Top Banner
LNG RECEIVING TERMINAL NYNÄSHAMN Facts Project Description Full containment Tank 20.000 cbm - Design and Engineering City/Country Nynäshamn / Sweden Client AGA Linde Gas, Lidingö Contract Value € 1,03 Mio. Construction Period 1/2009 - 1/2010 (24 months) .
1

LNG RECEIVING TERMINAL NYNÄSHAMN · 2016. 7. 7. · LNG RECEIVING TERMINAL NYNÄSHAMN Facts Project Description Full containment Tank 20.000 cbm - Design and Engineering City/Country

Jan 25, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • LNG RECEIVING TERMINALNYNÄSHAMN

    Facts Project DescriptionFull containment Tank 20.000 cbm - Design and Engineering

    City/Country

    Nynäshamn / Sweden

    Client

    AGA Linde Gas, Lidingö

    Contract Value

    € 1,03 Mio.

    Construction Period

    1/2009 - 1/2010 (24 months)

    .