Hamburg Achieving Predictable Outcomes for Modular Construction on LNG Projects John Jeffers Group Development Director
16

LNG Congress HAMBURG 2016

Jan 14, 2017

Download

Engineering

John Jeffers
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: LNG Congress HAMBURG 2016

International LNG Congress- Hamburg

Achieving Predictable Outcomes for Modular Construction on LNG Projects

John Jeffers Group Development Director

Page 2: LNG Congress HAMBURG 2016

A world leaderFounded in 1911, SNC-Lavalin is one of the leading engineering and construction groups in the world and a major player in the ownership of infrastructure. From offices in over 50 countries, SNC-Lavalin's employees are proud to build what matters. Our teams provide EPC and EPCM services to clients in a variety of industry sectors, including oil and gas, mining and metallurgy, infrastructure and power. SNC-Lavalin can also combine these services with its financing and operations and maintenance capabilities to provide complete end-to-end project solutions.

2

Page 3: LNG Congress HAMBURG 2016

3

Project Delivery Challenges

*Spotlight on oil and gas megaprojects report, EY 2014

64% 73%of megaprojects are facing cost overruns

of megaprojects are reporting schedule delays

Completion costs are regularly 59% higher than initial cost estimates, on average representing an incremental cost of USD500bn

Page 4: LNG Congress HAMBURG 2016

4

LNG Project cost in Australia / PNG

Pluto LNG

Prelude LNG*

GLNG

PLNG

QCLNG

APLNG

Wheatstone

Ichthys

Gorgon LNG

0 5 10 15 20 25 30 35 40 45 50 55

Intial budget Overrun

•* Prelude LNG project has an initial budget of $12-13bn and a current forecast overrun of $1-2bn

Source: FT.com 30th October 2016

Page 5: LNG Congress HAMBURG 2016

5

Page 6: LNG Congress HAMBURG 2016

6

›FIRED HEATER › ›2400 Tonnes,›14m W x 24m D› x 40 m H

Page 7: LNG Congress HAMBURG 2016

7

Benefits of Modularization

Page 8: LNG Congress HAMBURG 2016

8

Our Challenges

Page 9: LNG Congress HAMBURG 2016

9

Page 10: LNG Congress HAMBURG 2016

10

Constraints to Modular Approach

› Project schedule › Logistics

› Document control › Quality

Page 11: LNG Congress HAMBURG 2016

11

Achieving Predictable Outcomes

› Fully integrated project execution planning

› Experienced construction yard / Quality

› Single, integrated document management system

› Management of change

› Contract alignment - one team – one mission

Page 13: LNG Congress HAMBURG 2016

13

Page 14: LNG Congress HAMBURG 2016

14

What Success Looks Like

› Improved strategic master planning with realistic & achievable schedules

› Single integrated document management system

› Reverse pass planning – systems commissioning to early design

› Greater collaboration between all stakeholders – think auto!

Page 15: LNG Congress HAMBURG 2016

15

Page 16: LNG Congress HAMBURG 2016

16