David LapinskiConsumers Energy CompanyJune 16, 2009
SummarySummary
Ludington Plant OverviewLudington Plant Overview Operational CharacteristicsOperational Characteristics Past & Current UsePast & Current Use Impacts of increasing wind generationImpacts of increasing wind generation
Ludington Pumped Storage PlantLudington Pumped Storage Plant
In operation since 1973In operation since 1973 Jointly owned by Consumers Energy and Jointly owned by Consumers Energy and
The Detroit Edison CompanyThe Detroit Edison Company Pond is 2.5 miles x 1 milePond is 2.5 miles x 1 mile Six reversible pump – turbinesSix reversible pump – turbines 360 feet from Lake Michigan to full pond 360 feet from Lake Michigan to full pond
levellevel 27 billion gallons H2O27 billion gallons H2O
LPS Key Operating ParametersLPS Key Operating Parameters
1872 MW Generating capacity1872 MW Generating capacity 1960 MW Pumping 1960 MW Pumping 15000+ MWh generation storage15000+ MWh generation storage 70% cycle efficiency70% cycle efficiency Generators quick start & regulation Generators quick start & regulation
capablecapable Pumps quickly interruptiblePumps quickly interruptible
Historic and Current Operational Historic and Current Operational UsesUses
Economic alternative to more expensive Economic alternative to more expensive generation to meet loadgeneration to meet load If value of generation > 1.4 times cost of If value of generation > 1.4 times cost of
pumpingpumping Ancillary Services & flexible response to Ancillary Services & flexible response to
operational uncertaintiesoperational uncertainties
Managing Stored Energy is Managing Stored Energy is ImportantImportant
Predictability of Cost & ValuePredictability of Cost & ValueMISO Day-Ahead LMP
(March 2009)
0
10
20
30
40
50
60
1 13 25 37 49 61 73 85 97 109 121 133 145 157
hour of week
LM
P $
/MW
h
Example StrategyEquivalent Energy Stored - MWh
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
1 13 25 37 49 61 73 85 97 109 121 133 145 157
Hours
Strategy for economic value, with room for contingenciesStrategy for economic value, with room for contingencies
Potential Impacts of Increased Potential Impacts of Increased Wind EnergyWind Energy
Reduced predictabilityReduced predictability Increased variation in supply-demand Increased variation in supply-demand
balancebalance Other resources required to compensate for Other resources required to compensate for
longer duration variations (10’s of minutes to longer duration variations (10’s of minutes to hours)hours)
Potential for increased need for ramping Potential for increased need for ramping capacity & intermediate term reserves capacity & intermediate term reserves capacitycapacity
MISO Load and Wind Generation Feb 4-5, 2009
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
2/3/2009 12:00 2/4/2009 0:00 2/4/2009 12:00 2/5/2009 0:00 2/5/2009 12:00 2/6/2009 0:00 2/6/2009 12:00
Meg
awat
ts
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
MISO Load Wind Generation
Storage Technologies Have a RoleStorage Technologies Have a Role
For short term replacement and balancing, For short term replacement and balancing, pumped storage can fill inpumped storage can fill in rapid response for ramping and contingenciesrapid response for ramping and contingencies economic generation to buy time for longer economic generation to buy time for longer
lead time units to come on linelead time units to come on line absorb excess generationabsorb excess generation
Additional ConsiderationsAdditional Considerations
Reliance on accurate wind generation forecasts Reliance on accurate wind generation forecasts Storage Management Storage Management Overall system optimizationOverall system optimization
Optimum storage management changesOptimum storage management changes May require decreasing daily budget of energy May require decreasing daily budget of energy
available to day ahead marketavailable to day ahead market
Limits on ability to cycle pumped storage units to Limits on ability to cycle pumped storage units to compensate for variations.compensate for variations.
Pump mode startup is limitedPump mode startup is limited