A. Sales B. Construction For M/s And M Proiect - Qua Progress Report CIVIL ENGINEERING PVT. LTD., (4, Promoter's Name Ml s. CASA GRANDE CIVIL ENGINEER!NG PVT. LTD., and M/s. CASA GRAND BUTLDER PVT. LTD., Project Name CASAGRAND SAVOYE Project Registration No TN/OUBui ld ing/O t2/ 2OL9 dated 25 loLlzOLe Quarter Ending 31't December 2OL9 S.No Description Nos. Total Area (sq.m) 1 Flats Booked size wise (As given in Carpet Area Statement while registering) zBHK - 2BHK + 2T 3BHK + 2T 3BHK + 3T 38 50 3 9835.28 2000.37 8641.30 2 Parking Lots 3 UDS Registered in Sq.m S.No Description Block/Tower No. Status 1 Stage of construction of each Block ff ower, Floor wise Authori ILDER PVT. LTD., Area
10
Embed
LTD., M/s....L Foundation D Foundation BLOCK I M Foundation Foundation C A Foundation B Foundation C. Details of Clearances L. Completion Certificate No. - Enclosed 2. Annual Audit
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
A. Sales
B. Construction
For M/s
And M
Proiect - Qua Progress Report
CIVIL ENGINEERING PVT. LTD.,
(4,
Promoter's Name Mls. CASA GRANDE CIVIL ENGINEER!NG PVT. LTD.,and M/s. CASA GRAND BUTLDER PVT. LTD.,
Project Name CASAGRAND SAVOYE
Project Registration No TN/OUBui ld ing/O t2/ 2OL9 dated 25 loLlzOLeQuarter Ending 31't December 2OL9
S.No Description Nos. Total Area
(sq.m)1 Flats Booked size wise (As
given in Carpet Area Statementwhile registering)
zBHK -
2BHK + 2T
3BHK + 2T
3BHK + 3T
38
50
3
9835.28
2000.37
8641.30
2 Parking Lots
3 UDS Registered in Sq.m
S.No Description Block/TowerNo.
Status
1 Stage of construction ofeach Block ff ower, Floorwise
Authori
ILDER PVT. LTD.,
Area
BLOCK3
F Fourth Floor roofslab
BLOCK2
E
Second Floor roof slab
K First Floor roof slab
L Foundation
FoundationD
BLOCKI
M Foundation
FoundationC
FoundationA
B Foundation
C. Details of Clearances
L. Completion Certificate No. - Enclosed
2. Annual Audit Report of Special Account in Form 7 Already Submitted
D. Latest Photo with Date (At least from 2 angles)- Enclosed
For M/s.
And M/s.
NGINEERING PVT. LTD.,
R PVT. LTD.,
UAuthorized
Core J –Pour 2 -4th Floor Roof slab Electrical conduit laying work in progress
G core –-4th Floor Roof Slab work in progress
Core K – 4th Floor Roof Slab concrete completed
Core L –2nd floor Roof slab ready for concreting
Core D –2nd Floor Roof slab shuttering work in progress
Core C –1st Floor column work in progress
Core M –Stilt Roof slab Shuttering work in progress