TALKING ABOUT THE STREET CONCRETE PAVERS BREAKING THE CONTINUITY OF THE ABOVE PATTERN FOOTPATH- 1.5M WIDE PAVED WITH CONCRETE TILES GREEN BELT- 1.5M WIDE MAINTENANCE- A BIG ISSUE SECTION AA’ TRAFFIC FLOW- 25 CARS/MIN GENERALLY, THERE WERE RESIDENCE ON BOTH SIDES OF THE STREET- G+2(55%), G+1(40%); HARDLY 5% WAS COMMERCIAL. A LUSH GREEN COVER ON BOTH THE SIDES OF FOOTPATH GAVE A VERY PLEASING FEEL WHILE WALKING. WHILE, APPROACHING LODHI GARDEN WE FOUND THE WALKWAYS IN PATHETIC CONDITION BUT ANYWAY, WE WERE MOVED BY THE TEMPTING GREENERY OF THAT AREA. FREE NDMC PARKING- LODHI GARDEN CAPACITY- 60 CARS, 20 TWO- WHEELERS 900MM HIGH COMPOUND WALL IN RANDOM RUBBLE STONE MASONRY CONCRETE PAVERS RASHIKA DHIILON RISHABH KAKKAR SUMEDHA GUPTA SWATI BABBER PROJECT :-STUDY OF DISTRICT SAFDARJUNG TOMB , LODHI GARDEN , NIZAMMUDIN , HUMAYUN’S TOMB SHEET NO TOPIC
5

Lodi Road- Street Analysis(4.9.15)

Dec 11, 2015

Download

Documents

rashi1717

lodhi road
characterstics
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Lodi Road- Street Analysis(4.9.15)

TALKING ABOUT THE STREET

CONCRETE PAVERS BREAKING THE CONTINUITY OF THE ABOVE PATTERN

FOOTPATH- 1.5M WIDEPAVED WITH CONCRETE TILES

GREEN BELT- 1.5M WIDE

MAINTENANCE- A BIG ISSUE

SECTION AA’

• TRAFFIC FLOW- 25 CARS/MIN• GENERALLY, THERE WERE

RESIDENCE ON BOTH SIDES OF THE STREET- G+2(55%), G+1(40%); HARDLY 5% WAS COMMERCIAL.

• A LUSH GREEN COVER ON BOTH THE SIDES OF FOOTPATH GAVE A VERY PLEASING FEEL WHILE WALKING.

• WHILE, APPROACHING LODHI GARDEN WE FOUND THE WALKWAYS IN PATHETIC CONDITION BUT ANYWAY, WE WERE MOVED BY THE TEMPTING GREENERY OF THAT AREA.

FREE NDMC PARKING- LODHI GARDENCAPACITY- 60 CARS, 20 TWO-WHEELERS

900MM HIGH COMPOUND WALL IN RANDOM RUBBLE STONE MASONRY

CONCRETE PAVERS

RASHIKA DHIILONRISHABH KAKKARSUMEDHA GUPTASWATI BABBER

PROJECT :-STUDY OF DISTRICTSAFDARJUNG TOMB , LODHI GARDEN , NIZAMMUDIN , HUMAYUN’S TOMB

SHEET NOTOPIC

Page 2: Lodi Road- Street Analysis(4.9.15)

TALKING ABOUT THE STREET

SECTION BB’

• TRAFFIC FLOW- 38 CARS/MIN• MIXED LAND USE IS OBSERVED IN THIS

AREA. • OVER ONE SIDE OF THE STREET WERE

RESIDENCE(ONLY G TYPE), EACH MAINTAINING A PROPER SETBACK OF 15M AND ON THE OTHER SIDE WERE ALL VARYING FROM G+3 TO G+7.

THIS IS A PLACE WERE WE OBSERVE A HUGE CHANGE IN SCALE OF THE BUILDINGS ON THE EITHER SIDES OF THE ROAD.• PAVEMENT IN THIS AREA WAS MAINTAINED

THROUGHOUT. • BUT THERE WAS A PROBLEM WITH

VISIBILITY OF SIGNAGE CONCERN THIS AREA.

SIGNAGE- 3.5M AWAY FROM THE ROAD MAKING IT DIFFICULT TO READ FOR THE PERSON TRAVELLING BY

SIGNAGE HINDERED BY TREES

RASHIKA DHIILONRISHABH KAKKARSUMEDHA GUPTASWATI BABBER

SHEET NOTOPICPROJECT :-STUDY OF DISTRICTSAFDARJUNG TOMB , LODHI GARDEN , NIZAMMUDIN , HUMAYUN’S TOMB

Page 3: Lodi Road- Street Analysis(4.9.15)

STREET LANDSCAPING

PEEPAL TREE ALONG THE EDGES OF THE STREETS

ESCALLONIA HEDGE PLANTS ARE WIDELY USED

COMMONLY FOUND TREES-• NEEM (AZADIRACHTA INDICA)• PEEPAL (FICUS RELIGIOSA)• VILAYATI KEEKAR (PROSOPIS JULIFLORA)

• COMMONLY FOUND HEDGE PLANTS-• GOLDEN DURANTA• VARIEGATED DURANTA• ESCALLONIA

GOLDEN DURANTA

NEEM TREE PLANTED IN MEDIAN VARIEGATED DURANTA

MEDIAN ALSO SERVES AS GREEN BELT

RASHIKA DHIILONRISHABH KAKKARSUMEDHA GUPTASWATI BABBER

SHEET NOTOPICPROJECT :-STUDY OF DISTRICTSAFDARJUNG TOMB , LODHI GARDEN , NIZAMMUDIN , HUMAYUN’S TOMB

Page 4: Lodi Road- Street Analysis(4.9.15)

• ALL SIGNAGE ARE MADE FROM STAINLESS STEEL.• A SMART USE OF COLOUR SCHEMES HAS BEEN

USED IN DESIGNING THE SIGNAGE.• SINCE, WARM COLOURS HAVE A LONGER

WAVELENGTH, THIS SCHEME HAS BEEN ADOPTED IN DESIGNING SIGNAGE THAT EVERYBODY PASSING BY MUST READ.

• SINCE, GREEN IS THE MOST SOOTHING COLOUR TO THE EYE, THE NEXT IMPORTANT FACTOR…THE ROAD NAME HAS BEEN DONE IN GREEN.

• NEXT COMES THE LANDMARK…THE NAMES OF THE LANDMARKS HAVE BEEN DONE IN BLUE.

• ALSO THE TEXT SIZE OF THE SIGNAGE VARY ACCORDING TO THE ABOVE MENTIONED HIERARCHY.

• LANGUAGE – MOSTLY ENGLISH, HINDI(BEING UNIVERSAL LANGUAGES), URDU(REGIONAL LANGUAGE)

SIGNAGE

RASHIKA DHIILONRISHABH KAKKARSUMEDHA GUPTASWATI BABBER

SHEET NOTOPICPROJECT :-STUDY OF DISTRICTSAFDARJUNG TOMB , LODHI GARDEN , NIZAMMUDIN , HUMAYUN’S TOMB

Page 5: Lodi Road- Street Analysis(4.9.15)

THE ONLY DUSTBIN ON THE STRETCH WAS AT LODHI GARDEN BUS STOP.

APART FROM SIGNAGE, STREETLIGHTS, ELECTRIC BOXES WERE THERE IN THE STREET

STREET FURNITURE

• THE STREETLIGHTS ALONG THE MEDIAN WERE ROUGHLY PLACED 18M C/C.(GENERALLY VARIED FROM 14M TO 21M)

• LIGHTING FIXTURES- SODIUM LIGHTS (EMITS YELLOW LIGHT)

• PARTIALLY OPENING FENCING ALONG THE EDGES ALLOWING PEOPLE TO SEE THROUGH.

• MATERIALS- STONE RUBBLE MASONRY COMPOUND WALL (600 MM HIGH) WITH MILD STEEL RAILING

RASHIKA DHIILONRISHABH KAKKARSUMEDHA GUPTASWATI BABBER

SHEET NOTOPICPROJECT :-STUDY OF DISTRICTSAFDARJUNG TOMB , LODHI GARDEN , NIZAMMUDIN , HUMAYUN’S TOMB