Top Banner
LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA‐ PAKEJ 1: NETWORK (REKA BINA) NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11 Laporan Fotograf Bulanan No.34 (sehingga 25/9/2018) 1| FOTOGRAF LOKASI : SECTION A & SECTION C FOTOGRAF 1: ZON 1 – MB 10‐12 (21/9/18) Aktiviti: Pembinaan Lurang FOTOGRAF 2: ZON 2 – NPS 1 (17/9/18) Aktiviti: Pemasangan Paip Forcemain kaedah ‘Open Cut’ (1300 mm DN)
10

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP ...papan1.com/upload/gallery/2018/LFB-34.pdf · loji rawatan kumbahan serantau dan rangkaian paip pembetungan di papan, daerah kinta‐

Mar 10, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP ...papan1.com/upload/gallery/2018/LFB-34.pdf · loji rawatan kumbahan serantau dan rangkaian paip pembetungan di papan, daerah kinta‐

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN  DI PAPAN, DAERAH KINTA‐ PAKEJ 1: NETWORK (REKA BINA) 

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11  

Laporan Fotograf Bulanan No.34 (sehingga 25/9/2018) 

1 | F O T O G R A F   

 LOKASI : SECTION A & SECTION C 

 

  

FOTOGRAF 1: ZON 1 – MB 10‐12 (21/9/18) Aktiviti: Pembinaan Lurang 

 

  

FOTOGRAF 2: ZON 2 – NPS 1 (17/9/18) Aktiviti: Pemasangan Paip Forcemain kaedah ‘Open Cut’ (1300 mm DN) 

Page 2: LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP ...papan1.com/upload/gallery/2018/LFB-34.pdf · loji rawatan kumbahan serantau dan rangkaian paip pembetungan di papan, daerah kinta‐

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN  DI PAPAN, DAERAH KINTA‐ PAKEJ 1: NETWORK (REKA BINA) 

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11  

Laporan Fotograf Bulanan No.34 (sehingga 25/9/2018) 

2 | F O T O G R A F   

 

LOKASI : SECTION B 

 

  

FOTOGRAF 3: ZON 2 – JPS Jacking Pit (2/9/18) Activity:  Kerja‐kerja ‘Pipe Jacking’ sedang dijalankan dari Jacking Pit JPS ke Receiving Pit JPS. (1300 mm Dia.) 

  

Page 3: LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP ...papan1.com/upload/gallery/2018/LFB-34.pdf · loji rawatan kumbahan serantau dan rangkaian paip pembetungan di papan, daerah kinta‐

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN  DI PAPAN, DAERAH KINTA‐ PAKEJ 1: NETWORK (REKA BINA) 

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11  

Laporan Fotograf Bulanan No.34 (sehingga 25/9/2018) 

3 | F O T O G R A F   

 

LOKASI : SECTION B 

  

FOTOGRAF 4: ZON 2 – KTM Jacking Pit (24/9/18) Activity:  Kerja‐kerja ‘Pipe Jacking’ sedang disiap‐sediakan. (1300 mm Dia.) 

        

 

  

 

Page 4: LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP ...papan1.com/upload/gallery/2018/LFB-34.pdf · loji rawatan kumbahan serantau dan rangkaian paip pembetungan di papan, daerah kinta‐

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN  DI PAPAN, DAERAH KINTA‐ PAKEJ 1: NETWORK (REKA BINA) 

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11  

Laporan Fotograf Bulanan No.34 (sehingga 25/9/2018) 

4 | F O T O G R A F   

 

LOKASI : SECTION C 

 

  

FOTOGRAF 5: ZON 2 – NPS 1 (18/9/18) Aktiviti: Kerja‐kerja sivil dan struktur 

 

  

FOTOGRAF 6: ZON 3A – NPS 4 (22/9/18) Aktiviti: Pemasangan Paip Forcemain kaedah ‘Open Cut’ (400 mm DN) 

Page 5: LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP ...papan1.com/upload/gallery/2018/LFB-34.pdf · loji rawatan kumbahan serantau dan rangkaian paip pembetungan di papan, daerah kinta‐

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN  DI PAPAN, DAERAH KINTA‐ PAKEJ 1: NETWORK (REKA BINA) 

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11  

Laporan Fotograf Bulanan No.34 (sehingga 25/9/2018) 

5 | F O T O G R A F   

 

LOKASI : SECTION C 

 

 FOTOGRAF 7: ZON 3A – MB 6‐24B1 Jacking Pit (2/9/18) 

Activity:  Kerja‐kerja ‘Pipe Jacking’ sedang dijalankan dari MB 6‐24B1 ke MB 6‐24. (900 mm Dia.)   

Page 6: LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP ...papan1.com/upload/gallery/2018/LFB-34.pdf · loji rawatan kumbahan serantau dan rangkaian paip pembetungan di papan, daerah kinta‐

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN  DI PAPAN, DAERAH KINTA‐ PAKEJ 1: NETWORK (REKA BINA) 

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11  

Laporan Fotograf Bulanan No.34 (sehingga 25/9/2018) 

6 | F O T O G R A F   

 

LOKASI : SECTION C 

 

  

FOTOGRAF 8: ZON 3B – NPS 7 (25/9/18) Aktiviti: Kerja‐kerja sivil dan struktur 

 

 FOTOGRAF 9: ZON 3B – NPS 8 (17/9/18) Aktiviti: Kerja‐kerja sivil dan struktur 

Page 7: LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP ...papan1.com/upload/gallery/2018/LFB-34.pdf · loji rawatan kumbahan serantau dan rangkaian paip pembetungan di papan, daerah kinta‐

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN  DI PAPAN, DAERAH KINTA‐ PAKEJ 1: NETWORK (REKA BINA) 

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11  

Laporan Fotograf Bulanan No.34 (sehingga 25/9/2018) 

7 | F O T O G R A F   

 

LOKASI : SECTION C 

 

  

FOTOGRAF 10: ZON 3C – MB 1‐47 (5/9/18) Aktiviti:  Pembinaan Lubang. 

 

 FOTOGRAF 11: ZON 3B – MB 1‐48 (5/9/18) 

Aktiviti: Pembinaan Lubang. 

Page 8: LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP ...papan1.com/upload/gallery/2018/LFB-34.pdf · loji rawatan kumbahan serantau dan rangkaian paip pembetungan di papan, daerah kinta‐

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN  DI PAPAN, DAERAH KINTA‐ PAKEJ 1: NETWORK (REKA BINA) 

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11  

Laporan Fotograf Bulanan No.34 (sehingga 25/9/2018) 

8 | F O T O G R A F   

 

LOKASI : SECTION C 

 

  

FOTOGRAF 12: ZON 3C – NPS 9 (12/9/18) Aktiviti: Kerja‐kerja sivil dan struktur 

Page 9: LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP ...papan1.com/upload/gallery/2018/LFB-34.pdf · loji rawatan kumbahan serantau dan rangkaian paip pembetungan di papan, daerah kinta‐

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN  DI PAPAN, DAERAH KINTA‐ PAKEJ 1: NETWORK (REKA BINA) 

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11  

Laporan Fotograf Bulanan No.34 (sehingga 25/9/2018) 

9 | F O T O G R A F   

 

LOKASI : SECTION C 

 

  

FOTOGRAF 13: ZON 3C – MB 4‐23/1 Jacking Pit (21/9/18) Activity:  Kerja‐kerja ‘Pipe Jacking’ sedang dijalankan dari MB 4‐23/1 ke MB 4‐24. (750 mm Dia.) 

  

 

 

 

 

 

 

 

 

 

 

 

 

Page 10: LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP ...papan1.com/upload/gallery/2018/LFB-34.pdf · loji rawatan kumbahan serantau dan rangkaian paip pembetungan di papan, daerah kinta‐

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN  DI PAPAN, DAERAH KINTA‐ PAKEJ 1: NETWORK (REKA BINA) 

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11  

Laporan Fotograf Bulanan No.34 (sehingga 25/9/2018) 

10 | F O T O G R A F   

 

LOKASI : SECTION C 

 

  

FOTOGRAF 14: ZON 3D – MB 7‐23/1 (21/9/18) Aktiviti: Pembinaan Lubang 

 

  

FOTOGRAF 15: ZON 3D – MB 7‐23/2 (20/9/18) Aktiviti: Pembinaan Lubang