listen. think. deliver. CMAA Water Summit CMAA Water Summit Service Provider Executives Forum Service Provider Executives Forum July 19, 2010 Richard D. Fox Chairman & Chief Executive Officer Camp Dresser & McKee Inc.
13

Listen. think. deliver. CMAA Water Summit Service Provider Executives Forum July 19, 2010 Richard D. Fox Chairman & Chief Executive Officer Camp Dresser.

Dec 26, 2015

Download

Documents

Ashley Page
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Listen. think. deliver. CMAA Water Summit Service Provider Executives Forum July 19, 2010 Richard D. Fox Chairman & Chief Executive Officer Camp Dresser.

listen. think. deliver.

CMAA Water SummitCMAA Water SummitService Provider Executives ForumService Provider Executives Forum

July 19, 2010

Richard D. Fox

Chairman & Chief Executive Officer

Camp Dresser & McKee Inc.

Page 2: Listen. think. deliver. CMAA Water Summit Service Provider Executives Forum July 19, 2010 Richard D. Fox Chairman & Chief Executive Officer Camp Dresser.

listen. think. deliver.

Infr

astr

uct

ure

Inve

stm

ent

($ b

illi

ons)

WaterWater

ResourceWastewater

Underfunded Investment Is Clear But No Obvious Way

Forward

“More for Less”

(Nee

ded

)

(Nee

ded

)

(Nee

ded

)

(Act

ual

)

(Act

ual

)

(Act

ual

)

Page 3: Listen. think. deliver. CMAA Water Summit Service Provider Executives Forum July 19, 2010 Richard D. Fox Chairman & Chief Executive Officer Camp Dresser.

listen. think. deliver.

OpportunitiesOpportunities

Improving the Delivery of Assets

Better policies / regulations More sustainable infrastructure Technology advancement

Raising the Value of Water

Page 4: Listen. think. deliver. CMAA Water Summit Service Provider Executives Forum July 19, 2010 Richard D. Fox Chairman & Chief Executive Officer Camp Dresser.

listen. think. deliver.

Productivity of US construction versus Productivity of US construction versus productivity gain in non-farm industriesproductivity gain in non-farm industries

Source: US Department of Labor

1964 70 75 80 85 90 95 00

Page 5: Listen. think. deliver. CMAA Water Summit Service Provider Executives Forum July 19, 2010 Richard D. Fox Chairman & Chief Executive Officer Camp Dresser.

listen. think. deliver.

Why?Why?

MasterPlan

InvestmentPhase Design Bid Construct

Design-Bid-Build (D-B-B)

Commission Operate/Maintain

Page 6: Listen. think. deliver. CMAA Water Summit Service Provider Executives Forum July 19, 2010 Richard D. Fox Chairman & Chief Executive Officer Camp Dresser.

listen. think. deliver.

Service Provider OpportunityService Provider Opportunity

MasterPlan

InvestmentPhase Design Bid Construct

Design-Bid-Build (D-B-B)

Commission Operate/Maintain

Lev

el o

f In

vest

men

t

1 – 5 years 7 – 9 years 20 – 30 years

Page 7: Listen. think. deliver. CMAA Water Summit Service Provider Executives Forum July 19, 2010 Richard D. Fox Chairman & Chief Executive Officer Camp Dresser.

listen. think. deliver.

Seizing the OpportunitySeizing the Opportunity

Gain Productivity:• Eliminate interfaces• Lower LOE• Reduce re-work• Reduce schedule• Reduce change orders

Improve Owner Comfort:• Visualization• Transparency

Rationale Risk Transfer:• Procurement process• Knowledgeable advisor• Co-sponsored risk register

Collaborative 4-D Design

Page 8: Listen. think. deliver. CMAA Water Summit Service Provider Executives Forum July 19, 2010 Richard D. Fox Chairman & Chief Executive Officer Camp Dresser.

listen. think. deliver.

Owner ComfortOwner Comfort

Rehab Consistency Aesthetics/

Noise/Odor

High levels ofdesign control

Traditional design build

EPCM

Procure 65 % Design Negotiate Construct/Commission

– – –

Page 9: Listen. think. deliver. CMAA Water Summit Service Provider Executives Forum July 19, 2010 Richard D. Fox Chairman & Chief Executive Officer Camp Dresser.

listen. think. deliver.

TransparencyTransparency

Procure Design / Construct / Commission

D-BCompetitive Price / 10% Design Escalation

Change Orders

D-B-B Criteria/Price MarketCompetitivePrice

ChangeOrders Criteria/Price

Construction Manager

Select Designer Design Bid Construct Commission

EPCM

Procure 65 % Design Negotiate Construct/Commission

Target Price

Criteria/Design

Firm Price

Sub-bids

Page 10: Listen. think. deliver. CMAA Water Summit Service Provider Executives Forum July 19, 2010 Richard D. Fox Chairman & Chief Executive Officer Camp Dresser.

listen. think. deliver.

Risk TransferRisk Transfer

General Liability Insurance 0.1% - 0.2%

Errors/Omissions Professional Liability 0.1% - 0.3%

Worker Injury Workman’s Compensation 0.1% -

3.0% Contractor Payment Bonds 0.5% - 1.0%

Contractor Performance-Schedule Liquidated Damages 0% -

10% -Overall Contractual Transfer

0% - 7% Force Majuere Contract Exclusion 0% - 0%

Facilities Performance Contract Transfer (warranty) 0% - 3%

Limits on Liability Contractual Terms Erratic/Exorbitant

Consequentials Contractual TermsErratic/Exorbitant

RISKS MEANS/METHODS PRICING

Page 11: Listen. think. deliver. CMAA Water Summit Service Provider Executives Forum July 19, 2010 Richard D. Fox Chairman & Chief Executive Officer Camp Dresser.

listen. think. deliver.

4-D Design4-D Design

Page 12: Listen. think. deliver. CMAA Water Summit Service Provider Executives Forum July 19, 2010 Richard D. Fox Chairman & Chief Executive Officer Camp Dresser.

listen. think. deliver.

Orlando DB CenterOrlando DB Center

Page 13: Listen. think. deliver. CMAA Water Summit Service Provider Executives Forum July 19, 2010 Richard D. Fox Chairman & Chief Executive Officer Camp Dresser.

listen. think. deliver.

SummarySummary

Global forces demand “More For Less” Productivity of traditional delivery Design Control = Modified D/B or EPCM Transparency

– A real, client specific issue

– Discuss it / manage it

Risk Transfer – Rationale – Fair Pricing

– Full – Exorbitant Pricing/No Responsible players