Long Term Food Waste Co-Digestion PPP Case Study John Buonocore, PE Rahway Valley Sewerage Authority Chief Engineer/ Assistant Superintendent Christopher Taylor Hawkins Delafield & Wood LLP RVSA Special Counsel
22

Long Term Food Waste Co-Digestion PPP Case Study · Long Term Food Waste Co-Digestion PPP Case Study John Buonocore, PE Rahway Valley Sewerage Authority Chief Engineer/ Assistant

Oct 10, 2019

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Long Term Food Waste Co-Digestion PPP Case Study · Long Term Food Waste Co-Digestion PPP Case Study John Buonocore, PE Rahway Valley Sewerage Authority Chief Engineer/ Assistant

Long Term Food WasteCo-Digestion PPP Case Study

John Buonocore, PERahway Valley Sewerage Authority

Chief Engineer/Assistant Superintendent

Christopher TaylorHawkins Delafield & Wood LLP

RVSA Special Counsel

Page 2: Long Term Food Waste Co-Digestion PPP Case Study · Long Term Food Waste Co-Digestion PPP Case Study John Buonocore, PE Rahway Valley Sewerage Authority Chief Engineer/ Assistant

1 – Introduction to Rahway Valley Sewerage Authority

2 – Background and Genesis of the Project

3 – Highlights From the Agreement and Scope of Work

4 – Legal/Contractual Challenges and Considerations

5 – Current Project Operational Status and Lessons Learned

Presentation Overview

Page 3: Long Term Food Waste Co-Digestion PPP Case Study · Long Term Food Waste Co-Digestion PPP Case Study John Buonocore, PE Rahway Valley Sewerage Authority Chief Engineer/ Assistant

RAHWAY VALLEY SEWERAGE AUTHORITY WASTEWATER

TREATMENT FACILITY

1050 East Hazelwood AvenueRahway, NJ 07065

Average Flow: 25-30 MGDPeak Wet Weather Flow: 105 MGD

Page 4: Long Term Food Waste Co-Digestion PPP Case Study · Long Term Food Waste Co-Digestion PPP Case Study John Buonocore, PE Rahway Valley Sewerage Authority Chief Engineer/ Assistant

11 Member Municipalities and 4 customer municipalities

More than 250,000 residents and 3,500 industrial and commercial customers

Total Service Area = 49 square mile area

Page 5: Long Term Food Waste Co-Digestion PPP Case Study · Long Term Food Waste Co-Digestion PPP Case Study John Buonocore, PE Rahway Valley Sewerage Authority Chief Engineer/ Assistant

• Objective was to lower electricity costs, decrease dependency on the electrical grid, lower carbon footprint, benefit financially and utilize existing infrastructure

• Three existing anaerobic digesters with approximately 30% unused capacity

- Target for food waste to use 20-25%

• Existing cogeneration facility oversized

- Previously produced enough digester gas for 1 engine to run 8hours a day (22% of average daily electrical demand)

- Goal is for one engine to run 24 hours a day on digester gas (66% of demand)

Motivation and Objectives for Co-Digestion of Food Waste

Page 6: Long Term Food Waste Co-Digestion PPP Case Study · Long Term Food Waste Co-Digestion PPP Case Study John Buonocore, PE Rahway Valley Sewerage Authority Chief Engineer/ Assistant

• Allowed for extended contract beyond 5 years

• Guarantee of long term supply and tip rate before committing the finances for a receiving station

• Steady supply of consistent material without a dedicated marketing effort

• Shift siting and technology risk to partner

• Protection against expected market changes in the future

• Partner to help optimize the digester operation and share in the operational risks

Reasons for Moving Forward with aPublic Private Partnership (“PPP”)

Page 7: Long Term Food Waste Co-Digestion PPP Case Study · Long Term Food Waste Co-Digestion PPP Case Study John Buonocore, PE Rahway Valley Sewerage Authority Chief Engineer/ Assistant

• 10 year initial phase, with a possible 10 additional years

• Waste Management designed and built a new receiving and feed in station, financed by the Authority

• Waste Management is responsible for securing the inbound organics to their CORe facility in Elizabeth, NJ and processing the material into a Specified Feedstock Slurry

• Feedstock is trucked to the Authority and stored in the new feed in station

• Authority is responsible for the overall operation of the Feed-In Station and the digesters

Agreement with Waste Management

Page 8: Long Term Food Waste Co-Digestion PPP Case Study · Long Term Food Waste Co-Digestion PPP Case Study John Buonocore, PE Rahway Valley Sewerage Authority Chief Engineer/ Assistant

Allowed for a Specific Feedstock Quality

Page 9: Long Term Food Waste Co-Digestion PPP Case Study · Long Term Food Waste Co-Digestion PPP Case Study John Buonocore, PE Rahway Valley Sewerage Authority Chief Engineer/ Assistant

New Feed Station

Agreement included a design build requirement for a new feed station utilizing an existing gravity thickener

Page 10: Long Term Food Waste Co-Digestion PPP Case Study · Long Term Food Waste Co-Digestion PPP Case Study John Buonocore, PE Rahway Valley Sewerage Authority Chief Engineer/ Assistant

New Feed Station – Scope of Work

1. The interior of the tank required minor structural repair and was coated to protect the concrete from corrosion

2. New jet mixing system included

Page 11: Long Term Food Waste Co-Digestion PPP Case Study · Long Term Food Waste Co-Digestion PPP Case Study John Buonocore, PE Rahway Valley Sewerage Authority Chief Engineer/ Assistant

New Feed Station – Scope of Work (Cont.)

3. A new truck offloading station was included with integrated controls

Page 12: Long Term Food Waste Co-Digestion PPP Case Study · Long Term Food Waste Co-Digestion PPP Case Study John Buonocore, PE Rahway Valley Sewerage Authority Chief Engineer/ Assistant

New Feed Station – Scope of Work (Cont.)

4. New interior piping and pumping system including rebuilding one existing Moyno pump and installing a new peristaltic hose pump.

Page 13: Long Term Food Waste Co-Digestion PPP Case Study · Long Term Food Waste Co-Digestion PPP Case Study John Buonocore, PE Rahway Valley Sewerage Authority Chief Engineer/ Assistant

Legal and ContractualChallenges and Considerations

Page 14: Long Term Food Waste Co-Digestion PPP Case Study · Long Term Food Waste Co-Digestion PPP Case Study John Buonocore, PE Rahway Valley Sewerage Authority Chief Engineer/ Assistant

Performance Guarantees Built into the Agreement

Guaranteed design-build price and schedule

Minimum delivery commitment at guaranteed price

Maximum solids production based on percent increase over

historical trend

Odor guarantee

On-going optimization /coordination between parties

Page 15: Long Term Food Waste Co-Digestion PPP Case Study · Long Term Food Waste Co-Digestion PPP Case Study John Buonocore, PE Rahway Valley Sewerage Authority Chief Engineer/ Assistant

Key Protections for Both Parties

Only “Specified Feedstock” can be delivered

Four-Year ramp up period

Authority right to suspend deliveries

Specified performance guarantees / damages

Termination rights / “off-ramps”

Design build delivery

Page 16: Long Term Food Waste Co-Digestion PPP Case Study · Long Term Food Waste Co-Digestion PPP Case Study John Buonocore, PE Rahway Valley Sewerage Authority Chief Engineer/ Assistant

Miscellaneous Challenges During Negotiations

Authorities right for a convenience termination

Design-build pricing and working with EIT funding

Maintenance requirements and responsibilities

Third party waste suppliers

Sharing of Renewable Energy Certificate revenues

Page 17: Long Term Food Waste Co-Digestion PPP Case Study · Long Term Food Waste Co-Digestion PPP Case Study John Buonocore, PE Rahway Valley Sewerage Authority Chief Engineer/ Assistant

Security for Performance

Parent Company Guarantee

Performance Bonds

Letter of Credit

Page 18: Long Term Food Waste Co-Digestion PPP Case Study · Long Term Food Waste Co-Digestion PPP Case Study John Buonocore, PE Rahway Valley Sewerage Authority Chief Engineer/ Assistant

Current Project Operation Statusand Lessons Learned

Page 19: Long Term Food Waste Co-Digestion PPP Case Study · Long Term Food Waste Co-Digestion PPP Case Study John Buonocore, PE Rahway Valley Sewerage Authority Chief Engineer/ Assistant

Current Contract Status

Fully executed as of January 20, 2017

Completed commissioning of the Feed in Station in April of 2018

Began receiving Feedstock in May of 2018 at a rate of ~5,000

gallons per day

Commercial Operations Date occurred on August 1, 2018 at a

rate of ~7,000 gallons per day

Currently in Contract Year 2 with a delivery guarantee of ~14,000

gallons per day

Page 20: Long Term Food Waste Co-Digestion PPP Case Study · Long Term Food Waste Co-Digestion PPP Case Study John Buonocore, PE Rahway Valley Sewerage Authority Chief Engineer/ Assistant

Current Operational Status

Digester operation has acclimated to the new Feedstock

Initial clogging issues have been elevated through process

SOP changes.

Initial gas measurements indicate a significant increase in

digester gas production

Page 21: Long Term Food Waste Co-Digestion PPP Case Study · Long Term Food Waste Co-Digestion PPP Case Study John Buonocore, PE Rahway Valley Sewerage Authority Chief Engineer/ Assistant

Lessons Learned

Best to pump Feedstock at 5 – 12 % Solids

Continuous pumping is preferred over batch pumping

Important to flush lines when shutting down for even a

short period

Preferable to have a dedicated separate feed line to

transport the Feedstock to the digester

Separate odor control system for Feedstock handling would

be beneficial

Page 22: Long Term Food Waste Co-Digestion PPP Case Study · Long Term Food Waste Co-Digestion PPP Case Study John Buonocore, PE Rahway Valley Sewerage Authority Chief Engineer/ Assistant

Questions / Contact Information

John Buonocore, PERahway Valley Sewerage Authority

Rahway, N.J. 07065(732) 388-0868

[email protected]

Christopher TaylorHawkins Delafield & Wood LLP

New York, N.Y. 10007(212) 820-9395