A PRACTICAL TRAINING SEMINAR ON MANUFACTURING PROCESS OF 500 MW STATOR BAR AT BHARAT HEAVY ELECTRICALS LIMITED, HARIDWAR SUBMITTED TO SUBMITTED BY SHRI S C MITTAL LOKESH KHATRI SHRI M K LALVANI ELECTRICAL ENGG. UNIVERSITY COLLEGE OF ENGINEERING ,KOTA(RAJASTHAN )
Training from BHEL, Haridwar Training expoasure in Manufacturing of 500MW stator busbar
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
A PRACTICAL TRAINING
SEMINAR ONMANUFACTURING PROCESS
OF500 MW STATOR BAR
ATBHARAT HEAVY
ELECTRICALS LIMITED,HARIDWAR
SUBMITTED TO SUBMITTED BY SHRI S C MITTAL LOKESH KHATRISHRI M K LALVANI ELECTRICAL ENGG. UNIVERSITY COLLEGE OF ENGINEERING ,KOTA(RAJASTHAN)
Table of contents About the organization B.H.E.L Haridwar: A Glance Over view of 500 MW stator bar Manufacturing process of 500 MW Stator Bar
About the organization : BHARAT HEAVY ELECTRICALS LIMITED ,HARIDWAR
KEY FEATURES OF BHEL :FEATURES DESCRIPTIONINDUSTRY 1. HEAVY ELECTRICAL EQUIPMENT PLANT
2. POWER GENERATION
ESTABLISHED IN 1964
HEADQUARTER NEW DELHI,INDIA
AWARDS & RANK 1. LARGEST PSU WITH ‘MAHARATNA STATUS’2. 4TH RANK IN FORBES 50 LIST3. QUALITY ,SAFETY, ENVIORMENTAL MANAGEMENT COMPANY
TOTAL TURNOVER 9.07 billion $
PRODUCTS TURBINES, BOILERS, GENERATORS, SENSORS, DRIVES, CIRCUITBREAKERS, SWITCHGEARS, MOTOR etc.
BHEL MISSION,VISION & VALUES :
TYPE DESCRIPTION
DIVISIONS 15 MANUFACTURING, 2 REPAIR, 8 REGIONAL, 8 SERVICE CENTERS
CAPACITY 59% IN INDIA’S TOTAL INSTALLED GENERATING CAPACITY
EMPLOYMENT 49,280
EXPORTS TO ABOUT 21 COUNTRIES
LOCATION SHOWING THE PLANTS OF B.H.E.L OVER INDIA :
HEADQUARTER
MANUFACTURING UNITS
CHECK & REPAIRING UNIT
NEW DELHI
KOLKATA
VARANASI
GOINDWAL
HARIDWARRUDRAPUR
JAGDISHPURJHANSI
BHOPAL
HYDERABAD
BANGALORERANIPET
TIRUCHIRAPALLY
CHENNAI
B.H.E.L HARIDWAR : A GLANCE : BHEL Hardwar divided into 8 blocks. these blocks are.
MANUFACTURING OF 500 MW STATOR BAR : Why we call it bar?It is difficult to wind a large capacity generator with a specific gauge of Cu conductor or a wire. In large capacity generators we use bunch of Cu conductors is used after pass through a process. Those Cu strips called as bar. Bar may be 210MW,500MW,600MW etc.
STATOR BARS
Overview of manufacturing process :
INSULATION CHECK
CONDUCTOR CUTTING TRANSPOSITION STACK
PRESSING
INTER STRAND
SHORT TEST
FORMINGPICKLING PROCESS
BRAZING
WATERTEST
NITROGENTEST
INTERNAL PICKELING
BARSCOPIC TEST
THERMAL TEST
HELIUM LEKAGE TESTINSULATIONIMPREGNATI
ON & BAKING
FINISHING WARNISH & COATING
Insulation check : Insulated Cu conductors are used: (1) Solid Cu conductor (2) Hollow Cu conductor
Conductor cutting : It is done by C.N.C MACHINE. LOWER BAR :
UPPER BAR
CONDUCTOR SIZE LENGTH NO. OF CONDUCTORS
8*4.6*1.5mm hollow 10200 mm Hollow-20
8*2.8mm solid 10200 mm Solid-20
CONDUCTOR SIZE Length NO. OF CONDUCTORS
8*4.6*1.5mm(Hollow) 10500mm Hollow – 20
8*1.3mm(Solid) 10500mm Solid- 40
Transposition 1). To reduce eddy current in bar. 2). Done manually
Stack pressing : This is done for hollow & solid conductors to make a one unit.
Inter strand short test : (1) To check the short circuit between conductors. (2) No current flow between the conductors.
Forming : 1). Done on Universal forming Machine. 2). A bend is given to the bar, both side . 3). Bend use for terminal connections.
FORMING FIG.
Pickling process : BASIC SOLUTION FOR PICKELING PROCESS 1). For cleaning job (oily, dirty and dusty job) and for remove acidic properties.2).Solution is heat upto 50˚ C.3). Then our job is dipped in pickling solution for 15 minutes.
SOLUTION NAME PERCENTAGE(%)
SULPHURIC ACID 10%
PHOSPHORIC ACID 5%
HYDROGEN PEROXIDE
5%
Brazing : 1). Brazing is basically the process of fixation of both the contact sleeve and water box bottom part to bar.2).It is done by Induction machine.
Water test : 1). To check any blockage and vent in the bar. 2). Also check the flow of water in the bar.
Nitrogen test : 1). To check any puncture in the bar. 2). If there is any puncture air bubble give us exact location of puncture.
Internal pickling : 1). Done for cleaning of hollow conductors.
Thermal shock test : (1) To check the bar at extreme condition. (2) Process repeated at 26 times.(3) 26 hot water & 26 cold water cycle.
Thermal shock fig.
Helium leakage test : (1)Test is done in front of customer (2) By passing the helium inside the bar. (3). It pass at presssure of 11kg/cmsq.
Insulation : (1) To prevent short circuit, insulation is done. (2) MICALASTIC is used as insulating tape