Top Banner

of 24

LU600028 Redacted

Jun 03, 2018

Download

Documents

Mark Reinhardt
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 8/12/2019 LU600028 Redacted

    1/24

    BUREAU OF SURFACE AND ,A+_~N.~ STATE BOARD OF LAND COMMISSIONERSMINERAL RESOURCES _____________________ C. L. Butch Otter, Governor300 North d Street Suite 103 ODM0 DEPARTMENT OF LANDSJ Ben Ysursa, Secretary of StateP0 Box 83720 Lawrence G. Wasden, Attorney GeneralBoise ID 63720-0050 Donna M. Jones, State ControllerPhone (206) 334-0200 Tom Luna, Sup t of Public InstructionFax (208) 334-3698 GEORGE B. BACON, DIRECTOR

    EQUAL OPPORTUNITY EMPLOYER

    Hand DeliveredAugust 18, 2010Jeff KimBridge Energy, Inc.do Ryan V. MorganCentra Consulting413 West Idaho StreetSuite 302Boise, IdahoSUBJECT: Permit to Drill LU600028 (API 1 1-075-20-013, White 1-10)The Idaho Department of Lands has Completed our review of this permit to drillfor oil and gas. Enclosed is a copy of the approved permit. This permit wasapproved with the following stipulations:

    1. The permittee shall be required to submit an affidavit covering the initialBOP pressure test after installation signed by the operator or contractorattesting to the satisfactory pressure test,2. The permittee shall ensure mud pits are adequately sized, designed andconstructed for the reception and confinement of mud and cuttings and toprevent contamination of streams and potable water.3. Drilled holes cannot be used for any other purposes unless they areconstructed according to the applicable well construction standardsadministered by the Idaho Department of Water Resources.4. Multiple zone completion has not been requested, and must be applied forseparately, as required by IDAPA 20.07.02.220.5. If a full length annular seal wil l not be installed in the 5 inch casing, thenthe following information, in addition to any that may be required by IDAPA20.07.02.220, must be submitted to the Idaho Department of Lands priorto finishing the well:a. Identification of which zones will be sealed off and which zones will remainopenb. Criteria used to determine which zones are sealed or left openc. How the cementing plan will prevent commingling of aquifers that havedifferent temperatures, pressures, and other qualities

    Page of 2, Permit to Dri ll LU600028 Approval

  • 8/12/2019 LU600028 Redacted

    2/24

    6. No secondary recovery efforts have been applied for, and Class IIinjection wells for injecting brines and other fluids to aid oil and gasproduction may not be permitted.7. Non-productive wells must be decommissioned prior to drilling the nexthole.8. Temperature readings must be periodically taken to insure that the correctcement is used. Temperature readings must be logged and submittedwith other well information after hole completion.9. Applicant will obtain necessary water rights from Idaho Department ofWater Resources if nearby wells will be used to supply water for thedrilling operations.

    Please ensure that all operations are conducted in accordance with therequirements of IDAPA 20.07.02 (Rules Governing Conservation Of Crude OilAnd Natural Gas In The State Of Idaho).This permit will be administered by Nancy Welbaum in our SouthwestSupervisory Area. She will be inspecting the drilling operation, and may beaccompanied by our contractor assisting with inspections. Please contact her at208-334-3488 if you have any questions.Sincerely,

    Eric WilsonNavigable Waters/Minerals Program Manager

    cc: Nancy welbaumchad Hersley, IDWR, P0 Box 83720, Boise, Idaho 83720-0098

    Page 2 of 2, Permit to Drill LU600028 Approval

  • 8/12/2019 LU600028 Redacted

    3/24

    1) LUCoOOQ.~g0 %Pr~ 1(~ O75~)oo,~Al IDAHO OIL AND GAS CONSERVATION COMMISSION

    Application For Permit to Drill, Deepen or Plug BackAPPLICATION TO: DnA ~ Deepen E Plug Back fl

    NAME OF COMPANY OR OPERATOR: Bnide Energy, Inc. Date: 6/23/2010Address: 1580 Uncoln Street , Suite 1110City: _Q~ny~r State: QQ Zip Code: 80203 Telephone: _(3D3~3j3j~9DflDistance, in miles, and direction from nearest town or post office: ~ppxjmateIyj~2ilIsoiflheastofNewfjympjjthjD

    DESCRIPTION OF WELL AND LEASEName o f Lease: White Well Number: 1-10 Elevation (ground) 2265.68Well Locat ion: Section: 40 Township:7N_______________ Range: 4W (or block and survey)

    (give footage from section l ines): _6_~0~FNL 621.fWL (NW NW )Field and Reservoir (if wildcat, so state): Hamilton ~~County: ffl_Nearest distance from proposed location to property or lease line: 621 feetDistance from proposed location to nearest drilling, completed or applied for on the same lease: N/A feetProposed depth: 2~QO ft Rotary or cable tools:.ftot~jyApprox date work will start: _3ep~bjQ~0jp______ Number of acres in lease:7Q~pm~..Number of wells on lease, including this well, completed in or drilling to this reservoir: If lease purchased with one or more wells drilled, complete the following information:

    Purchased from (name)tl/A ______________________________________________________________________Address of above N/AStatus of bond N/A ___________________________ _____________________

    Remarks: (If this is an application to deepen or plug back, briefly describe work to be done, giving present producing zoneand expected new producing zone) Survey plats and drilling pjpgnosis are at tached.sase_De1a[[szEeaLease.~ __________________________ _____ ________________

    CERTIFICATE: I the undersigned, state that am the Constiltant________________________________________of~jJ~eEj:iergyjnc. _______________________________ ______________(company) and that amauthorized by said company to make this application and that this application was prepared under my supervision anddirection and that the facts stated herein are true, correct and complete to th e bes t o f my knowledge.Date: _______.~ .. ._____ Signature:Permit Number: ~~6O~2~Approval Date:2//O~& Approved by:NOTICE: Before sending in this form, be sure that you have giverfl~ on back.

    FORM P-ihUG 3 2 Authorized by Order No. 2Rev. Oafi4/07DUTHWESTERN IDAHO AREADEPARTMENT OF LANDS

  • 8/12/2019 LU600028 Redacted

    4/24

    DRILLING PROGNOSISBRIDGE ENERGY, LLCWhite 1-10 (Hamilton Prospect)NW/4 NW/4 o f Section 10 - Township 7N-Range 4WPayette County, IdahoJuly 16, 2010

    GENERALNOTE: This well is to be drilled as a tight hole. Unauthorized personnel are not to beallowed on the rig floor, and all information is to be kept confidential.Surface Location: 630 FNL and 621 FWL (NWNW), Section l0-T7N-R4WBottomhole Location: SameProposed TD/Objective: TD 2500Elevation: 2,266 GL (ungraded); 2,284 KB (estimated).Drilling Rig: To be determined.MECHANICALCasing Design:SIZE INTERVAL LENGTH DESCRIPTION

    16 0- 82 82 Conductor (0.219 WT ) -- --9-5/8 0 600+ 600+ 36 , 3-55, STC 21.9 8.18 7.045-1/2 0 2500 2,500 l7 , 3-55, STC 2.69 1.60 1.912-7/8 0 2500 2,500 6.5 , J-55, EUB 3.16 3.05 1.45NOTE: If mud weight exceeds 10.0 ppg at TD, casing design may be altered. Clean and drift all stringsof casing prior to running. Remove all thread sealant (Kindex) prior to running. Unloadproduction casing and tubing strings with a forklift.CEMENTCASING/HOLE SIZE CEMENT SLURRY SX PPGYIELD16 - 24 Cement to surface with 4 yds Redi-mix.9-5/8 - 12-1/4 Lead: Premium Light cement

    + 2 CaCI2+ 1/4 pps flocele 100 12.02.27 Tail: Class 0

    + 2 CaC12+ l/4ppsflocele 100 15.81.15

    NOTE: Precede cement with 50 bbl f resh water. Have 100 sx neat cement and one-inch tubing onlocation for topping-off. Cement volume has been calculated assuming 100 excess.

  • 8/12/2019 LU600028 Redacted

    5/24

    Drilling PrognosisHamilton ProspectWhite 1-10Page TwoCASING/HOLE SIZE CEMENT SLURRY SX j~f~jYIELD5 1/2 8 3/4 Class G cement containing fluidloss additive, bonding agent,and retarder as required. 300 15.8 1.15

    NOTE: Prior to cementing, slowly lower mud viscosity to 35-sec fiumel viscosity. Circulatehole for hour at this viscosity prior to cementing. Precede cement with 1000 gal mud flush and30 bbl fresh water spacer. Cement top contingent upon the presence of potentially productiveintervals. Actual cement volume to be determined from caliper log. Run pilot tests on proposedcement with actual make-up water. Cement design may be altered depending on actualbottomhole temperatures and the presence of lost circulation. Do not move the casing (under anycircumstances) while setting the casing slips.

    CEMENTING ACCESSORIESSurface Casing: 1) Guide shoe with insert float located one joint above shoe.2) Top wiper plug (rubber).

    3) Centralizer with stop ring in middle of shoe joint.4) Centralizers over collars on first three connections, omitting float collar.5) Use a total of five centralizers.

    Production Casing: I) Differential-fill float collar located one joint above differential-fill floatshoe.2) Top and bottom wiper plug.

    3) Centralizer with stop-ring in the middle of shoe joint.4) Centralize through and 100 on either side of potentially productive intervals.Run at least 12 centralizers.5) Thread-lock all connections through float collar and use API casing dope on allremaining connections.6) Stage cementing tool may be run to ensure placement of cement across anyproductive intervals and fresh water sands.7) Centralize above and below stage cementing tool (if run).

    WELLHEAI)Casing Head: 9-5/8 x 11 x 3 ,000 psi V IP f langed casing head with two-2 LP out le ts. Out le tsequipped with one-2 3,000 psi V/P ball valve, and one-2 x 3,000 psi WP bull plug

    on the outlets.Tubing Head: 1 x 7-1/16 x 3,000 psi VIP tubing head with two-2 LP threaded outlets.Outletsto be equipped with 2 x 3 ,000 psi VIP ball valves.Upper Half To be determined.

  • 8/12/2019 LU600028 Redacted

    6/24

    Drilling PrognosisHamilton ProspectWhite 1-10Page ThreeMU]) PROGRAMINTERVAL WEIGHT (PPG) VISCOSITY (SEC) WL (CCS)0 600+ 8.5 - 9.0 ppg 30 - 45 sec NC

    Spud well with fresh water viscosified with Pac Regular. Circulate reserve pit to maintain clear water atthe pump suction. Addition of lime and/or a selective flocculant may be made at the flowline to promotesolids settling in the reserve pit. Keep hole full and drill pipe moving at all times. Sweep hole with SuperSweep to insure the hole is clean prior to running surface casing.INTERVAL WEIGHT (PPG) VISCOSITY (SEQ WL (CCS)600+. 2500 8.5-9.8 ppg 28-34 sec 10 cc s or lessAfter drilling our surface casing shoe, displace to Synthetic Base Mud, SBM. Reference SBM programfor specific maintenance, product concentrations, and mud treatment.Keep hole fill at all times. Monitor pit volume constantly as lost circulation and water flows should beexpected at all times. Sweep hole as dictated by hole conditions.Deviation tendencies in this area should not be severe; however, prudent drilling practices should beadhered to at all t imes. Surveys should be run at 500 ft intervals, unless otherwise indicated.WELL CONTROL EOUIPMENTINTERVAL EQUIPMENT

    0600-f- None600+ 2500 11 x 3,000 psi WP double-gate BOP with blind and 4-1/2 pipe rams. Rig should beequipped with upper and lower kelly cocks, as well as stabbing valve (have wrenchavailable at all t imes). BOP equipment will be tested after nipple-up and every 30days thereafter. (Noti~ Idaho State field representative prior to testing). Close piperams daily and blind rams on trips, recording results on tour sheets.GEOLOGICALGeologist/Mud Logge r: Geo logist and mud logger with hotwire and chromatograph to be on location tofrom base of surface casing to TD. NotiQ, prior to spud and a fter settingsurface casing.Electric Logging: DIL-SFL-SP and BHC Sonic-GR-CAL to be run in tandem from base of surfacecasing to TD. LDT-CNL-GR-CAL may be run at the geologists discretion.

  • 8/12/2019 LU600028 Redacted

    7/24

    Drilling PrognosisHamilton ProspectWhite 1-10Page FourGEOLOGICAL (Continued)Formation Tops; Assumes KB elevation of 2,284 ft. DRILL

    FORMATION DEPTH SUBSEA

    n Sands 29 55Depth 6

    MISCELLENEOUS1. Pump carbide lag prior to running surfhce casing and prior to drilling out shoe. Pump efficiencieswill be calculated from this information. Run frequent carbide lags while drilling to determine degree

    of hole washout.2. Monitor mud hydraulics closely. An in-gauge hole is extremely critical to achieve open-hole packer

    seats, interpretable logs, and a good cement bond.3. Water will be hauled or pumped from nearby sources.4. Reserve pit is to be l ined with a 12-mu synthetic liner.5. It is anticipated that a mud motor and PVC bit will be used from approximately 600 to TD.6. In general, the above prognosis is presented as a guideline only; and is subject to change as dictatedby hole conditions and geological interpretation.PERSONNEL OfFICE NUMBER CELL NUMBERRon Richards 303-831-9022 720-209-0207JeffKim, Manager ofOperations 303-831-9022 303-981-7443Ed Davies, President 303-831-9022 720-6414737

    Prepared by:

    Ron Richards for Bridge Energy Inc.

  • 8/12/2019 LU600028 Redacted

    8/24

    BRIDGE RESOURCESWHITE 1-10WELLBORE DATA SHEET

    LEASE: Bridge Resources TOTAL DEPTH: 2500hWELL: While I-ID SURFACE LOCATION: N43-57-SS.64LOCATION, Sect lOlTownahip 7NtRango 4W W116-48-35 97

    Fayette County BOTTOM HOLE LOCATION: 1143-57-55 64SPUD DATE: August WI 16.46-3597OBJEC rivE Hamilton Sands ELEVATION: 226611ELEVAIION(KB): 2,2841t

    HOLE MUD FRACTUREFORMATION SIZE WEIGHT GRADIENTEVALUATION CASING SIZE (IN) COMMENTS ~IN) TVD (rpnl

    16LinePipe-Welded 82f1 NoFIT 25 _ ~I 6 8

    Top of coil-SOON

    12 I/C

    9811

    Mud LoggingEach III 11cm 5011 83/4

    1-taliburtondea lily naut(On,reststpviiy,lonlts :dr v ial cares

    SEN6i/W-llpff-R41kJBS-IJC 2500 83/4 ______ 250011 103 11

  • 8/12/2019 LU600028 Redacted

    9/24

    EXHIBiT MAP OF SITEWHITE 1-10A PORTION OF THE NORTHWEST 1/4 OF ThE NORTHWEST 1/4,OF SECTION 10, TOWNSHIP 7 NORTH , RANGE 4 WEST, SM.,

    PAYETFE COUNTY, IDAHO2010

    1 = 2 MILES

    .I

    SITELOCATION

    - - -. ~_/1 _...~

    p7

    HNHp

    -

    tiI

  • 8/12/2019 LU600028 Redacted

    10/24

    7 14660

    .7 9 )Iio ~E 1StAVE 0P210S32OP: 233672 Jcp:so2~t-t 6000 ..

    .4. I

    b9O1~3j,5 -~

    LOCATIONOFWHITEI-10_____ WELL SITE PAD (250x250)630 FNL AND 621 FWL

    U,

    -

    ZL.

    .EH:-L:I l

    ORUON W C NORTh*E5 /6 0 Tht NO~THWE~ 4/4 4OF SECTION 10. TOWNSHIP 7 NORTh, PANGS 4 W$T, aM.,PAYERS COUNTY I0A90 DO2010

  • 8/12/2019 LU600028 Redacted

    11/24

    OOQO4AIQ4N O~Afl gc~- _~g_r EP.~ U~l ~t -.qpt.~v - ~JP -SE 1ST AVEEP EP E a, EP EP EP

    -LAT N435755 64LONG: w11648aff.grEL: 2265 UBsft

    EXHIBIT MAP OP SITEWHITE 1-10A PORTION OF ThE NORTHWE 1/4 or WE NORTHWESt 1/4,OF SECTION 10, TOWNSHIP 7 NORTH. RANGE 4 WESt. Bit,PAYET1E COUNTY, IDftilO2010

    43SEC. OCR. g rP EP BRASS CAP

    HUB & LA TH SOUTH OF ROADGPS EL : 2260.92

  • 8/12/2019 LU600028 Redacted

    12/24

    W 1/4ALUMINUM CAP

    EXHIBIT MAP OF SITEWF-IITJB 1-10A PORTION OF THE HORM1EST 1/4 OF THE NOR11-IWESI 1/4,OF SECTION 10, TO WNSHIP 7 NOR TH, R 4N GE 4 WEST, G.M.PAYErTE COUNTY. IDAHO2010

    C 1(4

    = 500

    I

    SEC. COR. J_ N 10BRASS CAP ALUMINUM CAP CqC0~)(0

    LAT:N43W755.64

    621.00 700.21EnU,F(001

    LONG: W 116 4835.97EL : 22654 UsIt

    NWY4 NWZ

    NE,Y4 NWY4

    NWY4- SEC. 10--

    5wY4 NW)4 SEY4 NWEI4

  • 8/12/2019 LU600028 Redacted

    13/24

    fTWb* vjIt 44 IA I~

    ~BOUNDARY~ w~4eINCH

    ~. id1~ Itt ~~1C WELL~~~ a~ ~Aa~~44< Ii~ ~~~HE~EASESTI _I ON IaaPAYErr~aSI 4

    a >a~f; 47;4 II 1~ .I 1Q6&~FEETTO

    ~ KOIfltLfri I ?ain w~

  • 8/12/2019 LU600028 Redacted

    14/24

    Will CINT1R TO INO r SUCTION TANK- 848

    FOIl TANK

    fr~-~&

    B~z r HotZt

    nscrEzaH~:nL cr~nn TO OttL~n:-~c~

    L O tt ~t Mt~t :cu~z to or:

    VZELL ctrza

    I - 10 .4 C INTR It Wilt TO TAEt1-71 TJAS T8WATII~TAItC4- 1Z.5IIPUNPTOtZPUttPC-STJASITOItNIIIflt7- 8 RLH~ TO 618t.41&KIEOTSITOFOIITflKI2-2SSVOTOCLTWAiKII -4 R A H ? TO WATR TAlK

    SKID MEASUREMEN CATWALK ----------48j FUELTANK_j GAS BUSTER -SWi GEN HOUSE -83i JUNK BOX -SWSUCTION TANK-----SSHAIcER TANK S#1 PUMP -S4 2PUMP -SRAMP-~ --11SUBSTRUCTURE 2T-BASE -SWWATER TAN K------SWMUD HOUSE IO

    :4

    ~0 112

    nELL ct~tza to__~r :rtt n:n

    ~rtT :40Lz 53 r/Crf lor ~:rn

    8X5 CELL~.Eft

    3

    or tccitn~

  • 8/12/2019 LU600028 Redacted

    15/24

    WPz9I7P9 ,(rc WHS, LLCRazorback Rig Component Listing

    The following list contains the components of the 2004 Cameron C-900 Hp, Trailer Mounted Drilling Rigw/ VIN Number (5024). This rig also operates wI a FDS 150 Ton HMI hydraulic Top Drive.Qty Item RemarksI Drawworks - Cameron 42x 12 Water Circulating Drum w/ water cooled mainbrake and Wichita water cooled assist brake... Wichita Drum Clutch

    I Power and Drive Package Twin (2) Detroit Series 60 engines; 450 Hp each w/Allison 5960 Transmissions into a Cushman 1000 Hp gear driven Compound, toCushman 1000 Hp RA box; 1:1 RatioI Mast PEMCO 120 x 400K lbs hook load; 1.25 API rating; sheaved for 10 - 1-1/8 drill lines; Serial 13122 Hydraulic Scoping Cylinder f/ PEMCO derrick SpareI Fluid Design Services (FDS) 150 Ton Hydraulic Top Drive wI diesel power

    package.I Hydraulic Motor FDS 150 Ton Top Drive SpareI Block-200 Ton ABCO, 10 l ineS x 36 sheave w/ ABCO HookI Weight Indicator-Totco type 4I Sub Structure-I 7H x 10W x 16L w/6 foldout wings. Unit scopes down to106H x 136 on lowboy. 40 Kelly; HexI Kelly BushingI Kelly Shuck w/ protectorI Sub-structure/T-base-45 x 8I Sub-structure ramp-484 x 10, hydraulic raise-cylinders part SD83CC-24-1 31I Top Dog House-24lO x 7IO.S, hydraulic raise, with knowledge box, lockers,shelling, and bench seats. Framework installed for Pason Electronic DrillingRecorder and Autodriller computer system.I Kelly Spinner-Cam-tech model 6100 hydraulic Kelly spinner assy.

    Well Control Equipment-Shaffer LXT DBL I 1 x 5K psi MAWP, Dual Ram,hydraulic BOP mfg. Date 1-04, Serial 200213110-81Shaffer LTX I 1 x 5K psi MAWP spherical annular BOP

  • 8/12/2019 LU600028 Redacted

    16/24

    WHS, LLCRazorback Rig Component ListingQty Item Remarks

    4-1/16 x 5000 psi BOP valveChoke Manifold, fitted for HCR valve, choke-w/4outlets, 5000 psi

    I Closing Unit-Massco Inc. 5 station2 Generators-DDC 410KW generators, 277/480 VAC 3 Phase 60 HZ powered by 2Detroit Series 60 14.0 L Diesel engines/Tier III Emissions standards. Skidmounted in covered house with all electronic panels as I unit. Generator House-44 x 10 skid mountedI Swivel-EM5CO LB 200 Ton Serial 208I Mud System-2-tank system w/approx. 700 bbls capacity. 60 HP mud mixers, 4agitators, 4jet blowers, 70 bbls slugging tank, 2-Doublelife AWD III Linear shaleshakers built in tandem, 600 GPM each. Mud Conditioner unit consisting of; IDoublelife AWD III shale shaker, 1-Doublelife Mod. 1-210 Desander, and IDoublelife V-S 10, 10 cone Desilter.2 Mud Pumps-2 HHF-1000 HP triplex pumps w/pulsation dampners, powered byCAT 3412 1150 HP diesel engines, fully unitized. With 6 liners, 10 stroke,pumps will move 3.7 gal/stroke at 100 efficiency. Additional specificationsupon request.3 American Roller Bearings for CE-Fl 000 mud pump Spare2 SKF Pillar Block bearings fo r CE-FI000 Spare Mud/Gas Seperator: 30H x 6 Dia vessel mounted on skid for easy rig up andtear down.I Fresh Water Tank-200 bbl fresh water tank w/electronic 20 HP 480V frame 256T

    3 x 2 centrifugal 4 x 6 water pump powered by Detroit 353 (2800 rpm)I Catwalk-473 x 102 pipe racksI Junk Box-209 x 7IOI Rotary Table-22 IDECO rotary table assy. On 44 centers complete w/splitmaster bushing.I Drill Collar Slips-Type A 5-1/2 MS 98CI Drill Pipe Slips-Wooly M3-98I Drill Collar Clamp(Wedding Band)AOT 12116

    5 /2-6 5/82

  • 8/12/2019 LU600028 Redacted

    17/24

    WHS, LLCRazorback Rig Component ListingQty Item RemarksSerial 29140I Casing Elevators

    M66-5 250 ton 227 MTDrill Pipe Elevators-2-AOT(1) 150 ton(l) 250 tonCross Over Subs-Assorted

    I Survey Machine-Wireline survey machine.I Diesel Tank-8000 gal Cyllndrical Tank: Myers diesel tank transfer pump assy.w/3hp 3600rpm explosion proof motor. Skid mounted with 3 compartments for

    oils on front of skid.

    This rig moves in 27 loads including pipe). All components are skid mounted and mud-boated with lffiingears to be ljfled onto oilfleldfioats or lowboys. All loads are legalpermit loads.

    3

  • 8/12/2019 LU600028 Redacted

    18/24

    brAt 4,PPfl~b. 4Tb.~ wi ., ItbJAS .M DE LE U~ NT 6.Th~ ISiS. tND MANUALfl.i 5I6S~ /O/Oi 3 t

    .4~7~SENLPAL PRMiGtOCI4I~ STACK. f l~$IJ~ ~xI

    4 3

    D

    2

    C C

    D

    -0

    B

    C

    A

    B

    4 /~Y~ ~/J 5f~ciCSR66592 I//I/ 41/ ,~ I/~ ~i-

    I dz. /J i~

  • 8/12/2019 LU600028 Redacted

    19/24

    4 iIiW SM X 2 iiir SM CHOKE MANIFOLD

    r2 ill-S EM GAE ~kLV~

    ti~ ~M:.rt-\~.wr

    a

    ~-~r ~/: SPCo~4* . / .n.

    ~t-~ -.------

    1Px).5s, ~-WiY 4 -ui~r 5MX2 i~ii5 ~

    ~-i:~ 5 ~5M S(~T~ v~I2sr..

    n~~ ~. -v~ i~ ti? ~ L~

    n~

    b4

    r ~ C1=

  • 8/12/2019 LU600028 Redacted

    20/24

    WHS, LLCRIG FLOOR RIG FLOOR

    FROM GL to Bottom of Rotary Beam is 167 114

    SOP Schematic NU on Surface- Razorback Rig

    GROUND LEVEL

    REG7/30/20 10

  • 8/12/2019 LU600028 Redacted

    21/24

    Rt erve 1N ~

    0 xl ~ ~ 4

    (xx

    I b k

    A114.0 79.0

    170.0 120.0290.0

    I S MV S. h R~i~ci i:~~.ii~~/ .c::Kat.:I.oJi: .P1:~t

  • 8/12/2019 LU600028 Redacted

    22/24

    Reserve Pit

    ~ 170.O ~29O.OW I r kR

  • 8/12/2019 LU600028 Redacted

    23/24

    90.0

    nfl

    fit 13c,j

    130.0

    790- _________ 120.0

    rb kRi/Lct jnPjt

  • 8/12/2019 LU600028 Redacted

    24/24

    CENIR4CONSULTING INC.MEMORANDUMAugust 2, 2010To: Nancy Welbaum, IDLFrom: Ryan V. Morgan; P.E., LEED APCc: Steve West: Jeff Hamniel, E.IRe : Additional Information forWhite Well.Nancy,Per your request via email last Friday please find attached the additional information regarding distances from theproposed well to the additional features requested.Closest Gas Well 6120 (Tracy Trust)Closest Water Well 775 (residential well located to the west across HWY 30)Closest Structure 680 (residential building located to the west across HWY 30)Please note that the distance to the production boundary is not supplied as this boundary is yet to be determined.Should you have additional questions please let us know.

    CENTRA consulting, Inc. + 413 West Idaho Street, Suite 302, Boise, Idaho Tel: (208) 338-9400 Fax: (208) 338-3844 www.centrainc.com