Station Structures - Issue A4 2011 LUL 0334921 G054A Civil Engineering - Earth Structures - Issue A2 2014 LUL 0334922 G054B Earth Structures - Guide for Slope Stability Analysis - Issue A1 2014 LUL 0334923 G055 Civil Engineering - Deep Tube Tunnels and Shafts - Issue A2 2012 LUL 0334924 G0056 Civil Engineering - Pump Drainage Systems - Issue A3 2015 LUL 0334925 G0057 Civil Engineering _ Miscellaneous Assets - Issue A5 2011 LUL 0334926 G0058 Civil Engineering - Technical Advice Notes - Issue A20 2014 LUL 0

Page 3: LUL-London Underground Library

334927 G-073 Electrical Guidance Document - Issue A2 2011 LUL 0334928 G-074 Mechanical Building Services, Utility Provision and Energy Management in London Underground -

Issue A12011 LUL 0

334929 G075 Mechanical Building Services, Asset Maintenance Management in London Underground - Issue A1 2013 LUL 0334930 G085 Code of practice - Fire Safety of Materials and Fire Safety of Specific Items and Materials Used in the

Underground - Issue A52013 LUL 0

334931 G0106 Earthing and Bonding - Issue A1 2012 LUL 0334932 G0111 DC Protection and Commissioning - Issue no: A2 2013 LUL 0334933 G0115 Civil Engineering Competence Management System Framework - Issue A2 2014 LUL 0334934 G0127 Substation and Transformer Room - Design Guidance - Issue A1 2011 LUL 0334935 G0130 Asbestos Control & Management - Issue A4 2013 LUL 0334936 G0131A Guidance on the installation of Platform Tactile Strips - Issue A2 2011 LUL 0334937 G0131B Guidance on Station Platforms - Issue A2 2014 LUL 0334938 G0132 Guidance on Barriers and Fencing - Issue A3 2014 LUL 0334939 G0133 Guidance on Stairways and Ramps - Issue A1 2014 LUL 0334940 G0134A Guidance on Glazing - Issue A2 2014 LUL 0334941 G0134B Guidance on Doorsets and Gates - Issue A2 2014 LUL 0334942 G0135 Guidance on Premises Finishes - Issue A2 2014 LUL 0334943 G-136 Control of Works on LU Premises - Issue A2 2015 LUL 0334944 G0137 Walls and Partitions in Sub-Surface Stations - Issue A1 2012 LUL 0334945 G148 Management of Noise due to Public Address Systems - Issue A3 2015 LUL 0334946 G182 Ergonomic considerations for the design and development of a rolling stock operator_s cab - Issue A2 2011 LUL 0334947 G183 Guidelines for the Engineering of Underfloor Arc and Thermal Protection Requirements - Issue A2 2012 LUL 0334948 G185 Interior Crashworthiness and Egress - Issue A2 2011 LUL 0334949 G186 Assurance of Fractured Rolling Stock Components - Issue A2 2011 LUL 0334950 G0189 Adhesion Management for Open Sections of the LU Network - Issue A1 2014 LUL 0334951 G0213 Asset Condition Monitoring, Alarm and Alert Management - Issue A2 2013 LUL 0334952 G222 EMC best practice - Issue A2 2012 LUL 0334953 G0230 Good Practice Guide for the Application of Surface Coatings to Premises - Issue A1 2011 LUL 0334954 G0231 Manual of Good Practice Station Cleaning - Issue A1 2011 LUL 0334955 G0232 Manual of Good Practice Cleaning Areas of Limited Access - Issue A1 2011 LUL 0334956 G0233 Control of Pests on the Underground - Issue A2 2012 LUL 0334957 G-323 How to hold a Pre Closure Request Meeting _ Good Practice Guide - Issue A2 2015 LUL 0334958 G-345 Step Free Access Programme - Issue A4 2015 LUL 0334959 G-347 Platform Accessibility Humps - Issue A4; Incorporating Written Notice: 10/2/2014 2013 LUL 0334960 G371A Station Planning Standards and Guidelines - Issue A4 2012 LUL 0334961 G0419 Management of Protection Providers - Issue A1 2013 LUL 0334962 G0421 Management and competency requirements of those that carry out protection activities - Issue A1 2015 LUL 0334963 G557 Electronic Incident Reporting Form (eIRF) - Issue A5 2014 LUL 0334964 G0635 Signalling Product Approval - Issue A2 2015 LUL 0334965 G0900 Quality Inspection Completion Certificate (QICC) - Issue A1 2015 LUL 0334966 G1001 INCIDENT MANAGEMENT ARRANGEMENTS - CIVILS ASSET - Issue 00 2011 LUL 0334967 G1002 INCIDENT MANAGEMENT OF BRIDGE STRIKES - Issue 00 2011 LUL 0334968 G1004 PREPARATION FOR THE PERIODIC MEDICAL EXAMINATION (PME) - Version 2 2010 LUL 0

Page 4: LUL-London Underground Library

334969 G1008 London Underground Combined Access System (LUCAS) - Issue A2 2014 LUL 0334970 G1010 Safety Authorisation and Safety Certification Management Systems Manual - Issue A10 2012 LUL 0334971 G1013 REVIEW OF SUBSTANTIAL REVISIONS TO SAFETY CERTIFICATION AND AUTHORISATION - Issue

A102012 LUL 0

334972 G1014 REVIEW OF TRANSPORT UNDERTAKING_S SAFETY CERTIFICATION / AUTHORISATION - Issue A10 2012 LUL 0334973 G1015 Application of review criteria for Safety Certification / Authorisation applications - Issue A10 2012 LUL 0334974 G1016 Appendix B Safety Certification / Authorisation Review log - Issue A10 2012 LUL 0334975 G1019 Young Persons Risk Assessment Guidance - Issue 1 2011 LUL 0334976 G1020 Hazardous Substances Risk Assessment Guidance - Issue A1 2011 LUL 0334977 G1021 Hand Arm Vibration Risk Assessment Guidance - Issue 1 2011 LUL 0334978 G1026 Manual Handling Risk Assessment Guidance - Issue A5 2012 LUL 0334979 G1027 Guidance - Workplace Risk Assessment - Issue A4 2016 LUL 0334980 G1028 Guidance - Customer Risk Assessment - Issue A4 2013 LUL 0334981 G1030 Guidance: Reviewing risk assessment(s) for medically restricted staff - Issue A2 2014 LUL 0334982 G1034 Rolling stock rubber component: storage - Hammersmith Depot - Issue A3 2014 LUL 0334983 G1037 GUIDANCE NOTE OPERATIONAL READINESS PLAN - Issue A2 2015 LUL 0334984 G1039 DSE Assessment Steps - Issue A2 2013 LUL 0334985 G1040 Products Register User Guide - Issue A2 2011 LUL 0334986 G1042 GUIDANCE NOTE DECOMMISSIONING / DEMOLITION ARRANGEMENTS - Issue A1 2011 LUL 0334987 G1044 GUIDANCE NOTE DESIGN INFORMATION - Issue A1 2011 LUL 0334988 G1045 GUIDANCE NOTE INTERFACES & IMPACTS - Issue A1 2011 LUL 0334989 G1046 GUIDANCE NOTE MAINTENANCE MANUAL - Issue A1 2011 LUL 0334990 G1047 GUIDANCE NOTE OPERATIONS MANUAL - Issue A1 2011 LUL 0334991 G1048 GUIDANCE NOTE PLANT, TOOLS & EQUIPMENT APPROVAL - Issue A1 2011 LUL 0334992 G1049 GUIDANCE NOTE RESIDUAL RISKS & HAZARDS - Issue A1 2011 LUL 0334993 G1050 GUIDANCE NOTE TRAINING LOG - Issue A1 2011 LUL 0334994 G1052 Investment Prioritisation Process & Methodology - Issue A2 2014 LUL 0334995 G1054 AP Stations Project Acceptance - Issue A3 2011 LUL 0334996 G1079 WoCRA2 Lead Assessor Guidance - Issue A2 2015 LUL 0334997 G1082 Guidance Document: Prevention of Cable Theft - Issue A1 2011 LUL 0334998 G1084 Guidance on how to complete The Management System change form F1033 - Issue A9 2015 LUL 0334999 G1089 Track Work Scoping - Issue A2 2014 LUL 0335000 G1090 Guidance to staff prior to undertaking inspections - Issue A1 2012 LUL 0335001 G1091 PM3 Inspections, Plain Line - Issue A1 2012 LUL 0335002 G1092 Track-Lighting for worksites - Issue A1 2012 LUL 0335003 G1096 CorVu Basics for Track Operations - Issue A1 2012 LUL 0335004 G1098 Family and domestic leave schemes - Isssue A5 2015 LUL 0335005 G1100 Change to Rolling Stock - Issue A1 2011 LUL 0335006 G1102 Environmental Training Needs Analysis Summary - Issue A2 2015 LUL 0335007 G1105 Project Managers Milestones (PMMs) and Programme Accountability Milestones (PAMs) Guidance -

Version 2.02012 LUL 0

335008 G1109 Catering Vouchers - Issue A1 2011 LUL 0335009 G1110 Medical Assistance Programme: Information for employees - Issue A4 2012 LUL 0335010 G1111 Track Feasibility Study - Issue A1 2011 LUL 0

Page 5: LUL-London Underground Library

335011 G1112 Operation of Tunnel Gauge - Issue A1 2011 LUL 0335012 G1113 Track Survey Brief - Issue A2 2015 LUL 0335013 G1136 GUIDELINES FOR THE USE OF LUL_s INFORMATION AND ELECTRONIC COMMUNICATION

(INCLUDING EMAIL AND INTERNET) SYSTEMS AND EQUIPMENT - Issue A22011 LUL 0

335014 G1137 Guidance to Structural Maintenance Work Flows - Issue A3 2015 LUL 0335015 G1138 Guidance Document: Accessing the Management System library - Issue A2 2011 LUL 0335016 G1143 STRESS ADVICE _ MANAGING OTHERS - Version 2 2011 LUL 0335017 G1145 Occupational Health contacts - Issue A7 2013 LUL 0335018 G1148 Medication and Fitness for work - Issue A9 2015 LUL 0335019 G1150 BFG Referral Pack - Issue A3 2012 LUL 0335020 G-1151 How to use the Medical Advisory Service - Version 3 2015 LUL 0335021 G1152 MAP Musculoskeletal Disorders: Do not Complete MAP Forms - Issue A4 2012 LUL 0335022 G1153 A Guide to Abnormal Loads - Issue A1 2011 LUL 0335023 G1154 A Guide to Street Works - Issue A1 2011 LUL 0335024 G1155 Guidance Notes for Monitoring Operational Communications - Issue A7 2015 LUL 0335025 G1156 On-Site Exercise Classes - Issue A1 2011 LUL 0335026 G1159 Station Upgrades Deep Dive Guidance - Issue A1 2011 LUL 0335027 G1160 Raising and Distribution of CPAF certificates - Issue A1 2011 LUL 0335028 G1161 Waste Management Arrangements for Stations and Train Crew Depots - Issue A1 2011 LUL 0335029 G1162 Guidance for Station Tenants on Fire Risk Assessment - Issue A1 2010 LUL 0335030 G1163 Stations DLO - Failure Reporting Analysis & Corrective Action System (FRACAS) - Issue A2 2015 LUL 0335031 G1164 Making a Referral to the Drug and Alcohol Advisory and Treatment Service - Issue A2 2014 LUL 0335032 G1165 Calibration of Survey Equipment - Issue A1 2012 LUL 0335033 G1166 Management of station tenancies - Issue A2 2011 LUL 0335034 G1167 Contract Management - Issue A2 2015 LUL 0335035 G1168 Premises: Reactive Maintenance Works (Second Line Response) - Issue A2 2015 LUL 0335036 G1169 Premises : Planned Maintenance Works - Issue A2 2015 LUL 0335037 G1170 Premises: Emergency Response Works - Issue A2 2015 LUL 0335038 G1173 Accidental Exposure to Asbestos - Issue A1 2010 LUL 0335039 G1174 Alcohol in Food - Issue A1 2011 LUL 0335040 G1175 Anthrax - Issue A1 2011 LUL 0335041 G1177 Chicken pox - Issue A1 2011 LUL 0335042 G1178 Climbing stairs and your health - Issue A1 2010 LUL 0335043 G1179 Colds and _flu - Issue A1 2011 LUL 0335044 G1180 Complementary Therapies and Work - Issue A1 2011 LUL 0335045 G1181 Conjunctivitis - Issue A1 2011 LUL 0335046 G1182 Contagious Diseases - Issue A1 2011 LUL 0335047 G1183 Crowd Control Agents (CCA'S) - Issue A1 2010 LUL 0335048 G1184 NULL 2011 LUL 0335049 G1185 Escherichia Coli (E Coli) - Issue A1 2011 LUL 0335050 G1187 Glandular fever - Issue A1 2010 LUL 0335051 G1188 Good eating habits for night workers - Issue A1 2011 LUL 0335052 G1189 Guidance for Managers Overtime and Health - Issue A1 2010 LUL 0335053 G1190 Healthy Eating during Ramadan - Issue A1 2011 LUL 0

Page 6: LUL-London Underground Library

335054 G1191 Hepatitis A - Issue A1 2011 LUL 0335055 G1192 Hepatitis B Vaccinations - Issue A1 2011 LUL 0335056 G1193 HIV/AIDS - Issue A1 2011 LUL 0335057 G1194 Impetigo - Issue A1 2011 LUL 0335058 G1195 Influenza ('flu) vaccination - Issue A1 2011 LUL 0335059 G1196 Keeping cool on journeys to work and in the office - Issue A1 2011 LUL 0335060 G1197 Laser Eye Surgery - Issue A1 2011 LUL 0335061 G1198 Lupus - Issue A1 2011 LUL 0335062 G1199 Measles - Issue A1 2011 LUL 0335063 G1200 What causes meningitis? - Issue A1 2011 LUL 0335064 G1201 MRSA - Issue A1 2011 LUL 0335065 G1202 Needle Stick Injuries Advice for Employees - Issue A1 2011 LUL 0335066 G1203 Painful Periods - Dysmenorrhoea - Issue A1 2011 LUL 0335067 G1204 People Requiring Immediate Medical Attention - Issue A1 2011 LUL 0335068 G1205 Pigeon droppings - Issue A1 2011 LUL 0335069 G1206 Pregnant Employees Guidance - Issue A1 2011 LUL 0335070 G1207 Restrictions (Guidance for Managers) - Issue A1 2011 LUL 0335071 G1208 Return to Work Following Common Operations - Issue A1 2011 LUL 0335072 G1209 SARS information - Issue A1 2011 LUL 0335073 G1210 Scabies guidance - Issue A1 2011 LUL 0335074 G1211 Shingles guidance - Issue A1 2011 LUL 0335075 G1212 Sickness - Issue A1 2011 LUL 0335076 G1213 Skin - Issue A1 2011 LUL 0335077 G1214 Sleeping tips - Issue A1 2011 LUL 0335078 G1217 Spitting incidents - Issue A2 2013 LUL 0335079 G1218 Swine flu - Issue A1 2011 LUL 0335080 G1219 Testicular and other 'Men Only' Cancers - Issue A1 2011 LUL 0335081 G1220 Toxoplasmosis - Issue A1 2011 LUL 0335082 G1221 Treatment of Electric Shock - Issue A1 2011 LUL 0335083 G1222 Tuberculosis (TB) - Issue A1 2011 LUL 0335084 G1223 Typhoid - Issue A1 2011 LUL 0335085 G1224 Walking and Nutritional information - Issue A1 2011 LUL 0335086 G1227 NULL 2012 LUL 0335087 G1228 Responsibilities and Activities for Efficient Handover of L&E Projects - Issue A1 2011 LUL 0335088 G1230 Master Project Database (MPD) Desk Reference - Issue 2 2011 LUL 0335089 G1232 Work and the Menopause: A Guide for Managers - Issue A1 2010 LUL 0335090 G1233 Movement of Materials in L&E - Issue A3 2015 LUL 0335091 G1234 Incident recording, investigation and reporting - Issue A3 2015 LUL 0335092 G1235 Process for Managing Civils Risk - Issue A2 2013 LUL 0335093 G1239 Benefits Management Plan User Guide - Issue A3 2012 LUL 0335094 G1240 LUL PROTOCOL FOR DEALING WITH MISCONDUCT CASES - Issue A2 2016 LUL 0335095 G1242 Alcohol and Drugs at Work _ Managers For Cause and Post Incident Check List - Issue A3 2014 LUL 0335096 G1243 CoMET KPIs - Issue A1 2011 LUL 0335097 G1244 CoMET _ LU-led Case Studies - Issue A1 2011 LUL 0

Page 7: LUL-London Underground Library

335098 G1245 CoMET _ LU-Led Clearinghouse Studies - Issue A1 2011 LUL 0335099 G1246 CoMET _ Other metro-led Case and Clearinghouse Studies - Issue A1 2011 LUL 0335100 G1247 CoMET Use and Benefits - Issue A1 2011 LUL 0335101 G1248 CoMET Directorate Champions - Issue A1 2011 LUL 0335102 G1249 Environmental Incident Categories - Issue A4 2014 LUL 0335103 G1250 Medical guidance - Ebola virus - Issue A7 2015 LUL 0335104 G1251 TANC Guidance Note - Issue A3 2014 LUL 0335105 G1252 Primavera Planning Database - Issue A2 2012 LUL 0335106 G1254 Prevention of Cable Theft - Issue A1 2012 LUL 0335107 G1255 Managing and rectifying poor Health, Safety and Environmental performance - Issue A1 2012 LUL 0335108 G1258 Guidelines for the placement of inhibits on points, signals and track sections at Neasden Depot - Issue

A22015 LUL 0

335109 G1269 GUIDELINES FOR THE USE OF SOCIAL MEDIA - Issue A1 2012 LUL 0335110 G1288 Mediation General Guidance - Issue A2 2015 LUL 0335111 G1290 ESTEEM Building Surveying Guidance - Issue A1 2013 LUL 0335112 G1293 Completion of Premises post investment surveys and update of ellipse asset register using ESTEEM -

Issue A12012 LUL 0

335113 G1295 Reasonable adjustments process - Issue A1 2012 LUL 0335114 G1297 Shared Change Purpose/Elevator Speech - Issue A1 2012 LUL 0335115 G1298 Site Specific Workplace Transport Risk Analysis and Assessment - Issue A1 2012 LUL 0335116 G1299 Guidance on Civil Engineering Asset Strategic and Tactical Risk Models - Issue A2 2013 LUL 0335117 G1307 The Request for Action Form Section Guide - Issue A2 2014 LUL 0335118 G1311 Recommended Rail Clamp Selection - Issue A1 2014 LUL 0335119 G1313 Managing risks from Accessing Signals Assets at height - Issue A1 2014 LUL 0335120 G1314 Guidance for employees who are visiting and/ or returning from countries where there is an Ebola

outbreak - Issue A32015 LUL 0

335121 G1315 GUIDANCE FOR MANAGERS ABOUT EBOLA VIRUS - Issue A3 2014 LUL 0335122 G1316 Management of water ingress within LUL stations and premises - Issue A1 2014 LUL 0335123 G1323 Noise and Vibration Asset Design Guidance - Issue A2 2015 LUL 0335124 G1324 Approved Roles within the LU Institution of Railway Signal Engineers (IRSE) Licensing Scheme - Issue

A22016 LUL 0

335125 G1326 Confined space painting - Issue A1 2012 LUL 0335126 G1327 Using two-way radios - Issue A1 2012 LUL 0335127 G1328 Using confined space communication equipment - Issue A1 2012 LUL 0335128 G1329 Working at Height - Issue A3 2015 LUL 0335129 G1330 Management of Disgarded Syringes - Sharps - Issue A2 2015 LUL 0335130 G1331 Standby Duties - Issue A2 2015 LUL 0335131 G1332 CCTV surveys of drains and sewers - Issue A1 2012 LUL 0335132 G1333 MacTec Warm Start - Issue A1 2012 LUL 0335133 G1334 Escalator repair - Issue A3 2016 LUL 0335134 G1335 Interlink tower assembly guides - Issue A1 2012 LUL 0335135 G1336 Electricity at work - Issue A1 2012 LUL 0335136 G1337 Constructing working platforms - Issue A1 2013 LUL 0335137 G1338 Electrical testing - remedial works - Issue A1 2013 LUL 0335138 G1339 Asbestos information and control - Issue A2 2015 LUL 0

Page 8: LUL-London Underground Library

335139 G1340 Collection and disposal of waste - Issue A2 2013 LUL 0335140 G1341 Clearing up a Spillage - Issue A2 2013 LUL 0335141 G1342 Setting a Carriage Switch - Issue A1 2013 LUL 0335142 G1343 Setting of 11D brakes - Issue A1 2013 LUL 0335143 G1344 Testing operational brakes at the controller - Issue A1 2013 LUL 0335144 G1350 Guidance for the Provision of Civil Engineering Assurance - Issue A1 2012 LUL 0335145 G1351 Asset Stabilisation-Design Management - Issue A1 2012 LUL 0335146 G1352 Maintenance Scaffolding on Escalators and Moving Walks - ISSUE A1 2013 LUL 0335147 G1353 Production Drawings, Red Line Information and As-Built Drawings - Issue A2 2014 LUL 0335148 G1360 Guidance for use of hand gel - Issue A1 2014 LUL 0335149 G1361 Occupational Health guidance note: Restrictions - Issue A1 2014 LUL 0335150 G1362 Guidance to local managers and staff on provision of alternative shoes - Issue A1 2014 LUL 0335151 G1363 First aid assessment guidance - Issue A1 2014 LUL 0335152 G1364 Proof of address - Issue 2 2014 LUL 0335153 G1365 Beacon Site - _Achieving Best Practice_ Guidance - Issue A3 2015 LUL 0335154 G1366 Managing Train Operators' Annual Leave - Issue A2 2014 LUL 0335155 G1367 Senior manager Health, Safety and Environment tours - guidance - Issue A2 2015 LUL 0335156 G1370 Accidental Head Injury - Issue A1 2014 LUL 0335157 G1371 Postural Advice for Train & Instructor Operators - Issue A1 2014 LUL 0335158 G1372 Fitness to Attend Work Meetings - Issue A1 2014 LUL 0335159 G1373 Infrastructure Protection and Asset Protection on LUL Projects - Issue A1 2015 LUL 0335160 G1374 Management of site noise from construction and maintenance work activities - Issue A1 2014 LUL 0335161 G1375 Religious Observance guidelines - IssueA4 2015 LUL 0335162 G1376 Core Ellipse Data Requirements _ Equipment and Work Orders - Issue A1 2015 LUL 0335163 G1378 L&E Test Equipment, Management of Calibration - Issue A1 2014 LUL 0335164 G1379 Control and Monitoring of Mitigation Inspections - Issue A1 2014 LUL 0335165 G1386 Guidelines for Carers - Issue A1 2015 LUL 0335166 G1391 Managing Train Operator Attendance - Issue A3 2014 LUL 0335167 G1392 Managing Instructor Operators - Issue A2 2014 LUL 0335168 G1393 Train Operator Shift Planning and Coverage - Issue A2 2014 LUL 0335169 G1394 Managing Train Operator Errors - Issue A2 2014 LUL 0335170 G1395 Managing Train Operators' Requests for Special Leave and Flexible Working - Issue A2 2014 LUL 0335171 G1396 Lower Limb Class - Issue A1 2012 LUL 0335172 G1412 Withdrawn or Superseded Standards Records - Issue: A4; Includes Access to Additional Content 2015 LUL 0335173 G1413 Planning new lines and extensions to existing lines - Issue A1 2012 LUL 0335174 G1414 Third Party Attendance at Occupational Health Appointments - Issue A1 2012 LUL 0335175 G1415 Transferring EVA Data - Issue A1 2013 LUL 0335176 G1417 Grouting to control seepage in tunnels and structures - Issue A1 2013 LUL 0335177 G1418 TfL Retirement - Issue A1 2013 LUL 0335178 G1419 TfL Long Service Recognition - Issue A1 2013 LUL 0335179 G1460 Occupational Health Low Back Pain - Issue A2 2015 LUL 0335180 G1461 NULL 2013 LUL 0335181 G1462 Go, Look, See - Issue A3 2015 LUL 0335182 G1537 Speed signs (including temporary speed restrictions), stopping and coasting signs - Issue A2 2014 LUL 0

Page 9: LUL-London Underground Library

335183 G1601 Running rails, including plain line track and junctionwork - Issue A2 2015 LUL 0335184 G1760 Guidance for Premises inspections - Issue A4 2015 LUL 0335185 G1902 Short Term International Assignment Guidelines - Outgoing - Issue A1 2013 LUL 0335186 G1903 Jury Service Guidance for Employees - Issue A1 2013 LUL 0335187 G1904 Guidelines for Transgender employees and their managers - Issue A2 2014 LUL 0335188 G1905 PERFORMANCE MANAGEMENT GUIDANCE - Issue A4 2015 LUL 0335189 G1906 Conditions of Use _ Staff Oyster card - Issue A1 2014 LUL 0335190 G1907 Conditions of Use _ 75% Discounted Annual Season Ticket for travel on services operated by Govia

Thameslink Railway (previously FCC) - Issue A22014 LUL 0

335191 G1908 Conditions of use _ Privilege Ticket Authority Card - Issue A2 2015 LUL 0335192 G1909 Conditions of Use _ Staff Nominee Oyster card - Issue A1 2014 LUL 0335193 G1910 Conditions of Use _ Privilege Season Ticket - Issue A1 2014 LUL 0335194 G1911 Fares on Govia Thameslink Railway for annual season tickets - Issue A6 2016 LUL 0335195 G1912 Map of Virgin Trains East Coast (previously ECM) Routes - Issue A2 2015 LUL 0335196 G1913 Use of Tamping Machines - Issue A1 2014 LUL 0335197 G1914 Planning of On Track Machines - Issue A1 2014 LUL 0335198 G1915 Stations DLOVehicle and Driver Management - Issue A1 2014 LUL 0335199 G1916 Stations DLO _ Sulphuric Acid Contamination in waste water dilution - Issue A1 2014 LUL 0335200 G1917 Stations DLO - Electrical Call Response - Issue A1 2014 LUL 0335201 G1918 Stations DLO - Communications Call Response - Issue A1 2014 LUL 0335202 G1919 Fleet Maintenance "Torque Tightening" - Issue A1 2014 LUL 0335203 G1921 CEEQUAL _ Detailed information for TfL and our contractors - Issue A1 2015 LUL 0335204 G1923 TfL STAFF / RETIRED STAFF OYSTER CARDS VALID ON FORMER LONDON COUNTRY BUS SERVICES

- Issue A22014 LUL 0

335205 G1924 Internal Works and Services Delivery Agreement - Issue A1 2015 LUL 0335206 G2109 Guidance G2109 Wheel Defect Guidance - Issue A1 2016 LUL 0335207 G2111 Guidelines for employees undergoing fertility treatment - Issue A1 2015 LUL 0335208 G2112 Recruitment Medical Appointment Information for Candidates - Issue A1 2015 LUL 0335209 G2114 Processing Work Order Requests - Issue A1 2016 LUL 0335210 G2501 Manual of Good Practice - Signalling control systems (computer systems) - Issue A3 2012 LUL 0335211 G2521 Programme Machines - Issue A3 2012 LUL 0335212 G2549 Signalling and train control systems maintenance - Issue A4 2012 LUL 0335213 G3171 Assessing the Impact of Time Table Changes on Rolling Stock Assets - Issue A1 2015 LUL 0335214 G3172 Guidance for Granting Permission for Events Involving Alcohol - Issue A1 2015 LUL 0335215 G3175 Permit to Work Guidance - Fleet - Issue A1 2015 LUL 0335216 G3176 Reporting the discovery of hypodermic needles and other sharps - Issue A1 2015 LUL 0335217 G3177 Guidance for the provision of prescription safety eyewear - Issue A1 2015 LUL 0335218 G3180 Home working - Issue A1 2014 LUL 0335219 G3181 Personal Emergency Evacuation Plan - Issue A1 2015 LUL 0335220 G3184 Engineering Resource Deployment Scheme Template Completion - Issue A1 2015 LUL 0335221 G3185 Battery Schoma conversion manual - Issue A1 2015 LUL 0335222 G3187 Selection and assessment of work at height equipment - Issue A1 2015 LUL 0335223 G3188 Safe use of ladders and step ladders - Issue A1 2015 LUL 0335224 G3189 Safe use of mobile elevated work platforms - Issue A1 2015 LUL 0

Page 10: LUL-London Underground Library

335225 G3190 Safe use of prefabricated low level access equipment and mobile towers - Issue A1 2015 LUL 0335226 G3192 Lifting Plan Form Guide - Issue A1 2015 LUL 0335227 G3193 Compliance with Fire Precautions - Lifts & Escalators - Issue A1 2015 LUL 0335228 G3194 TfL Audit Guidance - Issue A1 2015 LUL 0335229 G3200 Process Failure Mode and Effect Analysis & (FAI) First Article Inspection - Issue A1 2015 LUL 0335230 G3201 Maintaining plain line track - Issue A2 2014 LUL 0335231 G3204 Maintaining junctionwork - Issue A1 2014 LUL 0335232 G3206 Prevention of buckling - Issue A1; Written Notice 11/18/2014 2014 LUL 0335233 G3208 Emergency track repairs - Issue A1 2014 LUL 0335234 G3209 Welding track - Issue A1 2014 LUL 0335235 G3218 Managing track quality - Issue A1 2014 LUL 0335236 G3219 Track handbook 19: Managing the critical aspects of track - Issue A1 2014 LUL 0335237 G3226 What good looks like _ Storage/Handback - Issue A1 2015 LUL 0335238 G3227 What good looks like _ HAV - Issue A1 2015 LUL 0335239 G3228 What good looks like _ Electricity - Issue A1 2015 LUL 0335240 G3229 What good looks like _ Working at height - Issue A1 2015 LUL 0335241 G3230 What good looks like _ Noise - Issue A1 2015 LUL 0335242 G3231 What good looks like - Lifting operations - Issue A1 2015 LUL 0335243 G3232 What good looks like - Welfare - Issue A1 2015 LUL 0335244 G3233 What good looks like - Site setup - Issue A1 2015 LUL 0335245 G3234 What good looks like _ COSHH - Issue A1 2015 LUL 0335246 G3235 What good looks like _ Manual handling - Issue A1 2015 LUL 0335247 G3236 What good looks like _ Excavations - issue A1 2015 LUL 0335248 G-CM-0003 Signal post telephone systems - Issue A1 2010 LUL 0335249 GN_31949 Permit to Work Guidance Notes - Fleet - Issue A1 2010 LUL 0335250 GN-31994 NULL 2010 LUL 0335251 GN-32016 NULL 2010 LUL 0335252 LF09 APP 1 NULL 2010 LUL 0335253 LF09 Metropolitan Line Network Rail / London Underground interface Local guidance for maintenance staff

working near Network Rail / LU end-on boundaries - Issue 042010 LUL 0

335254 LF14 Applying for a storage licence Guidance for external organisations requiring storage on LondonUnderground - Issue 2.3

2010 LUL 0

335255 LF22 Granting of a storage licence Guidance for LU staff - Issue 1.3 2010 LUL 0335256 LF26 Movement of materials in lifts and on escalators - Issue 01 2010 LUL 0335257 LF33 Hot outstabling procedure - Guidance for staff - Issue 01 2011 LUL 0335258 M8012 Track Handbook 12 Composite Conductor Rail Installation and Maintenance - Issue A2 2013 LUL 0335259 MSP-SRP-020 NULL 2011 LUL 0335260 MSP-SRP-025 NULL 2011 LUL 0335261 OSN018 High blustery winds and collision hazard - Version 2 2011 LUL 0335262 OSN072 Operation of train door interlocks, before starting from a platform - Version 2 2012 LUL 0335263 OSN091 Route proving for the Hammersmith & City, Circle and Metropolitan lines - Version 2 2010 LUL 0335264 OSN092 Route proving for the Piccadilly and District lines - Version 2 2010 LUL 0335265 OSN096 Movement of defective rail vehicles - Version 2 2012 LUL 0335266 OSN097 Evacuation register 2010 LUL 0

Page 11: LUL-London Underground Library

335267 OSN098 Fire Brigade strike 2010 LUL 0335268 OSN099 Accounting for customers during detrainments - Version 2 2011 LUL 0335269 OSN100 CCTV digital recording equipment 2011 LUL 0335270 OSN101 Getting Ready for the Olympics 2011 LUL 0335271 OSN104 Use of escalators by customers with dogs 2011 LUL 0335272 OSN105 Operating test trains during cancelled Engineering Hours 2011 LUL 0335273 OSN106 Network traction current and possession arrangements 2011 LUL 0335274 OSN107 Assisting wheelchair users up a moving escalator 2012 LUL 0335275 OSN108 LU Senior Operating Officer role replacing Rostered Duty Officer 2012 LUL 0335276 OSN113 Stopping trains using the train radio - Code Amber and Code Red messages 2014 LUL 0335277 R0007 London Underground Noise Sensitivity Register - Issue A4 2014 LUL 0335278 R0010 Framework for the TfL Management System content - Issue A12 2014 LUL 0335279 R0046 Project Engineer Accreditation Scheme - Issue A2 2014 LUL 0335280 R0049 Maintenance Assurance Plan (Track) 2014-2015 - Issue A9 2014 LUL 0335281 R0098 Guidance and material for giving tool box talks - Issue 1 2012 LUL 0335282 R0202 1972 Tube Stock Examination Quality Plan - Issue A6 2014 LUL 0335283 R0203 1972 stock shed day _A_ quality plan - Issue A4 2014 LUL 0335284 R0206 1972 tube stock reform test quality plan - Issue A3 2014 LUL 0335285 R0208 1972 Tube Stock Traction Equipment Maintenance Quality Plan - Issue A3 2014 LUL 0335286 R0210 1972 Tube Stock Mini Overhaul Quality Plan - Issue A3 2014 LUL 0335287 R0213 1972 Tube stock battery maintenance quality plan - Issue A4 2014 LUL 0335288 R0215 1972 Tube Stock Door Maintenance Quality Plan - Issue A4 2014 LUL 0335289 R0216 1972 Tube Stock Bogie Torque Tightening Chart - Issue A3 2014 LUL 0335290 R0217 1972 Tube Stock Crack Locations Map - Issue A6 2014 LUL 0335291 R0220 Train Preparation 92 Tube Stock Quality Plan Central line Only - Issue A4 2013 LUL 0335292 R0221 Train Preparation 92 Tube Stock Quality Plan Waterloo & City line - Issue A3 2014 LUL 0335293 R0226 Cab Air Conditioning Maintenance 92 Tube Stock Quality Plan Central Line - Issue A3 2014 LUL 0335294 R0227 Post Lifting Brake Test for Driving Units (A/B & E/F) 92 Tube Stock Quality Plan _ Central and

Waterloo & City lines - Issue A32014 LUL 0

335295 R0228 92 Tube Stock Post Lifting Brake Test for Non-Driving Units (B/C & B/D) MA10N - Issue A4 2014 LUL 0335296 R0234 Reform Test Procedure 92 Tube Stock Quality Plan Central line and Waterloo & City line - Issue

A42014 LUL 0

335297 R0239 Traction Motor Removal and Refitting 92 Tube Stock Quality Plan - Issue A4 2014 LUL 0335298 R0245 Cab Air Conditioning Defect Handling - Issue A2 2014 LUL 0335299 R0260 Detrainment Steps Annual Inspection 92 Tube Stock Quality Plan Central line and Waterloo &

City line - Issue A22014 LUL 0

335300 R0280 Confined space rescue plan for the train wash sump - Issue A1 2014 LUL 0335301 R0289 Investigating Alleged Brake Irregularity or SPADs on Trains in Stonebridge Park Depot - Issue A2 2012 LUL 0335302 R0299 1972 Tube Stock: Crack Locations Map: Inspection On Exam - Issue A3 2014 LUL 0335303 R0350 Guidance and advice for the use of personal protective equipment - Issue No. A1 2014 LUL 0335304 R0403 Personal Protective Equipment (PPE) catalogue - Version 1.1 2014 LUL 0335305 R0469 Acton Materials Management Emergency Plan - Issue A1 2014 LUL 0335306 R0492 Criteria for Commissioning a Formal Investigation - Issue A1 2014 LUL 0335307 R0493 Docklands Light Railway _ Workplace Risk Assessment Issue No.: A1 Issue date: Review date:

February 2014 - Issue A12014 LUL 0

Page 12: LUL-London Underground Library

335308 R0494 London Tramlink _ Workplace Risk Assessment - Issue A1 2014 LUL 0335309 R0495 TfL Corporate _ Workplace Risk Assessment - Issue A1 2014 LUL 0335310 R0624 Business Resumption Plan Central Line - Issue A1 2014 LUL 0335311 R1027 Emptying interceptors and sumps - Issue A1 2014 LUL 0335312 R1028 Glossary of terms - Issue A1 2014 LUL 0335313 R1029 Customer job requests - Issue A1 2014 LUL 0335314 R1030 Recruitment of temporary operational staff - Issue A1 2014 LUL 0335315 R1031 What_s wrong reporting - Issue A1 2014 LUL 0335316 R1032 Completing the local accident record book - Issue A1 2014 LUL 0335317 R2630 The LU Noise Map - A1 2013 LUL 0335318 R2700 Patrol Route Plan-Bakerloo Line Route 1BN: Elephant & Castle to Piccadilly Circus NB Including

London Road reception road and 28, 27, 26,8,7,6 points and E&C sidings - Issue No. A12014 LUL 0

335319 R2701 Patrol Route Plan-Bakerloo Line Route 2BN: Elephant & Castle to Piccadilly Circus SB including28, 27, 26, 8, 7, 6 points and E&C sidings. - Issue No. A1

2014 LUL 0

335320 R2702 Patrol Route Plan-Bakerloo Line Route 3BN: Piccadilly Circus - Paddington NB including Piccadilly 7points and 9 points at Baker Street - Issue No. A1

2014 LUL 0

335321 R2703 Patrol Route Plan-Bakerloo Line Route 4BN: Paddington - Piccadilly Circus SB including Piccadilly 7points and 3b points at Baker Street - Issue No. A1

2014 LUL 0

335322 R2704 Patrol Route Plan-Bakerloo Line Route 5BN: Paddington _ Queens Park NB including7,23,22,21,20,19,18,17,16,15,14,13 and 12 points - Issue No. A1

2014 LUL 0

335323 R2705 Patrol Route Plan-Bakerloo Line 6BN: Queens Park _ Paddington SB including7,23,22,21,20,19,18,17,16,15,14,13 and 12 points - Issue No. A1

2014 LUL 0

335324 R2706 Patrol Route Plan-Bakerloo Line Route BD5 - Stonebridge Park Depot - Issue No. A1 2014 LUL 0335325 R2707 Patrol Route Plan-Bakerloo Line Route BD6: London Road Depot - Issue No. A1 2014 LUL 0335326 R2708 Patrol Route Plan-Victoria Line Route VN1: Seven Sisters to Walthamstow NB including 5001 &

5002 catch points & 5003, 5004, 5006 and 5007 points - Issue No. A12014 LUL 0

335327 R2709 Patrol Route Plan-Victoria Line Route VN2: Seven Sisters to Walthamstow SB including 5001 &5002 catch points & 5003, 5004, 5006, 5007 and 5031 points - Issue No. A1

2014 LUL 0

335328 R2710 Patrol Route Plan-Victoria Line Route VN3: Seven Sisters _ Finsbury Park NB including 5034 points. -Issue No. A1

2014 LUL 0

335329 R2711 Patrol Route Plan-Victoria Line Route VN4: Seven Sisters - Finsbury Park SB - Issue No. A1 2014 LUL 0335330 R2712 Patrol Route Plan-Victoria Line Route VN5: King_s Cross to Finsbury Park NB - Issue No. A1 2014 LUL 0335331 R2713 Patrol Route Plan-Victoria Line Route VN6: King_s Cross to Finsbury Park SB - Issue No. A1 2014 LUL 0335332 R2714 Patrol Route Plan-Victoria Line Route VN7: Victoria to King_s Cross NB - Issue No. A1 2014 LUL 0335333 R2715 Patrol Route Plan-Victoria Line Route VN8: Victoria to King_s Cross SB - Issue No. A1 2014 LUL 0335334 R2716 Patrol Route Plan Victoria Line Route VN9: Brixton to Victoria NB - Issue A1 2014 LUL 0335335 R2717 Patrol Route Plan Victoria Line Route VN10: Brixton to Victoria SB - Issue A1 2014 LUL 0335336 R2718 Patrol Route Plan Victoria Line Route VD 11: Northumberland Park Depot - Issue A1 2014 LUL 0335337 R2719 Patrol Route Plan Victoria Line Route VN12: Seven Sisters - Northumberland Park Depot including

both depot roads - Issue A12014 LUL 0

335338 R2720 Patrol Route Plan-Victoria Line Route VN13: Northumberland Park Depot entrance to the Covered Waysection gap - Issue No. A1

2014 LUL 0

335339 R2722 Patrol Route Plan-Central Line Route CD1: Debden to Epping (Both Roads) - Issue No. A1 2014 LUL 0335340 R2723 Patrol Route Plan-Central Line Route CD2: Debden to Woodford (Both Roads) - Issue No. A1 2014 LUL 0335341 R2724 Patrol Route Plan-Central Line Route CN3 : Leytonstone to Snaresbrook (Both Roads) - Issue No. A1 2014 LUL 0335342 R2725 Patrol Route Plan-Central Line Route CN4: Snaresbrook to Woodford (Both Roads) - Issue No. A1 2014 LUL 0335343 R2726 Patrol Route Plan-Central Line Route CD5 : Woodford to Grange Hill (Both Roads) - Issue No. A1 2014 LUL 0

Page 13: LUL-London Underground Library

335344 R2727 Patrol Route Plan-Central Line Route CD6: Hainault Depot - Issue No. A1 2014 LUL 0335345 R2728 Patrol Route Plan-Central Line Route CD7: Grange Hill to Newbury Park (Both Roads) - Issue No. A1 2014 LUL 0335346 R2729 Patrol Route Plan - Central Line Route CN8: Newbury Park to Leytonstone Inner Road - Issue A1 2014 LUL 0335347 R2730 Patrol Route Plan - Central Line Route CN9: Newbury Park to Leytonstone Outer Road - Issue A1 2014 LUL 0335348 R2731 Patrol Route Plan - Central Line Route CN10: Stratford to Leytonstone (Both Roads) - Issue A1 2014 LUL 0335349 R2732 Patrol Route Plan - Central Line Route CN11: Liverpool Street to Stratford EB - Issue A1 2014 LUL 0335350 R2733 Patrol Route Plan - Central Line Route CN12: Liverpool Street to Stratford WB - Issue A1 2014 LUL 0335351 R2734 Patrol Route Plan - Central Line Route CN13: Marble Arch to Liverpool Street EB - Issue A1 2014 LUL 0335352 R2735 Patrol Route Plan - Central Line Route CN14: Marble Arch to Liverpool Street WB - Issue A1 2014 LUL 0335353 R2736 Patrol Route Plan - Central Line Route CN15: White City to Marble Arch EB - Issue A1 2014 LUL 0335354 R2737 Patrol Route Plan - Central Line Route CN16: White City to Marble Arch WB - Issue A1 2014 LUL 0335355 R2738 Patrol Route Plan - Central Line Route CD17: White City Depot - Issue A1 2014 LUL 0335356 R2739 Patrol Route Plan - Central Line Route CN18: White City to North Acton EB - Issue A1 2014 LUL 0335357 R2740 Patrol Route Plan - Central Line Route CN19: White City to North Acton WB - Issue A1 2014 LUL 0335358 R2741 Patrol Route Plan - Central Line Route CD20: Ealing Broadway to West Acton and Bridge ES31 (Both

Roads) - Issue A12014 LUL 0

335359 R2742 Patrol Route Plan - Central Line Route CN21A: Hanger Lane to North Acton EB - Issue A1 2014 LUL 0335360 R2743 Patrol Route Plan - Central Line Route CN21B: Hanger Lane to North Acton WB - Issue A1 2014 LUL 0335361 R2744 Patrol Route Plan - Central Line Route CD22: Northolt to Hanger Lane (Both Roads) - Issue A1 2014 LUL 0335362 R2745 Patrol Route Plan - Central Line Route CD23: West Ruislip to Northolt (Both Roads) - Issue A1 2014 LUL 0335363 R2746 Patrol Route Plan - Central Line Route CD24 1: Ruislip Depot (East) - Issue A1 2014 LUL 0335364 R2747 Patrol Route Plan - Central Line Route CD24 2: Ruislip Depot (West) - Issue A1 2014 LUL 0335365 R2748 Patrol Route Plan - Central Line Route CD24 3: Ruislip Depot (South) - Issue A1 2014 LUL 0335366 R2749 Patrol Route Plan - Central Line Route CD25: Woodford Sidings - Issue A1 2014 LUL 0335367 R2750 Patrol Route Plan - Central Line Route CD26: Loughton Sidings - Issue A1 2014 LUL 0335368 R2751 Patrol Route Plan - Waterloo & City Line CN27: Waterloo to Bank (Both Roads) including

Waterloo Depot - Issue A12014 LUL 0

335369 R2753 Patrol Route Plan - District Line Route 1DD : Ealing Common Depot & Acton Town Sidings -Issue A1

2014 LUL 0

335370 R2754 Patrol Route Plan - District Line Route 2DD: Acton Town to Stamford Brook EB & WB Local -Issue A1

2014 LUL 0

335371 R2755 Patrol Route Plan - District Line Route DTN1: Ealing Broadway to Acton Town E B - Issue A1 2014 LUL 0335372 R2756 Patrol Route Plan - District Line Route DTN2: Ealing Broadway to Acton Town W B - Issue A1 2014 LUL 0335373 R2757 Patrol Route Plan - District Line Route 3ADN : Stamford Brook to South Ealing WB Fast & WB

Local - Issue A12014 LUL 0

335374 R2758 Patrol Route Plan District Line Route 3BDN: Stamford Brook to South Ealing EB Fast & EB Local -Issue A1

2014 LUL 0

335375 R2759 Patrol Route Plan District Line Route 4ADN : Stamford brook to Barons Court Tunnel Mouth WB Fast -Issue A1

2014 LUL 0

335376 R2760 Patrol Route Plan District Line Route 4BDN: Stamford brook to Barons Court Tunnel Mouth EB Fast -Issue A1

2014 LUL 0

335377 R2761 Patrol Route Plan District Line Route 5ADN: Stamford Brook to West Kensington EB District &Olympia Line EB - Issue A1

2014 LUL 0

335378 R2762 Patrol Route Plan District Line Route 5BDN: Stamford Brook to West Kensington WB District &Olympia Line WB - Issue A1

2014 LUL 0

335379 R2763 Patrol Route Plan District Line Route 6DN: Putney Bridge to 254 points, East of Gloucester Rd WB -Issue A1

2014 LUL 0

Page 14: LUL-London Underground Library

335380 R2764 Patrol Route Plan District Line Route 7DN: Putney Bridge to 213 points, West of Gloucester Rd EB -Issue A1

2014 LUL 0

335381 R2765 Patrol Route Plan District Line Route 8DD : Parsons Green Sidings - Issue A1 2014 LUL 0335382 R2766 Patrol Route Plan District Line Route 9DD: Triangle Sidings - Issue A1 2014 LUL 0335383 R2767 Patrol Route Plan District Line Route 10DN : Victoria to High Street Kensington and Earls court EB, IR

& WB Roads - Issue A12014 LUL 0

335384 R2768 Patrol Route Plan District Line Route 11DN: Victoria to High Street Kensington and Earls court WB, OR& EB Roads - Issue A1

2014 LUL 0

335385 R2769 Patrol Route Plan District Line Route 12DN: Tower Hill to Victoria EB - Issue A1 2014 LUL 0335386 R2770 Patrol Route Plan District Line Route 13DN : Tower Hill to Victoria WB - Issue A1 2014 LUL 0335387 R2771 Patrol Route Plan District Line Route 14DN: Tower Hill to Campbell Road Sub-Gap EB - Issue A1 2014 LUL 0335388 R2772 Patrol Route Plan District Line Route 15DN: Tower Hill to Campbell Road Sub-Gap WB - Issue A1 2014 LUL 0335389 R2773 Patrol Route Plan District Line Route 16DN: Plaistow to Barking WB - Issue: A1 2014 LUL 0335390 R2774 Patrol Route Plan District Line Route 17DN: Plaistow to Barking EB - Issue A1 2014 LUL 0335391 R2775 Patrol Route Plan District Line Route 18DN: Campbell Road Sub-Gap to Plaistow Both Roads - Issue

A12014 LUL 0

335392 R2776 Patrol Route Plan District Line Route 18DD: Barking to Upney, both roads - Issue A1 2014 LUL 0335393 R2777 Patrol Route Plan District Line Route 19DD: Dagenham East to Upney both roads - Issue A1 2014 LUL 0335394 R2778 Patrol Route Plan District Line Route 20DD: Hornchurch to Dagenham East both roads - Issue A1 2014 LUL 0335395 R2779 Patrol Route Plan District Line Route 21DD: Hornchurch to Upminster both roads - Issue A1 2014 LUL 0335396 R2780 Patrol Route Plan District Line Route 22DD : Upminster Depot - Issue A1 2014 LUL 0335397 R2781 Patrol Route Plan District Line Route AWDI: Acton Works Sidings - Issue A1 2014 LUL 0335398 R2782 Patrol Route Plan District Line Route LBD1: Lillie Bridge Depot - Issue: A1 2014 LUL 0335399 R2783 Patrol Route Plan District Line Route D01: East Putney to Putney Bridge - Issue A1 2014 LUL 0335400 R2784 Patrol Route Plan District Line Route D02 : East Putney to Wimbledon Park E.B. - Issue: A1 2014 LUL 0335401 R2785 Patrol Route Plan District Line Route D03 : East Putney to Wimbledon Park W.B. - Issue: A1 2014 LUL 0335402 R2786 Patrol Route Plan District Line Route D04: Wimbledon towards Wimbledon Park, 736 points - Issue:

A12014 LUL 0

335403 R2788 Patrol Route Plan Metropolitan Line MD 1: Amersham to Rickmansworth NB - Issue: A1 2014 LUL 0335404 R2789 Patrol Route Plan Metropolitan Line MD 2: Rickmansworth to Amersham SB - Issue: A1 2014 LUL 0335405 R2790 Patrol Route Plan Metropolitan Line MD 3: Chesham to Chalfont & Latimer and Amersham to the

Network Rail Boundary - Issue: A12014 LUL 0

335406 R2791 Patrol Route Plan Metropolitan Line MD 4: Rickmansworth to Moor Park both roads, including allWatford Junctions. - Issue: A1

2014 LUL 0

335407 R2792 Patrol Route Plan Metropolitan Line MD 6: Moor Park to Watford, both local roads - Issue A1 2014 LUL 0335408 R2793 Patrol Route Plan Metropolitan Line MD 7: Moor Park to Roxborough Bridge NB Main - Issue A1 2014 LUL 0335409 R2794 Patrol Route Plan Metropolitan Line MD 8: Moor Park to Roxborough Bridge NB Local - Issue A1 2014 LUL 0335410 R2795 Patrol Route Plan Metropolitan Line MD 9: Roxborough Bridge to Moor Park SB Local - Issue A1 2014 LUL 0335411 R2796 Patrol Route Plan Metropolitan Line MD 10: Roxborough Bridge to Moor Park SB Main - Issue A1 2014 LUL 0335412 R2797 Patrol Route Plan Metropolitan Line 9 MD: Neasden Depot, Inner - Issue A1 2014 LUL 0335413 R2798 Patrol Route Plan Metropolitan Line 10 MD: Neasden Depot, Outer - Issue A1 2014 LUL 0335414 R2799 Patrol Route Plan Metropolitan Line MD11: Uxbridge to West Harrow WB and NB - Issue A1 2014 LUL 0335415 R2800 Patrol Route Plan Metropolitan Line MD 12: West Harrow to Uxbridge SB & EB and Uxbridge

Sidings - Issue A12014 LUL 0

335416 R2801 Patrol Route Plan Metropolitan Line MD 13: Northwick Park to Preston Road boundary,all roads -Issue A1

2014 LUL 0

335417 R2802 Patrol Route Plan Metropolitan Line 16 MD: Hammersmith Depot - Issue A1 2014 LUL 0

Page 15: LUL-London Underground Library

335418 R2803 Patrol Route Plan Metropolitan Line MN 1: West Harrow to Harrow-on-the-Hill (Uxbridge roads), SBlocal through to Northwick Park and SB fast from Northwick Park to Roxborough Bridge - Issue A1

2014 LUL 0

335419 R2804 Patrol Route Plan Metropolitan Line MN 2 : Northwick Park to Roxborough Bridge SB & NB main,NB fast & local roads - Issue A1

2014 LUL 0

335420 R2807 Patrol Route Plan Hammersmith and City Line HC 1: Aldgate to Farringdon Platform 1 Outer Road -Issue A1

2014 LUL 0

335421 R2808 Patrol Route Plan Hammersmith and City Line HC 2: Aldgate to Farringdon Platform 2 Inner Road -Issue A1

2014 LUL 0

335422 R2809 Patrol Route Plan Hammersmith and City Line HC 3: Baker Street to Farringdon Outer Road - Issue A1 2014 LUL 0335423 R2810 Patrol Route Plan Hammersmith and City Line HC 4: Baker Street to Farringdon Inner Road - Issue A1 2014 LUL 0335424 R2811 Patrol Route Plan Hammersmith and City Line HC 5: Finchley Road to Baker Street SB - Issue A1 2014 LUL 0335425 R2812 Patrol Route Plan Hammersmith and City Line HC 6: Finchley Road to Baker Street NB - Issue A1 2014 LUL 0335426 R2814 Patrol Route Plan Hammersmith and City Line HC 8: High Street Kensington to Praed Street Junction

Inner Road - Issue A12014 LUL 0

335427 R2815 Patrol Route Plan Hammersmith and City Line HC 9: Baker Street Platform 5 to Westbourne Park EB -Issue A1

2014 LUL 0

335428 R2816 Patrol Route Plan Hammersmith and City Line HC 10: Baker Street Platform 6 to Westbourne Park WB- Issue A1

2014 LUL 0

335429 R2817 Patrol Route Plan Hammersmith and City Line HC 11: Hammersmith 21 Road to Westbourne ParkPlatform EB - Issue A1

2014 LUL 0

335430 R2818 Patrol Route Plan Hammersmith and City Line HC 12: Hammersmith 22 & 23 Road toWestbourne Park Platform WB - Issue A1

2014 LUL 0

335431 RBS04 Permitted Running Routes for Passenger Rolling Stock 2014 LUL 0335432 RBS05 Permitted running routes for engineer_s trains and heritage trains 2014 LUL 0335433 RULE BOOK 3 Traction current and high voltage supply - See link in PDF to acquire most current Rule Book from LUL 2013 LUL 0335434 S1002 Work involving disturbance to signalling, telecommunication, and electrical systems - Issue A2 2014 LUL 0335435 S1004 Signage for Operational Purposes - Issue 11 2014 LUL 0335436 S1011 Product Acceptance and Registration - Issue A2; Incorporating Written Notices 2/4/2015, 11/6/2015 2013 LUL 0335437 S1021 Works Near Mains Services and Structures - Issue A2 2015 LUL 0335438 S1022 Land and Property - Issue A2 2013 LUL 0335439 S1023 Infrastructure Protection - Issue A4 2015 LUL 0335440 S1027 Site Hoarding, Fencing and Barriers - Issue A2 2014 LUL 0335441 S1035 Location coding system - Issue A3 2013 LUL 0335442 S1037 Computer Aided Design (CAD) Data - Issue A3 2014 LUL 0335443 S1041 Engineering Asset Information - Issue A3 2015 LUL 0335444 S1042 Asset Condition Reporting (ACR) - Issue A12 2015 LUL 0335445 S1044 Asset Risk Standard - Issue A1 2015 LUL 0335446 S1050 Civil Engineering - Common Requirements - Issue A8 2015 LUL 0335447 S1051 Civil Engineering - Bridge Structures - Issue A13; Includes Written Notice: 2/4/2015 2014 LUL 0335448 S1052 Civil Engineering - Gravity Drainage Systems - Issue A4 2011 LUL 0335449 S1053 Civil Engineering - Building and Station Structures - Issue A13 2015 LUL 0335450 S1054 Civil Engineering _ Earth Structures - Issue A4 2014 LUL 0335451 S1055 Civil Engineering _ Deep Tube Tunnels and Shafts - Issue A3; Includes Written Notice 01320:

1/12/20152014 LUL 0

335452 S1056 Civil Engineering - Pump Drainage Systems - Issue A2 2011 LUL 0335453 S1057 Civil Engineering - Miscellaneous Assets - Issue A9 2014 LUL 0335454 S1060 Civil Engineering _ Bridges and Structures Inspection Standard - Issue A6 2014 LUL 0

Page 16: LUL-London Underground Library

335455 S1061 Civil Engineering _ Bridges and Structures Assessment Standard - Issue A4 2013 LUL 0335456 S1062 Temporary Works - Issue A4 2015 LUL 0335457 S1063 Civil Engineering - Cutting, grinding, drilling, fixing to and supporting from existing structures - Issue

A42014 LUL 0

335458 S1064 Civil Engineering - Waterproofing - Issue A1; Incorporates Written Notices: 4/12/2016 2011 LUL 0335459 S1066 Lighting of London Underground Assets - Issue A4; Includes Written Notice 2/16/2016 2015 LUL 0335460 S1067 Tunnel and Public Area Cooling and Ventilation - Issue A2; Includes Written Notices 10/16/2015 2015 LUL 0335461 S1068 Mechanical Building Services, Utility Provision and Energy Management in London Underground -

Issue A42015 LUL 0

335462 S1069 Low Voltage Electrical Installations - Issue A4 2016 LUL 0335463 S1071 Electrical and Mechanical Services Control and Monitoring Systems - Issue A2 2011 LUL 0335464 S1075 Mechanical Building Services, Asset Maintenance Management In London Underground - Issue A1 2013 LUL 0335465 S1085 Fire Safety Performance of Materials - Stations and Tunnel Infrastructure - Issue A4 2015 LUL 0335466 S1086 Fire Safety classification of stations - Issue A5 2013 LUL 0335467 S1087 Fire Prevention and Protection _ Emergency Do Not Enter Signs - Issue A1 2014 LUL 0335468 S1088 Managing Changes to Stations Fire Precautions - Issue A1 2015 LUL 0335469 S1092 Escalators and Passenger Conveyors - Issue A6 2015 LUL 0335470 S1093 PMVT Lifts (including managed evacuation lifts) - Issue A5 2015 LUL 0335471 S1094 Heavy Duty Metro Type Escalators and Moving Walks - Issue A6 2016 LUL 0335472 S1095 SMVT Lifts (including Firefighters and Evacuation lifts) - Issue A4 2015 LUL 0335473 S1096 Control of Lift and Escalator Controller Software - Issue A1 2015 LUL 0335474 S1100 Load Change Application Requirements for Electrical, Compressed Air and other Services - Issue A5;

Includes Written Notices: 10/14/20152014 LUL 0

335475 S1105 Power Service Contract - Performance Specification - Issue A4; Includes Written Notice 2/12/2016 2013 LUL 0335476 S1108 DC Traction Feeder Cables - Issue A3 2012 LUL 0335477 S1109 Switchgear and Ancillary Equipment - Issue A2 2011 LUL 0335478 S1110 AC Electrical Protection Requirements - Issue A2 2012 LUL 0335479 S1111 DC Protection and Commissioning - Issue A4 2013 LUL 0335480 S1114 Safe Systems of Work on or Near Electrical Equipment - Issue A2 2011 LUL 0335481 S1115 Performance and Maintenance of Current Rail Indicator Device (CRID) - Issue A2 2011 LUL 0335482 S1116 NULL 2011 LUL 0335483 S1120 Power Cable Route Design, Testing and Recovery Requirements - Issue A4 2011 LUL 0335484 S1121 Cables: Electric, Data and Fibre Optic - Issue A2 2011 LUL 0335485 S1126 Batteries and Chargers for Fixed Power Supply Installations in Non-Substation Locations - Issue A2 2013 LUL 0335486 S1130 Control of Asbestos in London Underground Premises - Issue A3 2014 LUL 0335487 S1131 Premises - Station Platforms - Issue A5; Includes Written Notices 05/26/2015 2013 LUL 0335488 S1132 Premises - Barriers and Fencing (Non-Lineside) - Issue A5 2013 LUL 0335489 S1133 Premises - Stairways and Ramps - Issue A9 2014 LUL 0335490 S1134 Premises - Doorsets and Glazing - Issue A3 2013 LUL 0335491 S1135 Premises - Finishes - Issue A4; Incorporating Written Notice: 6/8/2014 2013 LUL 0335492 S1147 Surveillance & Security Systems - Issue A1; includes Written Notice 2/13/2015 2014 LUL 0335493 S1156 Gauging and Clearances - Issue A8 2014 LUL 0335494 S1157 Track _ Performance, Design and Configuration - Issue A7 2016 LUL 0335495 S1158 Track - Inspection and maintenance - Issue A8; Incorporating Written Notice: 06/02/2014,

07/22/2014, 08/19/2014, 09/02/2014, and 12/5/20142013 LUL 0

Page 17: LUL-London Underground Library

335496 S1159 Track _ Dimensions and Tolerances - Issue: A4; Written Notices 8/18/2015; 9/22/2015 2015 LUL 0335497 S1162 Conductor rail _ Performance, design and configuration - Issue A5 2016 LUL 0335498 S1163 Conductor rail - Inspection and Maintenance - Issue A2; Incorporating Written Notice: 4/22/2014 2013 LUL 0335499 S1164 Conductor Rail _ Dimensions and Tolerances - Issue A3 2015 LUL 0335500 S1167 Operational Boundary Fencing - Issue A3 2013 LUL 0335501 S1168 Track Asset Walkways - Issue A3 2013 LUL 0335502 S1171 All Plant - Acceptance, Use and Maintenance - Issue A2 2015 LUL 0335503 S1172 On Track Machines _ Design and Acceptance - Issue A2 2015 LUL 0335504 S1173 On Track Plant - Design and Acceptance - Issue A2 2015 LUL 0335505 S1174 Non-Railborne Plant - Design and Acceptance - Issue A2 2015 LUL 0335506 S1175 Track - Inspection of Cast Crossings and Cast Vees - Issue A2; Written Notice 01322: 2/3/2015 2012 LUL 0335507 S1176 Inspection and repair to reduce the risk of derailment at switches - Issue A1; Incorporating Written

Notice 11/13/2013, 5/27/20152012 LUL 0

335508 S1177 Track - Managing temperature-dependent risk - Issue A2 2015 LUL 0335509 S1180 Standard for Rolling Stock - Issue A6 2015 LUL 0335510 S1181 Permitted running routes for passenger, engineer_s and heritage trains - Issue A2 2011 LUL 0335511 S1184 The Acceptance of Third Party Vehicles - Issue A1 2012 LUL 0335512 S1187 Index of Components for Rolling Stock - Issue A3 2012 LUL 0335513 S1189 Variable Adhesion Conditions - Requirements for the Implementation of ATO on any Open Section of

the LU Network - Issue A12014 LUL 0

335514 S1193 Electromagnetic Compatibility (EMC) with LU Signalling System Assets - Issue A3 2013 LUL 0335515 S1194 Signalling Control - Functional Requirements - Issue A3 2011 LUL 0335516 S1195 Signalling - Functional Requirements - Issue A6 2013 LUL 0335517 S1196 Signalling and Signalling Control - Concept and Requirements - Issue A4; Incorporates Written Notice:

05/23/20142011 LUL 0

335518 S1197 Signalling and Signalling Control - Design and Implementation - Issue A4: Includes Written Notice;3/17/2015; 3/19/2015; 11/23/2015

2011 LUL 0

335519 S1198 Signalling and Signalling Control - Installation, Testing, Commissioning and Handover - Issue A3 2011 LUL 0335520 S1199 Signalling and Signalling Control _ Operation and Maintenance - Issue A4; Incorporating Written

Notice: 2/11/2014; 09/09/2014; 03/12/2015; 8/21/20152014 LUL 0

335521 S1200 Signalling and Signalling Control - Alterations to Systems - Issue A3 2011 LUL 0335522 S1201 Signalling and Signalling Control - Approvals - Issue A4; Incorporating Written Notice: 02/11/2014 2011 LUL 0335523 S1202 Signal Equipment Overhaul - Issue A2 2011 LUL 0335524 S1203 Competence of personnel working on signal and signal control systems - Issue A4; Incorporating

Written Notice: 03/11/20162014 LUL 0

335525 S1209 Requirements for systems engineering processes - Issue A4 2015 LUL 0335526 S1210 Safety-Related Software - Issue no: A2 2014 LUL 0335527 S1213 Asset Condition Monitoring, Alarm and Alert Management - Issue A2 2011 LUL 0335528 S1217 Integration of Human Factors into Systems Development - Issue A2 2013 LUL 0335529 S1218 Human Systems Interaction - Dialogues and Notifications - Issue A2 2014 LUL 0335530 S1222 Electromagnetic Compatibility (EMC) - Issue A2 2012 LUL 0335531 S1227 Train System Performance Evaluation - Issue A1 2013 LUL 0335532 S1251 Alcohol and Work - Issue A2; includes Written Notice 12/24/2014, 6/16/2015 2011 LUL 0335533 S1257 Drugs and Work - Issue A2; Includes Written Notice 01317: 12/24/2014 2011 LUL 0335534 S1321 Customer Acceptance Testing - Issue A4 2015 LUL 0335535 S1354 Customer - Facing Requirements for Temporary Works at Stations - Issue A8 2014 LUL 0

Page 18: LUL-London Underground Library

335536 S1365 Commercial opportunities within London Underground stations - Issue A2 2015 LUL 0335537 S1371 Station planning - Issue A5: Incorporates Written Notice 11/29/2014; 12/18/2014 and 04/24/2015 2011 LUL 0335538 S1375 Planning for Ticket Issuing Facilities - Issue A1 2014 LUL 0335539 S1376 Customer Facing Ticketing Equipment Capability - Issue A5 2014 LUL 0335540 S1419 Competence for Protection Master (Engineering Hours) Protecting Workers on the Track (Engineering

Hours) - Issue A22013 LUL 0

335541 S1483 High visibility clothing for going on or near the track - Issue A3; Incorporating Written Notice:10/10/2014

2014 LUL 0

335542 S1521 Safety Decision Making - Issue A6 2014 LUL 0335543 S1526 The Assessment and Management of Health, Safety and Environmental Risk - Issue A4 2014 LUL 0335544 S1538 Assurance - Issue A11 2015 LUL 0335545 S1548 Safety Critical Work - Issue A4 2012 LUL 0335546 S1552 Contract QUENSH Conditions - Issue A17; Incorporating Written Notice 9/24/2015; 4/6/2016 2015 LUL 0335547 S1556 Incident Reporting and Investigating - Issue A13 2015 LUL 0335548 S1566 Monitoring health, safety and environmental performance - Issue A6 2014 LUL 0335549 S1601 Management Arrangements to Assure Medical Fitness - Issue A5 2012 LUL 0335550 S1602 Corporate Medical Standard for Personnel Requiring Safety on the Track Certification - Issue A10;

Incorporates Written Notice 2/4/20152014 LUL 0

335551 S1603 Audiometric standard for personnel requiring safety on the track certification - Issue A7 2015 LUL 0335552 S1604 Vision standard for personnel requiring safety on the track certification - Issue A7 2015 LUL 0335553 S1605 Providers of Medical Assessment for Track Certification and other Safety Critical Certification Purposes

- Issue A42011 LUL 0

335554 S1622 Glossary of Terms and Abbreviations - Issue A37 2015 LUL 0335555 S1641 Concessions to Standards - Issue A9: Incorporates Written Notice 9/15/2015 2012 LUL 0335556 S1646 Queries to Standards - Issue A6 2015 LUL 0335557 S1712 Defective in service instructions - Issue 1 2011 LUL 0335558 S1760 Common Data Environment (CDE) Process - Issue A1 2015 LUL 0335559 S1761 Project Documents - Issue A1 2015 LUL 0335560 S1800 Cable Runs - Issue A2 2013 LUL 0335561 S1801 Competence requirements for undertaking Civil Engineering Safety Critical Work - Issue A1 2015 LUL 0335562 S1900 Quality Inspection Completion Certificate - Issue A1; Includes Written Notice 6/2/2015 2014 LUL 0335563 S1913 Common and General Requirements for Fixed Installation Power Supply Equipment (formerly

Powerlink Technical Specification SP80001 Rev 2) - Issue A12013 LUL 0

335564 S1914 Specification for Requirements for Domestic Electrical Installations in Substations for Use on TheSystem (formerly Powerlink Technical Specification SP82101 Rev 3) - Issue A1

2013 LUL 0

335565 S1915 Specification for the Requirements for Substations and Other Similar Buildings for Use on the System(formerly Powerlink Technical Specification SP82102 Rev 3) - Issue A1; Includes Written Notice4/1/2015

2013 LUL 0

335566 S1916 Physical and Electrical Environment of The System (formerly Powerlink Technical SpecificationSP82603 Rev 1) - Issue A1

2013 LUL 0

335567 S1922 Requirements for Electrical Track Equipment - Issue A1; Incorporated Written Notice: 4/22/2016 2015 LUL 0335568 S1926 Design, Manufacture, Testing and Maintenance of Short-Circuiting Devices - Issue A1 2015 LUL 0335569 S1930 Traction Converter Groups for Use on The System (formerly Powerlink Technical Specification

SP80101 Rev 2) - Issue A12013 LUL 0

335570 S1931 Power Cables for Rated Voltages from 3.8/6.6 kV up to 19/33 kV for Use on The System (formerlyPowerlink Technical Specification SP80201 Rev 3) - Issue A1

2013 LUL 0

335571 S1932 Pilot Cables and Accessories for Use on The System - Issue A1 2013 LUL 0

Page 19: LUL-London Underground Library

335572 S1933 Paper Insulated Lead Sheathed Power Cables for Rated Line Voltages of 11kV for Use on The System- Issue A1

2013 LUL 0

335573 S1934 Power Cable Accessories for Use on The System - Issue A1 2013 LUL 0335574 S1935 50 to 1000 mm2 Single and 1.5 to 400 mm2 Multi-core, 600/1000 V, Armoured Cables for Use on The

System - Issue A12013 LUL 0

335575 S1936 1.5 to 935 mm2 Single Core, 450/750 V, Unarmoured Sheathed and Unsheathed Cables for Use onThe System - Issue A1

2013 LUL 0

335576 S1937 Pilot Boxes and Cable Terminations for Pilot Cables for Use on The System - Issue A1 2013 LUL 0335577 S1938 Cabling/Wiring Management Systems using Trunking, Tray and Conduit for Use on The System -

Issue A12013 LUL 0

335578 S1939 High Voltage A.C. Indoor Switchboards up to 36kV for Use on The System - Issue A1; IncludesWritten Notice 7/23/2015

2013 LUL 0

335579 S1940 630/750 V Direct Current Indoor Switchboards for Use on The System - Issue A1 2013 LUL 0335580 S1941 400 V Nominal A.C. and 600 V Signal Indoor Switchboards for Use on The System - Issue A1 2013 LUL 0335581 S1942 22 kV/433 V and 11 kV/433 V Three Phase Auxiliary Transformers for Use on The System - 8/2013 2013 LUL 0335582 S1943 22/11kV Three Phase Power Transformers for Use on The System - Issue A1 2013 LUL 0335583 S1944 22kV and 11kV Three Phase Earthing Reactors and Earthing Auxiliary Transformers for Use on The

System - Issue A12013 LUL 0

335584 S1945 Acoustic Screening for Transformers for Use on The System - Issue A1 2013 LUL 0335585 S1946 Requirements for Stationary Compressed Air Equipment in Traction Substations - Issue A1 2013 LUL 0335586 S1947 50 and 110 V DC Supplies From Batteries and Chargers for Use on The System - Issue A1 2013 LUL 0335587 S1948 Battery Backed Power Supply Equipment for Local Emergency Power Supplies - Issue A1 2013 LUL 0335588 S1949 Specification for 110 V Control and 116 V Starting Batteries and Chargers for Use on The System at

Greenwich Power Station - Issue A12013 LUL 0

335589 S1950 Acoustic Hoods for Use on Rotating Frequency Changers - Issue A1 2013 LUL 0335590 S1957 The System _ Earthing Specification - Issue A1 2013 LUL 0335591 S1963 Substation Supervisory Control and Data Acquisition Equipment for Use on The System - Issue A1 2013 LUL 0335592 S1964 D.C. Track Feeder Protection - Issue A1 2013 LUL 0335593 S1965 630 V DC Circuit Characteristics and Protection Settings - Issue A1 2013 LUL 0335594 S1972 Security Planning Criteria for the Powerlink System - Issue A1 2013 LUL 0335595 S1978 Written Scheme of Examination for Pressure Systems - Issue A2 2013 LUL 0335596 S1979 Maintenance and Inspection of HV and Pilot Cables and Cable Routes - Issue A1; Incorporates Written

Notice 04/27/20152013 LUL 0

335597 S1980 Maintenance and Inspection of Substations and Similar Buildings - Issue A1; Incorporates WrittenNotice 4/27/2015

2013 LUL 0

335598 S1981 Maintenance and Inspection of SCADA Equipment and Associated Items - Issue A1; IncorporatesWritten Notice 4/27/2015

2013 LUL 0

335599 S1982 Maintenance and Inspection of HV Switchboards - Issue A1; Incorporates Written Notice 4/27/2015 2013 LUL 0335600 S1983 Maintenance Inspection Standard for Substation Domestic Installations - Issue A2 2015 LUL 0335601 S1984 Maintenance Inspection Standard for 630 V and 750 V D.C. Switchboards - Issue A1; Incorportes

Written Notice 4/27/20152013 LUL 0

335602 S1985 Maintenance and Inspection of LVAC Switchboards - Issue A1; Incorporates Written Notice 4/27/2015 2013 LUL 0335603 S1986 Maintenance and Inspection of Dry Type Transformers - Issue A1; Incorporates Written Notice

4/27/20152013 LUL 0

335604 S1987 Maintenance and Inspection of Liquid Filled Transformers - Issue A1; Incorporates Written Notice4/27/2015

2013 LUL 0

335605 S1988 Maintenance and Inspection of Rectifiers - Issue A1; Incorporates Written Notice 4/27/2015 2013 LUL 0

Page 20: LUL-London Underground Library

335606 S1989 Maintenance and Inspection of Frequency Changers - Issue A1; Incorporates Written Notice4/27/2015

2013 LUL 0

335607 S1990 Maintenance and Inspection Of Substation Compressed Air Installations - Issue A1; IncorporatesWritten Notice 4/27/2015

2013 LUL 0

335608 S1991 Maintenance and Inspection of LVAC Distribution Boards - Issue A1; Incorporates Written Notice4/27/2015

2013 LUL 0

335609 S1992 Maintenance and Inspection of Batteries and Battery Chargers - Issue A1; Incorporates Written Notice4/27/2015

2013 LUL 0

335610 S1993 On-Site Voltage Withstand Testing and Associated Insulation Testing of Electrical Equipment andCables for Use on The System - Issue A1

2013 LUL 0

335611 S1994 Collection and Disposal of Condensate - Issue A1 2013 LUL 0335612 S2100 Fire Engineering _ Fire Safety Design and Strategy - Issue A1; Incoroporating Written Notice

12/18/20142014 LUL 0

335613 S2101 Fire Engineering - Fire Suppression and Fire Fighting Equipment - Issue A1 2014 LUL 0335614 S2102 Fire Engineering - Fire Compartmentation - Issue A1 2014 LUL 0335615 S2103 Fire Engineering- Fire Detection and Alarm Systems - Issue A1 2014 LUL 0335616 S2104 Maintenance of Fire Systems and Fire Compartmentation - Issue A1 2015 LUL 0335617 S2120 Configuration Management - Issue A1 2014 LUL 0335618 S2180 Passenger Rolling Stock - Issue A2 2015 LUL 0335619 S2300 Change to Stations Assets CSA - Issue A2 2013 LUL 0335620 S2402 Snow and ice clearance from track, walkways and cable stiles - Issue A1 2011 LUL 0335621 S2451 Change to Rolling Stock (CRS) - Issue A3 2011 LUL 0335622 S2452 LU APD Fleet Depot Operational Procedures - Issue A2 2011 LUL 0335623 S2453 Control of Rolling Stock Sub-Standard Conditions - Issue A1 2011 LUL 0335624 S2454 Delivery Regulatory Notices Rolling Stock, Track and Signals - Issue A2 2012 LUL 0335625 S2455 Management of Rolling Stock Material Concessions - Issue A1 2012 LUL 0335626 S2456 Portable fire extinguisher for use on rolling stock - Issue A2 2015 LUL 0335627 S2500 Safety signalling philosophy - Issue A3 2012 LUL 0335628 S2501 Signalling control systems - Issue A5 2015 LUL 0335629 S2502 Design of Safety Signalling - Issue A4: Includes Written Notices 11/23/2015 2012 LUL 0335630 S2503 Wayside signalling - Issue A3 2013 LUL 0335631 S2504 Signalling interlocking systems - Issue A3 2012 LUL 0335632 S2505 Train detection systems - Issue A3 2012 LUL 0335633 S2506 Automatic train control - Issue A7 2012 LUL 0335634 S2507 Sighting of lineside signals, signs and indicators - Issue A2 2012 LUL 0335635 S2508 Environmental requirements for signalling equipment - Issue A4 2015 LUL 0335636 S2509 Design of signal equipment rooms - Issue A4; Includes Written Notices: 2/25/2016 2012 LUL 0335637 S2510 Rail connection systems for signal equipment cables - Issue A3 2012 LUL 0335638 S2511 Signal Engineering: Emergency on Call Roster - Issue A1 2015 LUL 0335639 S2512 Depot signalling - Issue A4 2013 LUL 0335640 S2513 Alterations to the signalling system - Issue A3 2015 LUL 0335641 S2523 Commissioning of signalling systems - Issue A3 2012 LUL 0335642 S2524 Testing of Signalling Installations - Issue A3 2015 LUL 0335643 S2525 Signalling Installation Handbook - Issue A3; Includes S&CSEST0021 A2 2012 LUL 0335644 S2526 JTC FS2500 Installation and Maintenance - Issue A3 2012 LUL 0

Page 21: LUL-London Underground Library

335645 S2529 Signalling and signalling control systems safety critical processes - Issue A3; Incorporating WrittenNotice: 4/11/2013; 09/09/2014

2012 LUL 0

335646 S2530 Irregular adjustments to the signalling system - Issue A3; Incorporating Written Notice: 5/23/2014;03/12/2015; 8/21/2015

2014 LUL 0

335647 S2531 Incident management and preservation of evidence for signalling and train control systems - Issue A3 2012 LUL 0335648 S2532 Maintenance of signalling and train control systems - Issue A4 2012 LUL 0335649 S2533 Routine Change Periods for Signalling Assets - Issue A3 2015 LUL 0335650 S2534 Management of signalling wiring and of degraded wire insulation - Issue A2 2012 LUL 0335651 S2535 Maintenance of Trainstops - Issue A7 2015 LUL 0335652 S2536 Maintenance of Points - Issue A7; Incorporating Written Notices: 9/4/2015 2014 LUL 0335653 S2537 Maintenance of Signals, Signs and Indicators - Issue A5 2012 LUL 0335654 S2538 Maintenance of Rail Circuits - Issue A6 2015 LUL 0335655 S2539 Maintenance of Air Distribution System - Issue A5 2012 LUL 0335656 S2540 Maintenance of Signalling Power Supplies - Issue A5 2015 LUL 0335657 S2541 Maintenance of track circuits - Issue A5 2015 LUL 0335658 S2542 Maintenance of Signalling Equipment Rooms - Issue A4 2012 LUL 0335659 S2543 Maintenance of Point Heaters - Issue A5 2012 LUL 0335660 S2544 Maintenance of Cable Runs - Issue A5 2012 LUL 0335661 S2545 Maintenance of Trackside Kiosks and Boxes - Issue A4 2012 LUL 0335662 S2546 Maintenance of Signalling Control Rooms - Issue A4 2012 LUL 0335663 S2547 Maintenance of non-vital Signalling Relays - Issue A4 2012 LUL 0335664 S2548 Maintenance of correct side door enable fixed equipment - Issue A6 2015 LUL 0335665 S2550 Air operated interlocking machines; Annual maintenance method schedule - Issue A4 2015 LUL 0335666 S2551 Hand and air operated miniature lever frames; Annual maintenance method schedule - Issue A2 2012 LUL 0335667 S2552 Point Heating Systems - Issue A1 2015 LUL 0335668 S2553 Maintenance of Dot Matrix Indicators - Issue A4 2012 LUL 0335669 S5044 Asset Risk Standard - Issue A3 2012 LUL 0335670 S5072 Testing of Portable Electrical Appliances - Issue A2 2011 LUL 0335671 S5254 LU Code of Conduct - Issue A2 2014 LUL 0335672 S5265 Workplace Aggression and Violence Standard - Issue A3 2015 LUL 0335673 S5267 Email and Intranet standard - Issue A2 2011 LUL 0335674 S5305 Commercial Filming - Issue A3 2015 LUL 0335675 S5327 Staff Appearance - Issue A4 2012 LUL 0335676 S5533 First Aid Requirements - Issue A4 2013 LUL 0335677 S5540 Safety Verification - Issue A2 2011 LUL 0335678 S5542 NULL 2013 LUL 0335679 S5543 Line Route Risk Assessment - Issue A2 2011 LUL 0335680 S5547 Refusal to work on the grounds of health and safety - Issue: A4 2014 LUL 0335681 S5557 Incident Reporting & Local Investigation - Issue A9 2014 LUL 0335682 S5567 Planned General Inspections - Issue: A4 2014 LUL 0335683 S5568 Health, Safety and Environmental Management Systems Checks - Issue: A4 2014 LUL 0335684 S5569 Senior Management Tours/Visits - Issue: A4 2014 LUL 0335685 S5570 The "What's Wrong" Reporting Process - Issue A4 2014 LUL 0335686 S5606 Colour Vision Standard - Issue A2 2015 LUL 0

Page 22: LUL-London Underground Library

335687 S5621 Standard for standards - Issue A10 2015 LUL 0335688 S5631 Railway Group Standards Reconciliation - Issue A2 2012 LUL 0335689 SCS-ST-0012 NULL 2010 LUL 0335690 S-CV-0010 Competence requirements for allowing the continued use of Civil Engineering assets in passenger

service - Issue A2; Incorporating Written Notice: 02/16/20112010 LUL 0

335691 SPC-LAE-30272049

Specification for Heavy Duty Metro Moving Walks - Issue A1 2015 LUL 0

335692 SPC-LAE-301941170-1-4

Specification for Heavy Duty Metro Escalators - Issue 07 2012 LUL 0

335693 SPC-LAE-301941170-5

Specification for Heavy Duty Metro Escalators - Issue A5 2011 LUL 0

335694 SPC-LAE-330272049-1-5

Specification for Heavy Duty Metro Moving Walks - Issue 01 2014 LUL 0

335695 SPC-LAE-SMVT-30745830

Specification for SMVT Lifts and SMVT Inclined Lifts - Issue 02 2014 LUL 0

335696 SPC-LAE-SMVT-30745830

Specification for SMVT Lifts and SMVT Inclined Lifts - Issue 01 2011 LUL 0

335697 S-RS-0002 Competence requirements for fleet safety critical tasks - Issue A2 2010 LUL 0335698 T0001 Civil Engineering - Track and Off-track Gravity Drainage Systems - Issue A1; Incorporating Written

Notice: 3/7/20142011 LUL 0

335699 T0002 Civil Engineering - Pump Drainage Systems - Issue A1 2011 LUL 0335700 T0003 Critical Pump Sites _ Control Panel Specification - Issue A1 2011 LUL 0335701 T0004 Priority Pump Sites _ Control Panel Specification - Issue A2 2014 LUL 0335702 T0005 Bridges and Structures - Materials and Workmanship - Issue A10 2013 LUL 0335703 T0006 Deep Tube Tunnels Materials and Workmanship - Issue A4 2014 LUL 0335704 T0007 Earth Structures Materials and Workmanship - Issue A2 2014 LUL 0335705 T0008 Non-critical Pump Sites _ Control Panel Specification - Issue A1 2014 LUL 0335706 T0050 Luminaire _ Column Head Lighting - Issue A1 2015 LUL 0335707 T0051 Luminaire _ Square Ceiling Lighting - Issue A1 2015 LUL 0335708 T0052 Lamp _Edison Screw - Issue A1 2015 LUL 0335709 T0053 Lamp _Bayonette Mount - Issue A1 2015 LUL 0335710 T0054 Luminaire _ Down Lighting - Issue A1 2015 LUL 0335711 T0055 Luminaire _ Wall Washer Lighting - Issue A1 2015 LUL 0335712 T0056 Lamp - PL Type - Issue A1 2015 LUL 0335713 T0057 Luminaire - Outdoor Linear 2015 LUL 0335714 T0058 Luminaire - Bulkhead Lighting - Issue A1 2015 LUL 0335715 T0059 Lamp - Linear Lighting - Issue A1 2015 LUL 0335716 T0060 Luminaire - Flood Lighting - Issue A1 2015 LUL 0335717 T0061 Luminaire - High Bay Lighting - Issue A1 2015 LUL 0335718 T0062 Luminaire _ Indoor Linear - Issue A1 2015 LUL 0335719 T0349 Rail reprofiling - Issue A1 2014 LUL 0335720 T0400 Common and Obtuse Crossings - Issue A1 2012 LUL 0335721 T0401 Track: Rail and baseplate pads - Issue A3 2015 LUL 0335722 T0402 Track: Geotextiles, Geogrids and Geocomposites - Issue A1 2012 LUL 0335723 T0403 Wood Sleepers, Bearers, Pitblocks and Slipper Runs - Issue A2 2012 LUL 0335724 T0404 Track: Concrete sleepers, pitblocks and bearers - Issue A2; Includes Written Notices: 3/3/2016 2012 LUL 0

Page 23: LUL-London Underground Library

335725 T0405 Track: Insulated rail joints - Issue A1 2012 LUL 0335726 T0406 Track: Conductor rail and associated components - Issue A1; Incorporating Written Notice:

01/31/20142012 LUL 0

335727 T0407 Track ballast and stoneblower aggregate - Issue A1 2012 LUL 0335728 T0408 Track-mounted rail lubricator design - Issue A1 2012 LUL 0335729 T0409 Track: Material for track work bolts , nuts and washers - Issue A2 2014 LUL 0335730 T0410 Track: Material for shims and packings - Issue A1 2012 LUL 0335731 T0411 Track: Material for keys - wood and steel - Issue A2 2014 LUL 0335732 T0412 Track: Screwspikes - Issue A2; Incorporating Written Notice: 08/19/2014 2012 LUL 0335733 T0413 Track: Material for monument blocks and plaques - Issue A1 2012 LUL 0335734 T0414 Track: Anchors for bullhead switches - Issue A2 2014 LUL 0335735 T0415 Track: Blanketing sand - Issue A2 2014 LUL 0335736 T0416 Track: Material for longitudinal bridge timbers and components - Issue A1; Incorporating Written

Notice: 03/18/20142012 LUL 0

335737 T0417 Second - stage concrete for tube track - Issue A2 2015 LUL 0335738 T0418 Track: Paper traps - Issue A2 2014 LUL 0335739 T0419 Track: Material for operational boundary fencing - Issue A1 2012 LUL 0335740 T0420 Track: Fixed train arrestors - Issue A2 2014 LUL 0335741 T0421 Track: Sand drags - Issue A2 2014 LUL 0335742 T0422 Track:Material for stainless steel deposit - Issue A1 2012 LUL 0335743 T0423 Track: De-icing fluid - Issue A2 2015 LUL 0335744 T0424 Track: Stretcher bar assemblies - Issue A2 2015 LUL 0335745 T0425 Track: Soleplates - Issue A2 2015 LUL 0335746 T0426 Track: Check rail blocks and and junctionwork blocks - Issue A2 2015 LUL 0335747 T0427 Track: Grout and small-aggregate concrete - Issue A2 2015 LUL 0335748 T0428 Material for track lubricants - Issue A1 2012 LUL 0335749 T0429 Material for track adhesion improver - Issue A1; Incorporates Written Notice: 12/17/2015 2012 LUL 0335750 T0430 Re-use of track materials - Issue A2 2015 LUL 0335751 T0431 Flash butt welding of rails - Issue A1 2012 LUL 0335752 T0432 Installation, Inspection and Reporting of Alumino-thermic Welding - Issue A3; Written Notice

11/12/2014, 12/05/20142014 LUL 0

335753 T0433 Conductor Rail arc welding - Issue A1 2012 LUL 0335754 T0434 Longitudinal Bridge Timber Design - Issue A1; Incorporating Written Notice: 03/18/2014 2012 LUL 0335755 T0435 Prefabrication and handling of junctionwork - Issue A2 2016 LUL 0335756 T0436 Weld repair of plain rails, switches and crossings - Issue A1 2012 LUL 0335757 T0437 Non-insulated running rail and check rail fishplates - Issue A1 2013 LUL 0335758 T0438 Composite sleepers, bearers and pitblocks - Issue A1 2013 LUL 0335759 T0439 Rail reprofiling - Issue A1 2014 LUL 0335760 T0440 Tube 4-foot walkway panels - Issue A1 2014 LUL 0335761 T0441 Track: Under-sleeper pads - Issue A1 2015 LUL 0335762 T0442 Track: Running rails and check rails - Issue A1 2015 LUL 0335763 T0450 Performance Specification for Ultrasonic Rail Flaw Detection Equipment - Issue A1 2012 LUL 0335764 T0500 Track Bonds for Both Underground and Surface Locations - Issue A2 2013 LUL 0335765 T0501 Pigtail Rail Connections for Both Underground and Surface Locations - Issue A2 2014 LUL 0335766 T0502 10 Core Screened Track Crossing Signalling Cable - Issue A1 2011 LUL 0

Page 24: LUL-London Underground Library

335767 T0503 Cable, Signalling 3-2 core and 5-2 core concentric, screened, neoprene sheathed with telephone pair -Issue A1

2011 LUL 0

335768 T0504 Cable for d.c. traction indications and rail connections - Issue A1 2011 LUL 0335769 T0505 Concentric Signalling Cables - Issue A1 2011 LUL 0335770 T0506 Signalling equipment overhaul specification 2-position double element vane relay - Issue A10 2012 LUL 0335771 T0507 Signalling equipment overhaul specification Single element vane relay - Issue A6 2012 LUL 0335772 T0508 Signalling equipment overhaul specification 3 position double element vane relay (WKR) - Issue A6 2012 LUL 0335773 T0509 Signalling equipment overhaul specification 2 position gravity biased relay (style BG) - Issue A5 2011 LUL 0335774 T0510 Signalling equipment overhaul specification Style F3 relay - Issue A5 2011 LUL 0335775 T0511 Signalling equipment overhaul specification Time element relay (style LT) - Issue A8 2011 LUL 0335776 T0512 Signalling equipment overhaul specification Style N time element relay - Issue A5 2011 LUL 0335777 T0513 Signalling equipment overhaul specification Style QN6 relay, line and track - Issue A3 2011 LUL 0335778 T0514 Signalling equipment overhaul specification Train speed detection relay (style LT) - Issue A7 2012 LUL 0335779 T0515 Signalling equipment overhaul specification Point escapement (4? and 6?) - Issue A7 2015 LUL 0335780 T0516 Signalling equipment overhaul specification Point lockslide castings (4? and 6?) - Issue A3 2011 LUL 0335781 T0517 Signalling equipment overhaul specification Twin cylinder E. P. point groundlock - Issue A5 2011 LUL 0335782 T0518 Signalling equipment overhaul specification Point and lock detector box - Issue A5 2015 LUL 0335783 T0519 10-core cable with moulded ends for trackside equipment connections - Issue A5 2013 LUL 0335784 T0520 Signalling equipment overhaul specification Chairlock point mechanism - Issue A8 2012 LUL 0335785 T0521 Signalling equipment overhaul specification Point auxiliary valve - Issue A5 2012 LUL 0335786 T0522 Signalling equipment overhaul specification Glass enclosed (GE) air valve - Issue A7 2013 LUL 0335787 T0523 Signalling equipment overhaul specification Style N circuit breaker box - Issue A4 2011 LUL 0335788 T0524 Signalling equipment overhaul specification H5 trainstop - Issue A13 2014 LUL 0335789 T0525 Signalling equipment overhaul specification J trainstop - Issue A16 2014 LUL 0335790 T0526 Signalling equipment overhaul specification K trainstop - Issue A6 2015 LUL 0335791 T0527 Signalling equipment overhaul specification Circuit breaker box (J and K trainstop) - Issue A5 2011 LUL 0335792 T0528 Signalling equipment overhaul specification Tripcock tester (motorised and un-motorised) - Issue A7 2015 LUL 0335793 T0529 Signalling equipment overhaul specification Disc signal (outdoor and tunnel types) - Issue A5 2011 LUL 0335794 T0530 3-core and 5-core screened cables with moulded ends for trackside connections - Issue A4 2011 LUL 0335795 T0531 Signalling equipment overhaul specification Clamplock point mechanism - Issue A13 2014 LUL 0335796 T0532 Clamplock groundlock wiring harness (5 core) 0.6 m long - Issue A3 2011 LUL 0335797 T0533 Signal equipment service specification Delta track circuit units Style A, B, C and D - Issue A3 2011 LUL 0335798 T0534 QSEV relay: acceptance tests and performance requirements - Issue A4 2011 LUL 0335799 T0535 Air Hose- Low smoke Zero Halogen - Issue A1 2011 LUL 0335800 T0536 Track Hose for signalling cables - Issue A1 2011 LUL 0335801 T0537 35mm and 70 mmTwo core AC Signal main cable-Non Halogen Low-smoke - Issue A1 2011 LUL 0335802 T0538 Specification for electric strip rail heating - Issue A3 2012 LUL 0335803 T0539 Triple-layer single-core abrasion resistant signalling wire - Issue A2 2012 LUL 0335804 TE-HBS-007 Track Handbook 07 Gauging and clearances - Issue A1 2011 LUL 0335805 TE-HBS-0014 Understanding track design - Issue A2 2011 LUL 0335806 WOB1 Introduction Glossary - Issue 3 2011 LUL 0335807 WOB3 Train speeds Single line working Wrong direction movements Shunting Trains left on running lines -

Issue 42011 LUL 0

335808 WOB4 Safety Electricity Accidents Floods and Snow - Issue 6 2011 LUL 0

Page 25: LUL-London Underground Library

335809 WOB5 Signalling Train Warning Systems Passing Signals at danger - Issue 4 2011 LUL 0335810 WOB6 Train Preparation Train movement - Issue 4 2011 LUL 0