Top Banner
Load Bank Solutions The SMART way to test Almisehal Load-Bank Project Sheets v03.indd 4 11/03/2014 10:27
10

Load Bank Solutionsalmisehal.com/public_data/files/load-bank-Solutions... · 2015. 2. 23. · ‘Load testing critical power systems is the best way to validate design and ensure

Sep 03, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Load Bank Solutionsalmisehal.com/public_data/files/load-bank-Solutions... · 2015. 2. 23. · ‘Load testing critical power systems is the best way to validate design and ensure

Load Bank SolutionsThe SMART way to test

Almisehal Load-Bank Project Sheets v03.indd 4 11/03/2014 10:27

Page 2: Load Bank Solutionsalmisehal.com/public_data/files/load-bank-Solutions... · 2015. 2. 23. · ‘Load testing critical power systems is the best way to validate design and ensure

‘Load testing critical power systems is the best way to validate design and ensure optimum performance.’

Load Bank Solutions

Resistive, Reactive and DC Load banks.Transformers.Turnkey Power Test Solutions.

• 4.5 to 2500kW per unit @ 120, 240, 480, 600 VAC• Up to 5MW @ 13.8kV or 4160V• Provides 0.8 PF companion to Resistive Load banks• Incremental load steps• 0.8 PF Reactive load bank for MV inductive testing• Up to 1000 V-DC for battery and UPS systems,• Variable Amperage settings up to 600 A• Multi-tap configurations: wye-wye or delta-wye• 50/60Hz capable step down to 480/600VAC• Liquid cooled high-power density load bank• Non-Linear Load bank• Advanced Control and Communication

Leading the load bank industry in capacity and expertise

Working alongside ComRent International an industry leader in the supply of load bank equipment we have call on more load banks, cables switchgear and transformers within our rental fleet than any other company in the Middle East and North Africa.

To date, we have provided load banks, cables, transformers switchgear and technical support for over 30,000 load bank tests, with a 99.99% on site performance record.

The company operates throughout the world with the support of key in territory supply partners, who provide a ‘stand-alone’, load bank equipment and engineering support services facility.

For more Information about Almisehal Load Bank Solutions in Saudi Arabia, please contact our engineering team direct, who would be pleased to discuss and offer a professional SMART, Load bank solution.

Call us today, to see how we can help.For more information, please contact:

DammamSteve Musa T: +966 55650 [email protected]

Riyadh Mohsin Akhtar T: +966 55880 [email protected]

or visit www.almisehal.com

Page 3: Load Bank Solutionsalmisehal.com/public_data/files/load-bank-Solutions... · 2015. 2. 23. · ‘Load testing critical power systems is the best way to validate design and ensure

load bank solutions – saudi arabia

Al-Khobar Workshop – CR922 (5MW) Load Bank ready for shipment to MAKKAH

Page 4: Load Bank Solutionsalmisehal.com/public_data/files/load-bank-Solutions... · 2015. 2. 23. · ‘Load testing critical power systems is the best way to validate design and ensure

load bank solutions – saudi arabia

Breaker Unit & 7MVA Transformer

Page 5: Load Bank Solutionsalmisehal.com/public_data/files/load-bank-Solutions... · 2015. 2. 23. · ‘Load testing critical power systems is the best way to validate design and ensure

load bank solutions – saudi arabia

5 MW Test SAWARY (Dammam)

Page 6: Load Bank Solutionsalmisehal.com/public_data/files/load-bank-Solutions... · 2015. 2. 23. · ‘Load testing critical power systems is the best way to validate design and ensure

Call us today, to see how we can help.For more information, please contact:

DammamSteve Musa T: +966 55650 [email protected]

Riyadh Mohsin Akhtar T: +966 55880 [email protected]

or visit www.almisehal.com

“Load testing critical power systems is the best way to validate design and ensure optimum performance, when it is needed.”

إن اختبار انظمة احامل الطاقة الحساسة يعد من افضل الوسائل للتأكد من صحة التصميم وضامن األداء األمثل عند الحاجة لذلك

As the duration of a power failure stretches beyond an hour, there are severe problems that can cause things to get expensive or dangerous.

Power outages are a reality that can threaten lives.

إن انقطاع التيار الكهربائية يعد من املهددات الحقيقية لحياة الناس.

Power problems plague hospitals much more frequently than they do other high-tech facilities such as banks, data centers and clean-room manufacturing facilities.

Most hospitals and clinics have in place a bespoke UPS system, designed to suit operational requirements should an emergency arise. But how is the system tested and is that test cost effective and reliable, taking into account the diverse power needs of todays modern hospitals?

Please call us today so we can arrange to discuss with your engineering team how Almisehal load bank solutions can test your UPS system to make sure you and your team are ready.

‘They are ready, are you?’إنهم جاهزون هل انتم كذلك

Load Bank SolutionsHospitals – Uninterrupted Power to Critical Systems

Page 7: Load Bank Solutionsalmisehal.com/public_data/files/load-bank-Solutions... · 2015. 2. 23. · ‘Load testing critical power systems is the best way to validate design and ensure

Project Sheet – Prince Sultan Military Hospital 10 MW Test

Almisehal – Load Bank Solutions

• 10 MW load test of Siemens Turbines.

• Equipment CR922 (5MW) 2 x K975 (5MW) 7MVA Transformer

• Test duration 2 weeks

Page 8: Load Bank Solutionsalmisehal.com/public_data/files/load-bank-Solutions... · 2015. 2. 23. · ‘Load testing critical power systems is the best way to validate design and ensure

load bank solutions – saudi arabia

Prince Sultan Military Hospital 10 MW Test

Page 9: Load Bank Solutionsalmisehal.com/public_data/files/load-bank-Solutions... · 2015. 2. 23. · ‘Load testing critical power systems is the best way to validate design and ensure

Project Sheet King Fahad Medical City - Riyadh

• 5 MW Multiple Load Test (Various site locations) • Equipment 2 x K975 (5MW) external power (Generators) • Test duration 4 weeks

Page 10: Load Bank Solutionsalmisehal.com/public_data/files/load-bank-Solutions... · 2015. 2. 23. · ‘Load testing critical power systems is the best way to validate design and ensure

load bank solutions – saudi arabia

Substation – Group Experience

• Project– Commission new substation transformer

• A Major (US) Electric Utility client suffered an outage while installing a new transformer, which cost them $500,000 dollars per day during the outage. They needed to qualify the operational status of the new transformer as soon as possible. They also were seeking a testing solution that could be employed to diminish potential downtime during future installations

• The Solution Regarding their immediate testing requirements, they had two options. They could test with grid power, which would require 2 weeks of testing to validate the transformer, or they could test with a load bank. They chose load bank testing with a single CR922 5MW 13.8kV unit and completed testing in exactly 2 hours and 23 minutes.

• The benefits to the customer Time to complete test reduced from 2 weeks to 1 day. Test solution for future transformer and substation projects was established. Load testing schedule was established with and in-house power systems monitoring program.

• Project– Commission new substation at industrial facility

• A New substation providing 13.8kV for facility use had been constructed on the property of a new industrial facility in North Carolina. The substation needed to be validated and commissioned prior to energizing the sensitive and critical system at the new facility.

• The Solution Commission substation current and voltage transformers, protective relays, breakers, and switches with (2) CR922 5MW resistive load banks. Almisehal proprietary CR922 is a medium voltage 5MW resistive load bank capable of supporting system test up to 15kV without the use of additional transformers and equipment.

• The benefits to the customer was able to commission entire substation in 1 day with ComRent load banks instead of a typical 14 day testing schedule and safely integrate the facility power systems with the commercial power on time and on budget.