Global Symphony Track Record TRACK RECORD GLOBALOFFSHORE.CO.UK Date Project Client Details September 2018 Kincardine Offshore Wind Farm Cobra Wind Installation and burial of 17.3km 33kV export cable including shore end pull-in, floating turbine pull in, PLGR, rock bag and mattress installation July 2018 Shell Gannet GC4- 04 Tie Back Subsea 7 Hybrid trenching of 3km flexible flowline at Shell Gannet C July 2018 Shell Nelson South Shell UK Limited Installation and burial of 6km umbilical at Shell Nelson South June 2018 Shapinsay to Stronsay SSE Installation of 14km 33kV submarine cable, shore end pull ins, burial and rock bag installation May 2018 Westray - Rousay SSE Jet trenching of 2.5km replacement 33kV HVAC interconnector from Westray to Rousay May 2018 Westray – Rousay (Completed by Topaz Installer) SSE Installation of 11km HVAC Submarine cable, shore end pull ins, pre-lay mattress Installation and Post Lay Rock Bag Installation. Mar 2018 Merkur Tideway Installation of 36 array cables and burial of 17 array cables at Merkur Offshore Windfarm October 2017 Al-Jurf Riser Replacement (Libya) Ocean Installer Removal and abandonment & installation of replacement static/dynamic production riser sections between platform & FPSO March 2017 Rampion E.ON Installation and burial on Second phase of 33kv array cables on Rampion offshore windfarm total 62 cables between turbines with a 81km total length August 2016 Rampion E.ON Installation and burial on first phase of 33kv array cables on the Rampion Offshore Wind Farm March 2015 Quad 204 Technip UK Installation of new Subsea Infrastructure December 2014 Humber Gateway E.ON Installation of 8 array cables and second end pull-in to TP of 2 prelaid cables. Work carried out during trenching campaign October 2014 Golden Eagle Technip UK Umbilical Installation October 2014 Germany NSW UXO Identification & Investigation
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Global Symphony Track Record
TRACK RECORD
GLOBALOFFSHORE.CO.UK
Date Project Client Details
September 2018Kincardine Offshore
Wind FarmCobra Wind
Installation and burial of 17.3km 33kV export cable including shore end pull-in, floating turbine pull in, PLGR, rock bag and mattress installation
July 2018Shell Gannet GC4-
04 Tie BackSubsea 7 Hybrid trenching of 3km flexible flowline at Shell Gannet C
July 2018 Shell Nelson SouthShell UK
Limited Installation and burial of 6km umbilical at Shell Nelson South
June 2018Shapinsay to
StronsaySSE
Installation of 14km 33kV submarine cable, shore end pull ins, burial and rock bag installation
May 2018 Westray - Rousay SSE Jet trenching of 2.5km replacement 33kV HVAC interconnector from Westray to Rousay
May 2018
Westray – Rousay
(Completed by
Topaz Installer)
SSE Installation of 11km HVAC Submarine cable, shore end pull ins, pre-lay mattress Installation and Post Lay Rock Bag Installation.
Mar 2018 Merkur Tideway Installation of 36 array cables and burial of 17 array cables at Merkur Offshore Windfarm
October 2017Al-Jurf Riser
Replacement (Libya)
Ocean
Installer
Removal and abandonment & installation of replacement static/dynamic production riser sections between platform & FPSO
March 2017 Rampion E.ONInstallation and burial on Second phase of 33kv array cables on Rampion offshore
windfarm total 62 cables between turbines with a 81km total length
August 2016 Rampion E.ONInstallation and burial on first phase of 33kv array cables on the Rampion
Offshore Wind Farm
March 2015 Quad 204 Technip UK Installation of new Subsea Infrastructure
December 2014 Humber Gateway E.ONInstallation of 8 array cables and second end pull-in to TP of
2 prelaid cables. Work carried out during trenching campaign
October 2014 Golden Eagle Technip UK Umbilical Installation
October 2014 Germany NSW UXO Identification & Investigation
For further information on Global Offshore please visit: GLOBALOFFSHORE.CO.UK or contact our sales team.
UK: +44 1245 702000 | Asia: +65 65131300
GO
01
1 v
7
February 2014 QUAD 204 Technip UK Decommissioning of Old Infrastructure and Installation of New
June 2013Quad 204 -
West of Shetland
Technip UK/
BP
Multi-phase project. Removal and recovery of 15 x dynamic risers/removal &
installation of subsea infrastructure
April 2013
Alma & Galia
Development -
North Sea
Technip UK/
EnQuest7 x flexible riser installations (wet-store ahead of FPSO installation)
March 2013 Judy Field Conoco Caisson Surveys
February 2013 FFFA Hess Gas Sampling and MBES Surveys
February 2013 Norwegian CS Maersk UK Rig Entry Surveys
January 2013 Horne & Wren Petrofac Damage Inspections
January 2013 Montrose Field Talisman OOS Surveys
November 2012 Gryphon Field Technip UK GARP Phase 6 – Continuation of Riser Installations
October 2012 Alma/Galia Field Technip UK Umbilical Installations
August 2012 Gryphon Field Technip UK GARP – Various Riser Installations
July 2012 Rochelle Field Technip UK Extensive Mattress Installations
July 2012 Gryphon Field Technip UK GARP Phase 3 – Riser Base Installations
June 2012 Causeway Field Technip UK Umbilical Installations