Top Banner
Longitudinal Coordination of Care (LCC) Workgroup (WG) LCC All Hands Meeting February 7, 2013 1
13

Longitudinal Coordination of Care (LCC) Workgroup (WG) LCC All Hands Meeting February 7, 2013 1.

Mar 27, 2015

Download

Documents

Lily Sharp
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Longitudinal Coordination of Care (LCC) Workgroup (WG) LCC All Hands Meeting February 7, 2013 1.

Longitudinal Coordination of Care (LCC) Workgroup (WG)

LCC All Hands Meeting

February 7, 2013

1

Page 2: Longitudinal Coordination of Care (LCC) Workgroup (WG) LCC All Hands Meeting February 7, 2013 1.

Agenda

• ONC S&I Updates• Key Accomplishments of the WG & SWGs• Use Case Working Session• Next Steps

2

Page 3: Longitudinal Coordination of Care (LCC) Workgroup (WG) LCC All Hands Meeting February 7, 2013 1.

ONC S&I Updates

• Developing S&I LCC Support Work plan to support next phase of LCC Initiative

• Engaging with S&I Transitions of Care (ToC) Support team to align and build from ToC artifacts and membership

• Identifying and engaging with additional LCC Stakeholder groups

• Engaged with ONC Office of Policy & Planning (OPP) to review and schedule LCC WG presentation to the HITPC

3

Page 4: Longitudinal Coordination of Care (LCC) Workgroup (WG) LCC All Hands Meeting February 7, 2013 1.

LCC WG Key Accomplishments

• Held two webinars regarding the Meaningful Use (MU) Stage 3 Request for Comments– Reviewed relevant Meaningful Use (MU) Stage 3 sections– Proposed concepts and definitions to reframe the

recommendations– Gathered community feedback to develop a shared response

• Submitted Comments for the Meaningful Use (MU) Stage 3 Request for Comments

• Updated the LCC and SWG Wiki pages– Streamlined content – Meeting Information more visible– PAS SWG is “Completed”

Page 5: Longitudinal Coordination of Care (LCC) Workgroup (WG) LCC All Hands Meeting February 7, 2013 1.

Wiki Re-Design

• http://wiki.siframework.org/Longitudinal+Coordination+of+Care+%28LCC%29

Page 6: Longitudinal Coordination of Care (LCC) Workgroup (WG) LCC All Hands Meeting February 7, 2013 1.

LTPAC SWG Key Accomplishments

• Developing a roadmap for a public and private collaboration– Create and ballot through HL7 Implementation Guides to

support transitions of care and the care plan/home health plan of care.

• Proposed a new CDA template section known as the “MAP” (AKA Master All-care Plan) which maps the many-to-many relations that connect the various elements of the care plan (e.g. Health Concerns, Goals, Interventions, Assessments, and Care Team).

• Reviewed and provided feedback to Lantana to support their work on defining a high-level Implementation Guide for the Transfer of Care dataset.

6

Page 7: Longitudinal Coordination of Care (LCC) Workgroup (WG) LCC All Hands Meeting February 7, 2013 1.

LCP SWG Key Accomplishments

• Led review and consolidation of LCC Community comments on ‘Care Plan Glossary’ and ‘RFC Webinar’

• Supported review and deep dive of ‘care plan components’ of IMPACT dataset

7

Page 8: Longitudinal Coordination of Care (LCC) Workgroup (WG) LCC All Hands Meeting February 7, 2013 1.

PAS SWG Key Accomplishments

• New website regarding transform tool:  www.transform.keyhie.org– Will be updated often as project unfolds

– Currently able to see info on benefits and pricing

– Sign up under “take a test drive” and you will be included in updates on project

• Aggressive launch schedule– Started pilots in mid-January with:

– Presbyterian Senior Living (SNF)

– Sun Home Health (HHA)

– Will bring on Geisinger Beacon facilities in Mar/Apr

– Anticipate full public launch in April

• Jim Younkin’s ONC presentation on project will be posted to wiki

8

Page 9: Longitudinal Coordination of Care (LCC) Workgroup (WG) LCC All Hands Meeting February 7, 2013 1.

Use Case Outline

NEXT STEPS:

• Look at the Problem list – expand or reduce the list

• Take the list and under each heading identify which health concerns are for what team members and which team members are working collaboratively

Team members:

• Hospitalist• Floor nurse• Psych Consultant• Case managerDelivered to:

• PCP

• Community-based care coordinator

• HHA nurse

• CBSO

• Behavior Health professional

9

Page 10: Longitudinal Coordination of Care (LCC) Workgroup (WG) LCC All Hands Meeting February 7, 2013 1.

Use Case Outline

Patient has the following Problems:•Diabetic Ulcer – – non weight-bearing on the foot with the ulcer

– neuropathy

– gait impairment

•Depression – – self-medicating with alcohol

•Substance Abuse Issues– Malnutrition from alcohol abuse

•Lives alone in a 3rd Floor Walkup with Kerosene Heater (no elevator)•Infectious Disease– MRSA

•PPD is positive•Vaccination Status•Visually Impaired - Unable to Drive•Cognitive Status•Smoking / COPD

10

Page 11: Longitudinal Coordination of Care (LCC) Workgroup (WG) LCC All Hands Meeting February 7, 2013 1.

Use Case Outline

Insurer:

•Medicaid/Medicare (dual)

Achieve following Goals:

•Marginal disease management

•Quality of life improvement

•Figure out what the patient really wants – what is important and how the care team can help (i.e., get housing on the first floor)

•Break the cycle of re-admission in ED

•Substance Abuse Intervention

Assumption:

•The Clinical Summary exists and wraps around this Use Case

11

Page 12: Longitudinal Coordination of Care (LCC) Workgroup (WG) LCC All Hands Meeting February 7, 2013 1.

A=ACTIVE Relationship of health concerns to other health concernsB=PRESENT H/M/LC=INACTIVE Health Concern

Health Concern Issue Patient Clinician Delta Inf Dis (+PPD) MRSA + Depres Cog Impaa Diabetes Status Priority Priority …r s t u vb Poor compliance A L H H H Hc Diet A H Hd Medications A H He Follow-up care A H Hf PCP Ag Opthalmology Ah Glycemic control A H Hi HgA1c 11 M Mj Diabetic Foot Ulcer - A M H M Hk non weight-bearing on the foot with the ulcer Hl dressing changes and monitoring H

m Retinopathy A H H Ln Low vision Ao Neuropathyp Gait impairment A M M Mq Chronic pain A H H L Hr Infectious Diseases MRSA colonization of foot ulcer B L L Lt Positive PPD B L L Lu Depression/anxiety - A H H Lv Cognitive Impairment A L H Hw Alcoholism A L H H H Hx COPD A L M My Substance Abuse A L H H Hz Intermittent opiate abuse P L M M

aa Alcoholism A L H Hbb Smoking A L H Hcc Malnutrition A L M M M H Hdd Environment Hee Lack of supports Pff Lack of access to appropriate diet A Hgg Social isolation Phh Lives alone in a 3rd Floor Walkup (no elevator) Pii Unable to drive Pjj Limited mobility A

kk Health Maintenancell Vaccinations I H

mm Cardiovascular risk factors Inn Suicide risk assessment A H

Use Case Map

Page 13: Longitudinal Coordination of Care (LCC) Workgroup (WG) LCC All Hands Meeting February 7, 2013 1.

13

Next Steps

• Finalize S&I LCC WG Support Plan• Update LCC Use Case with new Care Plan component

definitions– Revise functional specifications

• Kick-off IMPACT/ASPE public private partnership for development of ToC and Care Plan/ HHPoC Implementation Guides