Page 1: Logistics Solutions for the Warfighter Electronic Data Interchange (EDI) EDI Project –Task –Status –Concerns/Issue –Questions.

Logistics Solutions for the Warfighter

Electronic Data Interchange (EDI)

• EDI Project– Task– Status– Concerns/Issue– Questions

Page 2: Logistics Solutions for the Warfighter Electronic Data Interchange (EDI) EDI Project –Task –Status –Concerns/Issue –Questions.

Logistics Solutions for the Warfighter

TASK(EDI)

• Phase I– Contract Supported– Priority Group I

• 527D - Receipt/Due Verification• 527R – Receipt• 856 – Advance Shipment Notice• 856S – Shipment Status• 861 – Acceptance Status

– 112 Mils transaction to 5 EDI – Expected Completion May 31 2008

Page 3: Logistics Solutions for the Warfighter Electronic Data Interchange (EDI) EDI Project –Task –Status –Concerns/Issue –Questions.

Logistics Solutions for the Warfighter

TASK (Cont)EDI

• Phase II – IV – to be determined

Page 4: Logistics Solutions for the Warfighter Electronic Data Interchange (EDI) EDI Project –Task –Status –Concerns/Issue –Questions.

Logistics Solutions for the Warfighter

STATUS(EDI)

• Status– Coding

• 3 of 5 sets completed

• 2 of 5 set remain at 66% coded

– Testing• Inbound

– No connectivity to Defense Automated Addressing Service Centers (DAASC)

– Testing via File Transfer Site with limited input set

• Outbound– Sent test data to DAASC

– Correcting errors from original transmission

Page 5: Logistics Solutions for the Warfighter Electronic Data Interchange (EDI) EDI Project –Task –Status –Concerns/Issue –Questions.

Logistics Solutions for the Warfighter

Concerns/Issues(EDI)

• Application Security Plan– Gaining Authority to Operate/Connect (ATO/ATC)

– Awaiting signature from Marine Corps Network Operating Service Center Information Assurance (MCNOSC IA)

• Performance Based Agreement (PBA)– Obtaining signature from LOGCOM

– Being staffed through LOGCOM

• Testing– Ability to perform end-to-end via approved connectivity

Page 6: Logistics Solutions for the Warfighter Electronic Data Interchange (EDI) EDI Project –Task –Status –Concerns/Issue –Questions.

Logistics Solutions for the Warfighter

Questions(EDI)

• Questions