LOI – Next Steps? John Thomason
Jan 02, 2016
LOI – Next Steps?
John Thomason
ISIS Schedule
All still provisional!
Possible Workplan
Contractors lay in cables ready for break-out box in outer synchrotron
ISIS staff will be busy with routine maintenance work during this short shutdown period
ISIS staff to cable SP8 bias regulator to LOI cavity in R5.4 plus other preparatory work for January
Experiments in R5.4 to showfull operation of system with integration of ISIS LPRF, cure for oscillations in IA,
etc.
ISIS staff complete break-out box in synchrotronand prepare LOI HPD and water manifold for move to synchrotron SP6
May/June 2008