Top Banner
[Logistics Information System] Shipment Report 2-1. Shipment Report 2-1-1. SHIPMENT REPORT _ 1 st phase of screen SYSTEM 2-1-2. DAILY SHIPMENT REPORT _ 2 nd phase of screen SYSTEM As same as the process of OSS, Daily shipment report can be shown by clicking a blue letter on specific date and the format is as below.
4

Logistics Analysis System

Apr 11, 2017

Download

Documents

Michael Park
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Logistics Analysis System

[Logistics Information System] Shipment Report

2-1. Shipment Report 2-1-1. SHIPMENT REPORT _ 1st phase of screen SYSTEM

2-1-2. DAILY SHIPMENT REPORT _ 2nd phase of screen SYSTEM As same as the process of OSS, Daily shipment report can be shown by clicking a blue letter on specific date and the format is as below.

Page 2: Logistics Analysis System

2-1-3. SHIPMENT DETAILS _ 3rd phase of screen SYSTEM _ Data Input The final shipment details is Packing List which can be a base data for SHIPMENT REPORT updated by FFBCN LO. The first summary table can be the base data for the 1st phase screen as SHIPMENT REPORT and the 2nd phase screen as DAILY SHIPMET REPORT with using the key index as Container/AWS No. SEA SHIPMENT SAMPLE

AIR SHIPMENT SAMPLE

Page 3: Logistics Analysis System

2-2. Shipment Expense Report 2-2-1. SHIPMENT EXPENSE REPORT _ 1st phase of screen Shipment expense needed to be summarised with the whole process of shipping flow including China local handling cost, freight cost and destination handling cost by updating 2 invoices from the forwarder in China and the forwarder in destination country. The user can summarise the details with using analysis period function. SYSTEM

Page 4: Logistics Analysis System

2-2-2. Data Input Format _SHIPMENT INVOICE Retail Support will upload the value of shipment invoice as below format.

PROPOSED SYSTEM _ Data Input