Specifications Model Number Single-sided LS1500S Double-sided LS1500D Heat Output 9.2kW Star Rating (Minimum) 5.0* Gas Type NG - ULPG Flue Power Flue Heating Area 78 - 133m2 Input MJ/h 14 - 40 Power 3 pin plug. 1.5m power cord - right hand side of appliance Gas Connection 1/2 BSP Terminates inside the heater, lower left hand side Weight Net / Gross 110kg / 140kg Fan 2 Speed Convection Fan Control Remote and Wi-Fi Standard Appliance dimensions (Single / Double-sided (mm): Net: 745h x 1935w x 425d Gross: 931h x 2050w x 530d Glass dimensions (Single / Double-sided (mm): 280h x 1500w Outer Flue Diameter (mm) 75 Inner Flue Diameter (mm) 50 LS1500S - Single-sided Log set *Will vary according to gas type and flue configuration. LS1500D - Double-sided Log set LS1500D - Double-sided Burn media LS 1500 specification guide Application Ideal for living rooms and open plan areas. Versatile power flue system makes for easy installation in almost any living space, including bedrooms. The LS series is ideal for a new build installation into a false (mock) chimney. For further information please refer to rinnai.com.au to view all technical specifications. LS1500S - Single-sided Burn media
2
Embed
LS 1500 specification guide - Rinnai · Glass dimensions 800 800 x 505 mm 1000 1000 x 280 mm 1500 1500 x 280 mm 741 ± 5 mm 400 mm The clearances listed below, measured from the edge
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Specifications
Model Number
Single-sided LS1500S
Double-sided LS1500D
Heat Output 9.2kW
Star Rating (Minimum) 5.0*
Gas Type NG - ULPG
Flue Power Flue
Heating Area 78 - 133m2
Input MJ/h 14 - 40
Power 3 pin plug. 1.5m power cord - right hand side of appliance
Gas Connection 1/2 BSP Terminates inside the heater, lower left hand side
Weight Net / Gross 110kg / 140kg
Fan 2 Speed Convection Fan
Control Remote and Wi-Fi Standard
Appliance dimensions (Single / Double-sided (mm):
Net: 745h x 1935w x 425d Gross: 931h x 2050w x 530d
Glass dimensions (Single / Double-sided (mm): 280h x 1500w
Outer Flue Diameter (mm) 75
Inner Flue Diameter (mm) 50
LS1500S - Single-sided Log set
*Will vary according to gas type and flue configuration.LS1500D - Double-sided Log set
LS1500D - Double-sided Burn media
LS 1500 specification guide
ApplicationIdeal for living rooms and open plan areas. Versatile power flue system makes for easy installation in almost any living space, including bedrooms. The LS series is ideal for a new build installation into a false (mock) chimney. For further information please refer to rinnai.com.au to view all technical specifications.
LS1500S - Single-sided Burn media
16 | Linear installation guide 13563-A d5
Linear 1500 framing dimensions
1950 Min
796
Min
341
*
257
±5
*
1516 *
300
**
~
575
870 Min 1080 Min
990 710 Recommended that lintel is left until fire is installed so minimum clearances can be maintained
403
300
80**
870
1183
** Maintain 25 mm clearance to combustibles for first 300mmof flue
39 Assumes10 mm wallboard
* Wallboard cutout
403 mm assumes a 10 mm wallboardon both sides of a double-sided unit.
415 mm is the min. for a single-sidedunit to maintain 50 mm clearance tothe back of the fire.
• All dimensions are assuming a 10 mm wallboard
•
• Framing shown is 90 x 45 mm
• Fire platform shown is 18 mm plywood
•
Note: Install frame prior to plaster.
400 mm
400
mm
1000
mm
Linear installation guide 13563-A d3 | 9
The below diagrams are to assist people who are determining the clearance area around the Linear without having the unit on site.
800
Glass width
400 400
Clearance Clearance
505
Gla
ss h
eigh
t4
00
1600
Minimum above fire
257
± 5
Adjustable firebox feet
1000
Glass width
400 400
Clearance Clearance
280
Gla
ss h
eigh
t4
00
1800
Minimum above fire
Adjustable firebox feet
257
± 5
1500
Glass width
400 400
Clearance Clearance
280
Gla
ss h
eigh
t4
00
2300
Minimum above fire
Adjustable firebox feet
257
± 5
Lin
ear
800
Lin
ear
1000
Lin
ear
1500
Linear installation guide 13563-A d3 | 7
Unit dimensions (mm)The centre of the glass is NOT the centre of the appliance.Depth dimension is the same for all models.
The clearances listed below, measured from the edge of the glass, are minimum clearances unless otherwise stated. The Rinnai LS 1500 has an integrated zero clearance box (fire box) that isolates the appliance from combustible materials. This means it can be installed directly into a cavity constructed from materials such as wood or plaster.
400 mm
400
mm
1000
mm
Linear installation guide 13563-A d3 | 9
The below diagrams are to assist people who are determining the clearance area around the Linear without having the unit on site.
800
Glass width
400 400
Clearance Clearance
505
Gla
ss h
eigh
t4
00
1600
Minimum above fire
257
± 5
Adjustable firebox feet
1000
Glass width
400 400
Clearance Clearance
280
Gla
ss h
eigh
t4
00
1800
Minimum above fire
Adjustable firebox feet
257
± 5
1500
Glass width
400 400
Clearance Clearance
280
Gla
ss h
eigh
t4
00
2300
Minimum above fire
Adjustable firebox feet
257
± 5
Lin
ear
800
Lin
ear
1000
Lin
ear
1500
Linear installation guide 13563-A d3 | 7
Unit dimensions (mm)The centre of the glass is NOT the centre of the appliance.Depth dimension is the same for all models.
Maximum flu length: 8.5m, Maximum number of 90° Bends: 3. For every 90 ° bend, the overall length must be reduced by 1 m.
Side direct and side extended flueing
Up and back direct OR Up and back extended flueing
Down and out flueing Up and over flueing
34 | Linear installation guide 13563-A d3
Flueing optionsFor lowest cost, optimal performance, ease of installation and servicing, Rinnai recommend short flued installations are considered before all other options.
The gas pressures of the Linear are factory set for short flue installations, as pictured below. All other installations, greater than 3 m in length, are long flue installations and will require a dip switch change, refer commissioning sheet.
Maximum flue length and number of bends• Maximum flue length = 8.5 m• Maximum number of 90 ° bends = three
For every 90 ° bend, the overall length must be reduced by 1 m. For example, if an installation has three 90 ° bends, the maximum flue length can be 5.5 m.
The Linear flue installation differs slightly to Arriva and Evolve power flue installations as the elbow component of the Adaption flue (EVOKIT03) is not counted a 90 ° bend.
Horizontal flue terminalsAllow for a continuous 2 ° fall from the heater connection point to the wall terminal—there must be a 300 mm clearance between the flue terminal and ground level.
Adaption flue kit (EVOKIT03) condensate trap sectionThe Linear produces little or no condensate. As the EVOKIT03 comes with a condensate trap already attached, it’s important to cap off the drain tube using the cable tie supplied.
up to 1 mESWTERM
ESPIPE900
45 ° bends
EVOKIT03
up to 3 m
ASPDFKASPDFK
ESPIPE900
Wall terminal from ASPDFK
EVOKIT03
45 ° bend
ESPIPE900
up to 1 m in total
ESPIPE900
ESWTERM
45 ° bend
34 | Linear installation guide 13563-A d3
Flueing optionsFor lowest cost, optimal performance, ease of installation and servicing, Rinnai recommend short flued installations are considered before all other options.
The gas pressures of the Linear are factory set for short flue installations, as pictured below. All other installations, greater than 3 m in length, are long flue installations and will require a dip switch change, refer commissioning sheet.
Maximum flue length and number of bends• Maximum flue length = 8.5 m• Maximum number of 90 ° bends = three
For every 90 ° bend, the overall length must be reduced by 1 m. For example, if an installation has three 90 ° bends, the maximum flue length can be 5.5 m.
The Linear flue installation differs slightly to Arriva and Evolve power flue installations as the elbow component of the Adaption flue (EVOKIT03) is not counted a 90 ° bend.
Horizontal flue terminalsAllow for a continuous 2 ° fall from the heater connection point to the wall terminal—there must be a 300 mm clearance between the flue terminal and ground level.
Adaption flue kit (EVOKIT03) condensate trap sectionThe Linear produces little or no condensate. As the EVOKIT03 comes with a condensate trap already attached, it’s important to cap off the drain tube using the cable tie supplied.
up to 1 mESWTERM
ESPIPE900
45 ° bends
EVOKIT03
up to 3 m
ASPDFKASPDFK
ESPIPE900
Wall terminal from ASPDFK
EVOKIT03
45 ° bend
ESPIPE900
up to 1 m in total
ESPIPE900
ESWTERM
45 ° bend
34 | Linear installation guide 13563-A d3
Flueing optionsFor lowest cost, optimal performance, ease of installation and servicing, Rinnai recommend short flued installations are considered before all other options.
The gas pressures of the Linear are factory set for short flue installations, as pictured below. All other installations, greater than 3 m in length, are long flue installations and will require a dip switch change, refer commissioning sheet.
Maximum flue length and number of bends• Maximum flue length = 8.5 m• Maximum number of 90 ° bends = three
For every 90 ° bend, the overall length must be reduced by 1 m. For example, if an installation has three 90 ° bends, the maximum flue length can be 5.5 m.
The Linear flue installation differs slightly to Arriva and Evolve power flue installations as the elbow component of the Adaption flue (EVOKIT03) is not counted a 90 ° bend.
Horizontal flue terminalsAllow for a continuous 2 ° fall from the heater connection point to the wall terminal—there must be a 300 mm clearance between the flue terminal and ground level.
Adaption flue kit (EVOKIT03) condensate trap sectionThe Linear produces little or no condensate. As the EVOKIT03 comes with a condensate trap already attached, it’s important to cap off the drain tube using the cable tie supplied.
up to 1 mESWTERM
ESPIPE900
45 ° bends
EVOKIT03
up to 3 m
ASPDFKASPDFK
ESPIPE900
Wall terminal from ASPDFK
EVOKIT03
45 ° bend
ESPIPE900
up to 1 m in total
ESPIPE900
ESWTERM
45 ° bend
34 | Linear installation guide 13563-A d3
Flueing optionsFor lowest cost, optimal performance, ease of installation and servicing, Rinnai recommend short flued installations are considered before all other options.
The gas pressures of the Linear are factory set for short flue installations, as pictured below. All other installations, greater than 3 m in length, are long flue installations and will require a dip switch change, refer commissioning sheet.
Maximum flue length and number of bends• Maximum flue length = 8.5 m• Maximum number of 90 ° bends = three
For every 90 ° bend, the overall length must be reduced by 1 m. For example, if an installation has three 90 ° bends, the maximum flue length can be 5.5 m.
The Linear flue installation differs slightly to Arriva and Evolve power flue installations as the elbow component of the Adaption flue (EVOKIT03) is not counted a 90 ° bend.
Horizontal flue terminalsAllow for a continuous 2 ° fall from the heater connection point to the wall terminal—there must be a 300 mm clearance between the flue terminal and ground level.
Adaption flue kit (EVOKIT03) condensate trap sectionThe Linear produces little or no condensate. As the EVOKIT03 comes with a condensate trap already attached, it’s important to cap off the drain tube using the cable tie supplied.
up to 1 mESWTERM
ESPIPE900
45 ° bends
EVOKIT03
up to 3 m
ASPDFKASPDFK
ESPIPE900
Wall terminal from ASPDFK
EVOKIT03
45 ° bend
ESPIPE900
up to 1 m in total
ESPIPE900
ESWTERM
45 ° bend
34 | Linear installation guide 13563-A d3
Flueing optionsFor lowest cost, optimal performance, ease of installation and servicing, Rinnai recommend short flued installations are considered before all other options.
The gas pressures of the Linear are factory set for short flue installations, as pictured below. All other installations, greater than 3 m in length, are long flue installations and will require a dip switch change, refer commissioning sheet.
Maximum flue length and number of bends• Maximum flue length = 8.5 m• Maximum number of 90 ° bends = three
For every 90 ° bend, the overall length must be reduced by 1 m. For example, if an installation has three 90 ° bends, the maximum flue length can be 5.5 m.
The Linear flue installation differs slightly to Arriva and Evolve power flue installations as the elbow component of the Adaption flue (EVOKIT03) is not counted a 90 ° bend.
Horizontal flue terminalsAllow for a continuous 2 ° fall from the heater connection point to the wall terminal—there must be a 300 mm clearance between the flue terminal and ground level.
Adaption flue kit (EVOKIT03) condensate trap sectionThe Linear produces little or no condensate. As the EVOKIT03 comes with a condensate trap already attached, it’s important to cap off the drain tube using the cable tie supplied.
up to 1 mESWTERM
ESPIPE900
45 ° bends
EVOKIT03
up to 3 m
ASPDFKASPDFK
ESPIPE900
Wall terminal from ASPDFK
EVOKIT03
45 ° bend
ESPIPE900
up to 1 m in total
ESPIPE900
ESWTERM
45 ° bend
Vertical flueing
Note: All images are for illustration purposes only. Mandatory mesh-guard is not shown for purpose of highlighting the decorative logs and burn media, unique to the LS series. For the most up-to-date information, go to rinnai.com.au