GUIDELINES FOR IMPROVING THE QUALITY OF SHELTER CONSTRUCTION IN ALLAI
BY SAVE THE CHILDREN-USAArch. Alejandra Loughlin
14-January-2006
Notes: The photographs included in this document has being taken on the field (Banna, Allai) between 7 and 8 of January 2006
STRUCTURE
VERTICAL LOADS•Roof•Snow
OVERLAPPING
HORIZONTAL LOADS•Wind
•Earthquake
BRACINGJOINING WITH TENONS AND MORTICE
WOOD-TO-WOOD METALLIC CONNECTORS/WIRE
STRUCTURE
VERTICAL LOADS HORIZONTAL LOADS
EARTHQUAKE
STRUCTUREOVERLAPPING
EARTHQUAKE: HORIZONTAL MOVEMENT
BRACING
A FRAME(triangle):
Rigid shape
SKETCH
BRACING BAD: (NO bracing)
BRACING GOOD
ROOF
WOODEN JOININGS: TENON AND MORTICEOPTION 1 OPTION 2
WOODEN JOININGS: TENON AND MORTICE
JOINING: RIDGE BEAM-RAFTER-KING POSTBAD
UPGOOD
SUPPLYBAD GOOD
BESIDE: BAD BESIDE: BAD
NO METALLIC CONNECTOR: BAD
JOINING: RIDGE BEAM-RAFTER-KING POSTGOOD BUT NOT ENOUGH:LACK OF METALLIC CONECTORS