Local Roads Improvement Program Summary Report Department of Transportation Investment Management Bureau of Transit, Local Roads, Railroads and Harbors State Fiscal Years 2016-2017
306

Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

May 09, 2018

Download

Documents

vuongcong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

Local Roads Improvement Program

Summary Report

Department of Transportation Investment Management

Bureau of Transit, Local Roads, Railroads and Harbors

State Fiscal Years 2016-2017

Page 2: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

Table of Contents

A MESSAGE FROM THE PROGRAM STAFF ............................................................................ 1

LOCAL ROADS IMPROVEMENT PROGRAM OVERVIEW ............................................................ 3

Entitlement Component Biennial Funding Level ............................................................. 3

Discretionary Component Biennial Funding Level .......................................................... 4

2016-2017 PROGRAM SUMMARY ....................................................................................... 5

Figure 1 – Entitlement Component Funding Distribution ................................................. 5

Figure 2 – Discretionary Component Funding Distribution .............................................. 6

Figure 3 – Number of Projects by Program Component ................................................. 7

Statewide Totals by Component ..................................................................................... 8

Other Funding Outlays ................................................................................................... 8

Statewide Averages by Component and Total Project Cost ............................................ 9

Statewide Number of Projects and Average Project Cost by Type .................................. 9

DISCRETIONARY PROGRAMS’ SUMMARY ............................................................................ 10

FUNDING SUNSET POLICY ................................................................................................ 12

Statewide Program Funds Due to Sunset by Component ..............................................13

LOCAL ROADS IMPROVEMENT PROGRAM WEB SYSTEM ...................................................... 13

CONTACT INFORMATION ................................................................................................... 13

INTERNET LINKS .............................................................................................................. 14

REPORTS ........................................................................................................................ 14

PROJECT SUMMARY REPORT BY COUNTY AND PROJECT TYPE COUNTY ADMINISTRATIVE COSTS FOR FY 2016 AND FY 2017 HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT LRIP PROJECT REPORT - BY COUNTY TRID PROJECT REPORT MSID PROJECT REPORT CHID PROJECT REPORT BY WCHA DISTRICT

Page 3: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

1

A MESSAGE FROM THE PROGRAM STAFF

Since 1991, the Wisconsin Department of Transportation (WisDOT) has provided a total of $534.2 million in financial assistance to local governments through the Local Roads Improvement Program (LRIP) as detailed in the attached, History of LRIP Projects by County and Component. A report is published every two years in accordance with Administrative Rule Trans 206 to summarize the projects funded by the program. We are pleased to provide this 13th biennial report for fiscal years 2016 and 2017. This document is distributed electronically and accessible exclusively online on the LRIP Homepage (http://wisconsindot.gov/Pages/doing-bus/local-gov/astnce-pgms/highway/lrip.aspx).

The state biennial budget provided annual appropriations for entitlement program funds of $16.2 million in fiscal year 2016 and $16.2 million in fiscal year 2017 for a total of $32.4 million. Discretionary program funds were approved through a separate appropriation with $11.8 million in fiscal year 2016 and $11.8 million in fiscal year 2017 for a total of $23.6 million. Of this number, $5 million annually was expressly allocated for Town Road Discretionary (TRID) projects.

Through an administrative agreement with the Wisconsin Department of Natural Resources (DNR), the state biennial budget allocated $200,800 in fiscal year 2016 and $200,800 in fiscal year 2017 for a total of $401,600 to the DNR to fund a total of 3.0 FTE positions. These resources are targeted at providing a DNR single point of contact to local governments to help ensure local public transportation projects are built with environmental integrity. While many of these projects are 100 percent locally funded, both agencies acknowledge the collective value of providing this resource.

With the addition of uncommitted entitlement and discretionary funds from previous biennia, the 2016-2017 program cycle administered a total of $58.1 million on 854 projects and associated administrative costs. Individual allocations to each component are identified in Tables 1 and 2 on pages 3 and 4 of this document.

The narrative at the beginning of this report identifies local road improvements funded with program dollars and provides an overview of administrative activities associated with the program. The report identifies: funding levels, the number of approved projects for each program component, the distribution of funds, the number of projects by improvement type, statewide average of program funds, and average cost by improvement type. It also provides the status of projects affected by the sunset of funds that will occur on June 30, 2017. The balance of the report consists of a program history by county and component, a county by county listing of individual projects with details of the improvement types, as well as costs and funding levels associated with each project. Please note that the information in this report is current as of May 24, 2017. Not all projects and program activity from the 2016-2017 biennium (referred to as the 2016-2017 LRIP program cycle) have been completed as of May 24, 2017. Therefore, project listings in this report may not agree with changes that occur after this date.

The program provides funds to local governments for road improvements that may not be eligible for any other road improvement funding or cannot successfully compete for other state or federal funds. As a reimbursement program, LRIP leverages matching state and local dollars to fund high priority county highway, municipal street, and town road projects. The continuing demand for program funds demonstrates the ongoing, significant needs on the local road system. It also demonstrates the ability of local communities to leverage program funding to complete larger improvements. The popularity of the program among local governments and the positive feedback it consistently receives are major indicators of its continuing success.

Page 4: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

2

WisDOT extends its thanks to the county highway commissioners and their staff who serve as program administrators in each county, as well as to the organizations representing the program applicants – the Wisconsin Towns Association, Wisconsin Counties Association, Wisconsin County Highway Association, and the League of Wisconsin Municipalities. These individuals and organizations are fundamental to the effective management of the program, and their cooperation and support are critical to its ongoing success.

Page 5: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

3

LOCAL ROADS IMPROVEMENT PROGRAM OVERVIEW LRIP was established to provide state funds to assist local units of government in improving what statutes describe as seriously deteriorating town roads, municipal streets in cities and villages, and county highways. Funds are provided through reimbursements for improvement projects, up to a maximum of 50 percent of the total project cost. The program consists of three general components: one for towns (TRI), one for cities and villages (MSI), and one for counties (CHI). The entitlement component for MSI is further divided by size, one for communities with a population of 20,000 or more and another for communities with a population less than 20,000. Within the three general components, there are entitlement funds and discretionary funds. Table 1 shows the percentage distribution of $32.2 million in entitlement components for towns, villages, cities and counties based on centerline mileage, or a combination of mileage and population after removing $401,600 for funding for 3.0 FTE single point of contact DNR positions:

Table 1 Entitlement Component Biennial Funding Level

$32.2 million*

(Carryover Included)

Program Criteria % of Total Biennial Entitlement Funds

Basis for Allocations

Selection Process

Town Road Improvement Program (TRI)

Town Road 28.5% 100% centerline mileage

County Town Road Improvement Committee

Municipal Street Improvement Program (MSILT)

Municipal Street Cities and Villages

- populations of less than 20,000

13.3% 50% population 50% centerline

mileage

County Municipal Street Improvement Committee

Municipal Street Improvement Program (MSIGT)

Municipal Street Cities and Villages

- populations of 20,000 or more

15.2% 50% population 50% centerline

mileage

Provided directly to cities and villages meeting population criterion

County Highway Improvement Program (CHI)

County Trunk Highway

43.0% 60% population 40% centerline

mileage

Provided directly to each county

*Note: DNR funding from the 2015-2017 state biennial budget is not included in these

percentages. Counties are annually reimbursed a five percent administrative fee for the costs of the administrative services provided by the county highway department for the TRI and MSILT program components.

Page 6: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

4

Table 2 shows the percentage distribution of $25.4 million in discretionary funds for towns, villages, cities and counties. There is a higher distribution for TRID because the towns received an additional $10 million in funds in the state biennial budget. The discretionary components provide funds on a competitive, statewide basis for high-cost road improvements. 2 Table 2

Discretionary Component Biennial Funding Level

$25.4 million

(Carryover Included)

Program Criteria % of Total Biennial Discretionary Funds

Basis for Allocations Selection Process

Town Road Discretionary Improvement Program (TRID)

Town Road Minimum

project cost - $100K

51.2%

Competitive with all other towns submitting applications in the state

Selection by WisDOT Secretary, based on recommendation of statewide TRID committee

Municipal Street Discretionary Improvement Program (MSID)

Municipal Street Minimum

project cost - $250K

7.9%

Competitive with all other cities and villages submitting applications in the state

Selection by WisDOT Secretary, based on recommendation of statewide MSID committee

County Highway Discretionary Improvement Program (CHID)

County Trunk Highway

Minimum project cost - $250K

40.9%

Competitive within each of the WCHA districts

Selection by WisDOT Secretary, based on recommendations of 8 CHID committees

On July 1, 2017, all uncommitted funds from entitlement and discretionary components will be added to the 2018-2019 appropriations and redistributed according to the formula outlined in Trans 206. Wisconsin Statute 86.31 governs LRIP, while Administrative Rule Trans 206 further defines and prescribes procedures for the program. Decisions affecting the program occur at the local and state levels. Project selection, competitive bidding (which is required) and project administration are handled at the local level. At the state level, WisDOT approves project applications, initiates and signs state/municipal agreements and approves reimbursement requests. The WisDOT Secretary recommends discretionary projects for the Governor’s approval based on recommendations by the discretionary committees. Throughout Wisconsin, there are 101,864 miles of local roads. LRIP serves as a significant source of funding for local governments to make needed, long-lasting improvements to their local roads. By statute, projects funded with program dollars must have a projected design life of at least 10 years, with work performed in accordance with all applicable federal, state and local laws, rules, ordinances and standards.

Page 7: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

5

2016-2017 PROGRAM SUMMARY The following summarizes the overall performance of the program for the 2016-2017 program cycle.

Figure 1 and Figure 2 show a combined total biennial investment of $58.1 million in state entitlement and discretionary funds, which were matched by $164 million in local funds. These LRIP projects are, at times, part of larger road improvement projects that include work that was either not eligible for program funds or did not utilize such funds. While the program may reimburse projects up to a maximum of 50 percent of project costs, on a statewide basis the program covered an average of 25.9 percent of total project costs, resulting in an average local share of 74.1 percent. Figure 1 – Entitlement Component Funding Distribution

Approximately $32.6 million in entitlement funds were distributed pursuant to s. 86.31(3)(b), Wis. Stats. as follows:

$9.3 million (28.5%) for Town Road Improvement (TRI) projects

$9.3 million (28.5%) for Municipal Street Improvement (MSI) projects

$14 million (43.0%) for County Highway Improvement (CHI) projects $401,600 for DNR positions was included in the 2015-2017 state biennial budget. The budget language authorized the positions in DNR as program revenue positions and permitted payment of those positions using entitlement funds per agreement between WisDOT and DNR. LRIP provided $200,800 in each of fiscal years 2016 and 2017 to support three full-time equivalent positions to support DNR’s review of local road improvements.

TRI, $9.3 million 28.5%

MSI, $9.3 million 28.5%

CHI, $14 million 43%

Total of $32.6 Million in Entitlement Funds(Carryover and DNR funding Included)

(MSILT & MSIGT Combined)

Page 8: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

6

Figure 2 – Discretionary Component Funding Distribution

Approximately $25.4 million (includes carryover) designated for the discretionary components were allocated as follows:

$10.4 million (41%) for County Highway Discretionary Improvement (CHID) projects

$12.9 million (51%) for Town Road Discretionary Improvement (TRID) projects

$2.05 million (8%) for discretionary Municipal Street Improvement (MSID) projects

TRID, $12.9 million 51.2%

MSID, $2.05 million 7.9%

CHID, $10.4 million 40.9%

Total of $25.4 Million in Discretionary Funds(Carryover Included)

Page 9: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

7

Figure 3 summarizes how the projects were distributed by program component. Of the 854 projects funded:

Entitlement Projects:

406 projects (47.5%) were on town roads (TRI)

228 projects (26.7%) were on municipal streets in cities and villages with a population of less than 20,000 (MSILT)

38 projects (4.5%) were on municipal streets in cities and villages with a population of 20,000 or more (MSIGT)

86 projects (10.1%) were on county highways (CHI)

Discretionary Projects:

42 projects (4.9%) were on town roads (TRID)

8 projects (0.9%) were on municipal streets in cities and villages (MSID)

46 projects (5.4%) were on county highways (CHID) Figure 3 – Number of Projects by Program Component

0

100

200

300

400

500

TRI MSILT MSIGT CHI TRID MSID CHID

406

228

3886

428

46

TRI MSILT MSIGT CHI TRID MSID CHID

Page 10: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

8

Table 3 and Table 4 provide a statewide overview of the various LRIP components and other funding outlays, the number of projects, and the statewide average cost share distribution of projects for this biennium. Table 3

Statewide Totals by Component*

Component Total Number of Projects Local Share

LRIP Reimbursement

Amount Total Project

Cost

TRI 406 $26,786,041.25 $8,823,976.16 $35,610,017.41

MSIPLT 228 $28,061,910.79 $4,237,954.22 $32,299,865.01

MSIPGT 38 $20,561,743.49 $4,773,362.07 $25,335,105.56

CHI 86 $45,667,783.52 $13,850,139.23 $59,517,922.75

TRID 42 $13,931,429.80 $12,982,720.76 $26,914,150.56

MSID 8 $2,397,459.87 $2,050,967.13 $4,448,427.00

CHID 46 $26,463,041.74 $10,498,695.23 $36,961,736.97

Statewide Totals 854 $163,869,410.46 $57,217,814.80 $221,087,225.26

*Note: The funding totals do not reflect administrative fees, DNR funding, or any uncommitted

funds. Table 4

Other Funding Outlays

Funding Outlay LRIP Reimbursement Amount

Administrative Fees $688,773.28

DNR Funding $401,600.00

Total $1,090,373.28

Page 11: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

9

Table 5 identifies the statewide averages of program funds, local funds and total project cost for each component. Local funds cover, on average, from 51.76 percent of costs for the TRID component to 86.88 percent of costs for the MSILT component. The average project cost ranges from $87,709.40 (TRI) to $803,516.02 for (CHID). Program reimbursements range from an average of 13.12 percent (MSILT) to 48.24 percent (TRID).

Table 5

Statewide Averages by Component and Total Project Cost*

Component Average LRIP

Funds per Project

Average % of LRIP Funds per Project

Average Local Funds per

Project

Average % of Local

Funds per Project

Average Total Cost Per Project

TRI $21,733.93 24.78% $65,975.47 75.22% $87,709.40 MSILT $18,587.52 13.12% $123,078.56 86.88% $141,666.07 MSIGT $125,614.79 18.84% $541,098.51 81.16% $666,713.30 CHI $161,048.13 23.27% $531,020.74 76.73% $692,068.87 TRID $309,112.40 48.24% $331,700.71 51.76% $640,813.11 MSID $256,370.89 46.11% $299,682.48 53.89% $556,053.38 CHID $228,232.51 28.40% $575,283.52 71.60% $803,516.02 *Note: The funding totals do not include the DNR funding. Table 6 illustrates the number of projects and average project cost by improvement type. In some instances the local improvement greatly exceeds the size of the LRIP match, demonstrating the significant investments local governments continue to make in Wisconsin’s local roads system. This table shows the important role that state funding plays in supplementing local monies for improvements. Table 6

Statewide Number of Projects and Average Project Cost by Type*

Improvement Type Number of Projects

% of Total Number of Projects

Average LRIP Funds per Project

Average Local Funds per

Project Average Total

Cost per Project

Hot Mix Asphalt Purchase Only 158 18.50% $82,889.05 $188,057.62 $270,946.66

Pavement Replacement 251 29.39% $47,132.37 $119,146.66 $166,279.03

Reconditioning 110 12.88% $95,390.52 $228,521.24 $323,911.76

Reconstruction 135 15.81% $88,279.03 $380,732.28 $469,011.31

Resurfacing 189 22.13% $47,726.88 $140,368.85 $188,095.73

Structures 11 1.29% $78,192.06 $107,689.76 $185,881.82

*Note: The funding averages and numbers of projects do not reflect DNR funding.

Page 12: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

10

DISCRETIONARY PROGRAMS’ SUMMARY LRIP’s discretionary components are intended to alleviate financial pressure on local governments by providing funds on a statewide, competitive basis to fund high-cost road improvements. Each discretionary component has its own selection committee. Each committee considers four major criteria for project selection, which are detailed in each section below. Town Road Discretionary Improvement Program (TRID) The Statewide Town Road Discretionary Improvement Committee (STRIDC) consists of six Wisconsin Towns Association district directors and six members at large, appointed by the WisDOT Secretary. Also included as voting members on the committee are representatives from the Wisconsin Farm Bureau, the Great Lakes Timber Professionals Association, and the Wisconsin Dairy Business Association. Committee members may not submit projects during the term of their assignment on the committee. To be eligible for discretionary funding, the total project cost must be at least $100,000. The four major selection criteria, in priority order, are; (1) Safety; (2) Reconstruction with heavy vehicle or high volume traffic; (3) Reconstruction with typical traffic; and (4) Multi-jurisdictional Projects. In addition, applications submitted for projects fitting the (2) criteria require a professional design. WisDOT appreciates the work by local representatives who served on the 2016-2017 Committee:

Betty Manson, Town of Plymouth, Juneau County (WTA District #1) Lyle Updike, Town of Sun Prairie, Dane County (WTA District #1) Steve Dickinsen, Town of Garfield, Jackson County (WTA District #2) James Schuerman, Town of Seneca, Wood County (WTA District #2) Ed Gullickson, Town of Garfield, Polk County (WTA District #3) Lester Lewis, Town of Molitor, Taylor County (WTA District #3) Kevin Koth, Town of Bradley, Lincoln County (WTA District #4) Mike Pagel, Town of Lanark, Portage County (WTA District #4) Lee Engelbrecht, Town of Two Creeks, Manitowoc County (WTA District #5) Joe Schumacher, Town of Ellington, Outagamie County (WTA District #5) Richard Gimler, Town of Watertown, Jefferson County (WTA District #6) Richard Nawrocki, Town of Merton, Waukesha County (WTA District #6) Henry Schienebeck, Great Lakes Timber Professionals Association John Holevoet, Wisconsin Dairy Business Association Archie Morton, Jr., Wisconsin Farm Bureau

WisDOT Committee Staff:

June Coleman, WisDOT (Ex Officio) Lorrie Olson, WisDOT (Staff to Committee) Robert Reed, WisDOT (Staff to Committee)

Page 13: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

11

This is the 12th biennium for TRID, which helps to meet the significant needs on Wisconsin’s 61,674 miles of town roads and the ability of towns to undertake large improvements with strong funding assistance. For state fiscal years 2016 and 2017, 84 applications were received requesting $20.2 million in discretionary town funds and equaling $40.4 million in total project costs. Of the 84 applications, 82 were deemed eligible and submitted to the committee for consideration. Forty-two projects (51.2 percent of projects submitted for consideration) were funded with $12.9 million in program funds (92.8 percent of funds requested), and a local match of $13.9 million, for a total project cost of $26.8 million. Of these, the committee recommended 15 reconstruction projects; 13 reconditioning projects; 10 pavement replacement projects; 3 structure projects; and 1 resurfacing project. The selection committee’s primary goal is to continue to maintain as close to a 50 percent state/50 percent local match as possible, with fair geographic distribution of improvements.

Municipal Street Discretionary Improvement Program (MSID) A Statewide Municipal Street Discretionary Improvement Committee (SMSIDC) consisting of six members of the League of Wisconsin Municipalities (LWM) recommended projects to WisDOT’s Secretary. Members of the committee were nominated by their respective associations and appointed by the Secretary. Committee members may not submit projects during the term of their assignment on the committee. To be eligible for discretionary funding, the total project cost must be at least $250,000. The four major selection criteria categories used for projects are (1) Safety, (2) Reconstruction Projects, (3) High Traffic Volume Projects, and (4) Comprehensive Planning. WisDOT appreciates the work by local representatives that served on the 2016-2017 Committee:

Jerry Wehrle, Mayor, City of Lancaster Paul Fisk, Mayor, City of Lodi Todd Schmidt, Administrator, Village of Waunakee Cameron Clapper, City Manager, City of Whitewater Henry Veleker, Administrator, City of Waupaca Mark Johnsrud, Administrator, Village of Johnson Creek

WisDOT Committee Staff:

June Coleman, WisDOT (Ex-Officio) Lorrie Olson, WisDOT (Staff to Committee) Robert Reed, WisDOT (Staff to Committee)

This is the 9th biennium for MSID, which helps to meet the significant needs on Wisconsin’s 20,332 miles of city and village streets. For state fiscal years 2016 and 2017, 31 applications were received requesting approximately $12 million in discretionary funds for cities and villages, with over $27 million in total project costs. Of the 31 applications, 30 were deemed eligible and submitted to the committee for consideration. Seven reconstruction projects and 1 pavement replacement project (26.7 percent of projects submitted for consideration) were funded with $2.05 million in program funds (89.1 percent of funds requested), and a local match of $2.3 million, for a total project cost of $4.35 million.

Page 14: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

12

The selection committee’s primary goal is to continue to maintain as close to a 50 percent state/50 percent local match as possible, with fair geographic distribution of improvements. County Highway Improvement Program – Discretionary (CHID) The County Highway Improvement Program District Committees (CHIDC), established across each of WisDOT’s regions, prioritize and recommend projects to the WisDOT Secretary. The district committees are made up of all county highway commissioners within each WCHA district. The four major selection criteria used by the committees are (1) safety, (2) reconstruction, (3) traffic volume, and (4) joint projects between two or more counties. The committee has a goal of equitable distribution, allowing no more than one project per county to be approved in any given program cycle. This is the 9th biennium for CHID. For state fiscal years 2016 and 2017, $10.4 million in discretionary county funds were requested, with $26.5 million local share for a total of $35.9 million in project costs. This reflects ongoing needs along the state’s 19,858 miles of the county trunk highway system. Of the 46 applications, the CHIDCs recommended for approval 16 pavement replacement projects, 12 of which were for hot mix asphalt purchase only; 15 reconditioning projects, 9 of which were for the purchase of hot mix asphalt only; 6 reconstruction projects, 1 of which was for the purchase of hot mix asphalt only; and 9 resurfacing projects, 5 of which were for the purchase of hot mix asphalt only.

FUNDING SUNSET POLICY The funding sunset policy implemented in the 2004-2005 program cycle ensures the timely use of program funds. All monies not used by the sunset deadline are returned to the appropriation for redistribution in the next program cycle. WisDOT provides county highway commissioners with a statewide listing of open projects on a quarterly basis. The statewide Open Projects Report is also posted electronically at the LRIP Web System (http://wisconsindot.gov/Pages/doing-bus/local-gov/astnce-pgms/highway/lrip-web/default.aspx) on the WisDOT internet site. All entitlement and discretionary projects programmed with 2010-2011 funds were closed by the end of state fiscal year 2015 (June 30, 2015). On June 30, 2015, program sunset funds totaling $262,665.40 on 13 projects statewide were returned to the LRIP appropriation and used as carryover for the 2016-2017 program cycle. Current program cycles with corresponding sunset date:

Program Cycle Sunset Date 2012-2013 June 30, 2017 2014-2015 June 30, 2019 2016-2017 June 30, 2021

Page 15: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

13

Table 7 identifies the number of remaining 2012-2013 open projects by component and the program dollars due to sunset June 30, 2017. As of May 31, 2017, 66 projects totaling $4.6 million in program funds remain open. Table 7

Statewide Program Funds Due to Sunset by Component

Component Number of Open Projects LRIP Funds

CHI 7 $690,214.20

CHID 2 $780,023.62

MSIGT 2 $1,059,861.57

MSILT 20 $271,024.55

MSID 1 $236,200.00

TRI 30 $614,036.30

TRID 4 $966,084.14

Total 66 $4,617,444.38

LOCAL ROADS IMPROVEMENT PROGRAM WEB SYSTEM WisDOT continues to work on a program management system redesign. Scheduled for completion in the 2018-2019 LRIP program cycle, the new extranet-based environment will facilitate WisDOT program area staff and County Highway Commissioners in managing daily program and project administration. The LRIP web system can be accessed via the launch site at: http://wisconsindot.gov/Pages/doing-bus/local-gov/astnce-pgms/highway/lrip-web/default.aspx

CONTACT INFORMATION

Lorrie Olson, LRIP Program Manager [email protected] or (608) 266-0775 Contact Lorrie for all program-related questions and requests for project changes and substitutions. Joe Schneider, Contract Specialist [email protected] or (608) 266-9497 Contact Joe for reimbursement requests.

Page 16: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

14

INTERNET LINKS

LRIP homepage is located on the WisDOT Internet site at: http://wisconsindot.gov/Pages/doing-bus/local-gov/astnce-pgms/highway/lrip.aspx Wisconsin Statute 86.31: http://docs.legis.wisconsin.gov/statutes/statutes/86/31 Administrative Rule Trans 206: http://docs.legis.wisconsin.gov/code/admin_code/trans/206 The LRIP web system can be accessed via the launch site at: http://wisconsindot.gov/Pages/doing-bus/local-gov/astnce-pgms/highway/lrip-web/default.aspx

REPORTS

LRIP PROJECT SUMMARY REPORT BY COUNTY AND PROJECT TYPE

COUNTY ADMINISTRATIVE COSTS FOR FY 2016 AND FY 2017

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

LRIP PROJECT REPORT - BY COUNTY

TRID PROJECT REPORT

MSID PROJECT REPORT

CHID PROJECT REPORT BY WCHA DISTRICT

Page 17: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

1 $3,037,715.00 $93,828.08

0 $0.00 $0.00

4 $255,490.00 $100,430.01

0 $0.00 $0.00

Right-of-Way

1 $748,000.00 $363,817.64

0 $0.00 $0.00

Adams

Type No. Total $ LRIP Funding

Totals 6 $4,041,205.00 $558,075.73

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

1 $175,000.00 $70,206.79

0 $0.00 $0.00

3 $197,492.21 $63,473.92

0 $0.00 $0.00

Right-of-Way

1 $123,451.30 $46,500.00

0 $0.00 $0.00

Ashland

Type No. Total $ LRIP Funding

Totals 5 $495,943.51 $180,180.71

0 $0.00 $0.00Design

3 $689,329.97 $289,411.44

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

3 $275,950.00 $47,577.91

0 $0.00 $0.00

3 $172,297.01 $49,537.63

0 $0.00 $0.00

Right-of-Way

1 $60,000.00 $16,512.55

0 $0.00 $0.00

Barron

Type No. Total $ LRIP Funding

Totals 10 $1,197,576.98 $403,039.53

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

1 $133,803.67 $56,063.84

0 $0.00 $0.00

4 $279,297.00 $99,727.95

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Bayfield

Type No. Total $ LRIP Funding

Totals 5 $413,100.67 $155,791.79

0 $0.00 $0.00Design

1 $52,302.00 $13,484.79

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

5 $1,520,176.66 $417,857.66

0 $0.00 $0.00

3 $1,264,900.00 $282,434.97

0 $0.00 $0.00

Right-of-Way

4 $347,760.15 $145,027.65

0 $0.00 $0.00

Brown

Type No. Total $ LRIP Funding

Totals 13 $3,185,138.81 $858,805.07

0 $0.00 $0.00Design

1 $269,100.00 $59,126.20

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

0 $0.00 $0.00

0 $0.00 $0.00

4 $339,195.06 $96,620.66

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Buffalo

Type No. Total $ LRIP Funding

Totals 5 $608,295.06 $155,746.86

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

0 $0.00 $0.00

0 $0.00 $0.00

5 $219,634.68 $65,505.34

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Burnett

Type No. Total $ LRIP Funding

Totals 5 $219,634.68 $65,505.34

0 $0.00 $0.00Design

1 $618,174.00 $107,890.56

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

1 $92,168.00 $33,971.19

0 $0.00 $0.00

0 $0.00 $0.00

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Calumet

Type No. Total $ LRIP Funding

Totals 2 $710,342.00 $141,861.75

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

2 $1,151,912.48 $379,014.40

0 $0.00 $0.00

2 $113,427.99 $34,185.00

0 $0.00 $0.00

Right-of-Way

7 $2,702,412.96 $493,588.25

0 $0.00 $0.00

Chippewa

Type No. Total $ LRIP Funding

Totals 11 $3,967,753.43 $906,787.65

Data as of 5-24-17

Page 18: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

0 $0.00 $0.00Design

3 $881,867.29 $234,326.06

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

1 $330,697.00 $155,328.38

1 $50,000.00 $25,000.00

7 $861,543.39 $241,297.67

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Clark

Type No. Total $ LRIP Funding

Totals 12 $2,124,107.68 $655,952.11

0 $0.00 $0.00Design

9 $703,740.67 $295,124.08

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

4 $953,640.00 $50,705.30

0 $0.00 $0.00

0 $0.00 $0.00

0 $0.00 $0.00

Right-of-Way

1 $614,889.06 $299,074.18

0 $0.00 $0.00

Columbia

Type No. Total $ LRIP Funding

Totals 14 $2,272,269.73 $644,903.56

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

1 $108,200.00 $46,610.68

0 $0.00 $0.00

4 $1,692,377.68 $382,971.20

0 $0.00 $0.00

Right-of-Way

1 $124,000.00 $10,041.72

0 $0.00 $0.00

Crawford

Type No. Total $ LRIP Funding

Totals 6 $1,924,577.68 $439,623.60

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

7 $4,236,080.00 $1,523,569.68

0 $0.00 $0.00

14 $4,934,193.71 $1,105,978.79

0 $0.00 $0.00

Right-of-Way

2 $2,128,625.38 $558,938.64

0 $0.00 $0.00

Dane

Type No. Total $ LRIP Funding

Totals 23 $11,298,899.09 $3,188,487.11

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

1 $2,425,000.00 $280,644.81

0 $0.00 $0.00

2 $131,000.00 $34,346.00

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Dodge

Type No. Total $ LRIP Funding

Totals 3 $2,556,000.00 $314,990.81

0 $0.00 $0.00Design

7 $941,923.27 $209,872.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

0 $0.00 $0.00

0 $0.00 $0.00

0 $0.00 $0.00

0 $0.00 $0.00

Right-of-Way

1 $156,526.00 $20,000.00

0 $0.00 $0.00

Door

Type No. Total $ LRIP Funding

Totals 8 $1,098,449.27 $229,872.00

0 $0.00 $0.00Design

2 $1,472,961.18 $383,380.26

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

1 $3,240,000.00 $75,247.07

0 $0.00 $0.00

7 $567,887.38 $155,749.40

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Douglas

Type No. Total $ LRIP Funding

Totals 10 $5,280,848.56 $614,376.73

0 $0.00 $0.00Design

4 $1,016,200.00 $364,865.20

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

0 $0.00 $0.00

0 $0.00 $0.00

3 $391,706.85 $105,966.95

0 $0.00 $0.00

Right-of-Way

2 $247,637.08 $25,713.13

0 $0.00 $0.00

Dunn

Type No. Total $ LRIP Funding

Totals 9 $1,655,543.93 $496,545.28

0 $0.00 $0.00Design

4 $1,120,238.46 $517,822.57

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

1 $789,635.00 $25,574.18

0 $0.00 $0.00

0 $0.00 $0.00

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Eau Claire

Type No. Total $ LRIP Funding

Totals 5 $1,909,873.46 $543,396.75

Data as of 5-24-17

Page 19: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

0 $0.00 $0.00

0 $0.00 $0.00

1 $54,800.00 $27,004.37

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Florence

Type No. Total $ LRIP Funding

Totals 1 $54,800.00 $27,004.37

0 $0.00 $0.00Design

2 $1,053,582.90 $254,731.94

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

2 $758,261.00 $133,524.63

0 $0.00 $0.00

0 $0.00 $0.00

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Fond du Lac

Type No. Total $ LRIP Funding

Totals 4 $1,811,843.90 $388,256.57

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

1 $56,606.45 $24,999.99

0 $0.00 $0.00

1 $63,000.00 $25,000.00

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Forest

Type No. Total $ LRIP Funding

Totals 2 $119,606.45 $49,999.99

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

9 $1,161,920.00 $213,702.91

2 $180,000.00 $38,000.00

0 $0.00 $0.00

0 $0.00 $0.00

Right-of-Way

7 $2,480,000.00 $306,453.68

0 $0.00 $0.00

Grant

Type No. Total $ LRIP Funding

Totals 18 $3,821,920.00 $558,156.59

0 $0.00 $0.00Design

7 $1,739,460.00 $616,093.95

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

1 $157,128.13 $26,901.52

0 $0.00 $0.00

0 $0.00 $0.00

0 $0.00 $0.00

Right-of-Way

2 $207,153.74 $44,364.84

0 $0.00 $0.00

Green

Type No. Total $ LRIP Funding

Totals 10 $2,103,741.87 $687,360.31

0 $0.00 $0.00Design

3 $444,495.00 $113,152.39

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

2 $519,525.00 $208,822.88

0 $0.00 $0.00

2 $93,756.98 $21,103.38

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Green Lake

Type No. Total $ LRIP Funding

Totals 7 $1,057,776.98 $343,078.65

0 $0.00 $0.00Design

1 $285,412.00 $136,760.06

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

2 $493,929.25 $228,990.76

1 $63,700.00 $25,409.33

1 $47,000.00 $23,500.00

0 $0.00 $0.00

Right-of-Way

2 $253,000.00 $67,692.11

0 $0.00 $0.00

Iowa

Type No. Total $ LRIP Funding

Totals 7 $1,143,041.25 $482,352.26

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

0 $0.00 $0.00

0 $0.00 $0.00

2 $120,000.00 $37,329.37

0 $0.00 $0.00

Right-of-Way

2 $945,500.00 $85,138.54

0 $0.00 $0.00

Iron

Type No. Total $ LRIP Funding

Totals 4 $1,065,500.00 $122,467.91

0 $0.00 $0.00Design

2 $425,010.12 $165,398.83

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

0 $0.00 $0.00

0 $0.00 $0.00

3 $221,969.40 $60,027.90

0 $0.00 $0.00

Right-of-Way

1 $178,577.00 $89,288.50

0 $0.00 $0.00

Jackson

Type No. Total $ LRIP Funding

Totals 6 $825,556.52 $314,715.23

Data as of 5-24-17

Page 20: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

0 $0.00 $0.00Design

3 $1,856,250.00 $406,521.46

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

1 $237,000.00 $59,232.82

0 $0.00 $0.00

3 $462,783.26 $87,928.53

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Jefferson

Type No. Total $ LRIP Funding

Totals 7 $2,556,033.26 $553,682.81

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

1 $214,000.00 $21,488.06

0 $0.00 $0.00

5 $250,117.59 $66,978.69

0 $0.00 $0.00

Right-of-Way

7 $912,781.50 $286,354.09

0 $0.00 $0.00

Juneau

Type No. Total $ LRIP Funding

Totals 13 $1,376,899.09 $374,820.84

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

2 $2,202,000.00 $512,331.74

0 $0.00 $0.00

4 $792,956.71 $274,991.76

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Kenosha

Type No. Total $ LRIP Funding

Totals 6 $2,994,956.71 $787,323.50

0 $0.00 $0.00Design

8 $643,128.81 $295,257.03

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

0 $0.00 $0.00

0 $0.00 $0.00

1 $34,465.00 $13,796.38

0 $0.00 $0.00

Right-of-Way

1 $330,000.00 $160,507.78

0 $0.00 $0.00

Kewaunee

Type No. Total $ LRIP Funding

Totals 10 $1,007,593.81 $469,561.19

0 $0.00 $0.00Design

3 $1,425,488.00 $359,732.35

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

2 $340,000.00 $73,365.07

0 $0.00 $0.00

0 $0.00 $0.00

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

La Crosse

Type No. Total $ LRIP Funding

Totals 5 $1,765,488.00 $433,097.42

0 $0.00 $0.00Design

1 $225,000.00 $101,058.06

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

4 $282,624.28 $82,208.62

1 $32,000.00 $14,537.88

2 $821,610.24 $367,967.29

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Lafayette

Type No. Total $ LRIP Funding

Totals 8 $1,361,234.52 $565,771.85

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

1 $159,000.00 $77,335.57

0 $0.00 $0.00

4 $178,753.21 $59,097.49

0 $0.00 $0.00

Right-of-Way

1 $58,167.00 $23,468.69

0 $0.00 $0.00

Langlade

Type No. Total $ LRIP Funding

Totals 6 $395,920.21 $159,901.75

0 $0.00 $0.00Design

2 $122,747.54 $27,237.80

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

1 $1,250,000.00 $607,984.02

0 $0.00 $0.00

6 $926,372.66 $209,630.15

0 $0.00 $0.00

Right-of-Way

1 $52,000.00 $13,618.90

0 $0.00 $0.00

Lincoln

Type No. Total $ LRIP Funding

Totals 10 $2,351,120.20 $858,470.87

0 $0.00 $0.00Design

2 $147,000.00 $44,674.72

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

1 $645,000.00 $76,322.17

0 $0.00 $0.00

7 $896,736.70 $321,289.39

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Manitowoc

Type No. Total $ LRIP Funding

Totals 10 $1,688,736.70 $442,286.28

Data as of 5-24-17

Page 21: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

0 $0.00 $0.00Design

2 $2,050,000.00 $615,978.26

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

6 $1,216,361.55 $230,725.95

0 $0.00 $0.00

1 $62,061.00 $27,915.79

0 $0.00 $0.00

Right-of-Way

3 $335,321.68 $78,880.44

0 $0.00 $0.00

Marathon

Type No. Total $ LRIP Funding

Totals 12 $3,663,744.23 $953,500.44

0 $0.00 $0.00Design

7 $1,550,320.12 $567,005.09

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

3 $493,336.25 $191,005.27

0 $0.00 $0.00

1 $52,922.00 $26,100.00

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Marinette

Type No. Total $ LRIP Funding

Totals 11 $2,096,578.37 $784,110.36

0 $0.00 $0.00Design

10 $1,094,159.70 $422,736.21

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

0 $0.00 $0.00

0 $0.00 $0.00

0 $0.00 $0.00

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Marquette

Type No. Total $ LRIP Funding

Totals 10 $1,094,159.70 $422,736.21

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

1 $559,000.00 $70,206.79

0 $0.00 $0.00

0 $0.00 $0.00

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Menominee

Type No. Total $ LRIP Funding

Totals 1 $559,000.00 $70,206.79

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

2 $514,000.00 $136,312.22

0 $0.00 $0.00

5 $3,707,677.36 $1,219,608.29

0 $0.00 $0.00

Right-of-Way

5 $7,179,500.00 $2,395,363.89

0 $0.00 $0.00

Milwaukee

Type No. Total $ LRIP Funding

Totals 12 $11,401,177.36 $3,751,284.40

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

4 $767,304.00 $195,726.85

0 $0.00 $0.00

1 $37,934.00 $15,000.00

0 $0.00 $0.00

Right-of-Way

5 $304,837.67 $110,643.55

0 $0.00 $0.00

Monroe

Type No. Total $ LRIP Funding

Totals 10 $1,110,075.67 $321,370.40

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

2 $522,477.30 $173,771.84

0 $0.00 $0.00

1 $112,745.00 $18,172.34

0 $0.00 $0.00

Right-of-Way

9 $559,788.00 $149,381.06

0 $0.00 $0.00

Oconto

Type No. Total $ LRIP Funding

Totals 12 $1,195,010.30 $341,325.24

0 $0.00 $0.00Design

2 $458,037.54 $226,863.19

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

0 $0.00 $0.00

0 $0.00 $0.00

1 $65,729.24 $26,405.22

0 $0.00 $0.00

Right-of-Way

3 $429,017.01 $79,215.64

0 $0.00 $0.00

Oneida

Type No. Total $ LRIP Funding

Totals 6 $952,783.79 $332,484.05

0 $0.00 $0.00Design

2 $1,955,000.00 $860,255.82

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

6 $2,732,687.66 $830,651.21

0 $0.00 $0.00

0 $0.00 $0.00

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Outagamie

Type No. Total $ LRIP Funding

Totals 8 $4,687,687.66 $1,690,907.03

Data as of 5-24-17

Page 22: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

3 $3,790,000.00 $397,595.95

0 $0.00 $0.00

1 $77,000.00 $13,740.75

0 $0.00 $0.00

Right-of-Way

1 $175,000.00 $75,718.11

0 $0.00 $0.00

Ozaukee

Type No. Total $ LRIP Funding

Totals 5 $4,042,000.00 $487,054.81

0 $0.00 $0.00Design

4 $570,847.17 $147,939.05

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

2 $232,512.98 $75,039.39

0 $0.00 $0.00

0 $0.00 $0.00

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Pepin

Type No. Total $ LRIP Funding

Totals 6 $803,360.15 $222,978.44

0 $0.00 $0.00Design

8 $826,573.70 $351,099.24

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

1 $32,000.00 $15,249.89

0 $0.00 $0.00

1 $81,000.00 $15,249.90

0 $0.00 $0.00

Right-of-Way

2 $1,119,000.00 $544,267.29

0 $0.00 $0.00

Pierce

Type No. Total $ LRIP Funding

Totals 12 $2,058,573.70 $925,866.32

0 $0.00 $0.00Design

2 $1,678,892.06 $406,854.77

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

2 $745,500.00 $297,695.88

0 $0.00 $0.00

4 $487,242.96 $63,503.49

0 $0.00 $0.00

Right-of-Way

4 $247,714.37 $48,370.20

0 $0.00 $0.00

Polk

Type No. Total $ LRIP Funding

Totals 12 $3,159,349.39 $816,424.34

0 $0.00 $0.00Design

1 $1,777,000.00 $223,989.84

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

0 $0.00 $0.00

0 $0.00 $0.00

3 $103,241.35 $30,502.38

0 $0.00 $0.00

Right-of-Way

1 $2,514,000.00 $1,222,777.46

0 $0.00 $0.00

Portage

Type No. Total $ LRIP Funding

Totals 5 $4,394,241.35 $1,477,269.68

0 $0.00 $0.00Design

1 $393,337.38 $144,222.94

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

0 $0.00 $0.00

0 $0.00 $0.00

1 $15,855.00 $5,992.39

0 $0.00 $0.00

Right-of-Way

1 $600,000.00 $291,832.33

0 $0.00 $0.00

Price

Type No. Total $ LRIP Funding

Totals 3 $1,009,192.38 $442,047.66

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

5 $6,145,161.66 $902,501.21

0 $0.00 $0.00

6 $1,205,846.39 $189,978.52

0 $0.00 $0.00

Right-of-Way

2 $2,749,701.24 $326,570.02

0 $0.00 $0.00

Racine

Type No. Total $ LRIP Funding

Totals 13 $10,100,709.29 $1,419,049.75

0 $0.00 $0.00Design

3 $875,000.00 $412,222.45

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

1 $113,276.82 $19,838.19

1 $78,000.00 $39,000.00

0 $0.00 $0.00

0 $0.00 $0.00

Right-of-Way

1 $17,000.00 $8,500.00

0 $0.00 $0.00

Richland

Type No. Total $ LRIP Funding

Totals 6 $1,083,276.82 $479,560.64

0 $0.00 $0.00Design

4 $1,304,709.44 $432,052.79

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

2 $876,894.00 $99,479.44

1 $213,099.62 $106,549.81

2 $1,034,000.00 $155,828.32

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Rock

Type No. Total $ LRIP Funding

Totals 9 $3,428,703.06 $793,910.36

Data as of 5-24-17

Page 23: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

0 $0.00 $0.00Design

1 $200,000.00 $93,132.28

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

2 $114,658.80 $35,083.51

0 $0.00 $0.00

1 $188,800.00 $57,597.54

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Rusk

Type No. Total $ LRIP Funding

Totals 4 $503,458.80 $185,813.33

0 $0.00 $0.00Design

1 $675,000.00 $175,297.67

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

5 $1,691,162.25 $723,288.75

0 $0.00 $0.00

1 $1,425,393.98 $400,000.00

0 $0.00 $0.00

Right-of-Way

6 $390,190.34 $95,914.25

0 $0.00 $0.00

Sauk

Type No. Total $ LRIP Funding

Totals 13 $4,181,746.57 $1,394,500.67

0 $0.00 $0.00Design

1 $173,857.38 $86,928.69

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

0 $0.00 $0.00

1 $400,000.00 $194,554.89

1 $106,000.00 $53,000.00

0 $0.00 $0.00

Right-of-Way

2 $127,370.00 $60,694.14

0 $0.00 $0.00

Sawyer

Type No. Total $ LRIP Funding

Totals 5 $807,227.38 $395,177.72

0 $0.00 $0.00Design

2 $954,070.99 $392,390.11

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

2 $1,942,500.00 $19,000.00

0 $0.00 $0.00

1 $70,000.00 $30,000.00

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Shawano

Type No. Total $ LRIP Funding

Totals 5 $2,966,570.99 $441,390.11

0 $0.00 $0.00Design

4 $1,419,065.70 $668,078.08

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

0 $0.00 $0.00

0 $0.00 $0.00

7 $764,331.19 $182,572.00

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Sheboygan

Type No. Total $ LRIP Funding

Totals 11 $2,183,396.89 $850,650.08

0 $0.00 $0.00Design

12 $1,834,513.35 $545,377.69

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

6 $3,817,667.45 $468,096.05

0 $0.00 $0.00

0 $0.00 $0.00

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

St. Croix

Type No. Total $ LRIP Funding

Totals 18 $5,652,180.80 $1,013,473.74

0 $0.00 $0.00Design

2 $1,116,000.00 $174,059.94

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

0 $0.00 $0.00

0 $0.00 $0.00

9 $476,662.48 $119,463.37

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Taylor

Type No. Total $ LRIP Funding

Totals 11 $1,592,662.48 $293,523.31

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

2 $217,000.00 $16,253.33

1 $32,000.00 $13,889.47

3 $103,000.00 $35,905.61

0 $0.00 $0.00

Right-of-Way

8 $1,526,513.77 $407,262.37

0 $0.00 $0.00

Trempealeau

Type No. Total $ LRIP Funding

Totals 14 $1,878,513.77 $473,310.78

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

1 $200,490.00 $25,000.00

0 $0.00 $0.00

2 $85,768.00 $35,074.58

0 $0.00 $0.00

Right-of-Way

1 $110,000.00 $50,000.00

0 $0.00 $0.00

Vernon

Type No. Total $ LRIP Funding

Totals 4 $396,258.00 $110,074.58

Data as of 5-24-17

Page 24: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

1 $27,000.00 $6,731.53

0 $0.00 $0.00

0 $0.00 $0.00

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Vilas

Type No. Total $ LRIP Funding

Totals 1 $27,000.00 $6,731.53

0 $0.00 $0.00Design

1 $44,500.00 $14,190.20

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

1 $714,850.00 $23,673.00

1 $476,000.00 $202,304.00

8 $459,231.15 $132,487.17

0 $0.00 $0.00

Right-of-Way

2 $510,425.00 $240,504.42

0 $0.00 $0.00

Walworth

Type No. Total $ LRIP Funding

Totals 13 $2,205,006.15 $613,158.79

0 $0.00 $0.00Design

8 $530,599.26 $172,830.12

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

0 $0.00 $0.00

0 $0.00 $0.00

1 $80,000.00 $14,412.51

0 $0.00 $0.00

Right-of-Way

3 $996,000.00 $470,643.71

0 $0.00 $0.00

Washburn

Type No. Total $ LRIP Funding

Totals 12 $1,606,599.26 $657,886.34

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

6 $4,231,288.25 $676,264.31

0 $0.00 $0.00

4 $206,734.11 $57,983.20

0 $0.00 $0.00

Right-of-Way

1 $362,000.00 $176,072.17

0 $0.00 $0.00

Washington

Type No. Total $ LRIP Funding

Totals 11 $4,800,022.36 $910,319.68

0 $0.00 $0.00Design

0 $0.00 $0.00

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

1 $871,197.00 $22,515.79

0 $0.00 $0.00

8 $6,581,207.17 $1,413,326.36

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Waukesha

Type No. Total $ LRIP Funding

Totals 9 $7,452,404.17 $1,435,842.15

0 $0.00 $0.00Design

3 $1,090,000.00 $294,816.27

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

1 $91,845.67 $34,245.93

0 $0.00 $0.00

2 $112,140.38 $34,000.00

0 $0.00 $0.00

Right-of-Way

2 $412,065.41 $189,131.37

0 $0.00 $0.00

Waupaca

Type No. Total $ LRIP Funding

Totals 8 $1,706,051.46 $552,193.57

0 $0.00 $0.00Design

2 $559,342.50 $151,615.27

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

2 $803,000.00 $380,089.36

0 $0.00 $0.00

4 $240,500.00 $79,512.67

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Waushara

Type No. Total $ LRIP Funding

Totals 8 $1,602,842.50 $611,217.30

0 $0.00 $0.00Design

5 $1,691,008.74 $601,522.52

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

2 $1,897,750.00 $191,346.22

0 $0.00 $0.00

1 $60,000.00 $26,372.03

0 $0.00 $0.00

Right-of-Way

0 $0.00 $0.00

0 $0.00 $0.00

Winnebago

Type No. Total $ LRIP Funding

Totals 8 $3,648,758.74 $819,240.77

0 $0.00 $0.00Design

1 $15,000.00 $5,944.17

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

3 $693,926.57 $111,800.81

1 $510,000.00 $198,952.75

1 $103,259.67 $21,531.92

0 $0.00 $0.00

Right-of-Way

3 $948,610.92 $336,513.12

0 $0.00 $0.00

Wood

Type No. Total $ LRIP Funding

Totals 9 $2,270,797.16 $674,742.77

Data as of 5-24-17

Page 25: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

Grand Totals 603 $174,782,449.71 $45,343,584.91

Statewide Project Type Totals

Design

Recondition

Hot Mix Asphalt

Reconstruction

Structures

Resurfacing

Other

Right-of-Way

$63,001,820.13 $11,972,599.40

$34,284,536.58 $10,414,356.43

$34,491,047.14 $8,915,106.54

$2,034,799.62 $858,198.13

$0.00 $0.00

$0.00 $0.00

$40,970,246.24 $13,183,324.41

$0.00 $0.00

All Projects

135

110

189

11

0

0

158

0

No. Total $ LRIP Funding

Data as of 5-24-17

Page 26: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

COUNTY TRI FY16 MSILT FY16

Total

Administrative

Fees for FY 2016

Adams County $4,153.65 $233.93 $4,387.57

Ashland County $2,980.23 $752.57 $3,732.80

Barron County $5,214.49 $1,631.45 $6,845.93

Bayfield County $6,518.17 $328.03 $6,846.19

Brown County $2,484.04 $6,128.10 $8,612.14

Buffalo County $1,915.75 $543.76 $2,459.51

Burnett County $4,388.55 $296.00 $4,684.55

Calumet County $1,489.18 $1,787.96 $3,277.13

Chippewa County $4,263.59 $2,483.69 $6,747.28

Clark County $5,882.50 $1,125.33 $7,007.83

Columbia County $3,427.51 $2,046.65 $5,474.16

Crawford County $2,453.19 $915.57 $3,368.76

Dane County $5,998.30 $7,100.01 $13,098.31

Dodge County $3,794.48 $2,911.40 $6,705.88

Door County $2,811.61 $1,039.37 $3,850.98

Douglas County $4,607.15 $577.74 $5,184.89

Dunn County $3,721.63 $1,370.68 $5,092.30

Eau Claire County $2,312.07 $673.01 $2,985.07

Florence County $1,421.28 $0.00 $1,421.28

Fond du Lac County $3,433.07 $1,166.64 $4,599.70

Forest County $2,825.21 $201.45 $3,026.65

Grant County $5,047.14 $2,229.83 $7,276.96

Green County $2,700.05 $1,415.87 $4,115.92

Green Lake County $1,231.50 $742.43 $1,973.93

Iowa County $2,530.82 $991.59 $3,522.41

Iron County $1,964.70 $239.03 $2,203.73

Jackson County $3,693.97 $479.38 $4,173.35

Jefferson County $2,721.96 $2,135.29 $4,857.24

Juneau County $3,774.31 $854.95 $4,629.25

Kenosha County $700.18 $1,017.41 $1,717.59

Kewaunee County $1,815.31 $639.97 $2,455.28

La Crosse County $1,498.53 $1,930.66 $3,429.19

Lafayette County $2,619.42 $584.44 $3,203.85

Langlade County $2,521.09 $617.60 $3,138.68

Lincoln County $2,867.14 $987.10 $3,854.23

Manitowoc County $3,507.84 $1,421.45 $4,929.29

Marathon County $6,919.34 $3,605.61 $10,524.94

Marinette County $5,595.41 $1,417.83 $7,013.23

Marquette County $1,858.18 $360.58 $2,218.76

Menominee County $297.02 $0.00 $297.02

Milwaukee County $0.00 $6,021.15 $6,021.15

Monroe County $3,450.65 $1,475.11 $4,925.76

Oconto County $5,461.87 $775.22 $6,237.09

FY 2016 Administrative Fees

Page 27: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

COUNTY TRI FY16 MSILT FY16

Total

Administrative

Fees for FY 2016

Oneida County $4,864.12 $549.33 $5,413.45

Outagamie County $3,611.16 $2,635.95 $6,247.11

Ozaukee County $1,019.74 $2,624.76 $3,644.49

Pepin County $877.52 $230.00 $1,107.52

Pierce County $2,884.76 $1,605.25 $4,490.01

Polk County $5,013.43 $1,311.98 $6,325.41

Portage County $3,843.55 $1,337.82 $5,181.37

Price County $3,729.97 $473.08 $4,203.05

Racine County $1,210.76 $1,912.13 $3,122.89

Richland County $2,377.15 $522.07 $2,899.22

Rock County $3,788.17 $1,236.50 $5,024.67

Rusk County $2,958.40 $572.66 $3,531.06

St. Croix County $4,215.64 $2,568.81 $6,784.45

Sauk County $3,942.94 $2,475.15 $6,418.08

Sawyer County $3,958.08 $331.82 $4,289.89

Shawano County $4,230.07 $1,171.39 $5,401.46

Sheboygan County $2,222.83 $1,864.20 $4,087.03

Taylor County $3,842.39 $520.29 $4,362.67

Trempealeau County $2,924.10 $1,069.30 $3,993.39

Vernon County $3,952.70 $923.02 $4,875.72

Vilas County $4,170.14 $177.15 $4,347.29

Walworth County $2,987.41 $3,737.84 $6,725.25

Washburn County $3,413.49 $575.70 $3,989.19

Washington County $2,288.81 $4,280.28 $6,569.09

Waukesha County $2,779.86 $6,517.73 $9,297.58

Waupaca County $3,620.71 $1,795.95 $5,416.65

Waushara County $2,968.32 $622.89 $3,591.21

Winnebago County $2,694.00 $1,309.95 $4,003.95

Wood County $3,399.78 $3,515.74 $6,915.51

$344,386.30

FY 2016 Administrative Fees

Page 28: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

County TRI FY17 MSILT FY17

Total Administrative

Fees for FY 2017

Adams County $4,153.65 $233.93 $4,387.57

Ashland County $2,980.23 $752.57 $3,732.80

Barron County $5,214.49 $1,631.45 $6,845.93

Bayfield County $6,518.17 $328.03 $6,846.19

Brown County $2,484.04 $6,128.10 $8,612.14

Buffalo County $1,915.75 $543.76 $2,459.51

Burnett County $4,388.55 $296.00 $4,684.55

Calumet County $1,489.18 $1,787.96 $3,277.13

Chippewa County $4,263.59 $2,483.69 $6,747.28

Clark County $5,882.50 $1,125.33 $7,007.83

Columbia County $3,427.51 $2,046.65 $5,474.16

Crawford County $2,453.19 $915.57 $3,368.76

Dane County $5,998.30 $7,100.01 $13,098.31

Dodge County $3,794.48 $2,911.40 $6,705.88

Door County $2,811.61 $1,039.37 $3,850.98

Douglas County $4,607.15 $577.74 $5,184.89

Dunn County $3,721.63 $1,370.68 $5,092.30

Eau Claire County $2,312.07 $673.01 $2,985.07

Florence County $1,421.28 $0.00 $1,421.28

Fond du Lac County $3,433.07 $1,166.64 $4,599.70

Forest County $2,825.21 $201.45 $3,026.65

Grant County $5,047.14 $2,229.83 $7,276.96

Green County $2,700.05 $1,415.87 $4,115.92

Green Lake County $1,231.50 $742.43 $1,973.93

Iowa County $2,530.82 $991.59 $3,522.41

Iron County $1,964.70 $239.03 $2,203.73

Jackson County $3,693.97 $479.38 $4,173.35

Jefferson County $2,721.96 $2,135.29 $4,857.24

Juneau County $3,774.31 $854.95 $4,629.25

Kenosha County $700.18 $1,017.41 $1,717.59

Kewaunee County $1,815.31 $639.97 $2,455.28

La Crosse County $1,498.53 $1,930.66 $3,429.19

Lafayette County $2,619.42 $584.44 $3,203.85

Langlade County $2,521.09 $617.60 $3,138.68

Lincoln County $2,867.14 $987.10 $3,854.23

Manitowoc County $3,507.84 $1,421.45 $4,929.29

Marathon County $6,919.34 $3,605.61 $10,524.94

Marinette County $5,595.41 $1,417.83 $7,013.23

Marquette County $1,858.18 $360.58 $2,218.76

Menominee County $297.02 $0.00 $297.02

Milwaukee County $0.00 $6,021.15 $6,021.15

Monroe County $3,450.65 $1,475.11 $4,925.76

Oconto County $5,461.87 $775.22 $6,237.09

Oneida County $4,864.12 $549.33 $5,413.45

FY 2017 Administrative Fees

Page 29: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

County TRI FY17 MSILT FY17

Total Administrative

Fees for FY 2017

Outagamie County $3,611.16 $2,635.95 $6,247.11

Ozaukee County $1,019.74 $2,624.76 $3,644.49

Pepin County $877.52 $230.00 $1,107.52

Pierce County $2,884.76 $1,605.25 $4,490.01

Polk County $5,013.43 $1,311.98 $6,325.41

Portage County $3,843.55 $1,337.82 $5,181.37

Price County $3,729.97 $473.08 $4,203.05

Racine County $1,210.76 $1,912.13 $3,122.89

Richland County $2,377.15 $522.07 $2,899.22

Rock County $3,788.17 $1,236.50 $5,024.67

Rusk County $2,958.40 $572.66 $3,531.06

St. Croix County $4,215.64 $2,568.81 $6,784.45

Sauk County $3,942.94 $2,475.15 $6,418.08

Sawyer County $3,958.08 $331.82 $4,289.89

Shawano County $4,230.07 $1,171.39 $5,401.46

Sheboygan County $2,222.83 $1,864.20 $4,087.03

Taylor County $3,842.39 $520.29 $4,362.67

Trempealeau County $2,924.10 $1,069.30 $3,993.39

Vernon County $3,952.70 $923.02 $4,875.72

Vilas County $4,170.14 $177.15 $4,347.29

Walworth County $2,987.41 $3,737.84 $6,725.25

Washburn County $3,413.49 $575.70 $3,989.19

Washington County $2,288.81 $4,280.28 $6,569.09

Waukesha County $2,779.86 $6,517.73 $9,297.58

Waupaca County $3,620.71 $1,795.95 $5,416.65

Waushara County $2,968.32 $622.89 $3,591.21

Winnebago County $2,694.00 $1,309.95 $4,003.95

Wood County $3,399.78 $3,515.74 $6,915.51

$344,386.30

FY 2017 Administrative Fees

Page 30: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Adams County

1992-1993 1 $55,268.00 2 $6,751.00 5 $95,440.50

1994-1995 1 $58,608.00 2 $6,834.55 3 $100,633.00

1996-1997 1 $58,526.00 2 $6,646.00 3 $100,729.00

1998-1999 1 $83,853.00 1 $212,931.19 2 $9,085.74 4 $144,002.00 1 $181,114.00

2000-2001 1 $86,181.00 2 $9,101.50 3 $145,853.00 1 $119,351.72

2002-2003 1 $89,595.79 1 $235,000.00 2 $7,896.68 4 $147,408.38

2004-2005 1 $91,421.00 1 $248,793.11 1 $9,518.00 6 $150,124.50

2006-2007 1 $95,305.08 1 $9,375.10 3 $155,966.61

2008-2009 1 $99,075.09 1 $9,516.74 6 $161,747.24

2010-2011 1 $94,953.16 1 $247,440.95 1 $8,921.50 4 $142,629.16 1 $148,020.00

2012-2013 1 $94,770.11 1 $8,897.07 5 $155,435.30 1 $103,823.40

2014-2015 1 $94,631.02 1 $236,676.15 1 $9,058.99 5 $158,944.02 1 $60,972.20

2016-2017 1 $93,828.08 1 $8,889.32 5 $145,658.04 1 $363,817.64

Page 1 of 72

Page 31: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Ashland County

1992-1993 1 $43,000.00 3 $23,245.00 12 $66,667.18

1994-1995 1 $45,736.00 3 $23,814.00 11 $70,740.19

1996-1997 1 $45,377.00 3 $23,262.00 12 $71,926.00

1998-1999 1 $64,990.00 2 $32,650.00 13 $100,909.21 1 $59,698.73

2000-2001 1 $66,290.00 1 $180,761.00 3 $32,622.00 14 $104,476.32

2002-2003 1 $67,030.91 3 $31,705.78 12 $99,851.03 1 $155,518.00

2004-2005 1 $67,936.00 3 $31,357.98 6 $107,920.631 $350,000.00

2006-2007 1 $70,458.58 1 $150,000.00 1 $31,222.84 7 $112,790.00 1 $131,090.00

2008-2009 2 $72,804.84 2 $31,308.30 5 $116,516.92

2010-2011 1 $69,702.35 2 $29,411.05 6 $111,881.27

2012-2013 1 $69,229.25 1 $140,269.76 2 $28,933.64 4 $109,902.93

2014-2015 2 $70,737.61 2 $29,003.70 4 $114,000.81

2016-2017 1 $70,206.79 2 $28,597.74 3 $105,405.44

Page 2 of 72

Page 32: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Barron County

1992-1993 2 $93,188.00 2 $43,425.00 10 $120,682.00

1994-1995 6 $98,036.00 6 $44,980.00 12 $128,401.00

1996-1997 5 $96,896.00 4 $44,168.00 19 $127,275.00

1998-1999 7 $138,466.00 2 $62,515.00 11 $181,594.00

2000-2001 3 $141,045.00 1 $125,000.00 4 $63,074.00 12 $185,397.29 1 $301,476.00

2002-2003 3 $144,495.64 1 $179,316.82 6 $64,206.43 12 $185,788.00

2004-2005 3 $145,963.01 4 $65,027.00 11 $190,407.95

2006-2007 2 $151,972.00 2 $65,937.00 14 $197,470.09

2008-2009 2 $156,719.94 1 $527,701.85 4 $66,934.64 13 $204,809.03

2010-2011 1 $141,551.19 5 $63,332.59 13 $196,557.55

2012-2013 1 $149,776.78 4 $62,949.42 12 $195,250.34

2014-2015 1 $69,553.26 1 $206,131.73 4 $62,750.52 12 $199,546.70

2016-2017 1 $147,898.89 1 $125,000.00 5 $61,995.02 12 $198,150.56

Page 3 of 72

Page 33: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Bayfield County

1992-1993 1 $42,564.68 1 $10,004.00 6 $141,352.93

1994-1995 1 $48,715.00 1 $10,073.00 12 $165,930.00 1 $53,744.00

1996-1997 1 $47,949.00 2 $10,230.00 9 $164,155.00 1 $112,270.00

1998-1999 1 $68,583.00 1 $208,319.41 1 $14,313.00 10 $229,260.51

2000-2001 1 $69,872.00 1 $14,323.00 10 $198,398.00 1 $74,746.00

2002-2003 1 $68,742.20 2 $13,981.37 12 $236,482.98

2004-2005 1 $69,148.31 1 $13,860.73 10 $238,338.12 1 $35,174.51

2006-2007 1 $72,285.78 1 $13,780.42 8 $248,328.37

2008-2009 1 $74,559.98 1 $117,964.94 1 $13,834.23 6 $256,312.40

2010-2011 1 $71,635.69 1 $12,979.66 9 $244,270.84 1 $275,628.77

2012-2013 1 $71,852.05 1 $150,000.00 1 $11,666.30 8 $242,856.34

2014-2015 1 $70,950.39 1 $12,701.03 11 $249,342.11 2 $668,988.84

2016-2017 1 $70,311.84 1 $106,716.11 1 $12,464.95 7 $245,656.57 1 $971,850.29

Page 4 of 72

Page 34: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Brown County

1992-1993 1 $264,954.00 2 $152,732.00 7 $105,513.00 11 $70,347.00

1994-1995 1 $280,861.00 1 $160,655.00 7 $110,985.00 17 $75,149.00

1996-1997 1 $141,000.00 1 $159,315.00 7 $112,887.00 14 $75,232.36

1998-1999 2 $408,903.00 1 $247,631.00 2 $226,191.00 7 $163,111.00 11 $109,133.00

2000-2001 2 $419,737.00 1 $245,165.00 1 $229,681.00 7 $168,168.00 9 $115,065.00 1 $145,338.001 $131,288.00

2002-2003 2 $427,256.00 2 $274,915.00 6 $130,205.00 12 $114,723.00

2004-2005 2 $435,451.00 2 $511,773.00 2 $278,482.00 5 $157,012.48 7 $113,508.971 $208,866.66

2006-2007 2 $455,875.69 1 $106,790.37 2 $282,400.70 4 $236,206.53 7 $92,902.07

2008-2009 2 $473,270.65 1 $437,489.00 2 $287,017.28 5 $244,872.38 7 $97,116.88

2010-2011 2 $453,652.75 1 $450,000.00 4 $270,598.83 6 $232,378.35 7 $93,562.98 1 $70,316.49

2012-2013 2 $451,517.60 1 $350,000.00 3 $267,515.87 5 $230,248.39 7 $93,045.19 1 $88,323.70

2014-2015 1 $465,831.42 2 $272,299.72 5 $233,864.23 7 $94,765.92 1 $158,268.11

2016-2017 1 $464,989.59 1 $262,000.00 2 $268,950.17 5 $232,867.72 7 $94,393.58 1 $104,573.251 $294,962.21

Page 5 of 72

Page 35: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Buffalo County

1992-1993 2 $68,565.86 4 $15,220.00 3 $45,589.00

1994-1995 2 $63,008.90 3 $15,727.00 6 $48,479.00

1996-1997 1 $72,192.00 5 $15,527.00 3 $47,932.00

1998-1999 2 $103,010.00 1 $205,285.81 5 $21,927.00 6 $68,500.00

2000-2001 3 $105,015.00 6 $22,020.00 6 $69,685.00

2002-2003 3 $106,230.78 6 $22,250.18 5 $70,149.76 1 $131,218.00

2004-2005 5 $107,560.85 1 $40,635.08 3 $22,262.00 5 $71,017.81

2006-2007 3 $111,153.36 1 $238,899.97 3 $22,183.92 5 $73,796.25

2008-2009 2 $114,418.19 1 $85,000.00 3 $22,793.90 5 $76,047.61

2010-2011 2 $109,443.77 1 $96,444.67 2 $14,282.98 6 $72,818.85

2012-2013 2 $108,822.62 1 $80,000.00 3 $21,230.99 4 $72,298.17

2014-2015 2 $110,140.92 1 $61,690.00 3 $21,071.75 5 $73,291.78 1 $274,582.16

2016-2017 2 $100,230.73 3 $20,662.99 4 $72,798.36

Page 6 of 72

Page 36: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Burnett County

1992-1993 2 $51,480.00 5 $8,104.00 11 $102,434.05

1994-1995 2 $54,162.00 1 $8,491.00 13 $109,226.00 1 $52,957.62

1996-1997 2 $53,822.00 1 $8,357.00 17 $108,123.00

1998-1999 2 $76,812.72 1 $150,936.91 1 $11,788.00 18 $155,058.84

2000-2001 1 $78,633.00 1 $11,946.00 20 $157,680.00

2002-2003 1 $81,640.53 1 $12,056.73 19 $158,832.58

2004-2005 1 $82,987.97 1 $150,000.00 1 $12,130.00 11 $160,884.90

2006-2007 1 $86,091.52 2 $12,351.50 11 $167,662.88

2008-2009 1 $89,579.70 2 $12,447.47 11 $169,045.06

2010-2011 1 $85,799.47 1 $150,000.00 2 $11,665.86 11 $158,651.38

2012-2013 1 $85,499.22 2 $11,591.24 11 $164,268.94

2014-2015 1 $84,957.58 2 $11,435.34 11 $167,860.80

2016-2017 1 $84,206.86 2 $11,247.93 11 $166,004.57 1 $113,328.22

Page 7 of 72

Page 37: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Calumet County

1992-1993 1 $58,502.00 1 $23,634.00 2 $39,241.00

1994-1995 1 $61,449.00 1 $24,414.00 3 $41,802.00

1996-1997 1 $61,657.00 1 $24,323.00 1 $41,615.00

1998-1999 1 $89,059.00 1 $35,023.00 3 $58,574.50

2000-2001 1 $92,044.00 1 $491,447.00 1 $36,508.00 4 $60,753.801 $192,140.00

2002-2003 1 $94,143.61 1 $37,865.62 3 $62,707.67

2004-2005 1 $97,242.93 1 $38,269.00 3 $64,742.00

2006-2007 1 $102,631.69 1 $281,790.37 2 $39,493.28 2 $67,814.12

2008-2009 1 $109,029.78 2 $40,721.51 3 $70,255.52

2010-2011 1 $102,949.87 2 $38,547.04 4 $66,700.41

2012-2013 1 $102,835.32 2 $38,312.65 2 $67,241.49

2014-2015 1 $108,071.55 1 $292,520.85 1 $19,547.96 3 $68,683.91 1 $127,209.13

2016-2017 1 $107,890.56 2 $67,942.38 2 $55,883.75

Page 8 of 72

Page 38: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Chippewa County

1992-1993 5 $140,235.00 9 $45,947.00 26 $101,699.00

1994-1995 11 $142,509.71 8 $49,078.00 24 $108,415.39

1996-1997 19 $138,294.58 7 $47,991.00 24 $107,556.70

1998-1999 11 $202,968.89 1 $158,522.00 7 $67,976.00 24 $149,780.13 1 $126,708.00

2000-2001 6 $209,299.78 1 $200,000.00 7 $67,591.50 23 $157,655.00 1 $62,288.00

2002-2003 13 $211,258.30 1 $125,000.00 7 $68,571.00 22 $159,083.27 1 $155,270.921 $188,535.00

2004-2005 13 $214,237.41 1 $225,000.00 2 $69,241.27 11 $162,599.51 1 $191,495.30

2006-2007 17 $221,613.31 1 $101,744.00 3 $93,192.51 14 $159,802.65 1 $190,675.65

2008-2009 10 $194,662.49 1 $180,000.00 3 $98,059.72 9 $165,924.76

2010-2011 1 $226,110.58 1 $194,352.00 3 $94,273.72 12 $159,373.47

2012-2013 2 $225,368.08 1 $182,615.36 3 $93,930.11 11 $158,887.50

2014-2015 1 $230,155.87 1 $112,342.00 3 $95,721.23 12 $162,386.00 1 $224,486.70

2016-2017 1 $228,324.25 1 $190,150.00 3 $94,380.00 10 $162,016.00 1 $334,634.40

Page 9 of 72

Page 39: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Clark County

1992-1993 3 $85,158.00 2 $27,578.61 6 $132,987.04

1994-1995 3 $88,963.00 2 $30,659.00 7 $147,060.00

1996-1997 5 $88,045.00 3 $30,213.99 6 $147,195.00

1998-1999 2 $126,039.00 1 $96,967.00 4 $42,996.00 9 $210,332.00

2000-2001 3 $128,426.00 1 $97,000.00 6 $43,843.00 10 $212,632.20 1 $171,916.00

2002-2003 4 $130,536.00 1 $100,000.00 6 $44,481.98 11 $215,607.50

2004-2005 2 $131,922.00 1 $100,500.00 3 $44,656.00 13 $218,132.53

2006-2007 2 $136,647.94 1 $101,986.00 4 $44,543.00 9 $224,837.00

2008-2009 1 $140,327.33 2 $103,999.99 4 $45,018.99 7 $230,706.34 1 $69,635.08

2010-2011 2 $133,689.26 1 $98,363.00 3 $42,636.11 8 $216,936.05

2012-2013 1 $133,230.24 1 $100,000.00 3 $42,542.27 6 $216,194.06

2014-2015 1 $135,563.68 1 $93,710.00 3 $43,438.50 6 $222,882.28 1 $132,057.30

2016-2017 2 $134,268.06 1 $100,058.00 3 $42,762.56 5 $223,535.111 $155,328.38

Page 10 of 72

Page 40: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Columbia County

1992-1993 1 $108,530.00 5 $61,734.83 4 $79,315.00

1994-1995 5 $115,238.00 5 $50,748.00 4 $84,554.00

1996-1997 5 $114,254.00 5 $50,435.00 4 $80,585.45

1998-1999 6 $164,286.00 7 $71,874.00 6 $119,469.05

2000-2001 3 $168,537.00 1 $190,000.00 7 $73,830.00 6 $121,877.08

2002-2003 4 $173,393.93 7 $74,712.27 6 $124,111.01

2004-2005 2 $176,074.00 2 $402,877.20 7 $75,997.90 6 $125,611.28

2006-2007 2 $182,886.33 5 $78,180.29 6 $130,560.46

2008-2009 5 $188,415.79 1 $205,000.00 5 $76,144.93 6 $134,591.91

2010-2011 3 $181,136.03 7 $77,219.46 5 $125,428.41

2012-2013 1 $180,325.55 1 $154,535.25 7 $76,778.93 9 $128,146.64

2014-2015 1 $184,359.18 1 $280,000.45 7 $78,836.64 10 $131,166.04 1 $144,128.80

2016-2017 1 $182,486.97 7 $77,772.87 9 $130,245.19 1 $299,074.18

Page 11 of 72

Page 41: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Crawford County

1992-1993 1 $43,000.00 7 $21,450.00 10 $51,722.88

1994-1995 1 $45,736.00 7 $27,046.50 11 $60,412.90

1996-1997 1 $45,377.00 6 $26,049.00 5 $59,824.00

1998-1999 1 $64,990.00 1 $182,484.00 6 $37,230.00 6 $84,424.46

2000-2001 1 $66,290.00 7 $37,157.99 4 $87,452.00 1 $152,823.00

2002-2003 2 $67,030.91 3 $37,338.89 4 $87,999.28

2004-2005 1 $67,936.00 1 $545,000.00 3 $37,074.00 5 $89,350.68

2006-2007 1 $70,458.58 1 $37,285.01 4 $93,221.67

2008-2009 1 $72,804.84 2 $37,182.86 3 $95,569.13 1 $251,197.00

2010-2011 1 $69,702.35 1 $420,168.05 2 $36,128.84 2 $91,967.93

2012-2013 1 $69,229.25 3 $35,485.51 3 $90,995.27 1 $457,610.26

2014-2015 1 $70,737.61 1 $35,110.36 2 $93,751.21

2016-2017 1 $70,206.79 1 $249,014.88 2 $27,180.56 2 $93,221.37

Page 12 of 72

Page 42: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Dane County

1992-1993 5 $463,243.00 1 $262,487.00 8 $171,811.32 8 $137,945.67

1994-1995 4 $509,496.00 1 $287,499.00 18 $190,483.00 10 $148,263.00 1 $56,187.00

1996-1997 4 $511,315.00 1 $285,740.00 16 $189,247.89 9 $148,424.00

1998-1999 8 $735,942.00 1 $396,157.00 1 $407,285.00 28 $281,304.47 15 $213,241.18 1 $199,113.00

2000-2001 6 $754,125.00 1 $414,543.00 18 $294,205.33 16 $217,289.001 $93,944.05

2002-2003 12 $770,967.30 1 $622,925.68 4 $522,655.48 29 $237,906.27 15 $219,341.57

2004-2005 9 $789,538.99 3 $539,444.66 13 $241,710.70 13 $221,556.78

2006-2007 5 $826,572.07 3 $556,076.19 12 $252,783.96 13 $228,619.56 1 $141,256.82

2008-2009 5 $863,422.83 3 $640,381.13 3 $579,302.65 11 $266,985.23 14 $237,273.42

2010-2011 5 $829,063.42 4 $554,152.26 10 $256,264.40 14 $210,004.61

2012-2013 4 $824,985.20 2 $354,947.89 4 $550,410.64 13 $254,690.18 17 $225,979.95 1 $393,643.23

2014-2015 8 $861,334.59 4 $573,301.43 10 $267,897.31 13 $229,321.04 6 $1,313,890.55

2016-2017 5 $868,504.88 2 $400,000.00 4 $575,426.99 12 $269,800.28 15 $225,816.01 2 $1,809,589.60

Page 13 of 72

Page 43: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Dodge County

1992-1993 1 $171,772.00 4 $39,785.17 5 $86,332.00

1994-1995 1 $181,590.00 7 $75,089.00 15 $92,056.00

1996-1997 1 $179,517.00 4 $74,623.00 5 $91,960.00 1 $161,967.00

1998-1999 1 $257,983.00 1 $242,908.74 5 $106,197.02 8 $131,851.00

2000-2001 1 $264,621.00 1 $422,740.00 4 $111,195.00 5 $135,043.00

2002-2003 1 $272,369.40 6 $112,526.95 4 $136,826.99 1 $84,491.43

2004-2005 1 $275,382.73 6 $113,031.70 4 $138,836.66 1 $48,357.40

2006-2007 1 $285,193.02 1 $551,915.00 4 $113,561.34 4 $105,231.10 1 $92,478.00

2008-2009 1 $292,826.10 3 $116,017.68 5 $149,152.65

2010-2011 1 $280,445.62 2 $623,877.74 4 $110,505.50 4 $142,839.65

2012-2013 1 $278,463.44 2 $55,858.11 5 $141,944.251 $489,661.40

2014-2015 2 $282,709.04 1 $439,385.00 3 $112,003.62 4 $144,996.82 1 $92,124.35

2016-2017 1 $280,644.81 6 $110,633.33 3 $144,190.36

Page 14 of 72

Page 44: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Door County

1992-1993 1 $74,884.00 1 $29,920.00 1 $67,091.00

1994-1995 1 $77,718.00 3 $29,578.17 3 $71,532.00 1 $53,744.00

1996-1997 1 $76,445.00 3 $28,638.50 4 $70,818.00

1998-1999 1 $110,146.00 7 $39,754.00 8 $96,348.87

2000-2001 1 $112,980.00 4 $43,062.00 7 $100,897.22

2002-2003 2 $116,543.99 2 $250,000.00 4 $42,479.70 6 $102,353.87 1 $130,367.00

2004-2005 1 $118,457.68 2 $38,545.00 5 $103,742.001 $14,787.48

2006-2007 1 $122,783.78 1 $281,790.37 1 $42,732.38 8 $106,785.341 $423,880.14

2008-2009 1 $126,752.00 1 $43,418.02 7 $111,463.43

2010-2011 2 $125,947.55 1 $275,000.00 2 $41,006.12 7 $105,772.81

2012-2013 1 $125,407.86 3 $40,630.57 6 $105,106.13 2 $112,680.37

2014-2015 1 $123,635.11 1 $292,520.85 2 $40,054.18 7 $107,144.41 1 $92,039.55

2016-2017 1 $123,031.01 2 $39,496.16 7 $106,840.99 1 $132,297.32

Page 15 of 72

Page 45: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Douglas County

1992-1993 6 $93,488.50 1 $59,913.00 5 $103,562.72

1994-1995 4 $106,819.00 7 $62,066.00 4 $17,294.00 7 $114,410.00

1996-1997 5 $104,926.00 1 $53,039.57 3 $16,813.00 8 $113,270.75

1998-1999 4 $148,741.00 1 $172,240.30 1 $85,251.00 3 $23,514.00 10 $162,658.39

2000-2001 1 $151,535.00 1 $85,283.00 4 $23,539.00 8 $161,473.00

2002-2003 1 $153,404.73 1 $159,473.15 1 $82,538.92 4 $23,824.68 8 $166,913.231 $275,787.00

2004-2005 1 $156,204.00 1 $200,000.00 1 $81,603.73 4 $23,258.99 9 $168,334.00

2006-2007 1 $160,871.00 1 $191,356.00 1 $81,123.02 3 $23,169.05 7 $175,238.68

2008-2009 1 $165,230.84 1 $81,540.32 3 $23,540.33 6 $180,653.09 1 $50,315.73

2010-2011 1 $158,171.91 1 $76,530.75 2 $14,783.08 7 $148,358.16

2012-2013 2 $157,521.50 1 $250,000.00 1 $75,752.13 2 $21,921.76 11 $172,002.73

2014-2015 1 $159,969.60 1 $76,452.48 3 $22,263.84 6 $176,119.31

2016-2017 1 $158,380.26 1 $225,000.00 1 $75,247.07 3 $21,954.17 6 $175,071.87

Page 16 of 72

Page 46: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Dunn County

1992-1993 4 $110,100.00 7 $34,839.00 11 $85,355.35

1994-1995 1 $116,795.00 8 $36,776.00 13 $91,127.00

1996-1997 1 $115,358.00 9 $32,070.50 11 $90,103.97 1 $144,860.65

1998-1999 1 $165,335.00 1 $150,095.00 5 $52,494.00 11 $128,644.00

2000-2001 1 $169,186.00 1 $266,393.00 7 $53,588.20 11 $130,914.00

2002-2003 1 $172,398.21 1 $120,084.00 7 $51,874.98 11 $132,790.72 1 $79,703.00

2004-2005 1 $175,234.00 1 $225,000.00 4 $53,725.00 11 $135,142.91 1 $92,120.851 $100,087.37

2006-2007 1 $182,871.50 3 $54,138.28 11 $140,906.68 1 $246,279.00

2008-2009 1 $189,242.25 1 $140,000.00 4 $55,332.69 10 $144,915.46

2010-2011 1 $181,393.73 1 $160,436.00 4 $52,305.99 10 $140,040.18

2012-2013 1 $181,048.97 1 $130,000.00 4 $52,401.32 8 $139,147.33 1 $416,077.74

2014-2015 1 $184,483.58 1 $106,715.00 4 $52,936.26 8 $142,300.52 1 $99,771.87

2016-2017 1 $182,872.14 1 $156,280.00 4 $52,085.74 11 $141,421.89 1 $80,253.89

Page 17 of 72

Page 47: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Eau Claire County

1992-1993 5 $161,263.00 1 $99,945.00 4 $17,237.00 8 $52,065.14

1994-1995 6 $171,690.00 2 $107,472.00 3 $17,483.58 7 $55,477.00

1996-1997 9 $169,701.00 2 $106,758.00 4 $17,857.00 9 $55,374.99

1998-1999 8 $242,008.00 1 $158,409.62 1 $152,325.00 3 $24,843.68 6 $79,875.00

2000-2001 7 $247,600.00 2 $155,921.00 3 $25,847.00 8 $80,183.00

2002-2003 9 $250,468.29 1 $250,000.00 2 $157,556.61 3 $25,687.44 3 $82,372.44 1 $65,123.00

2004-2005 8 $254,452.00 1 $225,000.00 1 $158,576.55 4 $25,708.84 7 $83,971.661 $215,228.68

2006-2007 5 $263,037.49 1 $317,273.00 1 $160,754.26 2 $25,770.34 5 $86,690.63

2008-2009 4 $271,561.90 1 $225,000.00 1 $166,279.51 2 $26,453.34 6 $90,345.41 1 $82,931.711 $172,176.14

2010-2011 3 $259,723.17 1 $205,615.00 1 $157,177.10 2 $25,138.33 4 $86,655.34

2012-2013 3 $258,974.58 1 $155,000.00 1 $154,082.28 1 $24,918.81 3 $86,381.22 1 $218,162.00

2014-2015 4 $264,110.59 1 $183,700.00 1 $158,435.32 1 $25,285.24 2 $88,168.75

2016-2017 1 $263,148.17 1 $196,102.00 1 $156,811.55 1 $25,574.18 3 $87,858.61

Page 18 of 72

Page 48: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Florence County

1992-1993 2 $43,000.00 6 $25,753.28

1994-1995 1 $45,736.00 6 $35,191.00

1996-1997 1 $45,377.00 4 $34,862.00

1998-1999 1 $64,990.00 1 $312,351.00 5 $49,881.00

2000-2001 1 $66,290.00 5 $51,176.00

2002-2003 1 $67,030.91 5 $51,635.00 1 $99,050.00

2004-2005 1 $67,936.00 1 $237,260.00 4 $51,658.96

2006-2007 1 $70,458.58 4 $53,893.50

2008-2009 1 $72,804.84 1 $151,450.02 3 $54,422.22

2010-2011 1 $69,702.35 1 $144,607.25 2 $53,467.39

2012-2013 1 $69,229.25 3 $52,805.00

2014-2015 1 $70,737.61 1 $136,744.06 2 $54,367.34

2016-2017 1 $70,206.79 2 $54,008.74

Page 19 of 72

Page 49: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Fond du Lac County

1992-1993 4 $143,533.95 1 $56,147.00 3 $28,698.00 12 $78,532.98

1994-1995 6 $160,624.05 2 $60,391.00 3 $29,220.00 7 $83,579.00

1996-1997 4 $162,414.00 1 $60,707.00 2 $29,879.00 9 $82,464.00

1998-1999 9 $233,121.00 1 $179,350.00 1 $87,674.00 2 $42,694.00 8 $115,724.23

2000-2001 1 $238,006.00 1 $199,203.00 1 $89,240.00 4 $43,708.00 8 $98,500.89

2002-2003 1 $239,094.82 1 $90,105.02 3 $44,595.00 8 $121,218.74

2004-2005 2 $241,822.00 1 $187,651.00 1 $90,759.00 3 $44,838.00 5 $120,278.35

2006-2007 2 $249,834.55 2 $185,641.00 1 $92,388.95 1 $45,231.03 5 $129,561.57

2008-2009 2 $264,197.18 1 $95,609.23 1 $46,652.09 5 $133,736.18 1 $160,084.73

2010-2011 2 $253,120.18 1 $450,000.00 1 $90,621.11 1 $44,808.96 4 $129,039.01

2012-2013 2 $251,634.81 1 $90,175.32 2 $41,869.27 4 $128,322.43 1 $79,877.48

2014-2015 2 $256,776.20 1 $292,520.85 1 $90,413.24 1 $44,788.73 4 $130,992.13

2016-2017 2 $254,731.94 1 $89,192.36 1 $44,332.27 4 $130,456.52

Page 20 of 72

Page 50: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Forest County

1992-1993 1 $43,000.00 1 $6,017.00 3 $45,055.00

1994-1995 2 $45,736.00 1 $6,302.86 5 $68,546.00

1996-1997 1 $45,377.00 1 $6,384.00 4 $68,832.00

1998-1999 1 $64,678.54 1 $197,593.00 1 $8,953.00 7 $97,378.25 1 $143,457.00

2000-2001 1 $66,290.00 1 $9,010.00 7 $100,321.50 1 $200,256.00

2002-2003 1 $67,030.91 1 $8,606.14 10 $100,541.96

2004-2005 1 $67,936.00 1 $165,000.00 1 $8,469.95 7 $102,564.12

2006-2007 1 $70,458.58 1 $8,359.89 7 $107,259.74

2008-2009 1 $72,804.84 1 $148,750.42 1 $8,408.82 5 $110,628.81

2010-2011 1 $69,702.35 1 $7,912.34 5 $105,087.23

2012-2013 1 $69,229.25 1 $144,615.03 1 $7,786.28 4 $105,615.17

2014-2015 1 $70,737.61 1 $7,804.17 4 $107,991.62

2016-2017 1 $69,727.94 1 $144,222.94 1 $7,655.04 4 $103,293.62

Page 21 of 72

Page 51: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Grant County

1992-1993 1 $106,183.00 4 $53,176.60 9 $116,172.00

1994-1995 1 $110,386.00 6 $60,401.00 9 $123,927.00

1996-1997 1 $108,385.00 7 $59,265.00 12 $123,726.00

1998-1999 1 $154,293.00 5 $83,672.00 19 $168,735.59

2000-2001 1 $156,935.00 1 $369,741.00 7 $84,712.00 10 $179,849.00

2002-2003 1 $156,538.21 5 $84,620.10 10 $181,063.68

2004-2005 1 $158,054.85 1 $133,379.00 6 $84,970.00 8 $183,595.82

2006-2007 1 $163,570.34 1 $585,270.00 7 $85,846.63 12 $188,448.45

2008-2009 1 $167,602.74 4 $87,148.62 9 $192,232.39

2010-2011 1 $166,103.34 7 $83,363.35 6 $153,956.40

2012-2013 1 $160,386.00 7 $81,618.34 8 $188,766.37 1 $118,092.97

2014-2015 1 $163,129.75 9 $84,673.51 7 $192,903.67 1 $224,486.70

2016-2017 1 $163,189.12 10 $84,733.43 8 $191,791.22 1 $145,916.16

Page 22 of 72

Page 52: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Green County

1992-1993 3 $78,640.00 1 $38,094.00 8 $45,117.55

1994-1995 2 $80,893.99 1 $38,500.00 6 $63,339.94

1996-1997 1 $82,073.00 1 $39,119.00 4 $63,878.00

1998-1999 4 $117,622.00 4 $53,680.00 6 $91,923.00

2000-2001 3 $120,214.00 1 $170,000.00 4 $54,708.00 5 $94,009.00

2002-2003 3 $124,644.97 8 $54,206.11 7 $95,749.12 1 $134,462.00

2004-2005 2 $126,582.65 1 $537,165.00 1 $56,163.55 8 $96,780.50

2006-2007 3 $131,530.12 3 $56,630.25 8 $102,186.25

2008-2009 2 $136,197.97 1 $336,737.00 3 $48,946.19 6 $105,798.38

2010-2011 1 $125,174.08 3 $53,555.42 6 $101,364.14

2012-2013 1 $129,472.42 1 $424,640.00 3 $53,986.82 4 $100,905.82

2014-2015 2 $132,427.42 3 $54,711.87 3 $100,199.81 1 $419,790.13

2016-2017 1 $131,093.95 1 $400,000.00 2 $53,803.04 6 $102,463.32

Page 23 of 72

Page 53: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Green Lake County

1992-1993 3 $59,492.00 3 $20,962.50 2 $28,622.00

1994-1995 2 $62,710.00 5 $21,569.00 4 $30,431.00

1996-1997 2 $61,680.00 3 $21,218.00 3 $30,196.00

1998-1999 1 $88,082.00 1 $212,931.19 3 $29,519.00 3 $43,199.00

2000-2001 1 $89,989.00 1 $30,932.00 3 $44,044.00

2002-2003 1 $89,898.79 1 $235,000.00 3 $29,840.17 3 $44,348.88

2004-2005 2 $90,892.73 2 $29,671.00 4 $45,004.00

2006-2007 1 $93,785.88 2 $226,061.65 2 $29,716.86 4 $46,786.40

2008-2009 2 $96,274.57 2 $30,346.17 5 $48,404.81

2010-2011 2 $92,112.22 2 $247,440.95 3 $28,709.73 4 $46,352.65

2012-2013 1 $91,965.07 2 $28,369.35 4 $46,137.29

2014-2015 1 $92,868.04 1 $236,676.15 3 $28,615.00 4 $46,984.09

2016-2017 1 $92,049.01 3 $28,212.38 4 $46,797.00 1 $199,418.76

Page 24 of 72

Page 54: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Iowa County

1992-1993 1 $82,930.00 3 $24,618.09 6 $58,604.88

1994-1995 1 $88,129.00 3 $26,107.00 5 $62,631.00

1996-1997 1 $86,402.00 3 $25,701.00 6 $62,692.00

1998-1999 1 $123,692.00 4 $36,866.30 6 $89,437.27

2000-2001 1 $127,544.00 1 $291,456.00 4 $37,341.00 6 $90,962.00

2002-2003 3 $38,443.64 5 $91,841.55

2004-2005 1 $132,574.69 2 $182,989.80 3 $39,443.00 5 $92,891.03 1 $192,442.14

2006-2007 1 $138,726.67 3 $39,744.62 2 $96,291.56

2008-2009 1 $142,971.89 3 $40,508.66 5 $95,414.17

2010-2011 1 $136,723.13 3 $430,726.97 3 $38,503.98 3 $95,264.17 1 $133,482.15

2012-2013 1 $125,953.28 3 $37,975.79 5 $94,739.65 1 $134,330.75

2014-2015 1 $137,863.79 1 $328,110.00 3 $35,621.94 5 $96,857.14

2016-2017 1 $136,760.06 2 $37,680.27 3 $96,171.171 $211,740.76

Page 25 of 72

Page 55: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Iron County

1992-1993 1 $43,000.00 3 $7,296.00 2 $35,265.00

1994-1995 1 $45,000.00 2 $7,616.00 4 $49,135.62

1996-1997 1 $45,377.00 1 $7,452.00 3 $45,204.45

1998-1999 1 $64,990.00 1 $10,470.00 6 $68,296.00

2000-2001 2 $66,290.00 1 $250,000.00 1 $10,494.00 7 $69,778.00

2002-2003 1 $67,030.91 1 $10,260.81 5 $70,142.95

2004-2005 1 $67,936.00 1 $10,226.00 8 $70,498.16

2006-2007 1 $70,458.58 1 $179,783.66 2 $10,162.48 6 $72,866.29

2008-2009 1 $72,804.84 1 $5,867.48 6 $76,936.85

2010-2011 1 $69,702.35 2 $144,607.25 1 $9,574.62 5 $73,528.48

2012-2013 1 $69,229.25 1 $9,396.78 4 $71,519.87 1 $96,766.14

2014-2015 1 $70,737.61 2 $136,744.04 1 $9,228.81 4 $75,097.50

2016-2017 1 $70,206.79 1 $9,083.09 4 $67,192.89

Page 26 of 72

Page 56: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Jackson County

1992-1993 1 $57,426.00 2 $9,661.75 6 $83,116.88

1994-1995 1 $60,734.00 2 $13,557.99 3 $92,330.00

1996-1997 1 $60,014.00 3 $13,312.00 6 $91,378.00

1998-1999 1 $85,661.00 2 $18,922.80 5 $130,763.52

2000-2001 1 $88,776.00 1 $300,000.00 1 $18,921.00 4 $128,741.45

2002-2003 1 $90,459.99 3 $18,958.56 4 $133,738.35

2004-2005 1 $91,741.72 1 $196,127.75 2 $18,886.85 6 $135,294.00

2006-2007 1 $95,011.94 2 $19,164.19 8 $136,851.71

2008-2009 1 $97,958.50 1 $152,144.79 3 $19,603.87 7 $144,912.48

2010-2011 1 $93,745.30 1 $18,499.42 6 $139,499.78

2012-2013 1 $93,409.66 1 $60,000.00 1 $18,302.26 5 $138,417.46

2014-2015 2 $95,494.28 1 $65,557.00 2 $18,500.09 3 $136,402.41

2016-2017 1 $104,093.77 1 $61,305.06 2 $18,216.31 3 $140,208.24

Page 27 of 72

Page 57: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Jefferson County

1992-1993 3 $115,279.00 9 $76,971.86 15 $57,820.22

1994-1995 1 $122,226.00 10 $81,884.99 5 $61,764.54

1996-1997 4 $120,916.00 3 $34,767.00 6 $49,027.00 4 $66,206.00

1998-1999 2 $174,917.00 1 $398,956.00 2 $50,018.00 7 $71,513.00 4 $92,659.87

2000-2001 1 $178,877.00 2 $51,125.00 7 $74,361.00 5 $96,949.00

2002-2003 1 $181,147.53 2 $519,922.85 2 $77,808.19 4 $97,798.26 1 $77,759.001 $261,540.92

2004-2005 2 $183,627.53 1 $55,028.00 3 $79,593.00 5 $99,258.00

2006-2007 1 $190,117.78 1 $55,896.27 2 $79,406.48 4 $101,463.93

2008-2009 1 $197,057.70 1 $125,000.00 2 $57,483.49 4 $83,111.26 4 $104,174.33

2010-2011 1 $188,674.61 1 $54,284.97 3 $79,753.46 4 $100,067.58 1 $294,792.71

2012-2013 1 $187,363.38 1 $300,000.00 1 $53,551.05 3 $79,232.90 4 $99,505.81

2014-2015 1 $194,675.73 1 $200,000.00 1 $56,013.40 3 $82,285.26 5 $103,692.76 1 $146,534.941 $273,000.00

2016-2017 1 $192,727.52 1 $200,000.00 1 $55,122.81 3 $81,140.85 4 $102,267.35 1 $788,920.061 $192,468.97

Page 28 of 72

Page 58: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Juneau County

1992-1993 1 $65,098.00 1 $22,210.00 5 $86,868.00

1994-1995 2 $68,553.00 1 $22,963.00 4 $88,760.16

1996-1997 1 $68,366.00 1 $22,606.00 5 $89,315.00

1998-1999 2 $94,883.00 2 $26,914.10 8 $130,394.00

2000-2001 1 $97,032.00 1 $150,000.00 1 $32,548.00 6 $132,638.00

2002-2003 1 $98,909.00 1 $32,377.92 8 $133,320.13

2004-2005 1 $100,779.94 1 $32,561.81 6 $135,303.70

2006-2007 1 $104,442.00 1 $215,000.00 1 $32,700.63 10 $140,935.10

2008-2009 1 $109,309.51 1 $293,696.00 2 $34,290.99 8 $146,813.49

2010-2011 2 $104,949.08 2 $32,395.05 7 $141,911.21

2012-2013 2 $104,739.66 1 $202,813.78 1 $32,023.33 10 $138,013.241 $141,800.00

2014-2015 1 $105,565.37 3 $28,359.75 8 $144,183.33 1 $316,775.68

2016-2017 1 $104,642.25 1 $110,000.00 2 $31,097.31 10 $143,423.64

Page 29 of 72

Page 59: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Kenosha County

1992-1993 12 $175,699.84 1 $114,574.00 6 $39,493.16 6 $15,731.00

1994-1995 2 $191,312.00 1 $124,178.00 5 $42,541.37 6 $16,868.00

1996-1997 2 $191,060.00 1 $124,088.00 4 $44,935.00 6 $17,157.00 1 $110,214.00

1998-1999 5 $273,909.10 1 $210,962.00 1 $177,375.00 4 $64,717.00 5 $24,859.00

2000-2001 4 $281,358.00 1 $234,314.00 1 $180,457.00 4 $43,337.00 3 $25,591.00

2002-2003 2 $289,761.46 1 $209,600.00 1 $183,475.04 4 $71,213.92 5 $26,297.62

2004-2005 3 $295,572.68 1 $229,570.00 1 $184,717.00 2 $73,826.79 4 $28,030.881 $272,269.04

2006-2007 1 $307,619.16 2 $227,136.00 1 $188,256.09 2 $76,541.30 3 $29,456.30

2008-2009 1 $286,873.87 1 $231,622.00 1 $194,157.32 3 $79,195.13 4 $30,944.33

2010-2011 1 $306,143.86 1 $286,933.93 1 $184,958.36 2 $77,900.17 4 $30,059.66

2012-2013 1 $303,394.75 1 $272,476.49 1 $183,368.65 3 $87,618.13 3 $26,111.64 1 $148,271.27

2014-2015 1 $315,346.78 1 $278,413.67 1 $189,435.86 3 $89,227.79 3 $26,751.77

2016-2017 1 $229,054.22 1 $325,100.86 2 $239,599.92 2 $38,661.61 2 $26,606.73

Page 30 of 72

Page 60: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Kewaunee County

1992-1993 1 $55,022.00 4 $15,629.00 9 $38,287.80

1994-1995 1 $56,569.00 2 $7,982.00 10 $45,169.00 1 $113,839.00

1996-1997 2 $55,941.00 4 $16,090.00 10 $44,690.00

1998-1999 2 $80,026.00 1 $247,631.00 4 $19,146.50 10 $63,867.00

2000-2001 1 $81,918.00 4 $23,677.00 10 $64,984.00 1 $167,256.99

2002-2003 1 $87,570.98 1 $217,522.87 4 $24,689.80 10 $65,454.90

2004-2005 1 $68,821.00 2 $24,972.94 5 $66,288.62

2006-2007 1 $92,144.76 1 $281,790.38 2 $25,187.35 5 $68,980.74

2008-2009 1 $94,989.57 2 $26,034.20 5 $71,434.32

2010-2011 1 $91,022.79 2 $24,641.73 5 $68,284.21

2012-2013 1 $91,642.86 2 $24,474.83 5 $67,898.18 1 $101,405.00

2014-2015 1 $92,200.02 1 $292,520.85 2 $24,728.12 5 $69,409.73

2016-2017 1 $91,370.81 1 $124,381.70 2 $24,319.00 5 $68,981.90 1 $160,507.78

Page 31 of 72

Page 61: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

La Crosse County

1992-1993 1 $150,587.00 2 $77,477.00 4 $32,006.00 4 $33,160.00

1994-1995 1 $160,186.00 1 $81,749.00 4 $36,860.00 5 $34,545.00

1996-1997 1 $159,323.00 2 $80,107.00 6 $37,993.00 5 $34,338.00

1998-1999 1 $228,792.00 1 $344,500.00 2 $112,630.00 7 $56,398.00 8 $48,750.84

2000-2001 1 $233,892.00 2 $114,000.00 4 $59,094.00 4 $45,429.51

2002-2003 1 $234,128.37 1 $370,712.75 1 $111,400.00 3 $64,432.84 5 $50,996.41

2004-2005 2 $236,488.64 6 $110,721.86 3 $65,044.51 3 $52,464.60

2006-2007 2 $243,936.26 1 $110,959.97 3 $68,229.72 5 $55,547.85 1 $123,939.18

2008-2009 2 $251,477.97 1 $111,451.94 3 $72,426.77 3 $58,876.67

2010-2011 3 $205,452.43 1 $335,263.00 1 $105,742.23 3 $70,409.15 2 $55,427.47 1 $71,412.95

2012-2013 1 $241,507.20 1 $104,385.44 3 $70,436.66 2 $55,811.92

2014-2015 3 $248,919.62 1 $66,237.89 1 $105,184.71 2 $73,565.53 3 $57,454.58 1 $289,747.48

2016-2017 2 $247,856.10 1 $111,876.25 1 $104,134.31 2 $73,365.07 1 $56,944.26 1 $153,211.97

Page 32 of 72

Page 62: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Lafayette County

1992-1993 1 $61,758.00 6 $15,983.00 5 $61,082.00

1994-1995 2 $64,424.00 8 $16,507.00 7 $64,912.00

1996-1997 1 $63,527.00 2 $16,092.00 3 $64,220.00

1998-1999 1 $90,511.00 1 $262,850.21 2 $22,613.00 7 $90,155.90

2000-2001 1 $92,254.00 2 $23,055.00 6 $93,047.30

2002-2003 1 $96,254.78 1 $252,730.11 2 $23,055.00 6 $93,867.50

2004-2005 1 $97,324.76 2 $22,687.00 7 $95,239.00

2006-2007 1 $101,643.60 1 $392,500.00 2 $23,197.50 8 $99,478.96

2008-2009 1 $104,350.07 3 $23,550.19 6 $102,843.98

2010-2011 1 $99,963.76 1 $354,000.00 2 $22,042.52 6 $98,709.03

2012-2013 1 $99,409.82 2 $22,087.76 6 $98,058.28

2014-2015 1 $101,930.94 2 $22,602.28 4 $100,211.71 1 $71,912.27

2016-2017 1 $101,058.06 1 $357,162.17 2 $22,208.62 5 $97,343.00

Page 33 of 72

Page 63: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Langlade County

1992-1993 2 $65,425.66 1 $17,631.00 6 $57,325.00

1994-1995 2 $71,080.00 3 $18,170.00 12 $60,654.70

1996-1997 3 $62,274.06 2 $17,841.00 12 $60,594.00

1998-1999 4 $100,729.00 3 $25,310.99 13 $86,469.84

2000-2001 1 $102,684.00 1 $25,860.00 14 $82,726.00

2002-2003 2 $96,529.49 2 $25,585.14 15 $86,717.72

2004-2005 2 $104,976.78 1 $139,999.64 1 $25,346.70 9 $91,267.70

2006-2007 1 $108,547.77 1 $25,589.00 9 $95,215.20

2008-2009 1 $111,825.21 1 $25,781.40 9 $98,273.53

2010-2011 1 $50,237.22 2 $24,336.13 9 $91,816.17

2012-2013 1 $106,601.11 1 $144,615.00 1 $24,120.99 9 $93,908.59 1 $87,585.62

2014-2015 1 $105,885.78 1 $23,853.98 9 $96,099.701 $385,000.00

2016-2017 1 $104,883.74 1 $144,222.94 1 $23,468.69 6 $91,031.28 1 $77,335.57

Page 34 of 72

Page 64: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Lincoln County

1992-1993 3 $72,057.00 2 $27,402.00 7 $62,405.31

1994-1995 5 $76,768.00 4 $28,686.00 9 $68,970.92

1996-1997 6 $76,431.00 2 $28,098.00 11 $68,447.00 1 $185,160.69

1998-1999 11 $109,318.00 2 $39,665.00 13 $98,051.01

2000-2001 9 $113,331.00 4 $39,876.00 13 $100,374.00 1 $90,384.69

2002-2003 12 $115,372.22 3 $40,809.74 11 $101,711.22

2004-2005 16 $116,388.18 1 $40,713.87 8 $103,485.92

2006-2007 1 $121,341.06 1 $179,783.66 2 $41,286.06 8 $108,586.87

2008-2009 1 $124,886.36 1 $41,764.51 8 $104,400.84

2010-2011 1 $119,766.30 1 $144,607.25 1 $38,538.56 8 $107,846.92

2012-2013 1 $119,071.41 1 $38,688.64 8 $107,284.33 2 $279,826.91

2014-2015 1 $118,610.45 1 $136,744.04 1 $38,055.92 8 $109,742.20 1 $68,577.00

2016-2017 1 $117,644.79 1 $37,509.76 8 $108,951.25 1 $607,984.02

Page 35 of 72

Page 65: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Manitowoc County

1992-1993 5 $134,725.00 1 $53,292.00 6 $39,366.00 4 $81,885.00

1994-1995 1 $140,555.00 1 $56,395.00 7 $40,773.00 5 $87,115.00

1996-1997 4 $138,480.00 1 $55,579.00 5 $40,147.00 4 $85,166.00

1998-1999 1 $197,950.00 1 $78,509.00 3 $57,790.00 6 $123,200.00

2000-2001 2 $201,672.00 1 $250,000.00 1 $80,125.00 7 $58,722.00 5 $125,592.00

2002-2003 2 $199,872.90 2 $256,448.23 1 $79,338.74 8 $56,038.38 6 $126,643.45

2004-2005 1 $201,138.00 1 $80,583.00 5 $57,980.59 5 $128,113.84

2006-2007 1 $207,076.96 1 $281,790.37 1 $81,530.75 5 $58,325.52 5 $133,521.45

2008-2009 1 $212,026.17 1 $280,873.09 1 $82,957.17 5 $57,865.18 5 $137,667.44

2010-2011 2 $201,969.38 1 $250,000.00 2 $78,498.17 4 $55,532.56 5 $131,903.59

2012-2013 2 $200,573.19 1 $77,561.05 4 $54,903.04 5 $131,196.70

2014-2015 3 $198,926.98 2 $292,520.85 1 $77,637.61 5 $54,937.52 5 $134,192.92 1 $404,076.07

2016-2017 1 $196,651.15 1 $76,322.17 5 $54,015.16 5 $133,297.80

Page 36 of 72

Page 66: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Marathon County

1992-1993 1 $225,937.00 1 $63,270.00 3 $39,769.00 10 $174,326.98

1994-1995 2 $230,744.62 1 $69,626.00 3 $42,780.00 8 $184,617.18

1996-1997 2 $240,468.00 1 $68,835.00 3 $45,672.00 8 $172,552.67

1998-1999 1 $345,100.00 1 $97,741.00 8 $93,229.99 14 $254,600.55

2000-2001 1 $350,889.00 1 $125,000.00 1 $98,640.00 6 $101,629.21 14 $254,976.74 1 $86,377.13

2002-2003 1 $349,817.44 1 $97,534.35 6 $102,049.63 11 $260,650.02

2004-2005 2 $353,977.00 1 $248,793.11 1 $97,828.50 8 $121,432.94 12 $257,188.95 1 $86,076.17

2006-2007 1 $367,400.33 1 $155,070.00 1 $99,294.60 4 $136,175.51 11 $262,264.591 $290,024.69

2008-2009 1 $381,175.70 1 $259,411.47 2 $101,978.60 4 $142,750.31 14 $269,941.50

2010-2011 1 $366,361.34 1 $96,943.12 6 $136,629.23 11 $260,055.21

2012-2013 1 $365,735.30 1 $247,479.07 1 $96,343.80 4 $135,905.13 11 $256,838.33 1 $96,145.391 $463,700.00

2014-2015 1 $369,652.99 2 $95,845.56 5 $137,500.00 11 $264,532.54 1 $405,073.78

2016-2017 1 $366,517.64 1 $249,460.62 1 $94,391.66 5 $137,013.14 10 $262,934.78 1 $227,142.83

Page 37 of 72

Page 67: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Marinette County

1992-1993 1 $96,459.00 2 $41,082.00 8 $130,905.09

1994-1995 2 $102,072.00 4 $42,596.00 8 $138,939.50

1996-1997 3 $100,725.00 4 $41,177.03 8 $131,006.18

1998-1999 1 $144,022.00 1 $206,777.55 7 $58,223.00 10 $194,667.11

2000-2001 1 $146,856.00 6 $58,841.00 7 $186,445.69

2002-2003 1 $148,351.72 1 $217,519.00 6 $57,942.52 9 $202,069.69

2004-2005 1 $149,883.00 4 $57,567.88 9 $204,589.29

2006-2007 1 $162,014.34 1 $281,790.37 3 $57,908.00 9 $203,787.87

2008-2009 1 $167,734.02 4 $58,301.27 10 $217,586.79 1 $234,290.06

2010-2011 1 $160,158.22 3 $55,024.89 9 $208,961.28

2012-2013 2 $157,348.32 1 $217,837.51 3 $53,577.82 9 $209,098.56 1 $91,665.80

2014-2015 1 $155,474.39 3 $54,803.22 8 $212,026.55 1 $92,990.16

2016-2017 1 $153,900.53 1 $280,254.28 3 $53,877.39 8 $212,625.42 2 $246,837.26

Page 38 of 72

Page 68: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Marquette County

1992-1993 3 $54,689.00 1 $10,026.00 6 $35,315.78

1994-1995 3 $57,083.00 2 $7,904.29 6 $45,909.00

1996-1997 3 $56,658.00 4 $10,232.00 5 $45,559.00

1998-1999 4 $81,336.00 1 $14,553.00 9 $65,301.00

2000-2001 4 $83,485.00 1 $250,000.00 3 $12,650.42 7 $66,375.00

2002-2003 3 $85,381.34 1 $14,493.20 7 $66,745.95

2004-2005 4 $86,566.65 1 $248,793.11 1 $14,388.00 7 $67,954.99

2006-2007 1 $26,250.00 2 $14,512.23 5 $50,730.66

2008-2009 2 $92,500.45 1 $14,747.96 6 $65,301.99

2010-2011 2 $88,621.20 1 $13,860.88 7 $69,940.12

2012-2013 2 $88,174.43 1 $247,479.07 1 $13,696.84 6 $69,537.80

2014-2015 1 $89,757.57 1 $13,923.90 7 $71,075.52

2016-2017 1 $88,962.41 1 $249,460.62 1 $13,702.18 7 $70,611.00

Page 39 of 72

Page 69: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Menominee County

1992-1993

1994-1995 2 $45,736.00 1 $7,447.00

1996-1997 2 $45,377.00 1 $7,368.00

1998-1999 2 $64,990.00 3 $7,500.00

2000-2001 1 $66,290.00

2002-2003 1 $67,030.91 1 $10,762.84

2004-2005 1 $67,936.00 1 $274,164.00 1 $10,886.51

2006-2007 1 $70,458.58 1 $11,329.34

2008-2009 1 $22,955.00 1 $11,677.24

2010-2011 1 $69,702.35 1 $11,187.98

2012-2013

2014-2015 1 $70,737.61 1 $11,361.56

2016-2017 1 $70,206.79 1 $11,286.62

Page 40 of 72

Page 70: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Milwaukee County

1992-1993 1 $996,050.00 6 $1,032,424.00 12 $171,832.03

1994-1995 2 $1,078,074.00 7 $1,142,670.00 18 $185,868.99

1996-1997 1 $1,055,243.00 7 $1,118,977.27 12 $181,492.00

1998-1999 3 $1,479,754.00 1 $1,138,441.00 8 $1,568,011.00 12 $254,635.00

2000-2001 2 $1,471,712.00 2 $1,258,088.00 7 $1,549,688.00 12 $255,050.001 $227,598.00

2002-2003 2 $1,420,590.88 1 $1,104,834.00 8 $1,539,779.88 16 $247,944.41

2004-2005 2 $1,213,848.55 1 $1,097,985.00 7 $1,531,038.18 7 $244,743.543 $721,554.83

2006-2007 1 $1,175,608.05 1 $988,341.24 7 $1,536,427.90 6 $244,354.051 $122,560.64

2008-2009 1 $1,466,031.72 1 $956,961.73 7 $1,552,760.24 6 $246,146.701 $319,395.65

2010-2011 2 $1,269,957.51 1 $604,500.61 7 $1,467,067.50 5 $218,204.49

2012-2013 1 $1,363,520.14 1 $768,294.06 7 $1,437,872.81 6 $228,843.951 $472,400.00

2014-2015 1 $1,418,669.57 1 $755,106.76 8 $1,456,221.03 6 $232,333.21

2016-2017 1 $1,403,005.12 1 $844,456.30 7 $1,454,445.73 6 $228,803.75

Page 41 of 72

Page 71: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Monroe County

1992-1993 1 $98,433.00 5 $25,113.25 7 $78,554.30

1994-1995 2 $103,570.00 4 $29,917.00 7 $85,041.00

1996-1997 1 $102,516.00 5 $36,707.00 12 $84,251.25

1998-1999 1 $146,329.00 4 $52,568.00 7 $120,697.00

2000-2001 3 $149,387.00 6 $53,239.00 9 $122,982.00

2002-2003 2 $153,040.13 1 $375,000.00 6 $54,034.97 7 $124,247.43

2004-2005 3 $155,590.83 5 $54,626.00 8 $126,078.00

2006-2007 1 $161,441.69 1 $13,152.40 5 $55,468.20 7 $131,430.441 $162,094.00

2008-2009 3 $166,796.69 2 $165,204.00 5 $58,352.55 8 $135,925.82

2010-2011 3 $218,699.67 4 $44,567.87 4 $82,977.90

2012-2013 1 $159,643.39 3 $55,433.64 6 $129,608.20

2014-2015 1 $163,256.98 1 $625,000.00 5 $56,656.55 5 $129,577.53

2016-2017 1 $162,094.26 5 $56,054.31 6 $125,643.55

Page 42 of 72

Page 72: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Oconto County

1992-1993 1 $84,166.00 1 $21,427.00 3 $121,158.00

1994-1995 1 $89,489.00 1 $22,212.00 3 $122,792.66

1996-1997 1 $88,820.00 1 $21,820.00 5 $129,468.00 1 $262,984.00

1998-1999 1 $129,025.00 1 $247,631.00 1 $28,762.30 9 $182,221.26

2000-2001 1 $132,459.00 1 $245,165.00 1 $31,120.00 6 $187,603.84

2002-2003 1 $136,582.93 1 $30,955.75 8 $192,859.39

2004-2005 1 $139,667.53 1 $274,164.00 2 $30,858.00 8 $197,893.58

2006-2007 6 $145,135.92 3 $30,864.59 12 $205,240.00

2008-2009 16 $150,350.26 1 $280,873.09 1 $31,233.31 13 $213,061.08

2010-2011 14 $144,239.84 1 $29,422.29 13 $205,428.68 1 $114,413.27

2012-2013 5 $143,758.53 1 $29,113.96 12 $203,799.18 1 $195,837.511 $504,847.50

2014-2015 4 $144,161.04 1 $292,520.85 1 $29,857.47 12 $209,435.07

2016-2017 1 $144,313.49 1 $29,458.35 12 $203,898.08

Page 43 of 72

Page 73: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Oneida County

1992-1993 1 $62,703.00 1 $14,674.00 5 $110,801.41

1994-1995 1 $65,505.00 1 $15,349.00 5 $117,006.51

1996-1997 1 $66,343.00 1 $15,300.00 6 $117,202.00

1998-1999 1 $95,338.00 1 $21,668.00 8 $165,503.67

2000-2001 1 $97,255.00 1 $21,774.00 9 $171,034.94 1 $120,590.00

2002-2003 2 $100,575.86 1 $323,629.90 1 $21,330.41 9 $172,258.55

2004-2005 1 $102,063.00 1 $21,238.00 8 $174,973.00

2006-2007 1 $105,218.44 1 $22,681.59 8 $180,200.69

2008-2009 2 $108,540.71 1 $151,450.02 1 $22,873.31 8 $189,134.15 1 $49,790.25

2010-2011 1 $103,933.62 1 $21,834.19 7 $182,630.95 1 $71,508.30

2012-2013 1 $103,621.09 1 $144,615.00 1 $21,573.18 7 $180,823.10 1 $169,758.64

2014-2015 1 $101,007.32 1 $21,328.20 7 $181,423.35 2 $679,826.85

2016-2017 1 $82,640.25 1 $144,222.94 1 $20,874.70 7 $184,836.48 1 $114,300.99

Page 44 of 72

Page 74: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Outagamie County

1992-1993 1 $206,000.00 1 $102,117.00 6 $59,066.00 3 $71,217.87

1994-1995 7 $219,905.00 1 $108,399.00 5 $61,691.00 3 $77,009.00

1996-1997 2 $219,225.00 1 $108,112.00 5 $61,527.00 3 $77,643.00

1998-1999 3 $317,046.00 1 $154,682.00 5 $89,547.00 4 $114,136.00

2000-2001 2 $324,760.00 1 $495,166.00 1 $156,649.00 5 $92,678.00 5 $118,442.00

2002-2003 4 $329,179.00 3 $156,757.97 3 $93,147.99 4 $116,055.261 $194,886.00

2004-2005 2 $336,676.00 1 $383,830.00 1 $157,990.00 4 $96,577.99 3 $119,531.74 1 $137,818.59

2006-2007 1 $350,780.00 2 $159,892.48 2 $101,132.57 6 $134,028.00

2008-2009 1 $363,929.70 1 $450,000.00 1 $161,498.95 2 $104,373.82 5 $140,893.64 1 $303,996.43

2010-2011 2 $349,001.22 1 $402,034.43 1 $155,846.78 2 $100,320.22 4 $134,958.62

2012-2013 2 $344,594.09 1 $350,000.00 1 $155,725.95 1 $99,462.75 4 $134,814.84 2 $418,550.49

2014-2015 1 $357,065.65 1 $157,989.38 2 $101,272.90 4 $137,859.38 2 $362,831.171 $550,000.00

2016-2017 1 $355,255.82 1 $505,000.00 1 $156,644.11 2 $100,165.99 3 $137,224.21 2 $528,099.71

Page 45 of 72

Page 75: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Ozaukee County

1992-1993 1 $99,714.00 6 $101,172.41 5 $18,635.34

1994-1995 2 $106,829.00 3 $54,022.00 5 $61,872.00 5 $23,860.00

1996-1997 2 $105,980.00 1 $53,926.00 7 $65,845.00 6 $25,092.00

1998-1999 3 $156,865.00 1 $120,684.00 1 $76,455.00 7 $95,386.70 6 $36,457.98 1 $206,667.00

2000-2001 1 $160,336.00 2 $134,243.00 1 $77,745.00 6 $100,437.00 6 $37,479.001 $340,200.00

2002-2003 4 $161,707.93 1 $120,900.00 1 $79,050.65 7 $100,576.66 6 $37,938.19

2004-2005 1 $164,376.00 1 $127,500.00 1 $79,541.00 4 $103,894.85 3 $38,582.00

2006-2007 2 $170,318.73 1 $126,097.00 1 $80,297.31 4 $98,662.99 3 $38,343.49

2008-2009 1 $175,690.83 1 $129,164.00 1 $82,213.63 4 $105,031.08 3 $39,769.11

2010-2011 2 $159,920.90 1 $162,966.57 1 $77,746.72 4 $100,134.49 2 $25,659.471 $405,000.00

2012-2013 1 $167,270.75 3 $174,322.76 1 $76,910.14 3 $99,496.81 3 $38,223.22 1 $140,727.46

2014-2015 2 $169,943.97 1 $158,378.51 1 $76,722.18 4 $100,803.52 3 $39,025.99 1 $157,888.98

2016-2017 1 $168,668.31 1 $185,927.64 1 $75,718.11 3 $99,740.75 3 $38,750.02

Page 46 of 72

Page 76: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Pepin County

1992-1993 3 $43,000.00 1 $6,990.00 1 $10,000.00

1994-1995 3 $40,932.67 2 $6,989.00 4 $21,108.83

1996-1997 1 $45,377.00 1 $6,928.00 2 $21,488.00

1998-1999 1 $64,990.00 1 $9,686.00 2 $30,794.00

2000-2001 2 $66,290.00 4 $9,776.00 4 $31,259.00

2002-2003 1 $67,030.91 1 $9,593.39 4 $31,558.74

2004-2005 1 $67,936.00 3 $9,578.87 2 $31,936.53

2006-2007 2 $70,458.58 1 $155,739.00 1 $9,532.94 4 $33,254.24

2008-2009 1 $72,804.84 1 $9,546.56 2 $34,293.14

2010-2011 1 $65,035.56 1 $115,513.00 1 $9,145.49 2 $33,024.721 $270,100.00

2012-2013 2 $69,229.25 2 $9,012.92 2 $32,841.71

2014-2015 1 $61,944.58 2 $90,596.00 1 $8,898.28 2 $30,962.84 1 $73,521.50

2016-2017 1 $70,206.79 1 $52,319.25 1 $8,740.07 2 $33,345.86 1 $58,366.47

Page 47 of 72

Page 77: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Pierce County

1992-1993 5 $72,910.37 7 $34,760.00 5 $56,429.12

1994-1995 3 $80,764.00 7 $35,029.15 5 $69,042.40

1996-1997 2 $80,270.00 7 $36,213.00 5 $68,548.00

1998-1999 6 $114,581.00 1 $88,152.00 8 $52,411.50 5 $98,245.00

2000-2001 1 $117,154.00 1 $80,000.00 10 $53,254.75 5 $100,243.00

2002-2003 3 $120,643.99 1 $90,000.00 11 $55,313.84 8 $101,999.86

2004-2005 2 $122,826.00 4 $57,088.00 5 $103,784.78

2006-2007 3 $128,098.05 1 $191,008.00 4 $55,991.36 5 $108,506.61

2008-2009 2 $133,141.12 1 $100,000.00 4 $61,936.99 5 $109,294.70

2010-2011 1 $127,856.56 1 $112,069.00 2 $30,045.73 5 $108,457.651 $225,785.00

2012-2013 1 $127,759.96 1 $90,000.00 4 $59,583.18 5 $107,957.90 2 $201,861.69

2014-2015 1 $130,809.84 1 $77,412.00 4 $61,468.68 5 $110,354.48 1 $248,036.63

2016-2017 1 $129,627.75 1 $96,600.75 4 $60,999.58 5 $109,620.85 2 $544,267.29

Page 48 of 72

Page 78: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Polk County

1992-1993 2 $93,778.00 7 $28,042.00 14 $113,560.00

1994-1995 1 $99,014.00 8 $33,434.00 23 $122,389.00 1 $48,858.00

1996-1997 1 $98,127.00 8 $32,975.00 19 $121,239.95 1 $59,899.00

1998-1999 1 $140,483.00 1 $144,091.60 9 $46,689.00 21 $173,693.00

2000-2001 1 $143,544.00 12 $47,470.00 15 $176,069.07

2002-2003 2 $150,507.36 1 $166,071.00 10 $48,942.93 16 $179,236.37 1 $75,587.00

2004-2005 1 $153,584.51 1 $200,000.00 6 $49,611.80 14 $181,297.00

2006-2007 1 $159,885.00 6 $50,192.50 12 $188,445.581 $459,138.25

2008-2009 1 $165,729.60 1 $170,668.84 8 $52,578.19 11 $196,648.94

2010-2011 1 $158,823.14 1 $125,000.00 7 $50,737.81 11 $186,150.66 1 $182,441.50

2012-2013 1 $158,011.66 1 $238,719.77 5 $50,284.29 12 $187,424.86

2014-2015 1 $158,386.15 6 $50,612.95 8 $191,585.70 2 $544,384.25

2016-2017 1 $156,854.77 1 $250,000.00 6 $49,855.33 12 $190,510.491 $281,820.00

Page 49 of 72

Page 79: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Portage County

1992-1993 2 $142,097.00 1 $40,077.00 6 $30,453.00 12 $88,759.00

1994-1995 2 $148,954.00 2 $42,177.00 11 $32,413.50 13 $91,385.47 1 $143,642.00

1996-1997 1 $148,556.00 1 $38,745.95 11 $33,086.00 15 $90,451.30

1998-1999 3 $212,084.00 1 $212,931.19 1 $44,508.46 6 $48,339.00 15 $133,498.00

2000-2001 4 $216,302.00 1 $61,951.00 6 $49,713.62 14 $123,367.99 1 $82,470.26

2002-2003 3 $217,751.75 1 $235,000.00 2 $62,328.91 9 $48,115.49 15 $134,283.80

2004-2005 2 $219,725.00 1 $54,694.84 5 $47,998.10 9 $138,640.91

2006-2007 3 $225,748.26 1 $206,062.00 1 $63,117.57 6 $50,801.05 6 $145,752.28 1 $157,689.43

2008-2009 1 $230,218.48 1 $116,821.25 1 $63,768.32 4 $52,980.37 6 $151,941.60

2010-2011 3 $220,843.33 1 $247,440.95 1 $62,546.77 4 $50,345.85 7 $144,935.72

2012-2013 2 $220,223.35 1 $63,449.09 3 $48,740.32 3 $144,087.30 1 $73,710.31

2014-2015 1 $225,867.64 1 $219,880.22 1 $65,170.13 5 $51,442.00 4 $147,105.29 1 $127,389.32

2016-2017 1 $223,989.84 5 $50,837.31 6 $146,055.05 1 $1,222,777.46

Page 50 of 72

Page 80: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Price County

1992-1993 1 $52,295.00 3 $14,228.19 4 $85,188.59

1994-1995 1 $57,552.00 2 $14,912.00 5 $89,233.62 1 $71,459.23

1996-1997 1 $56,826.00 3 $14,934.00 5 $91,163.52

1998-1999 1 $81,135.00 4 $21,158.23 8 $125,700.77

2000-2001 1 $82,704.00 4 $21,303.00 6 $137,386.50

2002-2003 1 $82,704.27 1 $143,395.00 4 $20,731.05 8 $140,976.251 $250,473.00

2004-2005 1 $83,521.63 3 $20,496.51 7 $143,219.84 1 $166,681.251 $134,319.39

2006-2007 1 $86,222.54 3 $19,976.41 6 $142,163.58

2008-2009 1 $88,700.29 1 $151,450.02 3 $19,999.39 6 $146,620.74

2010-2011 1 $84,750.81 3 $18,722.40 6 $138,187.75

2012-2013 1 $84,294.52 1 $144,615.00 3 $18,466.16 7 $138,969.351 $236,200.00

2014-2015 1 $82,921.25 3 $18,217.97 6 $140,710.38 1 $137,236.20

2016-2017 1 $82,332.48 1 $144,222.94 3 $17,977.19 4 $140,823.58 1 $291,832.33

Page 51 of 72

Page 81: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Racine County

1992-1993 1 $207,373.00 1 $114,000.00 6 $29,519.82 9 $46,168.00

1994-1995 1 $155,994.00 1 $122,009.00 6 $35,918.68 7 $49,714.00 1 $190,668.00

1996-1997 1 $221,556.00 1 $118,985.00 6 $37,697.99 7 $50,631.00

1998-1999 1 $318,035.00 1 $244,679.00 1 $167,190.00 5 $54,618.00 9 $73,965.00

2000-2001 1 $323,259.00 1 $271,763.00 1 $167,936.00 4 $55,497.82 9 $76,956.00

2002-2003 2 $320,402.31 2 $243,000.00 1 $161,143.57 4 $59,837.42 8 $78,875.76 1 $102,059.00

2004-2005 2 $322,526.51 1 $250,500.00 1 $158,910.83 4 $60,742.00 4 $81,945.65

2006-2007 2 $332,336.36 1 $247,882.00 2 $219,069.55 4 $63,284.65 4 $69,277.41 1 $333,682.00

2008-2009 1 $343,052.84 1 $254,895.00 3 $292,996.72 3 $49,935.65 4 $50,066.66

2010-2011 2 $327,765.21 1 $247,764.74 3 $277,337.57 4 $70,295.22 3 $45,165.21 1 $70,030.46

2012-2013 2 $325,628.54 1 $248,521.03 3 $273,932.20 4 $67,368.30 3 $45,331.54 1 $236,185.94

2014-2015 2 $330,395.57 1 $239,401.34 3 $268,804.33 4 $73,757.90 3 $46,331.59 1 $104,043.79

2016-2017 2 $326,570.02 1 $275,729.84 3 $271,194.35 4 $72,661.00 3 $46,008.87 1 $187,502.271 $275,713.90

Page 52 of 72

Page 82: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Richland County

1992-1993 1 $69,424.00 1 $14,157.00 5 $53,870.07

1994-1995 1 $73,575.00 2 $14,862.00 4 $59,134.00

1996-1997 1 $72,660.00 2 $14,678.00 3 $58,517.00

1998-1999 1 $103,599.00 2 $21,130.00 4 $83,679.00 1 $63,576.19

2000-2001 1 $105,498.00 1 $242,637.00 1 $21,376.00 4 $85,184.30 1 $79,149.18

2002-2003 2 $106,698.76 2 $21,177.00 2 $85,775.96

2004-2005 1 $107,755.00 1 $21,068.73 5 $86,736.81

2006-2007 2 $111,132.17 2 $205,000.00 1 $21,131.97 6 $90,402.59

2008-2009 2 $114,173.91 1 $109,648.14 3 $21,104.73 5 $92,803.651 $261,925.00

2010-2011 1 $109,362.95 3 $19,995.14 4 $89,662.40

2012-2013 1 $108,701.45 1 $243,792.00 3 $19,720.89 5 $88,992.53

2014-2015 1 $110,446.94 2 $20,054.80 4 $87,470.22

2016-2017 1 $109,390.91 1 $260,000.00 1 $19,838.19 3 $90,331.54

Page 53 of 72

Page 83: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Rock County

1992-1993 4 $182,651.00 2 $150,322.00 2 $26,422.00 7 $86,235.00

1994-1995 3 $192,516.00 2 $158,605.00 2 $27,891.00 7 $91,625.00

1996-1997 2 $190,445.00 2 $157,227.00 5 $23,498.72 6 $90,962.00

1998-1999 3 $275,179.00 1 $405,220.48 2 $227,924.00 4 $40,537.00 6 $131,042.00

2000-2001 3 $280,865.00 2 $233,148.00 5 $34,786.61 3 $133,619.00

2002-2003 2 $283,406.77 1 $367,750.00 2 $233,349.87 4 $43,387.95 4 $135,048.00

2004-2005 4 $285,960.00 3 $234,781.29 3 $44,185.00 6 $137,079.99 1 $251,674.07

2006-2007 4 $294,045.56 1 $325,000.00 2 $237,498.57 3 $46,160.95 4 $142,951.84

2008-2009 2 $304,040.40 3 $244,708.96 2 $48,682.84 3 $127,620.12

2010-2011 2 $208,401.47 1 $290,000.00 2 $234,930.27 2 $46,592.21 4 $125,233.10

2012-2013 4 $370,845.86 3 $232,075.98 3 $31,250.00 7 $141,014.76 1 $213,101.45

2014-2015 1 $293,068.72 1 $411,600.00 2 $234,779.79 3 $46,929.39 2 $141,981.58 1 $151,975.68

2016-2017 1 $289,347.58 2 $231,320.60 3 $46,987.16 3 $142,705.21 1 $106,549.81

Page 54 of 72

Page 84: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Rusk County

1992-1993 1 $58,731.00 3 $16,927.00 9 $69,279.00

1994-1995 1 $61,403.00 5 $14,650.00 10 $73,748.00

1996-1997 1 $60,768.00 4 $17,164.00 6 $73,064.00

1998-1999 1 $86,624.00 5 $24,120.00 8 $104,692.00

2000-2001 1 $88,117.00 4 $24,176.00 8 $106,110.26

2002-2003 1 $88,843.68 1 $183,981.50 4 $23,018.23 5 $107,176.39

2004-2005 1 $89,828.63 1 $173,826.00 3 $23,118.00 5 $98,573.00

2006-2007 1 $92,742.77 1 $23,363.69 9 $113,005.39

2008-2009 1 $98,309.99 3 $22,176.85 7 $116,546.47

2010-2011 2 $93,940.03 1 $125,000.00 3 $22,302.93 7 $110,634.41

2012-2013 1 $93,302.50 2 $22,152.73 6 $110,789.98

2014-2015 1 $93,918.40 1 $150,000.00 3 $22,076.30 4 $113,196.941 $125,576.57

2016-2017 1 $93,132.28 1 $18,472.27 4 $112,419.33

Page 55 of 72

Page 85: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Sauk County

1992-1993 1 $101,237.00 4 $35,941.00 7 $92,245.00

1994-1995 1 $108,030.00 3 $58,208.00 5 $98,055.00

1996-1997 1 $107,503.00 5 $57,699.00 6 $96,965.00

1998-1999 1 $154,997.00 8 $83,269.00 7 $138,107.86

2000-2001 1 $158,917.00 1 $300,000.00 7 $86,523.00 7 $141,891.001 $138,155.00

2002-2003 3 $162,617.37 9 $88,915.20 6 $142,169.63 1 $66,753.84

2004-2005 2 $165,730.00 1 $600,000.00 5 $90,572.78 7 $144,137.00

2006-2007 2 $173,312.02 5 $93,035.20 10 $150,030.351 $215,018.00

2008-2009 2 $179,659.25 1 $475,000.00 5 $97,624.42 7 $154,430.68

2010-2011 2 $172,277.15 5 $93,734.39 9 $147,985.70

2012-2013 2 $171,446.81 1 $467,013.00 5 $92,988.25 9 $147,631.08 1 $223,146.51

2014-2015 1 $176,953.45 5 $93,867.95 7 $150,984.46 1 $174,606.761 $285,163.00

2016-2017 1 $175,297.67 1 $400,000.00 5 $94,055.53 9 $149,413.46 1 $322,894.111 $343,961.31

Page 56 of 72

Page 86: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Sawyer County

1992-1993 1 $55,000.00 3 $9,012.00 6 $92,230.00

1994-1995 1 $58,193.00 2 $8,210.01 3 $97,641.00

1996-1997 1 $57,758.00 3 $8,769.71 5 $92,210.00

1998-1999 1 $82,985.00 2 $12,732.00 7 $138,249.49

2000-2001 1 $84,907.00 1 $175,000.00 3 $13,343.00 7 $141,145.00

2002-2003 2 $86,563.13 3 $13,125.00 7 $143,234.97

2004-2005 1 $86,992.00 3 $13,486.00 6 $144,991.47

2006-2007 1 $90,368.53 2 $177,500.00 2 $11,804.71 4 $151,242.83

2008-2009 1 $93,364.70 3 $13,501.96 4 $155,890.15

2010-2011 1 $89,658.84 1 $125,000.00 1 $12,738.63 5 $149,008.96

2012-2013 1 $89,269.37 2 $12,455.44 4 $147,022.59 1 $100,871.08

2014-2015 1 $89,228.70 1 $200,000.00 2 $12,855.87 3 $149,485.51

2016-2017 1 $86,928.69 1 $12,609.14 3 $146,218.12 1 $194,554.89

Page 57 of 72

Page 87: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Shawano County

1992-1993 1 $88,223.00 2 $26,201.15 6 $87,168.00

1994-1995 1 $50,910.39 5 $31,367.00 6 $107,003.00

1996-1997 1 $91,860.00 5 $30,852.00 6 $104,092.00

1998-1999 3 $131,429.00 1 $247,631.00 6 $44,003.50 7 $147,865.66

2000-2001 3 $132,408.00 4 $44,918.00 7 $149,311.001 $160,517.00

2002-2003 2 $139,023.50 1 $400,000.00 4 $45,280.58 9 $152,309.52

2004-2005 2 $140,830.00 6 $45,900.00 8 $154,065.00 1 $191,011.73

2006-2007 3 $145,842.42 1 $121,040.37 3 $46,187.59 8 $160,777.81

2008-2009 1 $149,966.03 1 $259,411.47 4 $38,249.27 5 $166,137.47

2010-2011 1 $143,416.67 4 $44,714.59 7 $159,227.47

2012-2013 2 $142,528.31 1 $247,479.06 3 $44,389.68 6 $158,303.94 1 $199,773.94

2014-2015 1 $144,432.39 4 $45,200.52 5 $158,743.07

2016-2017 1 $142,929.49 1 $249,460.62 5 $44,512.81 5 $160,742.66

Page 58 of 72

Page 88: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Sheboygan County

1992-1993 2 $186,534.00 1 $74,526.00 5 $41,013.00 7 $49,813.00

1994-1995 4 $197,012.00 1 $78,983.00 6 $42,889.89 6 $53,159.00

1996-1997 6 $195,770.00 1 $77,642.00 9 $43,242.00 7 $52,758.00

1998-1999 4 $280,462.00 1 $247,631.00 1 $109,897.00 11 $62,079.22 8 $71,283.82

2000-2001 4 $286,453.00 1 $110,947.00 9 $64,660.04 7 $77,390.00

2002-2003 4 $287,033.77 1 $178,589.77 1 $109,550.10 9 $67,175.40 6 $78,433.33

2004-2005 5 $290,317.77 1 $108,499.82 6 $66,348.00 7 $79,709.00

2006-2007 2 $300,256.33 2 $196,040.37 1 $108,848.29 5 $68,844.60 6 $83,488.89

2008-2009 2 $305,673.04 1 $109,751.79 5 $73,551.25 5 $86,389.47

2010-2011 2 $295,378.99 1 $103,235.64 5 $71,010.93 5 $83,483.17

2012-2013 3 $293,012.83 2 $462,500.00 1 $101,696.61 4 $70,935.75 6 $83,111.82 1 $79,608.93

2014-2015 3 $295,808.32 1 $101,431.99 5 $71,918.22 4 $84,940.79

2016-2017 3 $292,078.08 1 $376,000.00 1 $99,694.48 6 $70,839.55 5 $84,467.63 1 $724,778.72

Page 59 of 72

Page 89: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

St. Croix County

1992-1993 1 $113,002.00 6 $42,651.00 13 $84,059.00

1994-1995 1 $119,959.00 10 $46,635.00 6 $89,748.00 1 $102,602.00

1996-1997 2 $118,644.00 9 $47,243.00 14 $89,820.99

1998-1999 1 $171,434.00 1 $154,787.00 9 $69,178.00 14 $129,151.00

2000-2001 1 $177,553.00 1 $172,393.00 7 $72,444.50 18 $133,708.00 1 $112,119.00

2002-2003 1 $185,638.86 1 $120,084.00 8 $78,439.97 13 $138,590.811 $391,345.00

2004-2005 1 $193,575.00 1 $200,853.68 6 $84,695.00 11 $144,237.73 1 $158,466.92

2006-2007 1 $204,014.16 1 $59,853.00 8 $91,239.51 11 $155,982.38

2008-2009 1 $218,019.65 1 $198,356.00 4 $65,136.43 11 $163,934.97

2010-2011 1 $208,948.88 1 $147,737.00 5 $94,817.81 11 $158,323.09 1 $238,360.981 $132,476.62

2012-2013 1 $207,411.54 2 $184,000.00 6 $94,235.36 11 $157,524.91 1 $246,207.02

2014-2015 1 $218,740.64 1 $92,182.00 6 $98,392.49 8 $161,268.08 2 $1,173,357.731 $324,000.00

2016-2017 1 $217,596.44 1 $182,150.00 5 $97,614.91 11 $160,194.38 1 $370,481.14

Page 60 of 72

Page 90: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Taylor County

1992-1993 2 $61,618.00 3 $13,506.00 9 $89,998.00

1994-1995 2 $65,164.00 4 $15,742.00 14 $95,796.00

1996-1997 1 $64,375.00 5 $15,244.00 16 $94,841.92

1998-1999 1 $91,916.00 1 $93,611.00 5 $21,403.00 21 $135,501.30

2000-2001 1 $93,646.00 1 $100,000.00 5 $21,622.00 20 $138,009.00

2002-2003 1 $95,812.38 1 $120,084.06 5 $21,122.00 22 $138,691.52 1 $114,573.00

2004-2005 1 $96,556.00 3 $20,931.00 11 $140,288.00

2006-2007 1 $99,775.19 1 $49,124.00 3 $20,890.25 11 $146,030.06

2008-2009 1 $102,825.91 3 $20,977.46 11 $150,576.83

2010-2011 1 $98,386.89 1 $254,281.10 3 $20,051.67 11 $142,946.32

2012-2013 1 $97,863.23 3 $19,792.92 11 $143,662.63 1 $259,066.45

2014-2015 1 $100,598.73 1 $34,935.60 3 $20,080.00 11 $146,950.06 2 $191,156.34

2016-2017 1 $99,735.44 1 $74,324.50 3 $19,770.90 11 $146,010.78

Page 61 of 72

Page 91: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Trempealeau County

1992-1993 5 $74,164.00 3 $25,689.99 4 $44,894.19

1994-1995 9 $81,218.00 7 $22,991.08 7 $70,762.86

1996-1997 3 $76,526.79 9 $26,470.98 7 $62,023.50

1998-1999 4 $114,706.00 11 $37,913.00 8 $99,648.77

2000-2001 2 $114,000.00 10 $38,305.82 10 $103,647.00

2002-2003 4 $118,568.95 9 $38,746.80 12 $104,852.20

2004-2005 2 $120,085.00 5 $39,437.00 9 $106,541.86

2006-2007 1 $124,189.35 4 $37,386.86 5 $110,999.76

2008-2009 2 $127,955.82 5 $41,431.68 10 $115,223.84

2010-2011 1 $122,466.31 5 $38,346.84 5 $104,087.77

2012-2013 2 $121,994.30 1 $150,000.00 5 $39,047.36 7 $105,862.49 1 $98,348.43

2014-2015 1 $125,068.45 1 $212,969.49 5 $40,183.24 8 $107,141.79

2016-2017 1 $124,179.88 1 $113,871.96 5 $40,633.34 8 $110,683.17 1 $100,195.77

Page 62 of 72

Page 92: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Vernon County

1992-1993 3 $76,294.00 1 $24,075.00 1 $92,065.00

1994-1995 1 $79,794.00 4 $25,336.00 3 $97,904.00

1996-1997 1 $79,236.00 3 $24,903.00 4 $96,801.02

1998-1999 1 $113,203.00 3 $35,323.73 5 $138,389.74

2000-2001 1 $115,376.00 1 $200,395.00 2 $35,879.00 7 $141,114.00

2002-2003 1 $118,221.09 2 $35,849.08 8 $142,260.12

2004-2005 1 $119,665.00 4 $36,292.81 9 $143,743.10

2006-2007 1 $124,091.25 1 $319,744.60 3 $36,536.93 6 $149,952.96

2008-2009 1 $128,015.87 1 $173,693.00 3 $37,278.07 10 $152,552.52

2010-2011 1 $122,632.47 4 $35,229.42 7 $148,601.36

2012-2013 1 $122,084.62 1 $269,368.00 3 $35,103.20 3 $147,794.031 $221,100.00

2014-2015 1 $124,393.66 3 $35,539.95 6 $146,968.68

2016-2017 1 $123,397.38 2 $35,074.58 3 $150,202.75

Page 63 of 72

Page 93: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Vilas County

1992-1993 1 $54,517.00 1 $4,771.00 17 $94,754.70

1994-1995 1 $57,235.00 1 $4,907.00 14 $102,920.41

1996-1997 1 $56,619.00 1 $4,809.00 13 $102,142.00

1998-1999 1 $81,237.00 1 $6,950.00 14 $144,611.98

2000-2001 1 $83,243.00 1 $263,504.00 1 $7,023.00 12 $127,224.00

2002-2003 1 $86,025.37 1 $6,787.91 14 $146,959.45

2004-2005 1 $87,377.00 1 $7,112.89 7 $151,451.00

2006-2007 1 $90,699.00 1 $179,783.66 1 $7,281.00 6 $157,655.00

2008-2009 1 $93,705.99 1 $7,303.87 7 $163,329.32 1 $154,176.85

2010-2011 1 $119,146.26 1 $7,075.50 7 $156,941.501 $168,312.12

2012-2013 2 $90,195.30 1 $7,051.06 6 $153,408.20 3 $521,856.58

2014-2015 1 $89,202.05 1 $136,744.05 1 $6,841.56 6 $159,329.21

2016-2017 1 $88,422.39 1 $6,731.53 1 $158,465.33

Page 64 of 72

Page 94: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Walworth County

1992-1993 1 $112,990.00 9 $60,622.00 16 $68,548.76

1994-1995 2 $120,581.00 9 $72,066.83 15 $75,149.97

1996-1997 2 $120,246.00 7 $72,510.00 9 $75,950.31

1998-1999 1 $173,625.00 1 $133,578.00 7 $105,461.79 13 $110,286.50

2000-2001 1 $179,485.00 1 $148,365.00 9 $109,836.00 11 $112,839.00

2002-2003 1 $188,609.03 1 $133,450.00 12 $115,100.58 14 $113,872.361 $163,866.00

2004-2005 1 $192,805.53 1 $149,800.00 7 $117,879.00 8 $115,344.73

2006-2007 1 $201,827.44 1 $148,191.00 6 $121,762.83 8 $120,158.42

2008-2009 1 $209,875.23 1 $151,548.00 7 $127,288.35 8 $123,842.34

2010-2011 1 $200,103.25 1 $199,637.04 5 $124,081.51 8 $119,393.71

2012-2013 1 $199,172.12 1 $197,919.56 6 $124,086.11 8 $118,871.39 1 $231,054.46

2014-2015 1 $204,148.63 1 $193,037.96 6 $143,848.21 8 $114,328.51 1 $494,868.47

2016-2017 1 $202,304.00 6 $142,037.99 8 $113,521.58 1 $216,831.42

Page 65 of 72

Page 95: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Washburn County

1992-1993 1 $49,666.00 1 $15,320.00 5 $74,143.25

1994-1995 1 $51,715.00 4 $16,200.00 11 $83,659.00

1996-1997 1 $51,302.00 4 $15,874.00 12 $83,721.00

1998-1999 1 $73,262.00 4 $22,328.00 17 $119,767.89

2000-2001 1 $75,010.00 1 $200,000.00 4 $23,367.00 17 $121,992.96

2002-2003 1 $77,316.62 4 $23,430.62 17 $122,868.60

2004-2005 1 $78,617.00 3 $23,331.00 12 $124,436.80

2006-2007 1 $81,502.27 1 $201,500.00 2 $23,291.41 11 $129,546.80

2008-2009 1 $84,339.58 2 $23,562.18 11 $133,980.35

2010-2011 1 $81,032.76 2 $22,136.19 11 $128,382.29

2012-2013 1 $80,741.07 2 $21,930.16 11 $127,650.27 1 $163,238.93

2014-2015 1 $79,552.20 1 $150,000.00 2 $22,006.07 11 $130,696.06

2016-2017 1 $78,890.85 2 $21,876.72 9 $129,712.64 2 $456,231.20

Page 66 of 72

Page 96: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Washington County

1992-1993 1 $133,238.00 1 $38,250.00 1 $52,998.00 6 $58,875.00

1994-1995 1 $144,194.00 1 $41,150.00 2 $58,640.50 7 $63,379.00

1996-1997 3 $146,963.00 1 $42,314.00 2 $61,484.00 13 $63,649.00

1998-1999 1 $212,475.00 1 $163,467.00 1 $60,777.00 4 $91,785.00 12 $92,667.00

2000-2001 1 $220,096.00 2 $181,562.00 1 $62,887.00 4 $97,406.00 12 $95,286.56

2002-2003 1 $225,412.42 1 $162,900.00 1 $63,103.96 4 $102,693.35 12 $96,555.021 $223,539.00

2004-2005 1 $229,066.89 1 $177,800.00 1 $64,130.00 2 $107,177.64 7 $99,326.891 $200,117.75

2006-2007 1 $238,550.16 1 $175,943.00 1 $66,662.44 3 $113,740.90 6 $104,856.28

2008-2009 1 $248,832.55 1 $179,823.00 1 $69,213.07 3 $121,908.69 7 $110,913.91

2010-2011 1 $239,993.50 1 $216,001.66 1 $65,965.13 4 $163,506.72 6 $85,880.70 1 $76,070.52

2012-2013 1 $239,068.64 1 $215,369.95 2 $65,240.94 4 $162,240.46 6 $85,770.93 1 $104,191.99

2014-2015 1 $245,396.80 1 $209,433.83 1 $67,309.30 3 $159,457.34 6 $87,570.98

2016-2017 1 $243,418.95 1 $244,428.05 1 $66,429.23 4 $162,650.77 6 $86,974.82 1 $176,072.17

Page 67 of 72

Page 97: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Waukesha County

1992-1993 2 $383,437.17 5 $276,333.00 13 $126,804.71 10 $60,350.00

1994-1995 1 $411,731.00 8 $293,521.00 13 $139,019.50 11 $55,935.00

1996-1997 1 $412,742.00 9 $291,823.00 15 $141,052.35 10 $68,405.00

1998-1999 1 $599,124.00 1 $460,933.00 6 $419,047.00 16 $216,919.00 12 $101,616.00

2000-2001 1 $620,530.00 1 $162,500.00 7 $490,994.00 14 $169,336.00 11 $106,095.00

2002-2003 1 $632,487.24 3 $620,499.50 6 $500,271.85 18 $211,274.70 11 $99,814.00

2004-2005 1 $645,358.00 1 $501,249.00 5 $504,142.39 10 $216,952.92 6 $102,823.51

2006-2007 1 $669,833.88 1 $496,304.00 7 $509,425.58 9 $203,629.18 5 $109,709.06

2008-2009 1 $693,419.49 2 $505,000.00 6 $519,751.81 9 $204,723.93 5 $95,327.82

2010-2011 2 $662,601.54 1 $537,873.21 7 $493,841.72 10 $225,877.70 6 $110,674.69

2012-2013 2 $658,082.96 1 $535,731.60 5 $488,315.98 11 $241,483.49 6 $103,726.65 1 $88,569.73

2014-2015 2 $681,445.30 1 $524,443.89 5 $497,712.49 11 $249,706.54 6 $106,072.87 1 $230,867.11

2016-2017 2 $675,944.69 2 $607,612.87 5 $491,370.23 11 $247,677.73 6 $105,634.51

Page 68 of 72

Page 98: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Waupaca County

1992-1993 2 $107,076.00 3 $45,060.00 5 $82,552.00

1994-1995 4 $113,915.93 5 $46,296.40 6 $87,849.00

1996-1997 3 $113,222.00 5 $46,461.00 7 $87,094.00

1998-1999 5 $162,608.00 7 $66,613.00 10 $124,411.50

2000-2001 2 $166,215.00 2 $380,000.00 5 $68,526.00 13 $127,223.98

2002-2003 3 $161,336.40 1 $121,214.69 4 $68,936.18 8 $124,077.13

2004-2005 3 $170,965.00 3 $124,396.56 7 $69,525.99 3 $130,493.75 1 $145,072.20

2006-2007 1 $51,495.91 2 $103,031.00 6 $70,987.69 3 $136,900.62 1 $119,172.28

2008-2009 3 $181,425.54 2 $259,410.48 4 $66,076.69 3 $137,892.64

2010-2011 2 $172,703.00 1 $123,720.51 3 $68,504.55 3 $136,520.31

2012-2013 1 $171,564.38 1 $123,739.54 3 $66,531.70 4 $135,478.56 1 $109,444.851 $52,811.40

2014-2015 1 $171,694.68 1 $118,338.10 3 $69,044.90 4 $138,589.50 1 $170,805.11

2016-2017 2 $170,085.96 1 $124,730.31 3 $68,245.93 2 $137,586.86 1 $164,131.37

Page 69 of 72

Page 99: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Waushara County

1992-1993 1 $78,643.00 1 $16,365.00 2 $44,292.93

1994-1995 1 $82,524.00 2 $16,888.00 4 $73,971.00

1996-1997 1 $81,673.00 2 $16,779.00 3 $72,531.22

1998-1999 1 $116,971.00 1 $212,931.19 1 $21,103.00 5 $102,790.00

2000-2001 1 $119,757.00 1 $23,819.00 5 $106,686.90

2002-2003 1 $124,013.44 1 $235,000.00 1 $22,789.62 7 $107,467.82

2004-2005 2 $127,284.94 2 $24,962.00 5 $107,421.64

2006-2007 2 $131,632.95 3 $206,062.00 3 $24,319.00 6 $113,246.40

2008-2009 1 $135,568.17 2 $25,404.23 6 $116,872.93

2010-2011 1 $129,687.78 1 $247,440.95 2 $24,013.87 7 $112,022.80

2012-2013 1 $129,089.09 2 $23,786.10 5 $111,131.68

2014-2015 1 $130,216.44 1 $236,676.15 2 $24,076.91 4 $111,504.57 1 $334,438.63

2016-2017 1 $129,056.02 2 $23,669.78 5 $112,796.27 1 $85,117.761 $294,971.60

Page 70 of 72

Page 100: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Winnebago County

1992-1993 1 $182,477.00 2 $122,527.00 4 $31,246.00 2 $55,199.00

1994-1995 1 $193,298.00 3 $131,720.00 3 $32,516.00 3 $58,535.00

1996-1997 1 $191,746.00 2 $130,706.00 3 $31,875.35 3 $59,444.00

1998-1999 1 $277,137.00 1 $247,631.00 2 $189,207.00 6 $46,913.00 4 $85,990.00

2000-2001 1 $282,872.00 3 $194,760.00 3 $48,347.00 3 $87,770.47 1 $51,824.001 $154,479.00

2002-2003 2 $284,430.00 1 $217,519.00 4 $194,053.76 3 $48,075.69 4 $89,642.69

2004-2005 1 $287,679.67 1 $383,830.00 4 $196,202.20 2 $48,236.00 3 $92,346.00

2006-2007 2 $303,272.24 2 $200,246.17 3 $50,590.19 2 $98,806.80

2008-2009 3 $313,381.48 1 $450,000.00 2 $203,873.69 1 $52,135.30 3 $103,774.61

2010-2011 2 $299,998.43 2 $193,086.90 2 $44,750.90 5 $96,408.22

2012-2013 2 $298,520.84 2 $444,999.15 2 $191,186.86 1 $49,604.50 3 $99,164.95

2014-2015 2 $306,363.27 2 $193,665.47 2 $50,266.95 4 $102,989.94

2016-2017 2 $286,425.52 1 $262,500.00 2 $191,346.22 1 $49,778.11 3 $78,969.03

Page 71 of 72

Page 101: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

CHIP

Count LRIP $CHIPD

Count LRIP $

MSIPGT

Count LRIP $

MSIPLT

Count LRIP $

TRIP

Count LRIP $

TRIPD

Count LRIP $

MSIPD

Count LRIP $County Name

HISTORY OF LRIP PROJECTS BY COUNTY AND COMPONENT

Wood County

1992-1993 1 $135,943.00 9 $90,794.78 9 $78,254.00

1994-1995 1 $140,867.00 7 $100,530.96 8 $83,065.00

1996-1997 1 $139,448.00 7 $100,565.00 7 $83,153.00

1998-1999 1 $198,932.00 1 $212,931.19 10 $142,185.69 9 $115,369.06

2000-2001 1 $202,436.00 2 $164,499.00 8 $141,064.38 7 $121,396.00

2002-2003 5 $198,941.51 8 $140,729.78 7 $122,144.29

2004-2005 2 $200,267.00 1 $248,793.11 5 $140,956.00 7 $123,563.00

2006-2007 1 $205,940.16 4 $140,833.73 7 $127,289.97

2008-2009 1 $211,739.82 1 $259,411.47 5 $143,206.23 7 $131,404.12

2010-2011 1 $201,809.33 5 $135,153.32 6 $125,768.14

2012-2013 1 $198,960.62 1 $247,479.07 5 $133,914.68 7 $125,103.65 2 $1,146,239.10

2014-2015 1 $200,777.55 5 $134,917.42 7 $129,725.90

2016-2017 1 $198,952.75 1 $249,460.62 5 $133,598.04 6 $129,191.50 1 $299,128.14

$534,222,785.80Grand Total LRIP Money Distributed to Date:

$162,795,884.57 $102,128,418.63 $15,809,637.42 $56,883,429.31 $48,824,584.83 $102,637,426.31 $45,143,404.73Total of Each Program

Page 72 of 72

Page 102: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Adams County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Adams County 14712 CTH P [3.14mi.]

CTH B

CTH G

Reconstruction $3,037,715.00 $93,828.08

MSIPLT

City of Adams 14713 N. Walker St. [450']

E. Liberty St. [131']

E. Brevort St.

Resurfacing $22,250.00 $8,889.32

TRIP

Town of Dell Prairie 14714 Gale Dr. [5560']

10th Ct. [618']

9th Ave.

Pavement Repl $120,000.00 $37,710.35

TRIP

Town of Jackson 14942 Freedom Rd. [3,015']

3rd Ct. (1)

Termini

Resurfacing $105,000.00 $37,710.35

TRIP

Town of New Chester 14207 5th Ave. [1600']

CTH E [450']

S. Eagle Ave.

Pavement Repl $32,814.00 $16,407.00

Wednesday, May 24, 2017

Page 103: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Adams County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of New Haven 14715 5th Dr. (2) [1501']

Gillette Dr. [1192']

Gillette Ave.

Resurfacing $32,240.00 $16,120.00

TRIP

Town of Rome 14208 Juniper Trail [2693']

Kingswood Trl.

Kingswood Trl.

Resurfacing $96,000.00 $37,710.34

Total for Adams County $3,446,019.00 $248,375.44

Wednesday, May 24, 2017

Page 104: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Ashland County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Ashland County 14535 CTH N (2 segments) [580']

STH 13

W. 1st St.

Reconstruction $175,000.00 $70,206.79

MSIPLT

City of Ashland 14126 9th Ave. W., Chapple Ave., & M

Various

Various

Resurfacing $90,000.00 $14,298.87

MSIPLT

City of Mellen 14536 Jefferson Ave., Thomas St., & L

Various

Various

Resurfacing $37,739.85 $14,298.87

TRIP

Town of Gordon 14537 Zielke Rd. [.73mi.]

Gordon Lake Rd.(1)

Borman Rd.

Resurfacing $69,752.36 $34,876.18

TRIP

Town of Jacobs 14125 Lenz Rd. [.4mi.]

Kempf Rd.

STH 13

Pavement Repl $48,058.53 $24,029.26

Wednesday, May 24, 2017

Page 105: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Ashland County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Shanagolden 14124 Lutz Rd. [1.16mi.]

STH 13

Lenz Rd.

Reconditionin $123,451.30 $46,500.00

Total for Ashland County $544,002.04 $204,209.97

Wednesday, May 24, 2017

Page 106: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Barron County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Barron County 14601 CTH D [2.1mi.]

CTH K

4th St.

Hot Mix Asph $295,797.78 $147,898.89

MSIPLT

City of Cumberland 14185 Lake St. [633']

2nd Ave.

Arcade Ave.

Pavement Repl $71,000.00 $11,933.31

MSIPLT

Village of Almena 14946 15th Ave. [662']

4 3/4 St. [.5-.62mi.]

Termini

Pavement Repl $36,865.00 $14,552.82

MSIPLT

Village of Dallas 14189 Dallas Dr. [1,320'][Assoc. proj. #

CTH U

3rd Ave.

Pavement Repl $70,000.00 $14,552.82

MSIPLT

Village of Haugen 14187 2nd Ave. N. [576']

CTH V

Park St.

Pavement Repl $25,344.56 $6,403.25

Wednesday, May 24, 2017

Page 107: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Barron County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

Village of Turtle Lake 14188 Osterman Dr. [470']

Prosser Ave.

Industrial Blvd.

Reconstruction $141,000.00 $14,552.82

TRIP

Town of Almena 14194 4th St. [2482']

14 1/2 Ave.

15th Ave.

Pavement Repl $54,000.00 $16,512.55

TRIP

Town of Barron 14193 15th Ave. & 16 1/2 Ave. [7286']

Various

Various

Resurfacing $42,297.01 $16,512.54

TRIP

Town of Bear Lake 14816 13th St. [5174']

24th Ave.

25th Ave

Pavement Repl $86,000.00 $16,512.55

TRIP

Town of Clinton 14192 13th Ave. [5386']

9th St.

CTH F

Resurfacing $50,000.00 $16,512.54

Wednesday, May 24, 2017

Page 108: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Barron County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Crystal Lake 14191 4 1/2 St. (1) [3274']

22 1/2 Ave.

23rd Ave.

Reconstruction $80,950.00 $16,512.54

TRIP

Town of Doyle 14817 23rd Ave. [5227']

CTH NN

28th St.

Reconstruction $54,000.00 $16,512.55

TRIP

Town of Oak Grove 14815 27 3/4 Ave. & 23 3/8 St. (2 segme

Various

Various

Pavement Repl $52,000.00 $16,512.54

TRIP

Town of Prairie Lake 14602 22 3/4 St. (1), 10 1/2 Ave., & 23r

Various

Various

Resurfacing $80,000.00 $16,512.55

TRIP

Town of Sioux Creek 14196 19 1/4 St. [5,800'][Assoc. proj. #1

2 1/4 Ave.

1st Ave.

Pavement Repl $110,000.00 $16,512.55

Wednesday, May 24, 2017

Page 109: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Barron County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Stanley 14195 12th Ave. [5386']

CTH O

19th St.

Reconditionin $60,000.00 $16,512.55

TRIP

Town of Sumner 14190 25th St. & Rustic Road 18 [5227']

Various

Various

Hot Mix Asph $92,032.19 $16,512.55

TRIP

Town of Turtle Lake 14814 10 1/2 Ave. [2746']

1/2 St.

Termini

Pavement Repl $50,000.00 $16,512.55

Total for Barron County $1,451,286.54 $408,044.47

Wednesday, May 24, 2017

Page 110: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Bayfield County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Bayfield County 14952 CTH D [6.25mi.]

Sugar Bay Dr.

Club Lake Rd.

Pavement Repl $1,000,000.00 $70,311.84

MSIPLT

City of Bayfield 14403 Bay Rd. [275']

First St.

Termini

Resurfacing $25,000.00 $12,464.95

TRIP

Town of Cable 14123 McNaught Rd. [1.51mi]

Randysek Rd.

Termini

Reconstruction $133,803.67 $56,063.84

TRIP

Town of Eileen 14716 Highland Rd. [1.02 mi.]

Woodland Rd.

Chapek Rd.

Resurfacing $62,000.00 $31,000.00

TRIP

Town of Iron River 14122 N. Bohn St. [735']

USH 2 [100']

Staples Ave.

Pavement Repl $39,932.56 $19,966.23

Wednesday, May 24, 2017

Page 111: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Bayfield County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Kelly 14794 Argo Rd. [2640']

Maple Ridge Rd.

Polich Rd.

Resurfacing $25,000.00 $12,500.00

TRIP

Town of Keystone 14120 Pezderic Rd. [1.73mi.]

CTH F

USH 63

Pavement Repl $229,890.00 $59,083.50

TRIP

Town of Port Wing 14121 Helsing St. & Washington Ave. [

Various

Various

Pavement Repl $46,561.94 $23,280.00

TRIP

Town of Russell 14793 Turner Rd. [4752'][Assoc. proj. #

STH 13 [14']

Weidinger Rd.

Resurfacing $167,297.00 $43,763.00

Total for Bayfield County $1,729,485.17 $328,433.36

Wednesday, May 24, 2017

Page 112: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Brown County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Brown County 14457 CTH EB [1.321mi.]

STH 54

STH 29

Pavement Repl $1,032,612.00 $464,989.59

MSIPGT

City of De Pere 14047 Geneva St [3856']

Various

Various

Resurfacing $215,400.00 $52,304.14

MSIPGT

City of Green Bay 14046 Various [16844']

Various

Various

Resurfacing $1,010,500.00 $216,646.03

MSIPLT

Village of Allouez 14051 Miramar Dr. W [900']

Riverside Dr.

DuCharme Ln.

Pavement Repl $82,032.00 $41,016.00

MSIPLT

Village of Ashwaubenon 14054 East Adam Dr. [2650']

Packerland Dr.

Short Rd.

Pavement Repl $97,652.08 $47,962.93

Wednesday, May 24, 2017

Page 113: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Brown County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

Village of Denmark 14454 W.Pine St. & E. Pine St. [951']

Various

Various

Reconstruction $306,400.00 $47,962.93

MSIPLT

Village of Hobart 14053 East Adam Dr. [2150']

Short Rd.

Termini

Pavement Repl $143,672.95 $47,962.93

MSIPLT

Village of Wrightstown 14453 Pine St. [581']

Main St.

River Ln.

Reconstruction $135,000.00 $47,962.93

TRIP

Town of Eaton 14455 Willow Rd. [2mi.]

Buyarski Rd. [.5mi]

CTH QQ

Reconstruction $225,000.00 $13,484.80

TRIP

Town of Glenmore 14049 Glenmore Rd.[1.01mi.]

Pine Grove Rd.

Creekview Rd.

Resurfacing $39,000.00 $13,484.80

Wednesday, May 24, 2017

Page 114: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Brown County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Holland 14050 Lamers Clancy Rd. [1mi.]

Old 57 Rd.

VandeWettering Rd.

Reconditionin $38,890.00 $13,484.80

TRIP

Town of Lawrence 14209 Little Rapids Rd. [1800']

Lawrence Rd.

Currant Ln.

Hot Mix Asph $52,302.00 $13,484.79

TRIP

Town of Ledgeview 14456 Cottonwood Ln. [1100']

CTH X

Termini

Reconditionin $65,000.00 $13,484.80

TRIP

Town of Scott 14048 Sussex Rd. [686']

Champeau Rd.

Termini

Reconditionin $28,870.15 $13,484.80

TRIP

Town of Wrightstown 14052 Partridge Cir. [.32mi.]

Partridge Rd.

Termini

Reconstruction $143,916.66 $13,484.79

Total for Brown County $3,616,247.84 $1,061,201.06

Wednesday, May 24, 2017

Page 115: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Buffalo County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Buffalo County 14041 CTH I [1.4mi.]

CTH KK [1.65mi]

CTH D

Resurfacing $82,209.06 $41,104.53

CHIP

Buffalo County 14482 CTH F [3.16mi.]

CTH V

CTH FF

Hot Mix Asph $269,100.00 $59,126.20

MSIPLT

City of Buffalo City 14043 8th St. [2904']

River St.

Washington St.

Pavement Repl $73,664.00 $6,887.67

MSIPLT

City of Mondovi 14044 Vine St. [1109']

Jackson St.

Termini

Pavement Repl $32,400.00 $6,887.66

MSIPLT

Village of Cochrane 14045 Elkamp St. [713']

Michaels St.

4th St.

Pavement Repl $27,315.00 $6,887.66

Wednesday, May 24, 2017

Page 116: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Buffalo County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Alma 14481 Hanson Rd. [.53mi.]

CTH F

Termini

Resurfacing $41,986.00 $9,070.15

TRIP

Town of Gilmanton 14042 French Valley Rd. [1.55mi.]

CTH NN

Termini

Resurfacing $85,000.00 $18,362.38

TRIP

Town of Glencoe 14479 Sobatta Valley Rd. [1.28mi.]

CTH C

Termini

Resurfacing $130,000.00 $28,083.60

TRIP

Town of Milton 14480 Waumandee Creek Rd. [2218']

Semling Rd.

Canada Ridge Rd.

Pavement Repl $80,000.00 $17,282.23

Total for Buffalo County $821,674.06 $193,692.08

Wednesday, May 24, 2017

Page 117: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Burnett County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Burnett County 14538 CTH Z [1.93mi.]

Church Rd.

Range Line Rd.

Pavement Repl $430,000.00 $84,206.86

MSIPLT

Village of Siren 14542 Ellis Ave. [739']

Dahlberg St.

Old 35

Resurfacing $30,700.00 $5,623.96

MSIPLT

Village of Webster 14205 Bass Ave. N. [2534']

Hickory St. W.

Oak St. W.

Pavement Repl $60,000.00 $5,623.97

TRIP

Town of Daniels 14541 Waldora Rd. [.98mi.]

Carlson Rd.

John Nelson Rd.

Pavement Repl $100,000.00 $15,160.45

TRIP

Town of Dewey 14539 Swiss Chalet Rd. [.5mi.]

CTH H

Bashaw Store Rd.

Pavement Repl $42,710.00 $15,160.46

Wednesday, May 24, 2017

Page 118: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Burnett County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Jackson 14198 Sweger Rd. [.5mi.]

Brad Rd.

Briggs Lake Rd.

Pavement Repl $85,000.00 $15,160.46

TRIP

Town of La Follette 14199 Dake Rd. [.5mi.]

Cranberry Marsh Rd.

Nelson Rd.

Pavement Repl $60,000.00 $15,160.46

TRIP

Town of Lincoln 14540 Lee Rd. [.74mi.]

Perida Rd.

Termini

Pavement Repl $60,000.00 $15,160.45

TRIP

Town of Roosevelt 14197 Hill Top Rd. [.5mi.]

Spring Lake Rd.

Bakker Rd.

Pavement Repl $35,000.00 $15,160.46

TRIP

Town of Rusk 14201 Yellow River Rd. [1.01mi.]

CTH H

Rolling Green Rd.

Resurfacing $65,134.68 $15,160.46

Wednesday, May 24, 2017

Page 119: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Burnett County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Siren 14203 Big Doctor Lake Rd. [.5mi.]

Old 35

Termini

Resurfacing $28,800.00 $14,400.00

TRIP

Town of Union 14204 Welch Rd. (2) [1.25mi.]

Lee Rd.

Termini

Resurfacing $35,000.00 $15,160.46

TRIP

Town of Webb Lake 14202 River Rd. [.5mi.]

STH 77

Foster Rd.

Resurfacing $60,000.00 $15,160.46

TRIP

Town of West Marshland 14200 E. Refuge Rd. [1.04mi.]

N. Fork Dike Rd.

Main Dike Rd.

Pavement Repl $185,000.00 $15,160.45

Total for Burnett County $1,277,344.68 $261,459.36

Wednesday, May 24, 2017

Page 120: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Calumet County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Calumet County 14598 CTH BB [3mi.]

CTH B

USH 10

Hot Mix Asph $618,174.00 $107,890.56

MSIPLT

City of Chilton 14409 Canary Ave., Robin Ave., & Ree

Various

Various

Pavement Repl $178,137.46 $33,971.19

MSIPLT

City of New Holstein 14311 State St. [739']

Calumet Dr.

Plymouth St.

Reconstruction $92,168.00 $33,971.19

TRIP

Town of Brillion 14410 Harverstor Rd. [1.02mi.]

CTH PP

Long Lake Rd.

Pavement Repl $167,912.88 $43,738.75

TRIP

Town of Rantoul 14446 E. River Rd. & Fischer Rd. [260']

Various

Various

Pavement Repl $24,290.00 $12,145.00

Total for Calumet County $1,080,682.34 $231,716.69

Wednesday, May 24, 2017

Page 121: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Chippewa County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Chippewa County 14918 CTH H [2mi.][Assoc. proj. #1483

30th Ave.

Termini

Reconditionin $1,115,000.00 $228,324.25

MSIPLT

City of Chippewa Falls 14163 Spruce St. [.23mi.]

Wheaton St.

Pearl St.

Reconstruction $241,912.48 $44,380.00

MSIPLT

City of Cornell 14567 7th St. [1056']

Squire Dr.

Osborne St.

Pavement Repl $85,000.00 $25,000.00

MSIPLT

Village of Cadott 14568 Ginty St. & N. Main St. [1192']

Various

Various

Pavement Repl $75,062.00 $25,000.00

TRIP

Town of Goetz 14361 230th St. [.99mi.]

CTH XX

100th Ave.

Reconditionin $87,238.00 $10,769.00

Wednesday, May 24, 2017

Page 122: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Chippewa County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Howard 14563 10th St. [2059']

Termini

Termini

Resurfacing $40,000.00 $12,674.00

TRIP

Town of Lafayette 14360 40th Ave. [1.05mi.]

220th St.

210th St.

Pavement Repl $86,641.68 $25,749.00

TRIP

Town of Lake Holcombe 14565 295th Ave. (1) [2112']

300th St.

Termini

Reconditionin $45,000.00 $14,231.00

TRIP

Town of Ruby 14359 275th Ave. [.25mi.]

330th St.

322nd St.

Reconditionin $30,174.96 $11,398.00

TRIP

Town of Sampson 14358 100th St. [5227']

CTH M

270th Ave.

Resurfacing $73,427.99 $21,511.00

Wednesday, May 24, 2017

Page 123: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Chippewa County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Sigel 14566 45th Ave. [.5 mi.]

250th St.

240th St.

Pavement Repl $32,730.38 $14,297.00

TRIP

Town of Tilden 14562 102nd Ave. [4365']

CTH Q

124th St.

Pavement Repl $101,274.00 $12,671.00

TRIP

Town of Wheaton 14564 50th St. [.97mi.]

60th Ave.

CTH N

Reconditionin $200,000.00 $24,341.00

TRIP

Town of Woodmohr 14561 157th Ave. [.89mi.]

110th St.

CTH Q

Reconditionin $110,000.00 $14,375.00

Total for Chippewa County $2,323,461.49 $484,720.25

Wednesday, May 24, 2017

Page 124: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Clark County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Clark County 14608 CTH E [2 mi.]

CTH A

County Line Rd.

Hot Mix Asph $232,738.00 $100,000.00

CHIP

Clark County 14607 CTH M [1.3 mi.]

E. Liberty Dr.

CTH N

Hot Mix Asph $165,059.00 $34,268.06

MSIPLT

City of Abbotsford 14604 Elderberry Rd. [1475'] (2 segment

STH 13 [487']

Termini

Resurfacing $60,000.00 $14,254.18

MSIPLT

City of Loyal 14603 Bluebird Ln. [1290']

Draper St.

Chickadee Rd.

Resurfacing $80,750.00 $14,254.18

MSIPLT

City of Neillsville 14158 Grand Ave. [2270']

USH 10

W. 4th St.

Resurfacing $59,105.08 $14,254.20

Wednesday, May 24, 2017

Page 125: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Clark County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Hewett 14129 Arndt Rd. [100']

CTH B [196']

Moonlite Rd.

Structures $50,000.00 $25,000.00

TRIP

Town of Hixon 14605 Clark Ave. [1.99 mi.]

Bridge Rd.

County Line Rd.

Resurfacing $351,977.00 $76,767.56

TRIP

Town of Loyal 14402 Willard Rd. [2.04mi.]

Miller Ave.

Owen Ave.

Resurfacing $74,216.23 $12,500.00

TRIP

Town of Sherman 14128 Catlin Rd. [2mi.]

STH 98

Twenty Six Rd.

Resurfacing $69,675.00 $32,500.00

TRIP

Town of Sherwood 14606 Badger Ave. [1.5 mi.]

STH 73

Termini

Resurfacing $165,820.08 $76,767.55

Total for Clark County $1,309,340.39 $400,565.73

Wednesday, May 24, 2017

Page 126: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Columbia County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Columbia County 14676 CTH CS [22493']

STH 22

CTH C

Hot Mix Asph $402,503.00 $182,486.97

MSIPLT

City of Portage 14681 Wood St. [2218']

Caledonia St.

Blackhawk Rd.

Pavement Repl $110,850.00 $12,945.09

MSIPLT

City of Wisconsin Dells 14745 Bauer St. [633']

Capital St.

Termini

Reconstruction $156,850.00 $14,021.92

MSIPLT

Village of Cambria 14143 Roberts St. [687']

W. Florence St.

W. Commerce St.

Reconstruction $100,240.00 $8,639.55

MSIPLT

Village of Fall River 14746 South St. [1410']

CTH D [130']

Cardinal Ln.

Reconstruction $511,160.00 $14,021.91

Wednesday, May 24, 2017

Page 127: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Columbia County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

Village of Pardeeville 14142 Haskins Dr. [1320']

STH 22

Morton St.

Hot Mix Asph $21,009.45 $9,122.30

MSIPLT

Village of Poynette 14682 Mill St. [1267']

Main St.

John St.

Reconstruction $185,390.00 $14,021.92

MSIPLT

Village of Wyocena 14160 Crawford Dr. [798']

Termini

STH 22

Pavement Repl $34,185.00 $5,000.18

TRIP

Town of Columbus 14677 Schaeffer Rd. [2693']

CTH K

Bristol Rd.

Hot Mix Asph $35,421.75 $17,710.87

TRIP

Town of DeKorra 14159 Smith Rd. [2693']

Koltes Rd.

CTH CS

Hot Mix Asph $35,380.00 $13,024.52

Wednesday, May 24, 2017

Page 128: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Columbia County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Hampden 14141 Loeffler Rd. [2693']

Sanderson Rd.

Arnold Rd.

Pavement Repl $143,205.21 $13,024.52

TRIP

Town of Leeds 14140 Stewart Rd. [3696']

STH 22

Termini

Hot Mix Asph $43,016.75 $13,024.52

TRIP

Town of Lewiston 14678 Adney Rd. [3700']

Anacker Rd.

CTH AA

Pavement Repl $148,434.11 $13,705.86

TRIP

Town of Lowville 14138 Stewart Rd. [3696']

Mountford Rd.

Termini

Hot Mix Asph $41,369.65 $13,024.52

TRIP

Town of Otsego 14679 Old F Rd. [1mi.]

King Rd.

Vangan Rd.

Hot Mix Asph $41,580.22 $13,705.86

Wednesday, May 24, 2017

Page 129: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Columbia County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Scott 14139 Vaughn Rd. [4,417']

Marquardt Dr.

Dodge Rd.

Hot Mix Asph $43,459.85 $13,024.52

TRIP

Town of Wyocena 14680 Country Club Rd. [1690']

Dietz Dr.

Termini

Hot Mix Asph $40,000.00 $20,000.00

Total for Columbia County $2,094,054.99 $390,505.03

Wednesday, May 24, 2017

Page 130: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Crawford County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Crawford County 14777 CTH D [6.2mi.][Assoc. Proj. #13

STH 35 [200']

STH 27

Resurfacing $772,000.00 $70,206.79

MSIPLT

Village of Ferryville 14445 Eagle Ridge Rd. & Turkey Run R

Various

Various

Resurfacing $34,277.68 $17,138.84

MSIPLT

Village of Wauzeka 14778 S. Station St. [360']

STH 60

E. Front St.

Reconditionin $124,000.00 $10,041.72

TRIP

Town of Marietta 14305 Meadowbrook Rd. [100']

CTH E [1.2mi]

Marietta Valley Rd.

Reconstruction $108,200.00 $46,610.68

TRIP

Town of Utica 14941 Pine Knob Rd. [1.55mi.]

Turben Ridge Rd. [.357mi.]

CTH B

Resurfacing $114,100.00 $46,610.69

Total for Crawford County $1,152,577.68 $190,608.72

Wednesday, May 24, 2017

Page 131: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Dane County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Dane County 14025 CTH F [1.54mi.]

CTH F

CTH Z

Resurfacing $130,032.25 $65,016.12

CHIP

Dane County 14026 CTH T [1.02mi.]

Oak Park Rd.

STH 19

Pavement Repl $452,000.00 $200,000.00

CHIP

Dane County 14485 CTH DM [7.31mi.]

Morrisonville Rd.

N. Military Rd.

Resurfacing $830,000.00 $200,000.00

CHIP

Dane County 14484 CTH Y [5.85mi.][Assoc. Proj. #1

Amenda Rd. [.37mi.]

STH 78

Resurfacing $795,000.00 $303,488.76

CHIP

Dane County 14024 CTH D [1.51mi.]

CTH CC

CTH M

Resurfacing $241,136.88 $100,000.00

Wednesday, May 24, 2017

Page 132: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Dane County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPGT

City of Fitchburg 14494 Pike Dr., Coho St., & Eggiman R

Various

Various

Pavement Repl $151,181.10 $58,280.54

MSIPGT

City of Madison 14000 Cottage Grove Rd. [1.28mi]

Various

Various

Resurfacing $1,400,000.00 $225,501.33

MSIPGT

City of Madison 14525 Grand Ave., Mason St., Van Hise

Various

Various

Reconditionin $1,300,000.00 $225,501.33

MSIPGT

City of Sun Prairie 14034 Market St. [1067']

Park Cir. [200']

STH 19

Reconstruction $575,000.00 $66,143.79

MSIPLT

City of Middleton 14895 N. Highpoint Rd. (2 segments) [3,

Termini

Terrace Ave.

Resurfacing $248,710.00 $36,199.92

Wednesday, May 24, 2017

Page 133: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Dane County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

City of Stoughton 14039 Chapin Ln. [792']

Devonshire Rd.

Sundt Ln.

Pavement Repl $172,000.00 $36,199.92

MSIPLT

Village of Belleville 14497 Evarts St. [864']

STH 92 [139']

E. Main St.

Reconstruction $250,380.00 $22,300.09

MSIPLT

Village of Black Earth 14498 Center St. [1214']

CTH KP

Park St.

Reconstruction $73,300.00 $22,300.05

MSIPLT

Village of Deerfield 14968 Meadowlark Cir. [686']

Meadow Trace

Termini

Pavement Repl $30,000.00 $8,680.05

MSIPLT

Village of Deerfield 14035 Washburn Rd. [845']

Meadow Trace

Termini

Pavement Repl $27,240.03 $13,620.00

Wednesday, May 24, 2017

Page 134: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Dane County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

Village of Marshall 14496 Riverview Dr. & Sleepy Hollow

Various

Various

Pavement Repl $62,000.00 $22,300.05

MSIPLT

Village of McFarland 14036 Larson Beach Rd. [1,214'][Assoc.

USH 51

Taylor Rd.

Pavement Repl $101,803.00 $22,300.05

MSIPLT

Village of Oregon 14037 N. Burr Oak Ave. [522']

CTH CC

Netherwood St.

Reconstruction $81,000.00 $22,300.05

MSIPLT

Village of Rockdale 14500 W. Adams St. & Jones St. [1214']

Various

Various

Pavement Repl $75,500.00 $22,300.05

MSIPLT

Village of Shorewood Hil 14499 Oxford Rd. [950']

Shorewood Blvd.

Bowdoin Rd.

Resurfacing $42,000.00 $19,000.00

Wednesday, May 24, 2017

Page 135: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Dane County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

Village of Waunakee 14038 Fourth St. [1373']

South St.

O'Malley St.

Reconstruction $250,000.00 $22,300.05

TRIP

Town of Black Earth 14492 Sutcliffe Rd. [2640']

Fosshage Rd. [2904']

CTH FF

Resurfacing $38,000.00 $15,388.25

TRIP

Town of Blooming Grove 14491 Schutte Dr. [.11mi.]

Jenness Ave.

Termini

Pavement Repl $31,699.00 $12,500.00

TRIP

Town of Cottage Grove 14032 Meadowlark St., Bluebird Ln, &

Various

Various

Resurfacing $40,325.14 $15,388.25

TRIP

Town of Dunkirk 14964 Washington Rd. [2.18mi.]

USH 51

Termini

Resurfacing $212,000.00 $15,388.25

Wednesday, May 24, 2017

Page 136: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Dane County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Dunn 14033 Duncan Rd., Giehler Dr., & Pike

Various

Various

Resurfacing $71,500.00 $15,388.25

TRIP

Town of Medina 14027 Canal Rd. [6600']

Hurd St. [317']

Cherry Lane

Pavement Repl $165,000.00 $15,388.25

TRIP

Town of Middleton 14489 Fountain Cir. [845']

Stonewood Dr.

Termini

Pavement Repl $106,500.00 $15,388.25

TRIP

Town of Pleasant Springs 14911 Skyline Dr. [4,541']

Williams Dr.

Hefferan Dr.

Pavement Repl $199,500.00 $15,388.25

TRIP

Town of Rutland 14488 Game Ridge Trl., Meanderwood

Various

Various

Pavement Repl $150,000.00 $15,388.25

Wednesday, May 24, 2017

Page 137: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Dane County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Springdale 14487 Town Hall Rd. [2600']

Ridgeview Rd. [2070']

Norwegian Trl.

Resurfacing $63,952.00 $15,388.25

TRIP

Town of Sun Prairie 14029 Baxter Rd. [.5mi.]

Pierceville Rd.

IH 94

Resurfacing $26,537.44 $13,268.72

TRIP

Town of Verona 14030 Goose Lake Dr. [1267']

Fitchrona Rd.

Pheasant Ln.

Pavement Repl $53,099.33 $15,388.25

TRIP

Town of Vienna 14486 Meek Rd. [2494']

Smokey Hollow Rd. [120']

Bonetti Rd.

Pavement Repl $65,193.00 $15,388.25

TRIP

Town of Westport 14031 Tuggle Ln. [1267']

River Rd.

Termini

Reconstruction $225,000.00 $15,388.25

Wednesday, May 24, 2017

Page 138: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Dane County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Windsor 14493 Finch Trl. [1426']

Portage Rd.

Termini

Pavement Repl $64,669.80 $15,388.29

Total for Dane County $8,801,258.97 $1,939,548.16

Wednesday, May 24, 2017

Page 139: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Dodge County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Dodge County 14735 CTH C [2.42 mi.]

Jersey Rd.

USH 151

Reconstruction $2,425,000.00 $280,644.81

MSIPLT

City of Beaver Dam 14317 S. University Ave. [898']

Stone St.

Shaw Hill Rd.

Pavement Repl $68,908.50 $13,298.00

MSIPLT

City of Horicon 14769 Washington St. [1743']

Main St.

Valley St.

Pavement Repl $409,660.00 $30,724.00

MSIPLT

Village of Clyman 14350 South St. [581']

Termini

Collins St.

Pavement Repl $27,592.73 $7,672.33

MSIPLT

Village of Lomira 14351 Main St. [640']

East Ave.

Termini

Resurfacing $31,000.00 $8,548.00

Wednesday, May 24, 2017

Page 140: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Dodge County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

Village of Lowell 14309 South St. [.73mi.]

STH 16

Mill St.

Resurfacing $100,000.00 $25,798.00

MSIPLT

Village of Neosho 14770 Rubicon St. [1109']

E. Lehman St.

Termini

Pavement Repl $250,000.00 $24,593.00

TRIP

Town of Lomira 14736 East Ln. [1.01 mi.]

Super Dr.

CTH KK

Pavement Repl $100,023.44 $39,146.71

TRIP

Town of Portland 14316 Sullivan Rd. [7815']

Stark Rd.

CTH T

Pavement Repl $126,393.92 $57,741.39

TRIP

Town of Theresa 14737 Bluemound Rd. S. [7920']

STH 28

CTH TW

Pavement Repl $145,000.00 $47,302.26

Total for Dodge County $3,683,578.59 $535,468.50

Wednesday, May 24, 2017

Page 141: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Door County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Door County 14267 CTH N (2) [11827']

Termini

CTH DK

Hot Mix Asph $563,236.00 $123,031.01

MSIPLT

City of Sturgeon Bay 14306 W. Redwood Pl. [950']

W. Spruce St. [30']

S. Hudson Ave.

Pavement Repl $62,347.87 $30,000.00

MSIPLT

Village of Forestville 14415 E. Park St. [950']

Krueger Ave.

Hucek Ave.

Pavement Repl $22,980.00 $9,496.16

TRIP

Town of Brussels 14694 Stevenson Pier Rd. [5280']

Curve Rd. (1)

CTH H

Hot Mix Asph $51,000.00 $13,000.00

TRIP

Town of Forestville 14868 S. Carnot Rd. [2640']

CTH J

E. Carnot Rd.

Hot Mix Asph $20,000.53 $10,000.00

Wednesday, May 24, 2017

Page 142: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Door County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Gardner 14693 Lovers Ln. [5227']

CTH C

Brussels Rd.

Hot Mix Asph $71,575.00 $12,000.00

TRIP

Town of Gibraltar 14867 Gibraltar Rd. (1) [11141']

CTH A

Sugar Bush Rd.

Hot Mix Asph $156,500.00 $17,500.00

TRIP

Town of Liberty Grove 14245 Old Stage Rd. [1.52 mi.]

CTH ZZ

Woodcrest Rd.

Reconditionin $156,526.00 $20,000.00

TRIP

Town of Nasewaupee 14246 Wilson Rd. [7920']

CTH O

New Settlement Rd.

Hot Mix Asph $31,026.74 $15,500.00

TRIP

Town of Sevastopol 14247 W. Dunn Rd. [3115']

CTH B

CTH HH

Hot Mix Asph $48,585.00 $18,840.99

Total for Door County $1,183,777.14 $269,368.16

Wednesday, May 24, 2017

Page 143: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Douglas County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Douglas County 14236 CTH A [4.61mi.]

John Schmidt Rd. [1.606mi.]

Larson Rd.

Hot Mix Asph $647,961.18 $158,380.26

MSIPGT

City of Superior 14552 Moccasin Mike Rd. [1.4mi.]

USH 2

Wisconsin Point Rd.

Reconstruction $3,240,000.00 $75,247.07

MSIPLT

Village of Lake Nebagam 14239 Lake Blvd. E. [.65mi.]

Honeymoon Point Rd. (2) [.69mi.

CTH S

Resurfacing $76,791.88 $7,318.05

MSIPLT

Village of Solon Springs 14551 Main St. [1680']

CTH A

S. 5th St.

Resurfacing $31,000.00 $7,318.05

MSIPLT

Village of Superior 14550 Hughitt Ave., John Ave., Ogden

Various

Various

Pavement Repl $60,000.00 $7,318.07

Wednesday, May 24, 2017

Page 144: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Douglas County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Brule 14238 County Line Rd. [.5mi.]

Hakkinen Rd.

Kauppi Rd.

Resurfacing $69,330.06 $18,924.19

TRIP

Town of Highland 14546 E. Beauregard Lake Rd. [1.47mi.]

CTH Y

Fire Tower Rd. (1)

Resurfacing $64,500.00 $19,912.08

TRIP

Town of Solon Springs 14549 Long Lake Rd. [1.31mi.]

Fire Lane Rd.

Cut Across Rd.

Resurfacing $171,000.00 $52,790.13

TRIP

Town of Summit 14548 Moen Rd. & Drolson Rd. [2.66mi

Various

Various

Resurfacing $64,000.00 $19,757.72

TRIP

Town of Superior 14547 Tuff Rd. [2746']

Leggate Rd.

Zachau Rd.

Pavement Repl $110,000.00 $33,958.57

Wednesday, May 24, 2017

Page 145: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Douglas County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Wascott 14237 Miles Lake Rd. [1.07 mi.]

CTH T

Lakeside Rd.

Resurfacing $91,265.44 $29,729.18

Total for Douglas County $4,625,848.56 $430,653.37

Wednesday, May 24, 2017

Page 146: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Dunn County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Dunn County 14556 CTH P [3.53mi.]

CTH D

130th Ave.

Hot Mix Asph $400,000.00 $182,872.14

MSIPLT

Village of Boyceville 14107 West St. & County Highway O [1

Various

Various

Pavement Repl $38,630.75 $14,861.91

MSIPLT

Village of Colfax 14553 3rd Ave. [950']

Dunn St.

Park Dr.

Pavement Repl $190,600.00 $14,861.91

MSIPLT

Village of Elk Mound 14108 Garland Ave. [158']

USH 12

Railroad St.

Pavement Repl $38,366.05 $14,861.92

MSIPLT

Village of Ridgeland 14109 Fuller St. [370']

Coe St.

Sherdan St.

Pavement Repl $17,347.60 $7,500.00

Wednesday, May 24, 2017

Page 147: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Dunn County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Colfax 14912 930th St. [.96mi]

CTH N

STH 40

Reconditionin $204,850.00 $12,856.53

TRIP

Town of Eau Galle 14104 130th Ave. [4382']

CTH P

130th St.

Hot Mix Asph $75,000.00 $12,856.53

TRIP

Town of Lucas 14100 530th Ave. [2355']

240th St.

200th St.

Pavement Repl $55,541.82 $12,856.53

TRIP

Town of New Haven 14106 1440th St. [2100']

190th St.

145th St.

Resurfacing $41,706.85 $12,856.53

TRIP

Town of Peru 14555 10th Ave. E. [3115']

STH 85

Termini

Pavement Repl $100,000.00 $12,856.52

Wednesday, May 24, 2017

Page 148: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Dunn County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Rock Creek 14105 90th Ave. [5280']

CTH H [2640']

1010th St.

Pavement Repl $94,747.00 $12,856.53

TRIP

Town of Sand Creek 14098 970th St. [1.01mi.]

Barron Dunn Ave.

235th Ave.

Pavement Repl $135,000.00 $12,856.53

TRIP

Town of Sheridan 14102 270th St. [4646']

STH 64

273rd St.

Hot Mix Asph $91,200.00 $12,856.53

TRIP

Town of Sherman 14554 910th Ave. [.97mi.]

380th St.

CTH F

Resurfacing $185,000.00 $12,856.53

TRIP

Town of Tainter 14103 618th St. [.25mi.]

CTH D

622nd St.

Reconditionin $42,787.08 $12,856.60

Wednesday, May 24, 2017

Page 149: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Dunn County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Weston 14099 370th St. [.5mi.]

STH 72

310th Ave.

Pavement Repl $50,000.00 $12,856.53

Total for Dunn County $1,760,777.15 $376,379.77

Wednesday, May 24, 2017

Page 150: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Eau Claire County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Eau Claire County 14726 CTH K [4.2mi.]

Termini

CTH HH

Hot Mix Asph $580,000.00 $263,148.17

MSIPGT

City of Eau Claire 14727 W. Hamilton Ave. [2746']

STH 37

Craig Rd.

Pavement Repl $850,000.00 $156,811.55

MSIPLT

City of Altoona 14775 Country Club Ln. [2006']

Spooner Ave.

Termini

Reconstruction $789,635.00 $25,574.18

TRIP

Town of Lincoln 14171 Pine Rd. [1.1mi.]

CTH SS [.3mi]

River View Dr.

Hot Mix Asph $60,389.33 $29,286.20

TRIP

Town of Pleasant Valley 14172 Spruce Rd. (2) [1mi.]

STH 93

Dahl Rd.

Pavement Repl $114,738.06 $29,286.21

Wednesday, May 24, 2017

Page 151: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Eau Claire County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Seymour 14173 120th Ave. [.99mi.]

St. Bridget's Dr.

CTH Q

Hot Mix Asph $79,849.13 $29,286.20

Total for Eau Claire County $2,474,611.52 $533,392.51

Wednesday, May 24, 2017

Page 152: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Florence County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Florence County 14596 CTH C [3.23 mi.]

LaSalle Falls Rd.

Bush Ln.

Pavement Repl $508,233.00 $70,206.79

TRIP

Town of Commonwealth 14597 Finn Town Rd. [.5 mi.]

CTH N

Koski Ln.

Pavement Repl $60,000.00 $27,004.37

TRIP

Town of Long Lake 14023 Fay Lake Rd. [1.97mi.]

Fay Lake Resort Rd.

Seifert Rd.

Resurfacing $54,800.00 $27,004.37

Total for Florence County $623,033.00 $124,215.53

Wednesday, May 24, 2017

Page 153: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Fond du Lac County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Fond du Lac County 14008 CTH VVV [2mi.]

CTH D

STH 23

Hot Mix Asph $528,582.90 $127,365.96

CHIP

Fond du Lac County 14505 CTH K [2.77mi.]

USH 45 (2)

STH 23

Hot Mix Asph $525,000.00 $127,365.98

MSIPGT

City of Fond du Lac 14504 7th St. [2165']

S. Main St.

S. Park Ave.

Reconstruction $507,400.00 $89,192.36

MSIPLT

Village of Rosendale 14503 Grant St., & Wisconsin St. [880']

Various

Various

Reconstruction $250,861.00 $44,332.27

TRIP

Town of Byron 14502 Mill Pond Rd. [.45mi.]

River Rd.

CTH D

Pavement Repl $128,180.19 $23,978.52

Wednesday, May 24, 2017

Page 154: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Fond du Lac County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Friendship 14007 Lincoln Rd. [1.00mi]

Town Line Rd.

CTH RP

Pavement Repl $117,119.80 $22,500.00

TRIP

Town of Metomen 14913 Sheldon Rd. [1.0mi]

Radio Rd.

CTH E

Pavement Repl $160,000.00 $53,000.00

TRIP

Town of Oakfield 14006 Prairie Rd. [1mi.]

Fountain Rd. [1mi.]

W. Church St.

Pavement Repl $117,475.94 $30,978.00

Total for Fond du Lac County $2,334,619.83 $518,713.09

Wednesday, May 24, 2017

Page 155: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Forest County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Forest County 14810 CTH M [6670']

STH 55

Schallock Rd.

Pavement Repl $139,455.89 $69,727.94

MSIPLT

City of Crandon 14284 Crandon Ave. [900']

Madison St.

E. Glen St.

Pavement Repl $18,000.00 $7,655.04

TRIP

Town of Armstrong Cree 14258 Wozniak Rd. [1.19mi.]

USH 8

Sportsman Ln.

Pavement Repl $98,796.72 $27,357.85

TRIP

Town of Nashville 14811 Airport Rd. (1) [1mi.]

STH 55 [.3mi.]

Airport Rd. (2)

Resurfacing $63,000.00 $25,000.00

TRIP

Town of Ross 14259 Pine St. [.38mi.]

STH 139

Cypress St.

Pavement Repl $51,871.56 $25,935.78

Wednesday, May 24, 2017

Page 156: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Forest County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Wabeno 14812 Trump Lake Rd. [1000']

STH 32 [600']

Rummels Rd.

Reconstruction $56,606.45 $24,999.99

Total for Forest County $427,730.62 $180,676.60

Wednesday, May 24, 2017

Page 157: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Grant County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Grant County 14756 CTH A [9.62mi.]

CTH J

McKinley St. N.

Reconditionin $1,924,000.00 $163,189.12

MSIPLT

City of Boscobel 14343 Chestnut St. [1200']

Riley Rd. (1) [824']

Fremont St.

Reconstruction $170,000.00 $8,473.34

MSIPLT

City of Fennimore 14805 Madison St., 2nd St., & Coolidge

Various

Various

Reconditionin $82,000.00 $8,473.34

MSIPLT

Village of Bloomington 14757 1st St. [375']

Prospect St.

Union St.

Reconstruction $62,400.00 $8,473.34

MSIPLT

Village of Blue River 14986 Main St. [950']

Jay St.

Martha St.

Reconstruction $120,510.00 $8,473.35

Wednesday, May 24, 2017

Page 158: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Grant County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

Village of Cassville 14803 Wyota St. [675']

Bluff St.

STH 133

Reconstruction $137,250.00 $8,473.35

MSIPLT

Village of Dickeyville 14962 N. Church St. [581']

USH 61

North Ave.

Reconstruction $130,000.00 $8,473.35

MSIPLT

Village of Hazel Green 14342 Main St. [380']

CTH W

19th St.

Pavement Repl $91,500.00 $8,473.34

MSIPLT

Village of Livingston 14341 Watson St. [475']

CTH E [200']

Jackson St.

Reconstruction $48,175.00 $8,473.34

MSIPLT

Village of Montfort 14873 Highland Rd. [687']

CTH I

View Rd.

Reconstruction $100,950.00 $8,473.34

Wednesday, May 24, 2017

Page 159: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Grant County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

Village of Muscoda 14804 Second St. [370']

Warehouse St.

STH 80

Reconstruction $92,635.00 $8,473.34

TRIP

Town of Cassville 14346 Fishnick Ln. [.79mi.]

Settlement Rd.

Termini

Reconditionin $90,000.00 $29,000.00

TRIP

Town of Hazel Green 14345 Logan Rd. [1.69mi.]

STH 11

Hyview Rd.

Reconditionin $90,000.00 $29,000.00

TRIP

Town of Liberty 14807 Liberty Ridge Rd. [300']

Hill Rd. [.65mi]

Kluckhorn St.

Structures $90,000.00 $19,000.00

TRIP

Town of Mount Ida 14806 Plum Valley Rd. [1.81mi]

USH 61

Green River Rd.

Reconditionin $100,000.00 $33,791.22

Wednesday, May 24, 2017

Page 160: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Grant County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of North Lancaster 14808 Badger Rd. [.6mi.]

Hilldale Rd.

Parkview Rd.

Pavement Repl $70,000.00 $19,000.00

TRIP

Town of Potosi 14963 River Ln. [300']

Ames Dr. [800']

Dean Ln.

Structures $90,000.00 $19,000.00

TRIP

Town of Waterloo 14758 Adrian Hollow Rd. [1.03mi.]

Archies Ln. [.05mi.]

Camel Ridge Rd.

Reconditionin $60,000.00 $14,000.00

TRIP

Town of Wyalusing 14347 Ready Hollow Rd. [1.69mi.]

CTH X

Gifford Ln.

Reconditionin $134,000.00 $29,000.00

Total for Grant County $3,683,420.00 $439,713.77

Wednesday, May 24, 2017

Page 161: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Green County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Green County 14473 CTH M [3.37mi.]

CTH B

Bidlingmaier Rd.

Hot Mix Asph $496,900.00 $131,093.95

MSIPLT

Village of Albany 14472 N. Taylor St. & Mineral St. [1689

Various

Various

Reconditionin $172,227.09 $26,901.52

MSIPLT

Village of New Glarus 14290 3rd St., 5th St., & 1st St. [951']

Various

Various

Reconstruction $157,128.13 $26,901.52

TRIP

Town of Albany 14251 Dunphy Rd. [4340']

STH 59

CTH E

Hot Mix Asph $64,090.00 $15,000.00

TRIP

Town of Brooklyn 14471 Benson Rd. [2640']

Amidon Rd.

King Rd.

Hot Mix Asph $35,770.00 $8,000.00

Wednesday, May 24, 2017

Page 162: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Green County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Clarno 14609 Patterson Rd. [5975'] (2 segments

STH 11

Bethel Rd.

Hot Mix Asph $86,000.00 $19,500.00

TRIP

Town of Exeter 14250 Nye Rd. [7920']

CTH CC

Silver Rd.

Hot Mix Asph $113,300.00 $25,800.00

TRIP

Town of Monroe 14470 Iliff Rd. [5280']

CTH N

Aebly Rd.

Hot Mix Asph $73,400.00 $16,700.00

TRIP

Town of Mount Pleasant 14253 Silver Rd. [900']

Purintun Rd. [350']

Krueger Rd.

Reconditionin $34,926.65 $17,463.32

Total for Green County $1,233,741.87 $287,360.31

Wednesday, May 24, 2017

Page 163: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Green Lake County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Green Lake County 14954 CTH DD [10,084']

CTH D

22nd Ave.

Hot Mix Asph $235,000.00 $92,049.01

MSIPLT

City of Berlin 14071 Center St. [2006']

E. Huron St.

E. Marquette St.

Hot Mix Asph $159,495.00 $9,404.13

MSIPLT

City of Markesan 14686 Vista Blvd. W. [528']

Margaret St.

Termini

Reconstruction $109,525.00 $9,404.12

MSIPLT

Village of Marquette 14685 W. Front St. & E. Front St. [.46m

Charlevoix St.

Dodges Ave.

Resurfacing $49,800.00 $9,404.13

TRIP

Town of Mackford 14684 Schure Rd. [3300']

CTH JJ

CTH S

Pavement Repl $100,000.00 $11,699.25

Wednesday, May 24, 2017

Page 164: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Green Lake County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Manchester 14683 Lovers Ln. [.25 mi.]

CTH U

Termini

Pavement Repl $45,000.00 $11,699.25

TRIP

Town of Princeton 14072 Pleasant Dr. [.49mi.]

CTH J

Loop Termini

Resurfacing $43,956.98 $11,699.25

TRIP

Town of Saint Marie 14073 Huckleberry Rd. [1.5mi.]

CTH CC [1.5mi.]

Lock Rd.

Hot Mix Asph $50,000.00 $11,699.25

Total for Green Lake County $792,776.98 $167,058.39

Wednesday, May 24, 2017

Page 165: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Iowa County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Iowa County 14859 CTH E [9900']

CTH G

CTH G

Hot Mix Asph $285,412.00 $136,760.06

MSIPLT

Village of Arena 14723 Pine St. [792']

Sharon St.

Pine Rd.

Reconditionin $154,000.00 $20,430.27

MSIPLT

Village of Avoca 14268 N. 8th St. [350']

Campsite Rd.

E. Lakeshore Dr.

Reconstruction $43,129.25 $17,250.00

TRIP

Town of Clyde 14283 Valley Rd. [200'][Assoc. proj. #1

Pine Knob Rd. [300']

CTH I

Structures $63,700.00 $25,409.33

TRIP

Town of Dodgeville 14296 Survey Rd. [.5mi.]

CTH B [.3mi]

Termini

Reconditionin $99,000.00 $47,261.84

Wednesday, May 24, 2017

Page 166: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Iowa County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Highland 14248 Pine Bluff Rd. [2500']

CTH PP

Wilson Rd.

Resurfacing $47,000.00 $23,500.00

Total for Iowa County $692,241.25 $270,611.50

Wednesday, May 24, 2017

Page 167: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Iron County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Iron County 14799 CTH FF [1.7mi.][Assoc. proj. #1

Union Rd.

Paul Rd.

Reconditionin $915,500.00 $70,206.79

MSIPLT

Iron County 14813 CTH FF [3840']

Popko Cir. E. [700']

USH 51

Pavement Repl $95,500.00 $9,083.09

TRIP

Town of Carey 14297 Camp 7 Rd. [2.96mi.]

Island Lake Rd.

Termini

Reconditionin $30,000.00 $14,931.75

TRIP

Town of Kimball 14802 Lakehead Rd. [1mi]

USH 2

North Dr.

Resurfacing $85,000.00 $22,397.62

TRIP

Town of Knight 14801 Island Lake Rd. [1200']

Nick Kangas Rd.

Coffee Rd.

Resurfacing $35,000.00 $14,931.75

Wednesday, May 24, 2017

Page 168: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Iron County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Mercer 14800 Popko Cir. W. [.8mi]

CTH FF

Turtle Rd.

Pavement Repl $100,000.00 $14,931.77

Total for Iron County $1,261,000.00 $146,482.77

Wednesday, May 24, 2017

Page 169: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Jackson County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Jackson County 14649 CTH FF [12,196']

Various

Various

Hot Mix Asph $302,400.00 $104,093.77

MSIPLT

Village of Melrose 14650 2nd St. [792']

Summit St.

Hart St.

Resurfacing $119,915.00 $9,108.16

MSIPLT

Village of Merrillan 14118 East St. N. [424']

STH 95

Polk St.

Pavement Repl $20,517.40 $9,108.15

TRIP

Town of Bear Bluff 14119 Bear Bluff Rd. S. [1mi.]

Staege Rd

Smith Rd.

Resurfacing $63,674.40 $31,837.20

TRIP

Town of Curran 14651 Lincoln Rd. [1.2 mi.]

Taylor Rd.

STH 95

Reconditionin $178,577.00 $89,288.50

Wednesday, May 24, 2017

Page 170: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Jackson County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Irving 14652 Byrns Rd. [1.06mi.]

CTH H

Church Rd.

Resurfacing $38,380.00 $19,082.54

Total for Jackson County $723,463.80 $262,518.32

Wednesday, May 24, 2017

Page 171: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Jefferson County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Jefferson County 14747 CTH Y [4.795 mi.]

USH 18

STH 26

Hot Mix Asph $900,000.00 $192,727.52

MSIPGT

City of Watertown 14748 West St. (1) [5069']

Milford St.

Benton St.

Resurfacing $380,000.00 $55,122.81

MSIPLT

City of Fort Atkinson 14280 Wilson Ave. [2588']

Riverside Dr.

Charles St.

Reconstruction $237,000.00 $59,232.82

MSIPLT

Village of Johnson Creek 14285 Aztalan St. & Milwaukee St. [301

Various

Various

Hot Mix Asph $56,250.00 $13,793.94

MSIPLT

Village of Palmyra 14739 Carriage Way [720']

Main St.

Carriage Ct.

Resurfacing $33,400.00 $8,114.09

Wednesday, May 24, 2017

Page 172: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Jefferson County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Cold Spring 14286 Marshall Rd. [.91mi.]

Stroupe Rd.

CTH D

Pavement Repl $120,000.00 $25,858.58

TRIP

Town of Koshkonong 14738 Groeler Rd. [3749']

Old 26 Rd (1)

Poeppel Rd.

Pavement Repl $173,700.00 $25,858.58

TRIP

Town of Palmyra 14281 Hooper Rd. [3960']

CTH E

Zion Rd.

Resurfacing $49,383.26 $24,691.63

TRIP

Town of Waterloo 14287 Island Church Rd. (2) [4530']

Blue Joint Rd. [2711']

CTH G

Pavement Repl $114,316.29 $25,858.56

Total for Jefferson County $2,064,049.55 $431,258.53

Wednesday, May 24, 2017

Page 173: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Juneau County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Juneau County 14614 CTH B [2.09 mi.]

STH 80

Zindorf Rd.

Reconditionin $380,000.00 $104,642.25

MSIPLT

City of New Lisbon 14136 Monroe St. [1003']

Court St.

Goodland St.

Reconstruction $214,000.00 $21,488.06

MSIPLT

Village of Union Center 14137 Hyland St. and Park St. [.53mi.]

Various

Various

Resurfacing $19,218.50 $9,609.25

TRIP

Town of Cutler 14629 25th St. & 6th Ave. S. [1.47mi.]

Various

Various

Reconditionin $64,500.00 $14,342.36

TRIP

Town of Finley 14616 2nd St. [3907']

STH 80

80th Ave. S.

Pavement Repl $98,000.00 $14,342.36

Wednesday, May 24, 2017

Page 174: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Juneau County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Fountain 14617 Zindorf Rd. [5333']

Wood Rd.

STH 80

Reconditionin $98,875.00 $14,342.40

TRIP

Town of Kingston 14135 Sprague-Mather Rd. [4171']

3rd Ave.

CTH H

Resurfacing $31,820.00 $14,342.36

TRIP

Town of Lemonweir 14131 Noe Rd. & Cemetary Rd. [1.01mi

Various

Various

Resurfacing $80,641.15 $14,342.36

TRIP

Town of Lindina 14618 Petrowitz Rd. [4700']

CTH O

Donlin Rd.

Resurfacing $48,437.94 $14,342.36

TRIP

Town of Lisbon 14619 10th Ave. [.25mi.]

N. Germantown Rd. [4,645']

42nd St.

Reconditionin $29,000.00 $14,342.36

Wednesday, May 24, 2017

Page 175: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Juneau County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Necedah 14132 22nd St. W. [5280']

7th Ave.

9th Ave.

Resurfacing $70,000.00 $14,342.36

TRIP

Town of Seven Mile Cree 14134 Brown Rd. [5280']

CTH K

Wafle Rd.

Reconditionin $36,348.50 $14,342.36

TRIP

Town of Wonewoc 14133 Thompson Rd. [4013']

Lumsden Rd.

CTH W

Reconditionin $54,058.00 $14,342.36

Total for Juneau County $1,224,899.09 $279,163.20

Wednesday, May 24, 2017

Page 176: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Kenosha County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Kenosha County 14695 CTH C & CTH JF [1.67mi.]

Various

Various

Resurfacing $458,108.45 $229,054.22

MSIPGT

City of Kenosha 14920 22nd Ave. [.5mi.]

75th St.

80th St.

Reconstruction $1,027,000.00 $187,230.88

MSIPGT

Village of Pleasant Prairi 14300 86th St., 54th Ave., 85th Pl., & 56

Various

Various

Pavement Repl $122,370.46 $52,369.04

MSIPLT

Village of Paddock Lake 14303 60th Pl., 245th Ave., & 243rd Ct.

Various

Various

Pavement Repl $153,300.00 $19,330.80

MSIPLT

Village of Twin Lakes 14304 Barry Rd. [792']

Wilmot Ave.

Chapel Ave.

Resurfacing $90,956.26 $19,330.81

Wednesday, May 24, 2017

Page 177: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Kenosha County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Brighton 14301 41st St. [4,013'][Assoc. Proj. #14

CTH B

Town Rd.

Resurfacing $137,010.00 $13,303.37

TRIP

Town of Paris 14302 213th Ave. [2323']

31st St.

Termini

Resurfacing $106,882.00 $13,303.36

Total for Kenosha County $2,095,627.17 $533,922.48

Wednesday, May 24, 2017

Page 178: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Kewaunee County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Kewaunee County 14184 CTH D [3.44mi.]

STH 42

CTH K

Hot Mix Asph $182,741.62 $91,370.81

MSIPLT

City of Kewaunee 14157 Baumeister Dr., Terraqua Dr. &

Various

Various

Hot Mix Asph $54,211.28 $12,159.50

MSIPLT

Village of Casco 14786 Braeburn Ave., Macintosh St., &

Various

Various

Hot Mix Asph $24,400.00 $12,159.50

TRIP

Town of Ahnapee 14783 Poplar Dr. [2700']

Wilson Rd. W.

CTH S

Hot Mix Asph $33,000.00 $13,796.38

TRIP

Town of Lincoln 14784 Tamarak Rd. [.5mi.]

CTH X

Cardinal Ln.

Hot Mix Asph $35,200.00 $13,796.38

Wednesday, May 24, 2017

Page 179: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Kewaunee County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Montpelier 14156 Hill Rd. [1mi.]

CTH V

Jahnke Rd.

Hot Mix Asph $28,145.84 $13,796.38

TRIP

Town of Pierce 14155 8th Rd. [.84mi.]

Longfellow Rd.

STH 42

Resurfacing $34,465.00 $13,796.38

TRIP

Town of Red River 14785 Tonet Rd. [2640']

Bader Rd.

Town Hall Rd.

Hot Mix Asph $36,666.67 $13,796.38

Total for Kewaunee County $428,830.41 $184,671.71

Wednesday, May 24, 2017

Page 180: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 La Crosse County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

La Crosse County 14476 CTH SN [5385']

CTH S

East Ave. N.

Hot Mix Asph $315,120.00 $150,000.00

CHIP

La Crosse County 14475 CTH HD [4698']

Empire St.

Bluffview Ct.

Hot Mix Asph $575,328.00 $97,856.10

MSIPGT

City of La Crosse 14478 Johnson St., Winnebago St., & A

Various

Various

Pavement Repl $215,000.00 $104,134.31

MSIPLT

Village of Bangor 14477 Bangor St. [1056']

CTH B

13th Ave. S.

Reconstruction $210,000.00 $37,416.19

MSIPLT

Village of West Salem 14534 Youlon St. [634']

Hamilton St.

Elm St.

Reconstruction $130,000.00 $35,948.88

Wednesday, May 24, 2017

Page 181: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 La Crosse County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Shelby 14635 Wedgewood Dr. E. & Valley Rd.

Various

Various

Pavement Repl $130,000.00 $56,944.26

Total for La Crosse County $1,575,448.00 $482,299.74

Wednesday, May 24, 2017

Page 182: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Lafayette County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Lafayette County 14760 CTH O [10500']

STH 11 [2100']

Drybone Rd.

Hot Mix Asph $225,000.00 $101,058.06

MSIPLT

Village of Argyle 14355 N. Lafayette St. [475']

Milwaukee St.

Monroe St.

Reconstruction $23,910.00 $7,402.87

MSIPLT

Village of Gratiot 14352 Railroad St. [264']

Main St.

Sheldon St.

Reconstruction $62,000.00 $14,805.75

TRIP

Town of Blanchard 14315 Brush Rd. [800']

Paulson Rd. [1800']

CTH F

Reconstruction $111,714.28 $20,000.00

TRIP

Town of Darlington 14880 Red Rock Rd. & Walnut Rd. [140

Various

Various

Reconstruction $85,000.00 $40,000.00

Wednesday, May 24, 2017

Page 183: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Lafayette County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Shullsburg 14864 Glenville Rd. [400']

CTH E [2650']

Wright Rd.

Structures $32,000.00 $14,537.88

TRIP

Town of Shullsburg 14965 Palfrey Rd. [1,214']

STH 11

Aetna Rd.

Pavement Repl $24,000.00 $12,000.00

TRIP

Town of Willow Springs 14759 Pond View Ln. [.53mi.]

CTH G

Termini

Resurfacing $21,610.24 $10,805.12

Total for Lafayette County $585,234.52 $220,609.68

Wednesday, May 24, 2017

Page 184: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Langlade County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Langlade County 14764 CTH S [9451']

STH 64

CTH F

Pavement Repl $232,926.00 $104,883.74

MSIPLT

Village of White Lake 14353 School St. [450']

CTH M

Legion St.

Reconditionin $58,167.00 $23,468.69

TRIP

Town of Ackley 14413 Range Line Rd. [2640']

Popple Rd.

Mendl Rd.

Resurfacing $37,224.00 $15,966.89

TRIP

Town of Antigo 14798 Cherry Rd. [2640']

Star Neva Rd. [1680']

Pioneer Rd.

Pavement Repl $51,000.00 $15,966.89

TRIP

Town of Neva 14797 Neva Lake Rd. [2640']

Claire Rd.

Moersch Ln.

Pavement Repl $43,733.93 $15,966.90

Wednesday, May 24, 2017

Page 185: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Langlade County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Norwood 14763 Evergreen Rd. [1,700']

STH 47

CTH D

Resurfacing $22,393.62 $11,196.81

TRIP

Town of Polar 14308 Edison Rd. [.5mi.]

CTH S

Jones Rd.

Resurfacing $44,135.59 $15,966.89

TRIP

Town of Wolf River 14307 Glen Hill Trl. & Poplar Ln. [4858

Various

Various

Resurfacing $75,000.00 $15,966.90

Total for Langlade County $564,580.14 $219,383.71

Wednesday, May 24, 2017

Page 186: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Lincoln County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Lincoln County 14957 CTH K & CTH Q [4.42mi.]

Various

Various

Resurfacing $650,000.00 $117,644.79

MSIPLT

City of Merrill 14326 Eugene St. [1030']

Jackson St. [207']

Water St.

Resurfacing $86,167.62 $37,509.76

TRIP

Town of Corning 14515 Joe Snow Rd. [1mi.]

Corning Rd.

Farming Dale Rd.

Hot Mix Asph $95,000.00 $13,618.90

TRIP

Town of King 14255 Pine Shore Ln. [.4mi.]

CTH A

E. Pine Shore Ln.

Pavement Repl $75,000.00 $13,618.95

TRIP

Town of Pine River 14348 Big Eddie Rd. [4123']

Center Rd.

STH 64

Resurfacing $93,975.09 $13,618.90

Wednesday, May 24, 2017

Page 187: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Lincoln County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Rock Falls 14514 Tug Lake Ave. [.75mi.]

CTH JJ

Resort Ln.

Hot Mix Asph $27,747.54 $13,618.90

TRIP

Town of Russell 14512 Town Hall Rd. [2mi.]

STH 17

Dudley Rd.

Resurfacing $30,000.00 $13,618.90

TRIP

Town of Schley 14325 French Ridge Rd. [1mi.]

CTH G [1mi.]

Sunrise Rd.

Resurfacing $34,274.00 $13,618.90

TRIP

Town of Scott 14349 Maple Grove Rd. [4240']

Wood Ave.

CTH Z

Reconditionin $52,000.00 $13,618.90

TRIP

Town of Skanawan 14513 Bear Trail Rd. [8659']

Grundy Rd.

Otter Lake Rd.

Resurfacing $31,955.95 $13,618.90

Total for Lincoln County $1,176,120.20 $264,105.80

Wednesday, May 24, 2017

Page 188: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Manitowoc County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Manitowoc County 14002 CTH K [4.37mi.]

CTH W

CTH NN

Resurfacing $478,196.70 $196,651.15

MSIPGT

City of Manitowoc 14463 E. Crescent Dr. & W. Crescent Dr

Various

Various

Reconstruction $645,000.00 $76,322.17

MSIPLT

City of Two Rivers 14003 27th St., 14th St. [1120']

Various

Vaious

Hot Mix Asph $72,000.00 $18,015.16

MSIPLT

Village of Cleveland 14467 Park Ln. & Park Ct. [845']

Various

Various

Resurfacing $20,000.00 $9,000.00

MSIPLT

Village of Mishicot 14464 Ranchview Ct. [425']

S. Main St.

Termini

Pavement Repl $30,971.81 $9,000.00

Wednesday, May 24, 2017

Page 189: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Manitowoc County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

Village of Saint Nazianz 14466 E. Birch St. [660']

S. 4th Ave.

S. 6th Ave.

Resurfacing $20,000.00 $9,000.00

MSIPLT

Village of Whitelaw 14465 N. Hickory Rd. [900']

W. Menasha Ave.

Termini

Pavement Repl $30,000.00 $9,000.00

TRIP

Town of Centerville 14460 South Union Rd. [1mi.]

CTH F

Point Creek Rd.

Resurfacing $90,000.00 $26,659.56

TRIP

Town of Gibson 14462 Pautz Rd. [1.04mi.]

CTH R

Melnik Rd.

Hot Mix Asph $75,000.00 $26,659.56

TRIP

Town of Kossuth 14978 Reifs Mills Rd. [1.49mi.]

Stone Rd.

Thunder Rd.

Resurfacing $109,000.00 $26,659.56

Wednesday, May 24, 2017

Page 190: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Manitowoc County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Maple Grove 14459 Taus Rd. [1.02mi.]

CTH W

Deer Haven Ln.

Resurfacing $89,540.00 $26,659.56

TRIP

Town of Newton 14461 Wilharms Rd. [1mi.]

Union Rd.

S. Custer St.

Resurfacing $90,000.00 $26,659.56

Total for Manitowoc County $1,749,708.51 $460,286.28

Wednesday, May 24, 2017

Page 191: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Marathon County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Marathon County 14626 CTH S [7.13 mi.]

STH 29

CTH A

Hot Mix Asph $1,100,000.00 $366,517.64

MSIPGT

City of Wausau 14628 N. 2nd St. [1,584'][Assoc. Proj. #

E. Bridge St.

E. Wausau Ave.

Reconstruction $640,000.00 $94,391.66

MSIPLT

Village of Athens 14081 Duenow St.& Schlegel St. [1162']

Various

Various

Reconstruction $153,388.49 $27,915.77

MSIPLT

Village of Elderon 14691 Wausau St., Grand Ave., Center S

Various

Various

Pavement Repl $50,700.00 $25,350.00

MSIPLT

Village of Rothschild 14627 Johnson St. [528']

Florence St.

Leroy St.

Reconstruction $121,272.00 $27,915.79

Wednesday, May 24, 2017

Page 192: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Marathon County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

Village of Stratford 14080 Webertown Ave. [.5mi.]

STH 153

Pine Ln.

Reconstruction $131,701.06 $27,915.79

MSIPLT

Village of Weston 14082 Schofield Ave. [3250']

Normandy St.

Fox St.

Resurfacing $62,061.00 $27,915.79

TRIP

Town of Day 14687 Elm. St. [5207']

CTH M [20']

Grand Meadow Rd.

Reconstruction $60,000.00 $26,293.46

TRIP

Town of Frankfort 14688 Walnut Rd. [1000']

Blueberry Rd. [4780']

Huckleberry Rd.

Pavement Repl $60,608.00 $26,293.48

TRIP

Town of Guenther 14689 Camp Rd. [1mi.]

Twilight Rd.

Guenther Rd.

Reconstruction $110,000.00 $26,293.48

Wednesday, May 24, 2017

Page 193: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Marathon County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Harrison 14079 Bear Lake Rd. (2) [.75mi.]

CTH Y

Nolan Rd.

Pavement Repl $135,000.00 $26,293.48

TRIP

Town of Knowlton 14075 Dubay Dr. [.57mi.]

Johns Ln.

Blackberry Ln

Reconditionin $56,622.00 $26,293.48

TRIP

Town of McMillan 14900 Mann St. [760']

Lincoln Ave. [2,040']

Meadow Ave. N.

Pavement Repl $58,780.48 $26,293.48

TRIP

Town of Rib Falls 14690 3rd Ave. [1.2mi.]

21st St. E. [.9mi]

North Ln.

Pavement Repl $62,500.00 $26,293.48

TRIP

Town of Rib Mountain 14692 Parrot Ln. [2866']

Rib Mountain Dr. [250']

Oriole Ln.

Reconditionin $124,711.49 $26,293.48

Wednesday, May 24, 2017

Page 194: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Marathon County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Ringle 14076 River Rd. [1897'][Assoc. proj. #1

Miles Ln.

Termini

Reconditionin $153,988.19 $26,293.48

TRIP

Town of Stettin 14078 Highland Dr. [5597']

CTH O

S. 86th Ave.

Pavement Repl $127,630.00 $26,293.48

Total for Marathon County $3,208,962.71 $860,857.22

Wednesday, May 24, 2017

Page 195: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Marinette County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Marinette County 14227 CTH R [7.66mi.]

STH 141

Mine Rd.

Hot Mix Asph $551,269.91 $153,900.53

MSIPLT

Village of Crivitz 14593 Spur St. [700']

Henriette Ave.

Hall Ave.

Reconstruction $108,519.00 $10,000.00

MSIPLT

Village of Pound 14592 Maple St. [528']

Business 141

Colburn St.

Reconstruction $82,326.00 $33,877.39

MSIPLT

Village of Wausaukee 14958 County Highway C Road [1,150']

North Ave.

USH 141

Pavement Repl $50,196.00 $10,000.00

TRIP

Town of Amberg 14233 Barker Rd. [1.37mi.]

Rousch Ln. [.62mi.]

Pike River Rd.

Hot Mix Asph $79,714.71 $26,837.57

Wednesday, May 24, 2017

Page 196: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Marinette County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Beaver 14230 18th Rd. E. [1mi.]

13th Rd.

5th Rd.

Hot Mix Asph $117,954.71 $26,837.57

TRIP

Town of Dunbar 14228 Trout Haven Rd. [.52mi.]

Trout Haven Ln. [50']

Twelve Foot Falls Rd.

Hot Mix Asph $53,093.07 $25,500.00

TRIP

Town of Lake 14936 Ferndale Rd. [.76mi.]

Hilldale Dr.

Porterfield Lake Rd.

Pavement Repl $61,900.00 $26,837.57

TRIP

Town of Niagara 14229 Hansen Rd. [.57mi.]

CTH N

Termini

Resurfacing $52,922.00 $26,100.00

TRIP

Town of Peshtigo 14231 Keller Rd. [1.28mi.]

CTH BB [1.36mi.]

CTH B

Hot Mix Asph $89,809.42 $26,837.57

Wednesday, May 24, 2017

Page 197: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Marinette County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Pound 14589 W. 10th Rd. [5280']

S. 27th Rd.

S. 31st Rd.

Pavement Repl $60,730.00 $26,837.57

TRIP

Town of Stephenson 14232 Parkway Rd. (2) [1.06mi.]

Boat Landing 6 Rd. [1820']

Boat Landing 13 Rd.

Hot Mix Asph $97,969.74 $26,837.57

Total for Marinette County $1,406,404.56 $420,403.34

Wednesday, May 24, 2017

Page 198: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Marquette County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Marquette County 14506 CTH E & CTH N [2.94mi.]

Various

Various

Hot Mix Asph $233,480.00 $88,962.41

MSIPLT

Village of Neshkoro 14164 W. Berlin St. [875']

STH 73 [150']

S. Montello St.

Hot Mix Asph $34,260.45 $13,702.18

TRIP

Town of Crystal Lake 14170 Dixie Ave. [.51 mi.]

14th Ave.

STH 22

Hot Mix Asph $30,523.50 $10,087.28

TRIP

Town of Douglas 14165 Gale Dr. [.6mi.]

Douglas Ave. [211']

CTH CX

Hot Mix Asph $30,561.00 $10,087.28

TRIP

Town of Harris 14169 12th Rd. [.59mi.]

CTH J

Town Line

Hot Mix Asph $35,078.40 $10,087.28

Wednesday, May 24, 2017

Page 199: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Marquette County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Moundville 14166 Grouse Rd. [.5mi.]

8th Rd. [.815mi]

CTH T

Hot Mix Asph $33,396.34 $10,087.33

TRIP

Town of Neshkoro 14168 19th Rd. [.463mi.]

CTH N

Eagle Rd.

Hot Mix Asph $33,167.51 $10,087.28

TRIP

Town of Packwaukee 14507 10th Rd. [.5mi.]

Gale Ave.

Gem Ave.

Hot Mix Asph $29,260.00 $10,087.27

TRIP

Town of Westfield 14167 Ember Ave. [.5mi.]

CTH J [.322mi.]

4th Ave.

Hot Mix Asph $26,932.50 $10,087.28

Total for Marquette County $486,659.70 $173,275.59

Wednesday, May 24, 2017

Page 200: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Menominee County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Town of Menominee 14543 South Branch Rd. [5.56mi.]

Branch Path S. (1)

CTH M

Reconstruction $559,000.00 $70,206.79

TRIP

Town of Menominee 14544 Trillium Rd. [.3mi]

Mip Anaq Rd.

Termini

Pavement Repl $36,000.00 $11,286.62

Total for Menominee County $595,000.00 $81,493.41

Wednesday, May 24, 2017

Page 201: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Milwaukee County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Milwaukee County 14847 CTH N [1.56mi.]

W. Forest Home Ave.

W. Howard Ave.

Reconditionin $3,800,000.00 $1,403,005.12

MSIPGT

City of Franklin 14001 S. 60th Street [3355']

W. Ryan Rd.

W. Franklin Dr.

Resurfacing $159,177.36 $79,588.68

MSIPGT

City of Greenfield 14931 W.Spring Green Rd.,S.106th St.,

Various

Various

Reconditionin $305,000.00 $68,415.95

MSIPGT

City of Milwaukee 14175 Various [18815']

Various

Various

Resurfacing $2,905,000.00 $995,031.97

MSIPGT

City of Oak Creek 14933 Carollton Dr. [1,690']

S. Patricia Blvd.

E. Debbie Dr.

Resurfacing $216,500.00 $71,799.02

Wednesday, May 24, 2017

Page 202: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Milwaukee County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPGT

City of South Milwaukee 14174 Hawthorne Ave. [2270']

Chicago Ave.

Lake Dr.

Resurfacing $175,000.00 $39,270.06

MSIPGT

City of Wauwatosa 14719 N. 96th St. [2006']

Ridge Blvd.

Menomonee River Pkwy.

Pavement Repl $529,560.00 $90,597.86

MSIPGT

City of West Allis 14176 S. 119th St. [1426']

W. Ohio Ave.

W. Oklahoma Ave.

Reconstruction $399,000.00 $109,742.19

MSIPLT

City of Saint Francis 14721 S. Kirkwood Ave. [160']

E. Lunham Ave.

Termini

Reconstruction $115,000.00 $26,570.03

MSIPLT

Village of Brown Deer 14179 N. 56th St., N 54th St., & N 52nd

Various

Various

Pavement Repl $241,450.00 $54,402.94

Wednesday, May 24, 2017

Page 203: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Milwaukee County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

Village of Fox Point 14722 Navajo Rd. [1795']

Mall Rd. [159']

Calumet Rd.

Pavement Repl $295,000.00 $34,425.70

MSIPLT

Village of Greendale 14178 Eastway [2957']

S. 51st St

Ramsey Ave

Reconditionin $367,000.00 $60,409.04

MSIPLT

Village of Hales Corners 14177 Meadowlark Ct. & Cardinal Ct. [

Various

Various

Resurfacing $252,000.00 $33,918.56

MSIPLT

Village of West Milwauk 14852 S. 46th St. [475']

Termini

W. Beloit Rd.

Reconditionin $150,000.00 $19,077.48

Total for Milwaukee County $9,909,687.36 $3,086,254.60

Wednesday, May 24, 2017

Page 204: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Monroe County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Monroe County 14787 CTH PP [.26mi.]

USH 12 [.01mi.]

I 90

Reconstruction $350,000.00 $162,094.26

MSIPLT

City of Sparta 14790 Central Ave. [1320']

N. Black River St.

N. Grace St.

Reconstruction $244,304.00 $11,210.87

MSIPLT

City of Tomah 14399 Scout St. [370']

Holton St.

Council St.

Pavement Repl $36,000.00 $11,210.86

MSIPLT

Village of Cashton 14333 South St. [528']

Albion St.

Taylor St.

Reconstruction $96,000.00 $11,210.86

MSIPLT

Village of Kendall 14397 Newbery St. [370']

George St.

Spring St.

Pavement Repl $23,760.00 $11,210.86

Wednesday, May 24, 2017

Page 205: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Monroe County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

Village of Wilton 14761 Enderby St. [528']

Railroad St.

Cemetery St.

Reconstruction $77,000.00 $11,210.86

TRIP

Town of Adrian 14762 Indigo Ave. [3980']

CTH M

Innsbruck Rd.

Resurfacing $37,934.00 $15,000.00

TRIP

Town of Grant 14788 Aspen Ave. [3696']

USH 12

Artesian Rd.

Reconditionin $54,800.00 $25,000.00

TRIP

Town of Greenfield 14335 Cherry Rd. [2693']

CTH G

Chariot Ave.

Reconditionin $39,037.67 $19,518.83

TRIP

Town of La Grange 14398 Dogwood Ave. [1775']

Dolphin Rd.

CTH N

Reconditionin $50,000.00 $15,000.00

Wednesday, May 24, 2017

Page 206: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Monroe County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Lincoln 14334 Arctic Rd. [2640']

CTH EW [200']

Aspen Ave.

Reconditionin $61,650.00 $25,000.00

TRIP

Town of Wells 14789 Jancing Ave. [.63mi.]

Jason Ave. [.73mi.]

Jasmine Rd.

Reconditionin $99,350.00 $26,124.72

Total for Monroe County $1,169,835.67 $343,792.12

Wednesday, May 24, 2017

Page 207: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Oconto County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Oconto County 14040 CTH H [.98mi]

CTH R

Red Banks Rd.

Reconstruction $311,477.30 $144,313.49

MSIPLT

City of Gillett 14021 S. Birch Ave. [1300']

STH 22

Ridgewood Dr.

Reconstruction $211,000.00 $29,458.35

TRIP

Town of Bagley 14636 Pipeline Rd. [18162']

Herning Rd.

Logan Rd.

Reconditionin $23,000.00 $11,500.00

TRIP

Town of Doty 14022 S. Bass Lake Boat Landing Ln. [5

Archibald Lake Rd.

Termini

Reconditionin $22,695.00 $11,347.00

TRIP

Town of How 14902 River Rd. [5,280']

Willow Rd.

Hill Rd.

Reconditionin $104,000.00 $17,500.00

Wednesday, May 24, 2017

Page 208: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Oconto County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Lena 14638 Jagiello Rd. [2640']

Kriescher Rd.

CTH A

Reconditionin $43,870.00 $18,172.34

TRIP

Town of Little River 14639 Hogsback Rd. [1.5mi.]

CTH A

LaFollett Rd.

Reconditionin $140,000.00 $18,172.35

TRIP

Town of Morgan 14640 Morgan Marsh Rd. [1.2 mi.]

CTH C

Wery Rd.

Reconditionin $45,958.00 $18,172.34

TRIP

Town of Mountain 14641 Y Camp Rd. & S. Shore Dr. [63

Various

Various

Resurfacing $112,745.00 $18,172.34

TRIP

Town of Oconto 14642 Hoehne Ln. [.76 mi]

CTH J

Termini

Reconditionin $71,325.00 $18,172.35

Wednesday, May 24, 2017

Page 209: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Oconto County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Oconto Falls 14643 Degantown Rd. [1.00mi.]

CTH CC

Sandy Corners Rd.

Reconditionin $66,650.00 $18,172.34

TRIP

Town of Stiles 14644 Geulig Rd. [2100']

Magnin Rd. [4000']

Old 141

Reconditionin $42,290.00 $18,172.34

TRIP

Town of Townsend 14645 Burnt Dam Rd. E. [1900']

CTH T

Valley View Rd.

Pavement Repl $39,000.00 $18,172.34

TRIP

Town of Underhill 14646 Red Banks Rd. [3000']

Morgan Rd.

CTH H

Pavement Repl $51,374.00 $18,172.34

Total for Oconto County $1,285,384.30 $377,669.92

Wednesday, May 24, 2017

Page 210: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Oneida County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Oneida County 14274 CTH Y [1.98mi.]

River Rd.

Brown Creek Rd.

Hot Mix Asph $165,280.50 $82,640.25

MSIPLT

City of Rhinelander 14271 Boyce Dr. [3379']

W. Prospect St.

USH 47

Pavement Repl $202,236.00 $20,874.70

TRIP

Town of Hazelhurst 14522 Lower Kaubashine Rd. [3010']

Creek Rd.

Termini

Pavement Repl $52,878.40 $26,405.21

TRIP

Town of Minocqua 14243 Camp Pinemere Rd. [.5mi.]

Sutton Rd. [.12mi]

Hower Rd.

Reconditionin $99,321.26 $26,405.22

TRIP

Town of Newbold 14272 Black Lake Rd. [.99mi.]

Spider Lake Rd.

S. Shore Dr. (2)

Reconditionin $130,000.00 $26,405.21

Wednesday, May 24, 2017

Page 211: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Oneida County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Pelican 14523 N. Shore Dr. [2322']

Cedar Ln.

Termini

Resurfacing $65,729.24 $26,405.22

TRIP

Town of Pine Lake 14524 Timber Ln. [1901']

Shepard Lake Rd.

Termini

Pavement Repl $65,000.00 $26,405.20

TRIP

Town of Stella 14273 Spafford Rd. [2500']

9th Rd. [2252']

Dollar Lake Rd.

Pavement Repl $62,783.96 $26,405.21

TRIP

Town of Woodruff 14922 Mid Lake Rd. [1.42mi.]

STH 47

Thoroughfare Rd.

Reconditionin $199,695.75 $26,405.21

Total for Oneida County $1,042,925.11 $288,351.43

Wednesday, May 24, 2017

Page 212: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Outagamie County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Outagamie County 14519 CTH EE & CTH S [4.15mi.]

Various

Various

Hot Mix Asph $945,000.00 $355,255.82

MSIPGT

City of Appleton 14518 N. Division St. [1426]

W. Franklin St.

W. Atlantic St.

Reconstruction $398,000.00 $156,644.11

MSIPLT

City of Kaukauna 14057 Gertrude St. [1162']

Harrison St. [316']

Maloney Rd.

Reconstruction $615,895.00 $50,082.99

MSIPLT

City of Seymour 14517 Foote St. [1900]

Elm Ln. [318']

E. Bronson Rd.

Reconstruction $306,000.00 $50,083.00

TRIP

Town of Bovina 14056 Van Patten Dr. [1mi.]

CTH P

STH 54

Pavement Repl $72,598.72 $22,870.70

Wednesday, May 24, 2017

Page 213: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Outagamie County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Freedom 14055 French Rd. [3660']

E. Broadway Dr.

Evergreen Ln.

Reconstruction $327,032.80 $45,741.40

TRIP

Town of Hortonia 14516 Ledge Hill Rd. [.75mi.]

CTH TT

Termini

Pavement Repl $150,000.00 $68,612.11

Total for Outagamie County $2,814,526.52 $749,290.13

Wednesday, May 24, 2017

Page 214: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Ozaukee County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Ozaukee County 14700 CTH I [1.58mi.][Assoc. proj. #14

CTH Z

Belgium-Kohler Rd.

Reconstruction $1,750,000.00 $168,668.31

MSIPGT

City of Mequon 14276 Green Bay Rd. [.51mi.]

Lake Bluff Rd.

Highland Rd.

Reconditionin $175,000.00 $75,718.11

MSIPLT

City of Port Washington 14696 N. Harrison St. [1425']

W. Jackson St.

W. Dodge St.

Reconstruction $290,000.00 $43,000.00

MSIPLT

Village of Fredonia 14698 Fox Glen Rd. [1637']

Partridge Ln.

Fredonia-Kohler Dr.

Resurfacing $77,000.00 $13,740.75

MSIPLT

Village of Grafton 14697 6th Ave. [1637']

Spring St.

Elm St.

Pavement Repl $201,000.00 $43,000.00

Wednesday, May 24, 2017

Page 215: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Ozaukee County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Cedarburg 14324 Horns Corners Rd. [2640']

Bridge St.

Western Ave.

Pavement Repl $136,277.84 $12,916.68

TRIP

Town of Fredonia 14277 Fredonia Kohler Dr. [4300']

CTH I

Termini

Pavement Repl $200,000.00 $12,916.67

TRIP

Town of Grafton 14699 Falls Rd. [.57mi.]

Fox Tail Ln.

CTH C

Pavement Repl $132,750.00 $12,916.67

Total for Ozaukee County $2,962,027.84 $382,877.19

Wednesday, May 24, 2017

Page 216: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Pepin County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Pepin County 14474 CTH H [3.86mi.]

Termini

L Rd. W.

Hot Mix Asph $230,453.20 $70,206.79

MSIPLT

Village of Stockholm 14949 Spring St. [800']

STH 35

3rd St.

Hot Mix Asph $18,900.00 $8,740.07

TRIP

Town of Pepin 14005 Big Hill Rd., 16th Creek Rd. [800

Various

Various

Reconstruction $38,000.00 $16,672.92

TRIP

Town of Waterville 14615 Semple Rd. [3,696']

CTH D

CTH Z

Hot Mix Asph $36,993.97 $16,672.94

Total for Pepin County $324,347.17 $112,292.72

Wednesday, May 24, 2017

Page 217: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Pierce County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Pierce County 14070 CTH J [8132']

STH 65

690th Ave,

Hot Mix Asph $268,657.54 $129,627.75

MSIPLT

City of River Falls 14709 Mound View Rd., W. Summit St.,

Various

Various

Resurfacing $81,000.00 $15,249.90

MSIPLT

Village of Ellsworth 14862 Cross Town Rd. [2800']

STH 65

Railroad St.

Hot Mix Asph $52,800.00 $15,249.89

MSIPLT

Village of Elmwood 14710 Martin St. & Omaha Ave. [1045']

Various

Various

Pavement Repl $49,828.00 $15,249.90

MSIPLT

Village of Plum City 14711 Johnson Hill Rd. [370']

CTH U

CTH S

Reconstruction $32,000.00 $15,249.89

Wednesday, May 24, 2017

Page 218: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Pierce County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Clifton 14708 770th Ave. [5790']

CTH F [90']

1250th St.

Hot Mix Asph $94,160.00 $21,924.17

TRIP

Town of Gilman 14860 690th Ave. [2700']

450th St.

730th Ave.

Hot Mix Asph $46,000.00 $21,924.17

TRIP

Town of Hartland 14870 590th St., 660th St., & 250th Ave.

Various

Various

Hot Mix Asph $55,352.00 $21,924.17

TRIP

Town of Maiden Rock 14861 380th St. [4382']

160th Ave.

375th St.

Hot Mix Asph $62,000.00 $21,924.17

TRIP

Town of Salem 14879 410th Ave. [3800']

290th St.

450th Ave.

Hot Mix Asph $52,400.00 $21,924.17

Total for Pierce County $794,197.54 $300,248.18

Wednesday, May 24, 2017

Page 219: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Polk County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Polk County 14400 CTH C [8.27mi.] [Assoc. proj. #1

STH 65

CTH F

Hot Mix Asph $839,446.03 $156,854.77

MSIPLT

City of Amery 14086 Lakeview Ave. [528'][Assoc. proj

Arlington Dr.

2nd St.

Pavement Repl $25,878.11 $3,616.55

MSIPLT

City of Saint Croix Falls 14586 Pine St. [642']

Industrial Pkwy.

Termini

Pavement Repl $87,236.88 $8,309.22

MSIPLT

Village of Clayton 14084 Woodland Trl. & Maple Ct. [214

Various

Various

Reconditionin $59,079.99 $8,309.22

MSIPLT

Village of Luck 14955 Park Ave. [740']

Lake St. S.

7th St.

Pavement Repl $42,612.00 $13,001.89

Wednesday, May 24, 2017

Page 220: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Polk County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

Village of Milltown 14588 W. 1st Ave. [230']

Main St.

Termini

Pavement Repl $30,000.00 $8,309.22

MSIPLT

Village of Osceola 14587 4th Ave. [317']

Chieftain St.

5th Ave.

Reconditionin $91,500.00 $8,309.23

TRIP

Town of Alden 14585 45th Ave. [1.13mi.]

140th St.

CTH C

Resurfacing $165,000.00 $15,875.88

TRIP

Town of Beaver 14584 140th Ave. [6500']

33rd St.

135th Ave.

Pavement Repl $188,070.00 $15,875.88

TRIP

Town of Bone Lake 14583 90th St. [1mi.]

270th Ave.

280th Ave.

Pavement Repl $122,000.00 $15,875.88

Wednesday, May 24, 2017

Page 221: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Polk County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Clayton 14088 105th Ave. and 80th Ave. [1.19m

Various

Various

Pavement Repl $118,930.85 $15,875.87

TRIP

Town of Eureka 14087 230th St. [7761']

Beede Lake Trl.

210th Ave.

Resurfacing $98,762.00 $15,875.87

TRIP

Town of Farmington 14625 10th Ave., Cherry Dr., 40th Ave.,

Various

Various

Resurfacing $34,699.96 $15,875.86

TRIP

Town of Garfield 14580 138th St. & 140th Ave. [1.43mi.]

Various

Various

Reconstruction $145,500.00 $15,875.88

TRIP

Town of Georgetown 14581 70th St. [1.01mi.]

CTH G

180th Ave.

Resurfacing $188,781.00 $15,875.88

Wednesday, May 24, 2017

Page 222: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Polk County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Johnstown 14090 235th Ave. [2848']

233rd Ave [3382']

40th Ave.

Pavement Repl $91,044.04 $15,875.87

TRIP

Town of Luck 14582 150th St. [2587']

240th Ave.

Chippewa Trl.

Reconditionin $45,000.00 $15,875.88

TRIP

Town of Osceola 14091 Big Lake Dr. [2482']

CTH K

Termini

Reconditionin $52,134.38 $15,875.87

TRIP

Town of West Sweden 14089 160th St. [2112']

STH 48

310th Ave.

Pavement Repl $57,451.06 $15,875.87

Total for Polk County $2,483,126.30 $397,220.59

Wednesday, May 24, 2017

Page 223: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Portage County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Portage County 14740 CTH F [6.92mi.][Assoc. proj. #14

CTH W

STH 54

Hot Mix Asph $1,777,000.00 $223,989.84

MSIPLT

Village of Amherst 14293 Oak View Ct. [.12mi.][Assoc. Pro

McKinley St.

Termini

Resurfacing $35,300.00 $10,167.46

MSIPLT

Village of Junction City 14771 Kramer Ave. [475']

CTH P

W. Second St.

Pavement Repl $21,060.00 $10,167.48

MSIPLT

Village of Plover 14295 Vineyard Dr. [1320']

STH 54

Termini

Resurfacing $46,200.00 $10,167.46

MSIPLT

Village of Rosholt 14772 Washington Ave. [600']

Main St. S.

Union St. S.

Pavement Repl $36,823.50 $10,167.45

Wednesday, May 24, 2017

Page 224: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Portage County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

Village of Whiting 14294 Linden St. [584']

Jacobson St. [50']

Walter St.

Resurfacing $21,741.35 $10,167.46

TRIP

Town of Almond 14744 4th Ave. [3930']

6th St. N. [40']

Morgan Rd.

Pavement Repl $99,225.63 $25,000.00

TRIP

Town of Amherst 14743 Isaacson Rd. [5000']

CTH A [2050']

Elkins Rd.

Pavement Repl $184,500.00 $35,000.00

TRIP

Town of Dewey 14937 Dewey Dr. [3,935']

Willow Springs Dr.

Torun Rd.

Pavement Repl $123,000.00 $23,000.00

TRIP

Town of Grant 14292 Oak St. [2100']

CTH U [115']

90th St. S.

Pavement Repl $85,632.00 $20,055.05

Wednesday, May 24, 2017

Page 225: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Portage County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Lanark 14291 Madley Rd. & Riley Rd. [5861']

Various

Various

Pavement Repl $142,464.51 $35,000.00

TRIP

Town of Pine Grove 14741 School St. [896']

CTH W

Isherwood Rd.

Pavement Repl $34,000.00 $8,000.00

Total for Portage County $2,606,946.99 $420,882.20

Wednesday, May 24, 2017

Page 226: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Price County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Price County 14260 CTH F [1.55mi.]

Short Cut Rd.

Rock Creek Rd.

Pavement Repl $272,700.00 $82,332.48

MSIPLT

City of Park Falls 14266 6th St. N. [350']

1st Ave. N.

2nd Ave. N.

Resurfacing $15,855.00 $5,992.39

MSIPLT

City of Phillips 14839 S. Airport Rd. [700']

Airport Rd.

CTH H

Pavement Repl $43,000.00 $5,992.40

MSIPLT

Village of Prentice 14840 Center St. [700']

Dr. Mackinnon [1008']

Old 8 Rd. E.

Pavement Repl $33,000.00 $5,992.40

TRIP

Town of Catawba 14257 Hobbles Creek Rd. [.53mi.]

CTH O [2.6mi.]

CTH I

Pavement Repl $58,169.44 $29,084.72

Wednesday, May 24, 2017

Page 227: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Price County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Elk 14846 Carpenter Creek Rd. [.5mi.]

CTH W [1.2mi.]

Danish Settlement Rd.

Pavement Repl $64,500.00 $30,000.00

TRIP

Town of Emery 14707 Springs Dr. [4963']

CTH K

Cherry Rd.

Pavement Repl $125,000.00 $51,738.86

TRIP

Town of Lake 14256 Maple Ridge Rd. (1) & Lyman St.

Various

Various

Pavement Repl $90,695.11 $30,000.00

Total for Price County $702,919.55 $241,133.25

Wednesday, May 24, 2017

Page 228: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Racine County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Racine County 14114 CTH V [2.47mi.}

CTH G

Termini

Reconditionin $1,249,701.24 $150,000.00

CHIP

Racine County 14594 CTH X [1.35mi.]

Bankers Rd.

CTH Y

Reconditionin $1,500,000.00 $176,570.02

MSIPGT

City of Racine 14660 Cleveland Ave. [4435']

Graceland Blvd.

15th St.

Reconstruction $1,052,000.00 $145,389.95

MSIPGT

Village of Caledonia 14111 Dunkelow Rd [2 segments] [1215

CTH H

STH 38

Resurfacing $248,027.68 $64,657.08

MSIPGT

Village of Mount Pleasan 14110 Braun Rd. [1.442mi.][Assoc. Proj

Wheaton Ln. [.55mi.]

Willow Rd.

Resurfacing $482,000.00 $61,147.32

Wednesday, May 24, 2017

Page 229: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Racine County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

City of Burlington 14595 Kendall St. [.53mi.]

W. State St.

W. Chestnut St.

Reconstruction $1,620,661.66 $18,165.25

MSIPLT

Village of Elmwood Park 14112 Elmwood Dr. S. [.17mi.]

McArthur Pl.

Elmwood Dr. E.

Pavement Repl $40,000.00 $18,165.25

MSIPLT

Village of Rochester 14113 Fox Grove Dr. [1267']

River Rd. N.

River Rd. N.

Resurfacing $58,000.00 $18,165.25

MSIPLT

Village of Union Grove 14661 Mill Ave. [370']

USH 45

State St.

Pavement Repl $93,000.00 $18,165.25

TRIP

Town of Burlington 14117 Crossway Rd. [.99mi.]

Ketterhagen Rd.

STH 11

Resurfacing $105,357.93 $15,336.28

Wednesday, May 24, 2017

Page 230: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Racine County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Norway 14116 Malchine Rd. [.55mi.]

Division Rd. S. [.82mi.]

Gunderson Rd.

Resurfacing $110,000.00 $15,336.30

TRIP

Town of Yorkville 14115 Grandview Pkwy. [1715']

W. Frontage Rd. [200']

Grandview Pkwy. W.

Resurfacing $202,460.78 $15,336.29

Total for Racine County $6,761,209.29 $716,434.24

Wednesday, May 24, 2017

Page 231: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Richland County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Richland County 14664 CTH Y [1.97mi.]

Mutch Ln.

Crow Hill School Rd.

Hot Mix Asph $230,000.00 $109,390.91

MSIPLT

City of Richland Center 14083 E. Union St. & W. Union St. [510

Various

Various

Reconstruction $113,276.82 $19,838.19

TRIP

Richland County 14663 CTH Y [.93mi.]

Crow Hill School Rd.

CTH Q

Hot Mix Asph $125,000.00 $42,831.54

TRIP

Town of Dayton 14662 Mutch Ln. [150']

CTH Y

Termini

Structures $78,000.00 $39,000.00

TRIP

Town of Forest 14796 Abelt Ln. & Duhnke Ln. [.51mi.]

Various

Various

Reconditionin $17,000.00 $8,500.00

Total for Richland County $563,276.82 $219,560.64

Wednesday, May 24, 2017

Page 232: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Rock County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Rock County 14701 CTH A [3.38 mi.]

CTH M

Countly Line Rd.

Hot Mix Asph $935,000.00 $289,347.58

MSIPGT

City of Beloit 14279 Wisconsin Ave. [1109']

Woodward Ave.

White Ave.

Reconstruction $775,000.00 $81,192.28

MSIPGT

City of Janesville 14703 E. Milwaukee St. [5600']

N. Sumac Dr.

N. Wright Rd.

Resurfacing $1,000,000.00 $150,128.32

MSIPLT

City of Edgerton 14275 Highland Ave. [465']

STH 59

Park Ave.

Reconstruction $101,894.00 $18,287.16

MSIPLT

City of Milton 14704 2nd Ln. [740']

W. Madison Ave.

Vernal Ave.

Resurfacing $34,000.00 $5,700.00

Wednesday, May 24, 2017

Page 233: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Rock County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

Village of Clinton 14613 Scot Dr. [1743']

Delco Dr.

Milwaukee St.

Pavement Repl $348,630.00 $23,000.00

TRIP

Town of Harmony 14874 Pleasant Rd. & Grandview Dr. [5,

Various

Various

Hot Mix Asph $97,509.44 $48,754.72

TRIP

Town of Janesville 14288 Polzin Rd. [5385']

Fenrick Rd.

USH 14

Hot Mix Asph $160,000.00 $50,000.00

TRIP

Town of Plymouth 14702 Orfordville Hanover Rd. [5280']

STH 213

S. Footville Rd.

Hot Mix Asph $112,200.00 $43,950.49

Total for Rock County $3,564,233.44 $710,360.55

Wednesday, May 24, 2017

Page 234: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Rusk County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Rusk County 14483 CTH W [2.11mi.]

USH 8

Old Hwy 14

Hot Mix Asph $200,000.00 $93,132.28

MSIPLT

Village of Bruce 14278 Chippewa St. E. [1,795'][Assoc. p

Trails End N.

Termini

Pavement Repl $59,000.00 $18,472.27

TRIP

Town of Big Bend 14270 Dzimiela Rd. [700']

Kramer Rd. [.1mi.]

Bednarek Rd.

Reconstruction $80,000.00 $24,405.92

TRIP

Town of Marshall 14269 Range Line Rd. [2.19 mi.]

CTH D

Broken Arrow Rd.

Resurfacing $188,800.00 $57,597.54

TRIP

Town of Rusk 14318 County Line Rd. [.5mi.]

Hogback Rd.

CTH D

Pavement Repl $52,257.11 $19,738.28

Wednesday, May 24, 2017

Page 235: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Rusk County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Willard 14249 Nosser Rd. [300']

CTH D [250']

Termini

Reconstruction $34,658.80 $10,677.59

Total for Rusk County $614,715.91 $224,023.88

Wednesday, May 24, 2017

Page 236: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Sauk County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Sauk County 14960 CTH W [6.20mi.]

CTH D

CTH PF

Hot Mix Asph $675,000.00 $175,297.67

MSIPLT

Village of North Freedom 14225 W. Franklin St. [528']

E. Walnut St.

Termini

Reconstruction $105,000.00 $18,811.10

MSIPLT

Village of Plain 14634 Park Ave. [.07mi.]

CTH B

Cedar St.

Reconstruction $132,000.00 $18,811.10

MSIPLT

Village of Rock Springs 14675 Hill St. [750]

Montgomery St.

Smythe St.

Pavement Repl $57,700.00 $18,811.10

MSIPLT

Village of Spring Green 14935 Varsity Ave. [300']

N. Wood St.

N. Westmor St.

Reconstruction $58,000.00 $18,811.13

Wednesday, May 24, 2017

Page 237: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Sauk County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

Village of West Baraboo 14673 University Hill Ct. [370']

Connie Rd.

Termini

Pavement Repl $55,781.00 $18,811.10

TRIP

Town of Dellona 14224 South Ave. [2830']

Coon Bluff Rd.

Partridge Dr.

Reconditionin $34,830.00 $17,415.00

TRIP

Town of Franklin 14670 Sunny Ln. [1637']

CTH B

Termini

Reconditionin $30,000.00 $10,000.00

TRIP

Town of Freedom 14671 Freedom Rd. [2640']

Retgen Rd.

Seeley Ln.

Pavement Repl $50,000.00 $17,833.07

TRIP

Town of La Valle 14672 W. Redstone Rd. [2640']

Douglas Rd. (2) [1320']

Canary Ct.

Reconditionin $50,000.00 $17,833.07

Wednesday, May 24, 2017

Page 238: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Sauk County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Prairie du Sac 14223 Block Rd. (2) [.88mi.]

CTH PF

Exchange Rd.

Reconditionin $58,070.34 $17,833.07

TRIP

Town of Spring Green 14222 Rainbow Rd. [1.53mi.]

STH 60 [50']

USH 14

Pavement Repl $169,500.00 $17,833.07

TRIP

Town of Sumpter 14633 Nolden Rd. [.53mi.]

Termini

Termini

Reconditionin $38,690.00 $15,000.00

TRIP

Town of Troy 14632 Cassel Rd. [8271']

STH 60 [441']

Seitz Rd.

Reconditionin $178,600.00 $17,833.11

TRIP

Town of Winfield 14792 Ekes Dr. [.58mi.]

Heidrich Rd. [50']

Termini

Pavement Repl $60,000.00 $17,833.07

Total for Sauk County $1,753,171.34 $418,766.66

Wednesday, May 24, 2017

Page 239: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Sawyer County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Sawyer County 14412 CTH F [1.48mi.]

Teal Lane 31 [2909']

Right of Way Rd.

Hot Mix Asph $173,857.38 $86,928.69

MSIPLT

Village of Exeland 14310 Elm Park Dr. (2) [1320']

Ball Park Dr.

Termini

Reconditionin $31,200.00 $12,609.14

TRIP

Town of Bass Lake 14384 Williams Resort Rd. [3221']

Williams Rd.

Termini

Reconditionin $96,170.00 $48,085.00

TRIP

Town of Edgewater 14773 Woodale Rd. [.8mi.]

Scenic Rd.

Yarnell Rd.

Resurfacing $106,000.00 $53,000.00

TRIP

Town of Sand Lake 14774 Ham Lake Ln. & Runzel Rd. [1.2

Various

Various

Pavement Repl $90,266.25 $45,133.12

Total for Sawyer County $497,493.63 $245,755.95

Wednesday, May 24, 2017

Page 240: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Shawano County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Shawano County 14244 CTH J & CTH G [2.87mi.]

Various

Various

Hot Mix Asph $320,936.73 $142,929.49

MSIPLT

Village of Aniwa 14340 Sportsman Dr. [1161']

CTH Z

Termini

Pavement Repl $50,381.35 $8,400.00

MSIPLT

Village of Birnamwood 14362 Maple St. [1109']

USH 45

CTH N

Pavement Repl $48,000.00 $8,750.00

MSIPLT

Village of Bonduel 14655 2nd St., W. Mill St., & Park St. [3

Various

Various

Reconstruction $1,555,000.00 $10,000.00

MSIPLT

Village of Cecil 14339 Freeborn St. [2798']

Lemke St.

E. Limit St.

Reconstruction $387,500.00 $9,000.00

Wednesday, May 24, 2017

Page 241: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Shawano County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

Village of Eland 14654 2nd St. & Maple St. [1215']

Various

Various

Pavement Repl $41,204.83 $8,362.81

TRIP

Town of Herman 14653 Winkle Rd. [2640']

CTH U [2640']

Kucksdorf Ln.

Pavement Repl $67,500.00 $30,000.00

TRIP

Town of Seneca 14338 Airport Rd. [2975']

CTH D

Roosevelt Rd.

Pavement Repl $153,000.00 $35,371.33

TRIP

Town of Washington 14336 Pensaukee Ln. [2746']

Pensaukee Rd

Termini

Pavement Repl $72,381.28 $30,000.00

TRIP

Town of Wescott 14337 Woods Rd. [.69mi.]

Park Ave.

Azalea Dr.

Pavement Repl $135,610.00 $35,371.33

Wednesday, May 24, 2017

Page 242: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Shawano County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Wittenberg 14430 College Ave. [.25mi.]

Grandview St.

Eagle Ln.

Resurfacing $70,000.00 $30,000.00

Total for Shawano County $2,901,514.19 $348,184.96

Wednesday, May 24, 2017

Page 243: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Sheboygan County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Sheboygan County 14526 CTH A [2799']

Meadowlark Rd. [2534']

STH 32

Hot Mix Asph $180,000.00 $90,000.00

CHIP

Sheboygan County 14527 CTH J [10666']

STH 57

CTH M

Hot Mix Asph $317,382.00 $158,691.00

CHIP

Sheboygan County 14214 CTH MM [10876']

Willow Rd.

CTH M

Hot Mix Asph $144,341.00 $43,387.08

MSIPGT

City of Sheboygan 14533 Camelot Blvd. [2746']

CTH OK

S. 18th St.

Resurfacing $345,000.00 $99,694.48

MSIPLT

City of Sheboygan Falls 14528 Chippewa Dr. [1162']

CTH PP

Huron Tr.

Pavement Repl $93,837.46 $29,882.30

Wednesday, May 24, 2017

Page 244: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Sheboygan County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

Village of Cascade 14218 Johnson Dr. [411']

Francis Ave. [434']

Termini

Pavement Repl $30,000.00 $5,000.00

MSIPLT

Village of Cedar Grove 14220 Grove Ct. [422']

S. 2nd St.

Termini

Pavement Repl $40,580.00 $10,124.12

MSIPLT

Village of Elkhart Lake 14219 W. Rhine St. [687']

CTH J

Termini

Resurfacing $28,500.00 $6,188.16

MSIPLT

Village of Glenbeulah 14909 Benson St. [142']

Dillingham St. [260']

Termini

Resurfacing $12,000.00 $5,000.00

MSIPLT

Village of Howards Grov 14530 Appletree Rd. [1268']

Bittersweet Ln.

Millersville Ave.

Pavement Repl $95,800.00 $14,644.97

Wednesday, May 24, 2017

Page 245: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Sheboygan County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Greenbush 14215 Hillcrest Dr. [7733']

CTH Z

CTH S

Resurfacing $135,445.30 $21,912.16

TRIP

Town of Lyndon 14531 Mill Rd. [5438']

Clear View Rd.

CTH F

Pavement Repl $170,000.00 $12,778.27

TRIP

Town of Rhine 14959 Snake Rd. [6,178']

CTH EH

Termini

Resurfacing $150,000.00 $18,597.56

TRIP

Town of Sherman 14217 Lynn Rd. [1.01mi.]

Abbott Dr.

STH 144

Resurfacing $43,385.89 $14,665.16

TRIP

Town of Wilson 14216 Wilson Lima Rd. [1935']

CTH KK [3345']

Termini

Resurfacing $50,000.00 $16,514.48

Total for Sheboygan County $1,836,271.65 $547,079.74

Wednesday, May 24, 2017

Page 246: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 St. Croix County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

St. Croix County 14665 CTH D [3.5mi.]

CTH G

CTH S

Hot Mix Asph $570,300.00 $217,596.44

MSIPLT

City of Hudson 14162 Vine St. [3062']

1st St.

9th St.

Reconstruction $2,112,239.75 $16,269.15

MSIPLT

City of New Richmond 14153 N. Starr Ave. & Hughes St. [1267

Various

Various

Reconstruction $344,727.70 $24,403.72

MSIPLT

Village of Baldwin 14666 9th Ave. [400']

Lokhorst St.

Summit St.

Reconstruction $94,000.00 $16,269.16

MSIPLT

Village of Hammond 14161 1st St. & Vine St. [740']

Various

Various

Reconstruction $140,000.00 $16,269.15

Wednesday, May 24, 2017

Page 247: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 St. Croix County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

Village of Woodville 14154 Maple St. [1267']

Church St.

Termini

Reconstruction $365,000.00 $24,403.73

TRIP

Town of Baldwin 14147 230th St. [4963']

USH 12

80th Ave. (2)

Pavement Repl $64,228.66 $14,563.13

TRIP

Town of Eau Galle 14667 55th Ave. [6600']

220th St.

233rd St.

Hot Mix Asph $97,000.00 $14,563.08

TRIP

Town of Erin Prairie 14668 190th St. [6125']

160th Ave.

170th Ave.

Hot Mix Asph $110,000.00 $14,563.13

TRIP

Town of Hammond 14144 190th St. [1.01mi.]

USH 12

90th Ave.

Hot Mix Asph $80,593.09 $14,563.13

Wednesday, May 24, 2017

Page 248: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 St. Croix County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Hudson 14973 Jacobs Ln. [5,227']

CTH UU

CTH UU

Hot Mix Asph $45,800.00 $14,563.13

TRIP

Town of Richmond 14149 140th St. [5280']

140th Ave.

CTH G

Hot Mix Asph $86,134.34 $14,563.13

TRIP

Town of Somerset 14146 215th Ave. [.72mi.]

STH 35

Termini

Hot Mix Asph $63,035.92 $14,563.13

TRIP

Town of Springfield 14148 W. 80th Ave. [6600']

280th St.

292nd St.

Hot Mix Asph $117,000.00 $14,563.13

TRIP

Town of Stanton 14669 185th St. [2693']

CTH H

235th Ave.

Hot Mix Asph $45,000.00 $14,563.13

Wednesday, May 24, 2017

Page 249: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 St. Croix County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Star Prairie 14151 110th St [4118']

CTH H

210th St.

Hot Mix Asph $118,000.00 $14,563.13

TRIP

Town of Warren 14950 140th St. [5,280']

USH 12

100th Ave.

Hot Mix Asph $74,200.00 $14,563.13

Total for St. Croix County $4,527,259.46 $475,405.73

Wednesday, May 24, 2017

Page 250: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Taylor County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Taylor County 14623 CTH F [6.5mi.]

STH 73

CTH H

Hot Mix Asph $780,000.00 $99,735.44

MSIPLT

City of Medford 14009 Lemke Ave. [845'][Assoc. proj. #

Urquhart Ave.

Roberta St.

Pavement Repl $42,490.00 $3,954.18

MSIPLT

Village of Gilman 14010 Mill St. [1320']

CTH B

8th Ave.

Pavement Repl $24,534.37 $7,908.36

MSIPLT

Village of Lublin 14630 Lublin St. [1954']

CTH A

Taylor St.

Pavement Repl $57,000.00 $7,908.36

TRIP

Town of Browning 14020 Hall Dr. [3010']

STH 64

Klinger Ln.

Resurfacing $59,636.36 $13,273.71

Wednesday, May 24, 2017

Page 251: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Taylor County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Deer Creek 14019 Apple Ave. [5333']

Ruby Dr.

Hall Dr.

Resurfacing $81,518.40 $13,273.71

TRIP

Town of Goodrich 14018 Martin Dr. [2mi.]

Termini

Faber Ln.

Resurfacing $57,930.00 $13,273.71

TRIP

Town of Hammel 14017 Mondeaux Dr, Strawberry Ave.,

Various

Various

Resurfacing $30,663.75 $13,273.71

TRIP

Town of Little Black 14016 S. Cardinal Dr. [5333']

Elm Ave.

County Line Rd.

Resurfacing $61,020.00 $13,273.71

TRIP

Town of Maplehurst 14015 Buffalo Ave. [5861'][Assoc. proj.

Clark Dr.

CTH T

Resurfacing $76,521.44 $13,273.71

Wednesday, May 24, 2017

Page 252: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Taylor County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Medford 14014 River Dr. [2746']

Hites Ln.

Pleasant Ave.

Pavement Repl $52,162.04 $13,273.71

TRIP

Town of Molitor 14013 Sackett Dr. [3088']

CTH M [2350']

Keyes Ave.

Resurfacing $44,641.69 $13,273.71

TRIP

Town of Roosevelt 14012 7th Ave. [2mi.]

CTH F

Diamond Dr.

Resurfacing $35,700.00 $13,273.70

TRIP

Town of Taft 14624 Meridian Dr. [5280']

CTH F [5280']

CTH S

Pavement Repl $90,000.00 $13,273.70

TRIP

Town of Westboro 14011 Business HWY 13, Junes Ln. [89

Various

Various

Resurfacing $29,030.84 $13,273.70

Total for Taylor County $1,522,848.89 $265,517.12

Wednesday, May 24, 2017

Page 253: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Trempealeau County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Trempealeau County 14734 CTH G [1.25mi.]

CTH J

Galewski Rd.

Reconditionin $375,000.00 $124,179.88

MSIPLT

City of Galesville 14093 S. 1st St. [422']

W Gibston Ave.

Gale Ave.

Pavement Repl $34,864.00 $8,126.67

MSIPLT

City of Independence 14092 7th St. [792'][Assoc. proj. #14706

STH 93

Washington St.

Resurfacing $35,000.00 $8,126.67

MSIPLT

City of Whitehall 14733 Abrams St. [590']

Scranton St.

Kelley St.

Reconstruction $140,000.00 $8,126.66

MSIPLT

Village of Strum 14732 Fir St. [898']

5th Ave. S.

8th Ave.

Reconstruction $77,000.00 $8,126.67

Wednesday, May 24, 2017

Page 254: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Trempealeau County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

Village of Trempealeau 14094 Bank St. [264']

10th St.

Termini

Pavement Repl $45,808.95 $8,126.67

TRIP

Town of Albion 14728 Eide Ln. [.5mi.]

Sterry Rd.

Termini

Reconditionin $30,000.00 $13,889.47

TRIP

Town of Arcadia 14096 Kujak Ln. [3749']

North Creek Rd.

Termini

Reconditionin $86,600.00 $13,889.47

TRIP

Town of Chimney Rock 14127 Berg and Hanson Ln. [.60mi.]

CTH VV

Termini

Reconditionin $26,913.77 $13,456.88

TRIP

Town of Ettrick 14097 Cantlon Ln. [800']

CTH CC [2820']

Senn Ln.

Structures $32,000.00 $13,889.47

Wednesday, May 24, 2017

Page 255: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Trempealeau County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Hale 14729 Pawelke Rd. [6653']

CTH D

Gunem Rd.

Resurfacing $40,000.00 $13,889.47

TRIP

Town of Pigeon 14095 Rogers Rd. [2429']

Shepard Rd.

Termini

Reconditionin $94,000.00 $13,889.47

TRIP

Town of Preston 14730 Anderegg Rd. [.8mi.]

Quarne Rd.

Trump Coulee Rd.

Resurfacing $28,000.00 $13,889.47

TRIP

Town of Sumner 14731 Ridge Ln. (1) & Ridge Ln. (2) [35

CTH E

Termini

Reconditionin $65,000.00 $13,889.47

Total for Trempealeau County $1,110,186.72 $275,496.39

Wednesday, May 24, 2017

Page 256: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Vernon County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Vernon County 14510 CTH D [3.11mi.][Assoc. proj. #1

Buckeye Ridge Rd.

STH 82

Pavement Repl $449,097.76 $123,397.38

MSIPLT

City of Westby 14508 State St. [925']

Monroe St.

Bekkedal Ave.

Reconstruction $200,490.00 $25,000.00

MSIPLT

Village of La Farge 14059 North St. [686']

Maple St.

Bird St.

Resurfacing $21,500.00 $10,074.58

TRIP

Town of Christiana 14509 E. Ridge Rd. [1mi.]

Quarry Rd.

Termini

Pavement Repl $223,000.00 $75,202.75

TRIP

Town of Greenwood 14130 Kouba Valley Rd. [4382']

Pine Hill Rd.

McKenzie Rd.

Reconditionin $110,000.00 $50,000.00

Wednesday, May 24, 2017

Page 257: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Vernon County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Union 14058 Valley Ave. [1.6mi.]

Termini

Jug Creek Rd.

Resurfacing $64,268.00 $25,000.00

Total for Vernon County $1,068,355.76 $308,674.71

Wednesday, May 24, 2017

Page 258: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Vilas County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Vilas County 14897 CTH O [5.04 mi.][Assoc. proj. #1

CTH W

Termini

Pavement Repl $874,500.00 $88,422.39

MSIPLT

City of Eagle River 14282 S. Third St. [325']

E. Pine St.

E. Tamarack St.

Reconstruction $27,000.00 $6,731.53

TRIP

Vilas County 14898 CTH O [5.04 mi.][Assoc. proj. #1

CTH W

Termini

Pavement Repl $874,500.00 $158,465.33

Total for Vilas County $1,776,000.00 $253,619.25

Wednesday, May 24, 2017

Page 259: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Walworth County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Walworth County 14924 CTH DD [280']

E. Lakeshore Dr.

W. Lakeshore Dr.

Structures $476,000.00 $202,304.00

MSIPLT

City of Delavan 14579 High St. [725']

5th St.

N. 7th St.

Pavement Repl $73,000.00 $23,673.00

MSIPLT

City of Whitewater 14235 W. Center St. [1267']

S. Franklin St.

S. Summit St.

Reconstruction $714,850.00 $23,673.00

MSIPLT

Village of Darien 14576 Badger Pkwy. [1642']

Madison St. [100']

Termini

Resurfacing $105,000.00 $23,673.00

MSIPLT

Village of Genoa City 14575 Sumner St. [370']

CTH B

Gifford St.

Pavement Repl $78,000.00 $23,673.00

Wednesday, May 24, 2017

Page 260: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Walworth County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

Village of Sharon 14577 New Factory Rd., & Natural Way

Various

Various

Reconditionin $64,625.00 $23,673.00

MSIPLT

Village of Walworth 14578 S. 5th Ave. & 3rd St. [1795']

Various

Various

Resurfacing $61,300.00 $23,672.99

TRIP

Town of Bloomfield 14570 White Pigeon Rd. [900']

CTH H

CTH B

Pavement Repl $123,935.10 $14,190.20

TRIP

Town of Geneva 14569 Lake View Rd. [1637']

McDonald Rd.

Termini

Resurfacing $44,010.75 $14,190.20

TRIP

Town of Lafayette 14574 Fir Ct. [317']

Evergreen Dr.

Termini

Resurfacing $28,380.40 $14,190.20

Wednesday, May 24, 2017

Page 261: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Walworth County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Lyons 14939 Prairie Rd. [.26mi.]

Weeks Rd.

STH 120

Resurfacing $75,000.00 $14,190.18

TRIP

Town of Richmond 14925 McCabe Rd. [.6mi.]

Richmond-Whitewater Townline

Robin's Way

Hot Mix Asph $44,500.00 $14,190.20

TRIP

Town of Sugar Creek 14571 Schmidt Rd. [2600']

USH 12 [25']

Voss Rd.

Resurfacing $63,000.00 $14,190.20

TRIP

Town of Troy 14647 Marsh Rd. [.56mi.]

STH 20

Termini

Resurfacing $37,500.00 $14,190.20

TRIP

Town of Whitewater 14573 Island Rd. [2000']

STH 89 [3068']

Termini

Resurfacing $45,040.00 $14,190.20

Total for Walworth County $2,034,141.25 $457,863.57

Wednesday, May 24, 2017

Page 262: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Washburn County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Washburn County 14469 CTH DD [5702']

CTH D

Termini

Hot Mix Asph $165,000.00 $78,890.85

MSIPLT

City of Spooner 14468 Orchard Ln. [2851']

Paulson Dr.

STH 170

Hot Mix Asph $74,250.00 $16,876.72

MSIPLT

Village of Birchwood 14254 Main St. [370']

Park Ave.

Balsam Ave.

Hot Mix Asph $10,395.00 $5,000.00

TRIP

Town of Bashaw 14060 Loop Rd. [.5mi.]

Greer Valley Rd.

STH 70 .

Hot Mix Asph $40,000.00 $14,412.51

TRIP

Town of Bass Lake 14240 Bass Lake Rd. & Edgewood Dr. [

Various

Various

Resurfacing $80,000.00 $14,412.51

Wednesday, May 24, 2017

Page 263: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Washburn County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Beaver Brook 14062 Wildcat Rd. [.83mi.]

Bobcat Rd.

Veterans Way

Hot Mix Asph $73,485.26 $14,412.51

TRIP

Town of Brooklyn 14064 Palmer Dr. [1mi.]

Mack Lake Rd.

USH 53

Pavement Repl $129,000.00 $14,412.56

TRIP

Town of Crystal 14940 9th St. [4,200']

CTH A [1,500']

1st Ave.

Hot Mix Asph $54,000.00 $14,412.51

TRIP

Town of Evergreen 14242 Tower Hill Rd. [1.45mi.]

CTH A

STH 70

Hot Mix Asph $60,000.00 $14,412.51

TRIP

Town of Madge 14063 Leesome Lake Rd. [4000']

Fenander Rd.

Kirby Rd.

Hot Mix Asph $53,469.00 $14,412.51

Wednesday, May 24, 2017

Page 264: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Washburn County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Minong 14061 Coyote Dr. [2693']

Big Sand Rd.

Termini

Reconditionin $58,000.00 $14,412.51

TRIP

Town of Trego 14066 Marsh Rd. [1320']

Schaub Rd. [750']

Termini

Pavement Repl $31,708.96 $14,412.51

Total for Washburn County $829,308.22 $230,480.21

Wednesday, May 24, 2017

Page 265: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Washington County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Washington County 14857 CTH P [1.2mi.][Assoc. proj. #148

STH 60 [350']

Woodland Rd.

Reconstruction $1,600,000.00 $243,418.95

MSIPGT

City of West Bend 14766 Sunset Dr. [950']

Terrace Dr.

Hawthorn Dr.

Reconstruction $294,290.00 $66,429.23

MSIPLT

City of Hartford 14765 High St. [1375']

W. State St.

N. Main St.

Reconstruction $389,800.00 $40,662.69

MSIPLT

Village of Jackson 14356 Wilshire Dr. [1373']

Jackson Dr.

Georgetown Dr.

Reconstruction $137,614.25 $40,662.69

MSIPLT

Village of Kewaskum 14856 Roseland Dr. [1690']

Prospect St.

Hillside Dr.

Reconstruction $209,584.00 $40,662.70

Wednesday, May 24, 2017

Page 266: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Washington County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

Village of Slinger 14411 Glacier Pass, Lous Way, Olympic

Various

Various

Pavement Repl $235,861.56 $40,662.69

TRIP

Town of Addison 14357 Aurora Rd. [2534']

Mile Rd.

Hillcrest Dr.

Resurfacing $36,121.63 $14,495.80

TRIP

Town of Farmington 14416 Indian Lore Rd. [1mi.]

CTH A

Newark Dr.

Pavement Repl $111,475.15 $14,495.80

TRIP

Town of Germantown 14854 Marquette Rd., Hilltop Ct., & Spr

Various

Various

Resurfacing $30,000.00 $14,495.80

TRIP

Town of Jackson 14938 Church Rd. [1mi.]

Sherman Rd.

CTH T

Pavement Repl $113,000.00 $14,495.82

Wednesday, May 24, 2017

Page 267: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Washington County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Wayne 14855 Sunset Dr. [1000']

CTH W

Broadview Ln.

Resurfacing $36,000.00 $14,495.80

TRIP

Town of West Bend 14414 Cedarview Dr. [.75mi.]

STH 144

Division Rd.

Resurfacing $104,612.48 $14,495.80

Total for Washington County $3,298,359.07 $559,473.77

Wednesday, May 24, 2017

Page 268: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Waukesha County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Waukesha County 14749 CTH Y (5 segments) [37954']

Various

Various

Resurfacing $2,100,000.00 $337,972.35

CHIP

Waukesha County 14312 CTH C, CTH EE, CTH HH, CTH

Various

Various

Resurfacing $1,909,659.00 $337,972.34

MSIPGT

City of Brookfield 14329 Santa Barbara Dr., Monterey Blv

Various

Various

Pavement Repl $316,591.00 $102,525.88

MSIPGT

City of Muskego 14753 Parkland Dr., Regency Ct., Jacob

Various

Various

Resurfacing $200,000.00 $62,221.41

MSIPGT

City of New Berlin 14754 Observatory Rd., Harland Dr., M

Various

Various

Pavement Repl $489,975.00 $98,756.62

Wednesday, May 24, 2017

Page 269: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Waukesha County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPGT

City of Waukesha 14755 Madison St. [2150']

Manchester Dr. [100']

S. Grandview Blvd.

Pavement Repl $277,590.00 $137,838.29

MSIPGT

Village of Menomonee F 14330 Marcy Rd. & Deer Trl. [3686']

Various

Various

Pavement Repl $196,246.85 $90,028.03

MSIPLT

City of Delafield 14321 Horseshoe Bend Dr. [.55 mi.]

Oakwood Dr.

Termini

Pavement Repl $136,000.00 $22,515.79

MSIPLT

City of Oconomowoc 14752 Glenwood Rd. [2165']

CTH Z

Riverwood Dr.

Pavement Repl $247,676.00 $22,515.79

MSIPLT

City of Pewaukee 14751 Hunters Ridge Rd. [950']

STH 190

Greenbriar Rd.

Pavement Repl $63,500.00 $22,515.80

Wednesday, May 24, 2017

Page 270: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Waukesha County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

Village of Butler 14313 132nd St., & Glendale Ave. [380

Various

Various

Reconstruction $871,197.00 $22,515.79

MSIPLT

Village of Eagle 14882 South St. [1100']

South Rd.

Grove St.

Pavement Repl $77,000.00 $22,515.79

MSIPLT

Village of Elm Grove 14956 N. 124th St. & Knoll Rd. [2,390']

Various

Various

Resurfacing $157,914.17 $22,515.79

MSIPLT

Village of Hartland 14328 Nixon Ave. [1020']

E. Capitol Dr.

Renson Rd.

Pavement Repl $101,379.75 $22,519.79

MSIPLT

Village of North Prairie 14750 Brian Ct. & Chad Ct. [1426']

Morrissey Dr.

Termini

Pavement Repl $58,960.00 $22,515.79

Wednesday, May 24, 2017

Page 271: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Waukesha County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

Village of Pewaukee 14320 Cecelia Dr. [2746']

Cecelia Dr. (1)

Sussex Rd.

Pavement Repl $268,000.00 $22,515.80

MSIPLT

Village of Summit 14969 Genesee Lake Rd. [4,752']

STH 67

Dousman Rd.

Resurfacing $102,000.00 $22,515.80

MSIPLT

Village of Sussex 14881 Weaver Dr. [1373']

CTH VV

Park Rd.

Resurfacing $70,000.00 $22,515.80

TRIP

Town of Eagle 14331 S. Shore Dr. [1800']

Jacks Bay Rd.

Jacks Bay Rd.

Pavement Repl $279,048.78 $17,605.75

TRIP

Town of Genesee 14323 Parke Ln. W., & Stone Gate Ln. [

Various

Various

Pavement Repl $75,577.00 $17,605.75

Wednesday, May 24, 2017

Page 272: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Waukesha County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Mukwonago 14314 Kettle Ridge Dr. [1795']

CTH I

Termini

Pavement Repl $60,480.44 $17,605.75

TRIP

Town of Oconomowoc 14327 McMahon Rd. [4435']

STH 67

Pennsylvania St.

Pavement Repl $180,000.00 $17,605.75

TRIP

Town of Vernon 14883 Center Dr. [1.85mi.]

Edgewood Ave.

Maple Ave.

Pavement Repl $174,000.00 $17,605.76

TRIP

Town of Waukesha 14322 National Ave., Sultan St., & Whit

Various

Various

Pavement Repl $92,162.00 $17,605.75

Total for Waukesha County $8,504,956.99 $1,520,627.16

Wednesday, May 24, 2017

Page 273: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Waupaca County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Waupaca County 14210 CTH Q [1.29mi.]

STH 54

Round Lake Dr.

Hot Mix Asph $110,000.00 $50,000.00

CHIP

Waupaca County 14724 CTH I [8.61mi.]

USH 45

Termini

Hot Mix Asph $420,000.00 $120,085.96

MSIPLT

City of Manawa 14211 High St. [540']

CTH B [41']

Factory St.

Reconstruction $91,845.67 $34,245.93

MSIPLT

Village of Big Falls 14725 W. Harrison St. [1426']

Main St.

Termini

Resurfacing $18,000.00 $9,000.00

MSIPLT

Village of Scandinavia 14212 Lake St. [.41mi.]

Oak St. [845']

Termini

Reconditionin $74,615.41 $25,000.00

Wednesday, May 24, 2017

Page 274: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Waupaca County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Dayton 14213 Old Hwy. 22 & Barlow St. [5756'

Various

Various

Resurfacing $94,140.38 $25,000.00

TRIP

Town of Lind 14865 Lind Center Rd. [10032']

CTH A

CTH EE

Pavement Repl $249,300.00 $112,586.86

Total for Waupaca County $1,057,901.46 $375,918.75

Wednesday, May 24, 2017

Page 275: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Waushara County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Waushara County 14779 CTH V (2 segments) [5.86mi.]

CTH O

N. Oak St.

Hot Mix Asph $510,467.50 $129,056.02

MSIPLT

Village of Coloma 14782 N. Front St. [800']

STH 21

South St.

Resurfacing $50,000.00 $11,834.89

MSIPLT

Village of Redgranite 14907 Dearborn St. [.19mi.]

STH 21

STH 21

Pavement Repl $51,496.70 $11,834.89

TRIP

Town of Aurora 14780 37th Ave. & Cumberland Ave. [4

Various

Various

Hot Mix Asph $48,875.00 $22,559.25

TRIP

Town of Deerfield 14069 Brown Deer Ave. [1.21mi.]

CTH C

11th Dr.

Resurfacing $64,000.00 $22,559.28

Wednesday, May 24, 2017

Page 276: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Waushara County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Hancock 14781 2nd Ave. [1.25mi.]

CTH C

Brown Deer Ct.

Pavement Repl $137,500.00 $22,559.24

TRIP

Town of Leon 14067 26th Ln. [.70mi]

CTH H

Beechnut Ln. (2)

Resurfacing $63,250.00 $22,559.25

TRIP

Town of Mount Morris 14068 Porters Lake Rd. [.70mi.]

STH 152

Pine Lane Rd.

Resurfacing $63,250.00 $22,559.25

Total for Waushara County $988,839.20 $265,522.07

Wednesday, May 24, 2017

Page 277: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Winnebago County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Winnebago County 14262 CTH M [2.5mi.]

Fairview Rd.

Coon Rd.

Hot Mix Asph $265,859.73 $132,929.86

CHIP

Winnebago County 14947 CTH N [3.32mi.]

STH 26 [20']

James Rd.

Hot Mix Asph $557,698.00 $153,495.66

MSIPGT

City of Neenah 14600 E. Cecil St. [3010']

Commercial St.

Congress St.

Reconstruction $601,750.00 $58,630.35

MSIPGT

City of Oshkosh 14599 W. New York Ave. [1954']

Wisconsin St.

N. Main St.

Reconstruction $1,296,000.00 $132,715.87

MSIPLT

City of Menasha 14241 Sixth St. [1848']

Tayco St.

Racine St.

Pavement Repl $165,215.26 $49,778.11

Wednesday, May 24, 2017

Page 278: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Winnebago County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Black Wolf 14265 Fisk Ave. [.7mi.]

CTH I

Country Club Rd.

Hot Mix Asph $52,000.00 $26,000.00

TRIP

Town of Omro 14263 Leonard Point Rd. [.46mi.]

Sand Pit Rd.

Marquardt Ln.

Hot Mix Asph $53,194.01 $26,597.00

TRIP

Town of Vinland 14945 Woodenshoe Rd. [2,000']

Green Valley Rd.

Briggs Ln.

Resurfacing $60,000.00 $26,372.03

Total for Winnebago County $3,051,717.00 $606,518.88

Wednesday, May 24, 2017

Page 279: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Wood County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

CHIP

Wood County 14557 CTH T [100']

CTH N [50']

Johnson Ln.

Structures $510,000.00 $198,952.75

MSIPLT

City of Marshfield 14659 N. Broadway Ave. [1003']

W. Blodgett St.

W. North St.

Reconstruction $398,000.00 $50,616.08

MSIPLT

City of Pittsville 14560 Monroe St. [422']

STH 80

First Ave.

Reconstruction $44,000.00 $7,607.18

MSIPLT

City of Wisconsin Rapids 14182 Apple St. & 1st St. N. [2425']

Various

Various

Reconstruction $251,926.57 $53,577.55

MSIPLT

Village of Hewitt 14183 Soo Lane [650']

Yellowstone Dr.

Termini

Hot Mix Asph $15,000.00 $5,944.17

Wednesday, May 24, 2017

Page 280: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Wood County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

MSIPLT

Village of Port Edwards 14559 Nepco Lake Rd. [4392']

CTH Z [1436']

STH 13

Reconditionin $200,000.00 $15,853.06

TRIP

Town of Auburndale 14558 Yellowstone Rd. [1.01mi.]

CTH M

North Rd.

Pavement Repl $77,500.00 $21,531.92

TRIP

Town of Cameron 14656 Millcreek Dr. [4646']

Lincoln Ave.

USH 10

Pavement Repl $114,486.48 $21,531.92

TRIP

Town of Dexter 14180 Dexter-Wood Rd. [.5mi.]

Turner Rd.

Dairy Rd.

Reconditionin $133,610.92 $21,531.92

TRIP

Town of Port Edwards 14885 Kimball Ave. [1mi.]

Lynn Hill Rd.

Creamery Rd.

Resurfacing $103,259.67 $21,531.92

Wednesday, May 24, 2017

Page 281: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 Wood County

Component Name

Muni Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

TRIP

Town of Saratoga 14658 Bell Rd. [1.25 mi.]

Tower Rd.

Ten Mile Ave.

Pavement Repl $128,791.06 $21,531.90

TRIP

Town of Wood 14181 Hilltop Rd. [4295']

CTH E

Apple Rd.

Pavement Repl $57,081.60 $21,531.92

Total for Wood County $2,033,656.30 $461,742.29

Wednesday, May 24, 2017

Page 282: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 TRIPD

Muni Name

County Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

Town of Rome

Adams County 14366 Archer Ave. [13,306']

STH 13

15th Ave.

Reconditioning $748,000.00 $363,817.64

Town of Barksdale

Bayfield County 14367 Ondossagon Rd. [2.98mi.]

E. Ondossagon Rd.

Engoe Rd.

Pavement

Replacement

$1,998,100.00 $971,850.29

Town of Ledgeview

Brown County 14368 Dollar Rd. [3194']

Half Crown Run [40']

CTH V

Reconditioning $215,000.00 $104,573.25

Town of La Follette

Burnett County 14426 Malone Rd. [1.76mi.]

Lynch Bridge Rd.

CTH B

Pavement

Replacement

$233,000.00 $113,328.22

Page 1 of 11Wednesday, May 24, 2017

Page 283: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 TRIPD

Muni Name

County Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

Town of Wheaton

Chippewa County 14369 40th St. & 30th Ave. [11,760']

Various [4,224']

Various

Reconstruction $910,000.00 $334,634.40

Town of Wyocena

Columbia County 14370 Patchin Rd. [7920']

Langdon Rd.

STH 22

Reconditioning $614,889.06 $299,074.18

Town of Cross Plains

Dane County 14427 Stagecoach Rd. [7985']

CTH P

USH 14

Reconstruction $2,781,400.00 $1,352,837.40

Town of Albion

Dane County 14371 Albion Rd. [9775']

USH 51 [310']

CTH A

Pavement

Replacement

$939,071.14 $456,752.20

Page 2 of 11Wednesday, May 24, 2017

Page 284: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 TRIPD

Muni Name

County Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

Town of Nasewaupee

Door County 14372 Sand Bay Rd. [7920']

CTH M

CTH PD

Pavement

Replacement

$272,000.00 $132,297.32

Town of Rock Creek

Dunn County 14428 150th Ave. [.5mi.]

CTH O [.2mi.]

STH 85

Resurfacing $165,000.00 $80,253.89

Town of Glen Haven

Grant County 14429 Ramsey Rd. [1.16mi.]

Texas Rd.

STH 133

Reconstruction $300,000.00 $145,916.16

Town of Princeton

Green Lake County 14431 Swamp Rd. [6547']

Old Green Lake Rd.

CTH J

Reconstruction $410,000.00 $199,418.76

Page 3 of 11Wednesday, May 24, 2017

Page 285: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 TRIPD

Muni Name

County Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

Town of Oakland

Jefferson County 14432 Ripley Rd. [1.8mi.]

Park Rd.

CTH A

Pavement

Replacement

$1,622,000.00 $788,920.06

Town of Franklin

Kewaunee County 14433 Bolt Rd. [2mi.]

CTH Q

Collegiate Rd.

Reconditioning $330,000.00 $160,507.78

Town of Shelby

La Crosse County 14434 N. Chipmunk Rd. [4428']

Various

Various

Pavement

Replacement

$315,000.00 $153,211.97

Town of Antigo

Langlade County 14435 E. 8th Ave. [200']

Spruce Ln. [77']

Fischer St.

Reconstruction $159,000.00 $77,335.57

Page 4 of 11Wednesday, May 24, 2017

Page 286: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 TRIPD

Muni Name

County Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

Town of Schley

Lincoln County 14436 Heineman Rd. [2.63mi.]

CTH R

STH 17

Reconstruction $1,250,000.00 $607,984.02

Town of Mosinee

Marathon County 14373 Moon Rd. & Rangeline Rd. [2.7mi.]

Various

Various

Pavement

Replacement

$464,893.00 $227,142.83

Town of Lake

Marinette County 14438 Ferndale Rd. [11,088']

Hilldale Dr.

Hilldale Dr.

Reconstruction $302,491.25 $147,127.88

Town of Middle Inlet

Marinette County 14437 Moonshine Hill Rd. [1mi.]

Camp Five Rd.

Meyer Rd.

Pavement

Replacement

$205,000.00 $99,709.38

Page 5 of 11Wednesday, May 24, 2017

Page 287: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 TRIPD

Muni Name

County Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

Town of Woodboro

Oneida County 14439 Washburn Lake Rd. [4000']

CTH K

Trout Creek Rd.

Pavement

Replacement

$235,000.00 $114,300.99

Town of Greenville

Outagamie County 14375 Julius Dr. [5702']

Spring Rd.

School Rd.

Reconstruction $768,259.86 $373,671.77

Town of Freedom

Outagamie County 14374 Vanden Bosch Rd. [4013']

CTH J

Golden Glow Rd.

Reconstruction $317,500.00 $154,427.94

Town of Albany

Pepin County 14376 Albany Y Rd. [1267']

Albany YY Rd.

CTH W

Reconstruction $194,512.98 $58,366.47

Page 6 of 11Wednesday, May 24, 2017

Page 288: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 TRIPD

Muni Name

County Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

Town of Ellsworth

Pierce County 14377 710th St. [5650']

450th Ave.

490th Ave.

Reconditioning $628,000.00 $305,451.17

Town of Rock Elm

Pierce County 14440 170th St & 530th Ave. [5704']

Various

Various

Reconditioning $491,000.00 $238,816.12

Town of Hull

Portage County 14441 N. 2nd Dr. [3.28mi.]

CTH X

Termini

Reconditioning $2,514,000.00 $1,222,777.46

Town of Fifield

Price County 14442 W. Central Ave., Old 13 Rd., Elm

St.,Ash St., & Cherry St. [7127']

Various

Various

Reconditioning $600,000.00 $291,832.33

Page 7 of 11Wednesday, May 24, 2017

Page 289: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 TRIPD

Muni Name

County Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

Town of Norway

Racine County 14443 Britton Rd. [1.07mi.]

CTH K

Bennett Rd.

Reconstruction $385,500.00 $187,502.27

Town of Center

Rock County 14378 Roherty Rd. [200']

Topp Rd. [2000']

USH 14

Structures $213,099.62 $106,549.81

Town of Spring Green

Sauk County 14444 Mercer Rd. [3mi.]

County Line Rd.

Dyke Rd.

Reconstruction $663,862.25 $322,894.11

Town of Radisson

Sawyer County 14447 Blueberry Ave. [.06mi.]

CTH H [.35mi]

Gardner Rd.

Structures $400,000.00 $194,554.89

Page 8 of 11Wednesday, May 24, 2017

Page 290: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 TRIPD

Muni Name

County Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

Town of Sherman

Sheboygan County 14379 Abbott Dr. [26928']

STH 28

Allen Rd.

Pavement

Replacement

$1,490,127.00 $724,778.72

Town of Troy

St. Croix County 14448 Glover Rd. [1.6mi.]

STH 35

CTH U

Reconstruction $761,700.00 $370,481.14

Town of Chimney Rock

Trempealeau County 14449 Kolve Valley Rd. [.7mi.]

STH 121 [1.76mi.]

Termini

Reconditioning $206,000.00 $100,195.77

Town of Sharon

Walworth County 14380 Shadys Rd. [1.51mi.]

Peters Rd.

CTH K

Reconditioning $445,800.00 $216,831.42

Page 9 of 11Wednesday, May 24, 2017

Page 291: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 TRIPD

Muni Name

County Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

Town of Sarona

Washburn County 14382 School House Rd. [1.23mi.]

Silo Rd. [.7mi.]

Little Kegema Rd.

Reconditioning $498,000.00 $242,220.83

Town of Beaver Brook

Washburn County 14381 Boot Lake Dr. [10507']

USH 53

CTH B

Reconditioning $440,000.00 $214,010.37

Town of Trenton

Washington County 14383 Trading Post Trl. [.49mi.]

CTH M

Wallace Lake Rd.

Reconditioning $362,000.00 $176,072.17

Town of Lebanon

Waupaca County 14450 Tank Rd. [4818']

Prahl Rd.

Collier Rd.

Reconditioning $337,450.00 $164,131.37

Page 10 of 11Wednesday, May 24, 2017

Page 292: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 TRIPD

Muni Name

County Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

Town of Oasis

Waushara County 14451 9th Ave. [1426']

Aniwa Ln.

CTH P

Reconstruction $175,000.00 $85,117.76

Town of Port Edwards

Wood County 14452 Lynn Hill Rd. [18322']

CTH G

CTH A

Reconditioning $615,000.00 $299,128.14

TRIPD Program Total $26,976,656.16 $12,980,806.22

Page 11 of 11Wednesday, May 24, 2017

Page 293: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 MSIPD

Muni Name

County Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

Village of Pulaski

Brown County 14363 E. Green Bay St. [.45mi.]

S. St. Augustine St.

S. Wisconsin St.

Reconstruction $709,860.00 $294,962.21

City of Thorp

Clark County 14421 E. Rusch St. [1795']

STH 73

S. Conway St.

Reconstruction $330,697.00 $155,328.38

Village of Barneveld

Iowa County 14422 S. Jones St. [1850']

CTH ID

Arneson Rd.

Reconstruction $450,800.00 $211,740.76

City of Waterloo

Jefferson County 14364 Canal Rd. [2482']

STH 19

Termini

Pavement

Replacement

$409,770.00 $192,468.97

Page 1 of 2Wednesday, May 24, 2017

Page 294: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 MSIPD

Muni Name

County Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

City of Saint Croix Falls

Polk County 14365 State St. & Vincent St. [1869']

Various

Various

Reconstruction $600,000.00 $281,820.00

Village of Waterford

Racine County 14423 2nd St. & Division St. [1268']

Various

Various

Reconstruction $587,000.00 $275,713.90

Village of Spring Green

Sauk County 14424 E. Madison St. [1426']

S. Peterson St.

STH 23

Reconstruction $732,300.00 $343,961.31

Village of Hancock

Waushara County 14425 N. Main St., S. Main St., & CTH V

[1326']

Various

Various

Reconstruction $628,000.00 $294,971.60

$4,448,427.00 $2,050,967.13MSIPD Program Total

Page 2 of 2Wednesday, May 24, 2017

Page 295: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 CHIPD

Muni Name

County Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

Region ID

Dane County

District 1 14927 CTH Y [5.85mi.][Assoc. proj. #14484]

Amenda Rd. [.37mi.]

STH 78

Resurfacing $795,000.00 $66,562.69

SW

Dane County

District 1 14391 CTH C [1.56mi.][Assoc. proj. #14611]

STH 19

Egre Rd.

Reconditioning $828,625.38 $333,437.31

SW

Green County

District 1 14819 CTH K [6 mi.]

13th St.

CTH P

Hot Mix Asphalt $870,000.00 $400,000.00

SW

Jefferson County

District 1 14818 CTH Y [4.756mi.]

Resort Dr.

Jefferson Rd.

Hot Mix Asphalt $900,000.00 $200,000.00

SW

Page 1 of 12Wednesday, May 24, 2017

Page 296: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 CHIPD

Muni Name

County Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

Region ID

Lafayette County

District 1 14834 CTH W [4.27mi.]

CTH O

CTH I

Resurfacing $800,000.00 $357,162.17

SW

Sauk County

District 1 14387 CTH D [51327']

STH 154 [100']

CTH PF

Resurfacing $1,425,393.98 $400,000.00

SW

Kenosha County

District 2 14407 CTH H [1500'][Assoc. Proj. #14767]

93rd Pl. [4550']

82nd St.

Reconstruction $1,175,000.00 $325,100.86

SE

Milwaukee County

District 2 14844 CTH BB [1.21mi.]

USH 45

W. Hawthorne Ln.

Reconditioning $2,557,500.00 $844,456.30

SE

Page 2 of 12Wednesday, May 24, 2017

Page 297: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 CHIPD

Muni Name

County Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

Region ID

Ozaukee County

District 2 14853 CTH I [1.58mi.]

CTH Z

Belgium-Kohler Rd. W.

Reconstruction $1,750,000.00 $185,927.64

SE

Racine County

District 2 14837 CTH K & CTH V [.95mi]

Various

Various

Reconstruction $2,500,000.00 $275,729.84

SE

Washington County

District 2 14858 CTH P [1.2mi.][Assoc. proj. #14857]

STH 60 [350']

Woodland Rd.

Reconstruction $1,600,000.00 $244,428.05

SE

Waukesha County

District 2 14836 CTH E [6.43mi.]

STH 16

CTH Q

Resurfacing $1,317,218.00 $331,003.50

SE

Page 3 of 12Wednesday, May 24, 2017

Page 298: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 CHIPD

Muni Name

County Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

Region ID

Waukesha County

District 2 14408 CTH E [3.11mi.]

Various

Various

Resurfacing $724,416.00 $276,609.37

SE

Brown County

District 3 14405 CTH HS [3300']

Glendale Ave. [400']

USH 41

Pavement

Replacement

$524,000.00 $262,000.00

NE

Kewaunee County

District 3 14401 CTH D [3.44mi.]

CTH K

STH 42

Hot Mix Asphalt $248,763.40 $124,381.70

NE

Marinette County

District 3 14386 CTH H [5.4mi.]

USH 8

Termini

Hot Mix Asphalt $560,508.56 $280,254.28

NE

Page 4 of 12Wednesday, May 24, 2017

Page 299: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 CHIPD

Muni Name

County Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

Region ID

Outagamie County

District 3 14820 CTH ZZ [3.88mi.]

Haas Rd.

Outagamie Rd.

Hot Mix Asphalt $1,010,000.00 $505,000.00

NE

Sheboygan County

District 3 14385 CTH C [21915']

STH 57

Sunset Rd.

Hot Mix Asphalt $777,342.70 $376,000.00

NE

Winnebago County

District 3 14821 CTH GG [32,900']

CTH A

CTH T

Hot Mix Asphalt $762,257.00 $262,500.00

NE

Marathon County

District 4 14822 CTH C [5.72mi.]

Burroughs Rd.

CTH J

Hot Mix Asphalt $950,000.00 $249,460.62

NC

Page 5 of 12Wednesday, May 24, 2017

Page 300: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 CHIPD

Muni Name

County Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

Region ID

Marquette County

District 4 14824 CTH Y & CTH Z [9.06 mi.]

Various

Various

Hot Mix Asphalt $607,500.00 $249,460.62

NC

Shawano County

District 4 14395 CTH G & CTH M [6.09mi.]

Various

Various

Hot Mix Asphalt $633,134.26 $249,460.62

NC

Waupaca County

District 4 14823 CTH B [3.62mi.]

STH 49

Drath Rd.

Hot Mix Asphalt $560,000.00 $124,730.31

NC

Wood County

District 4 14396 CTH Y [3911']

Wren Rd. [1158']

Lincoln Ave.

Pavement

Replacement

$775,000.00 $249,460.62

NC

Page 6 of 12Wednesday, May 24, 2017

Page 301: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 CHIPD

Muni Name

County Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

Region ID

Crawford County

District 5 14943 CTH D [6.2mi.][Assoc. Proj. #14777 &

#13466]

STH 35 [200']

STH 27

Resurfacing $772,000.00 $249,014.88

SW

Juneau County

District 5 14833 CTH HH [6000']

STH 82

55th St.

Reconditioning $250,000.00 $110,000.00

SW

La Crosse County

District 5 14832 CTH PI [3.41mi.]

STH 162

Termini

Hot Mix Asphalt $535,040.00 $111,876.25

SW

Richland County

District 5 14831 CTH Y [4.25mi]

STH 80

Mutch Ln.

Hot Mix Asphalt $520,000.00 $260,000.00

SW

Page 7 of 12Wednesday, May 24, 2017

Page 302: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 CHIPD

Muni Name

County Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

Region ID

Chippewa County

District 6 14830 CTH H [2mi.][Assoc. proj. #14918]

30th Ave.

Termini

Reconditioning $1,115,000.00 $190,150.00

NW

Clark County

District 6 14390 CTH X [3.74mi.]

Lark Ave.

Bruce Mound Ave.

Hot Mix Asphalt $484,070.29 $100,058.00

NW

Dunn County

District 6 14829 CTH Q [4.57 mi.]

STH 64

10th St.

Hot Mix Asphalt $450,000.00 $156,280.00

NW

Eau Claire County

District 6 14828 CTH H [3.10mi.]

Horse Creek Rd. [2798']

County Forest Rd. 2

Hot Mix Asphalt $400,000.00 $196,102.00

NW

Page 8 of 12Wednesday, May 24, 2017

Page 303: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 CHIPD

Muni Name

County Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

Region ID

Jackson County

District 6 14404 CTH X [1.25mi.]

CTH C

Larkin Rd.

Hot Mix Asphalt $122,610.12 $61,305.06

NW

Pepin County

District 6 14934 CTH J [4.10mi.]

CTH E [2,112']

CTH CC

Hot Mix Asphalt $284,500.00 $52,319.25

NW

Pierce County

District 6 14389 CTH J [9662']

690th Ave.

750th Ave.

Hot Mix Asphalt $195,204.16 $96,600.75

NW

St. Croix County

District 6 14826 CTH C [2.23mi.]

CTH CC

CTH CC

Hot Mix Asphalt $427,450.00 $182,150.00

NW

Page 9 of 12Wednesday, May 24, 2017

Page 304: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 CHIPD

Muni Name

County Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

Region ID

Taylor County

District 6 14825 CTH F [2.95mi.]

STH 73

8th Ave.

Hot Mix Asphalt $336,000.00 $74,324.50

NW

Trempealeau County

District 6 14835 CTH D [1.93mi.]

CTH OO

Olafs Rd.

Reconditioning $643,000.00 $113,871.96

NW

Forest County

District 7 14388 CTH P [9810']

Hageman Rd. [400']

Peshtigo River Rd.

Pavement

Replacement

$320,000.00 $144,222.94

NC

Langlade County

District 7 14851 CTH C [13200']

S. Pratt Rd.

County Line Rd.

Pavement

Replacement

$295,229.00 $144,222.94

NC

Page 10 of 12Wednesday, May 24, 2017

Page 305: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 CHIPD

Muni Name

County Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

Region ID

Oneida County

District 7 14394 CTH Q [12831']

Roothouse Rd.

Norway Point Rd.

Hot Mix Asphalt $292,757.04 $144,222.94

NC

Price County

District 7 14393 CTH B [3.12mi.]

CTH E

STH 70

Hot Mix Asphalt $393,337.38 $144,222.94

NC

Barron County

District 8 14841 CTH AA [1.96mi.]

CTH A

STH 25

Hot Mix Asphalt $301,500.00 $125,000.00

NW

Bayfield County

District 8 14953 CTH D [6.25mi.]

Sugar Bay Dr.

Club Lake Rd.

Pavement

Replacement

$1,000,000.00 $106,716.11

NW

Page 11 of 12Wednesday, May 24, 2017

Page 306: Local Roads Improvement Program Summary Reportwisconsindot.gov/Documents/doing-bus/local-gov/astnce...Local Roads Improvement Program Summary Report D epartment of Transportation Investment

LRIP Project Reports --2016-2017 CHIPD

Muni Name

County Name

Project No

Road Description

From

To

Project Type Total Cost Reimbursement

Region ID

Douglas County

District 8 14951 CTH Y [5.41mi.]

Simms Lake Rd.

Barron Dr.

Hot Mix Asphalt $825,000.00 $225,000.00

NW

Polk County

District 8 14392 CTH C [8.27mi.] [Assoc. proj. #14400]

STH 65

CTH F

Hot Mix Asphalt $839,446.03 $250,000.00

NW

$35,453,803.30 $10,410,787.02CHIPD Program Total

Page 12 of 12Wednesday, May 24, 2017