Luis Medeiros Romão Dirk Vandeplassche SCKCEN Roadmap towards the MYRRHA Accelerator Construction MYRRHA Accelerator 1 st International Design Review – Brussels, 12 – 13 November 2012 Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 1
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Luis Medeiros RomãoDirk Vandeplassche
SCKCEN
Roadmap towards theMYRRHA Accelerator Construction
MYRRHA Accelerator 1st International Design Review – Brussels, 12 – 13 November 2012
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 1
Agenda
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 2
• Context• Scope• Time frame• Reactor’s roadmap• General needs• R&D Roadmap• Road to construction• Concluding thoughts
Context
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 3
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 14
The accelerator is a unique engine with first of a kind performances that can be acquired by the MYRRHA Consortium from an external scientific – industrial collaboration, the Accelerator Consortium.
General Needs
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 15
Present Accelerator Roadmap
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 16
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 21
• MLA can be considered as an engine– 2 choices: Make or Buy– SCK’s present position: Buy is the choice really open ?
• Is this model viable ? – Other similar projects follow a different path– Strong internal involvement in every phase– European project is in preparation in order to analyse
this scenario
Concluding thoughts
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 22
• Longer term issues:– Operations– Maintenance– Reengineering– Configuration management
Can the MYRRHA Consortium live without the Accelerator Consortium after delivery ?