Local Planning and Network

Development(LPND)

2010 Update for LMHAs

Page 2: Local Planning and Network Development (LPND) 2010 Update for LMHAs.

Local Service Area Plan

FY 2010 contract requires submission of a comprehensive Local Service Area Plan (LSAP)

Provider Network Development Plan in one component of the LSAP

The Local Services, Crisis Services and Diversion Action sections of the plan are prepared are in narrative format

Page 3: Local Planning and Network Development (LPND) 2010 Update for LMHAs.

Scope of Template

Provider Network Development Plan uses the 2010 LPND Template

2010 template does not cover the Local Service Plan

Instructions for submission of the LSAP found in Information Item I of the Authority Performance Contract

Page 4: Local Planning and Network Development (LPND) 2010 Update for LMHAs.

2010 LPND Template

Aim for concise communication of requested information

Use bullet format whenever possible Limit completed plan to 25 pages DSHS will request additional information if

needed Separate PowerPoint presentation covers

changes to the template

Page 5: Local Planning and Network Development (LPND) 2010 Update for LMHAs.

Provider Availability Assessment

Page 6: Local Planning and Network Development (LPND) 2010 Update for LMHAs.

Goals for 2010

Shared understanding of LMHA needs and provider interests and capacity at the local level

Mutually beneficial procurement provisions

Successful procurement

Page 7: Local Planning and Network Development (LPND) 2010 Update for LMHAs.

New Step in Planning Process

Follow-up contact between LMHA and provider required

Initiated by LMHA using DSHS website LMHA specifies teleconference or visit LMHA provides scheduling flexibility Provider has 45 days to participate

Page 8: Local Planning and Network Development (LPND) 2010 Update for LMHAs.

New Provision The LMHA may conclude that a provider

is not interested in contracting with the LMHA if the provider does not participate in a teleconference or in-person meeting (whichever is requested by LMHA) within 45 days.

LMHA must assume provider is interested if LMHA does not initiate contact

Page 9: Local Planning and Network Development (LPND) 2010 Update for LMHAs.

Significance An LMHA is not obligated to go through

procurement if no providers have demonstrated interest in contracting with the LMHA

DSHS may contact providers to confirm LMHA conclusions regarding provider interest

Page 10: Local Planning and Network Development (LPND) 2010 Update for LMHAs.

Content of Meeting

Local conditions Community needs and preferences DSHS requirements Provider experience and capacity Provider needs and preferences Level of provider interest

Page 11: Local Planning and Network Development (LPND) 2010 Update for LMHAs.

Purpose LMHAs and providers have complete

information for decision-making Providers can focus on areas with

greatest potential for success LMHAs avoid unsuccessful procurement

Page 12: Local Planning and Network Development (LPND) 2010 Update for LMHAs.

Revised Provider Inquiry Form

Single form with checklist of LMHAs Specific questions about experience Broad categories of service listed

Service packages vs. discrete services

Adults vs. children/adolescents

Page 13: Local Planning and Network Development (LPND) 2010 Update for LMHAs.

Planning Process

Page 14: Local Planning and Network Development (LPND) 2010 Update for LMHAs.

Sequence of Events Conduct initial provider availability assessment

first Use results to frame local meetings Draft plan Check DSHS website for additional providers

and revise plan if needed

Page 15: Local Planning and Network Development (LPND) 2010 Update for LMHAs.

Community Input

Use 2008 plan as the starting point for discussion

Review past plan and results Describe current options based on

provider availability assessment

Page 16: Local Planning and Network Development (LPND) 2010 Update for LMHAs.

Community Input

Ensure stakeholders understand procurement is required if providers are available

Request input on how to achieve that goal based local priorities Services to procure in 2010 Timeframe for full transition (to use

available capacity)

Page 17: Local Planning and Network Development (LPND) 2010 Update for LMHAs.

Community Input

If LMHA has no interested providers, focus on other elements of plan: Reducing barriers Attracting providers Improving consumer access and

choice Some questions require no response if

LMHA has no interested providers—insert NA as instructed

Page 18: Local Planning and Network Development (LPND) 2010 Update for LMHAs.

Additional Information

Page 19: Local Planning and Network Development (LPND) 2010 Update for LMHAs.

Review Process

Similar to process used in 2008 LMHAs will receive questions from LANAC

before the scheduled conference call LANAC has developed approval criteria to

guide the review process These criteria or guidelines are not a substitute

for the rule Document with criteria and explanation

available on LPND website

Page 20: Local Planning and Network Development (LPND) 2010 Update for LMHAs.

Additional Training

Separate PowerPoint presentation covers the 2010 LPND Template

Modules posted on LPND website Monthly conference calls through June;

schedule posted on website Presentation at Risk Management

Conference on January 29th

Page 21: Local Planning and Network Development (LPND) 2010 Update for LMHAs.

Additional Information

Refer to LPND website for additional information and updates: http://www.dshs.state.tx.us/mhcommunity/LPND/

Submit questions to the LPND Mailbox: [email protected]

Contact Tamara Allen: [email protected]