PodInvestitia:RECONSTRUCTIA ECOLOGICA A AMENAJARII PISCICOLE
MURIGHIOL JUD. TULCEAFaza: D.E.Obiect :POD PESTE CANALLISTA DE
CANTITATI NR 1BILL OF QUANTITIES No 11 EURO
=3.9277RON(07.10.2008)Nr crtNo.Cod art.Article codeDESCRIEREA
LUCRARIIWORKS DESCRIPTIONUMM.U.CantitateQuantityPret unitarUnit
price( EURO )Pret totalTotal costs( mii EURO)Pret unitarUnit
price(RON)Pret totalTotal cost( mii
RON)0123456781.INFRASTRUCTURA12A2Umpluturi la platformePlatform
fillingm3m3100.005.160.5220.272.0313.927722B4AForarea pilotilor de
diametru mare - F=1080mmDrilling of piles with a large diametre -
D= 1080 mmmm48.00177.158.50695.7933.4013.927732B9AArmatura OB37 in
piloti forati de diametru mareOB37 reinforcement for driller column
of big diametrett1.101,018.931.124,002.054.4013.927742B9BArmatura
PC52 in piloti forati de diametru marePC52 reinforcement for
driller column of big
diametrett3.501,037.043.634,073.1814.2613.927752B13BBeton clasa
C20/25 in piloti foratiConcrete of C20/25 class for drilled
pilesm3m347.70116.705.57458.3621.8613.927762B15CBeton clasa C20/25
in elevatiiConcrete of C20/25 class for
elevationsm3m311.0098.341.08386.254.2513.927772B10AArmatura OB37 in
elevatiiOB37 reinforcement in
elevationstt1.10787.860.873,094.483.4013.927782B10BArmatura PC52 in
elevatiiPC52 reinforcement in
elevationstt1.70802.401.363,151.595.3613.927792B15GBeton clasa
C30/37 in elevatiiConcrete of C30/37 class for
elevationsm3m334.20102.133.49401.1413.72102B12ACofraje plane pentru
elevatii - obisnuitePlane shutterings for elevations -
usualm2m2125.0013.791.7254.166.77112B12BCofraje curbe pentru
elevatii - obisnuiteCurve shuttering for elevations -
usualm2m240.8037.341.52146.665.98122B21A1Hidroizolatie pe
suprafetele de beton in contact cu
pamantulm2113.903.820.4415.001.710TOTAL
129.82117.143.92773927.72.SUPRASTRUCTURA0132C1A2AGrinzi pref. prec.
cu armatura aderenta L=8,20m h=0,42mPrecast prestressed beams with
adherent reinforcement L=8,20m
h=0,42mbuc.pcs.9.00882.487.943,466.1231.2013.9277142C9AArmatura
OB37 in suprastructuraOB37 reinforcement for
superstructurett4.30728.413.132,860.9812.3013.9277152C9BArmatura
PC52 in suprastructuraPC52 reinforcement for
superstructurett0.62745.470.462,927.981.8213.9277162C10FBeton
turnat monolit in suprastructura clasa C30/37Concrete cast monolith
in the superstructure class C
30/37m3m317.00107.261.82421.297.1613.9277172C8ACofraje plane pentru
suprastructura - obisnuitePlane shuttering for the superstructure -
usualm2m220.0033.120.66130.092.6013.9277182C11HidroizolatieWaterproofingm2m246.0031.831.46125.025.75192C26A3Borduri
15x20cmkerbs with 15x20 cmm20.0010.470.2141.120.82202C12Calea pe
podCarriageway on the
bridgem2m241.0017.860.7370.152.88212C16DParapet metalic directional
tip foarte greu pe suprastructuraDirectional metallic guardrail
verry heavy on
superstructuremm20.0059.181.18232.444.65222C15ADispozitive de
acoperire a rosturilor de dilatatie de 20 mmDevices for covering of
expansion joints - 20 mmmm12.00282.203.391,108.4013.300TOTAL
221.0082.483.92773927.703. RACORDARI CU TERASAMENTELE0232B18APlaci
de racordare L=3.00mPrecast transition slabs
L=3.00mbuc.pcs.10.00179.071.79703.337.0313.9277242B17Dren din
piatra brutaRubble stone
drainm3m340.0034.061.36133.785.3513.9277252B21Hidroizolatii pe
culei si placile de racordareWaterproofing on the abutments and
precast trasition
slabsm2m233.0031.831.05125.024.1313.9277262C16AParapet metalic
pietonal pe suprastructuraPedestrian guardrail on
superstucturemm18.0044.890.81176.313.170TOTAL
35.0119.683.92773927.704. LUCRARI AUXILIARE0272A1Drumuri
tehnologiceTechnological
roadskm0.1027,525.122.75108,110.4110.8113.92770TOTAL
42.7510.813.92773927.7TOTAL58.59230.113.9277PROIECTANT /
DESIGNER,OFERTANT / TENDERER,Sef Proiect,Verificat, Intocmit,Ing.
Mirela COJENESCUIng. Victor DRAGOMIR Tehn.Maria MOCOFANa)Prezentele
liste de cantitati contin un numar de 20 articole si un numar de 2
pagini;The present bill of quantities contains a number of 20
article and 5 page;b)Proiectantul completeaza si raspunde de
valorile inscrise in coloanele 1,2,3 si 4;The Designer completes
and is responsible for the values mentioned in columns1,2,3 and
4;c)Ofertantul completeaza si raspunde de valorile inscrise in
coloanele 5,6,7 si 8.The Tenderer completes and is responsible of
the values mentioned in columns 5,6,7 and 8.PROIECTANT /
DESIGNER,OFERTANT / TENDERER,Sef Proiect,Intocmit,Ing. Mirela
COJENESCUIng. Victor DRAGOMIR
&C
Descr.pret_PDESCRIERE DE PRETURILUCRARI
PODNr.Crt.CodarticolDescriere articol01212A2UMPLUTURI LA
PLATFORMESe pltete la metru cub (m3) de umplutur, si se refera la
platformele necesare efectuarii forajelor pentru piloti , msurat
dup compactareIn pre se includ: decopertarea stratului vegetal i
compactarea amprizei umpluturii; sptura n groapa de mprumut;
transportul materialului rezultat din sptur; mprtierea i
compactarea pmntului n umplutur; finisarea platformei i verificarea
cotelor necesare, precum i desfacerea platformei; transportul
materialului rezultat n depozit i redarea terenului n circuitul
agricol la terminarea lucrrilor.Prin proiect i Caietul de sarcini
se vor preciza tehnologia de compactare i caracteristicile
materialului compactat.m322B4AFORAREA PILOTILOR DE DIAMETRU MARE -
F=1080MMSe pltete la metru liniar (m) de forajIn pre se includ:
amenajarea suplimentar a platformei pentru poziionarea instalaiei
de forat; amenajrile necesare execuiei forajului; deplasarea
instalaiei de forare de la un pilot la altul i de la o fundaie la
alta; forarea pilotului de la nivelul platformei pn la vrful
pilotului; transportul materialului rezultat din forare; mprtierea
materialului n depozitul de antier; desfacerea i evacuarea
amenajrilor necesitate de foraj; verificarea cotei de fundare i
natura terenului de fundare.Prin proiect i Caietul de antier se vor
preciza: diametrul i lungimea pilotului; tehnologia de forare i
categoria de teren.m32B9AARMATURA OB37 IN PILOTI FORATI DE DIAMETRU
MARESe pltete la ton (t)In pre se includ: procurarea oelului beton;
procurarea evilor pentru control i injectare; procurarea tablei
pentru toba de injecie; confecionarea tronsoanelor de carcas cu
evile i toba de injectare; transportul materialelor; manipulrile
barelor de armtur i a carcaselor; montajul carcasei de armtur;
mbinrile ntre tronsoanele carcasei; susinerea carcasei n timpul
mbinrilor dintre tronsoane i n final n timpul betonrii; verificarea
dimensiunilor carcasei i a poziiei acesteia n gaura de
foraj.t42B9BARMATURA PC52 IN PILOTI FORATI DE DIAMETRU MARESe
pltete la ton (t)In pre se includ: procurarea oelului beton;
procurarea evilor pentru control i injectare; procurarea tablei
pentru toba de injecie; confecionarea tronsoanelor de carcas cu
evile i toba de injectare; transportul materialelor; manipulrile
barelor de armtur i a carcaselor; montajul carcasei de armtur;
mbinrile ntre tronsoanele carcasei; susinerea carcasei n timpul
mbinrilor dintre tronsoane i n final n timpul betonrii; verificarea
dimensiunilor carcasei i a poziiei acesteia n gaura de
foraj.t52B13BBETON CLASA C20/25 IN PILOTI FORATISe vor evalua
preuri separate, difereniate dup clasa betonuluiSe pltete la metru
cub (m3)In pre se includ: procurarea agregatelor necesare preparrii
betonului; procurarea cimentului; prepararea betonului conform
prescripiilor din Caietul de sarcini; transportul betonului de la
staia de preparare la locul de punere n oper; manipulrile; punerea
n oper a betonului; verificarea calitii betonului din pilotul forat
prin metode nedistructive i de laborator; injectarea la baz a
piloilor.Prin proiect i Caietul de sarcini se precizeaz clasa
betonului, natura i sorturile agregatelor, calitatea cimentului,
adaosurile.m362B15CBETON CLASA C20/25 IN ELEVATIISe pltete la metru
cub (m3)In pre se includ: procurarea agregatelor necesare preparrii
betonului; procurarea cimentului; procurarea adaosurilor;
prepararea betonului conform prescripiilor din Caietul de sarcini;
transportul betonului de la staie la locul de punere n oper;
manipulrile; punerea n oper i protecia betonului pe timpul ntririi;
verificarea calitii betonului la staie i pe antier.Prin proiect i
Caietul de sarcini se vor preciza clasa betonului, natura i
sorturile agregatelor, calitatea cimentului i
adaosurile.m372B10AARMATURA OB 37 IN ELEVATIISe pltete la ton (t)In
pre se includ: procurarea oelului beton; confecionarea de bare din
carcase; transportul materialului metalic; manipulrile barelor de
armtur i a carcaselor; montarea barelor sau carcaselor precum i
nndirea acestora prin sudur sau prin petrecere; mbinrile ntre bare
i carcase; susinerile barelor pe poziie pentru mbinri sau montaj;
verificarea poziiei conform proiectului.t82B10BARMATURA PC52 IN
ELEVATIISe pltete la ton (t)In pre se includ: procurarea oelului
beton; confecionarea de bare din carcase; transportul materialului
metalic; manipulrile barelor de armtur i a carcaselor; montarea
barelor sau carcaselor precum i nndirea acestora prin sudur sau
prin petrecere; mbinrile ntre bare i carcase; susinerile barelor pe
poziie pentru mbinri sau montaj; verificarea poziiei conform
proiectului.t92B15GBETON CLASA C30/37 IN ELEVATIISe pltete la metru
cub (m3)In pre se includ: procurarea agregatelor necesare preparrii
betonului; procurarea cimentului; procurarea adaosurilor;
prepararea betonului conform prescripiilor din Caietul de sarcini;
transportul betonului de la staie la locul de punere n oper;
manipulrile; punerea n oper i protecia betonului pe timpul ntririi;
verificarea calitii betonului la staie i pe antier.Prin proiect i
Caietul de sarcini se vor preciza clasa betonului, natura i
sorturile agregatelor, calitatea cimentului i
adaosurile.m3102B12ACOFRAJE PLANE PENTRU ELEVATII OBISNUITESe
pltete la metru ptrat (m2)In pre se includ: procurarea materialelor
necesare confecionrii cofrajelor inclusiv schele si esafodaje;
confecionarea cofrajelor; montarea i demontarea cofrajelor, a
schelelor si esafodajelor; transportul materialului necesar
cofrajelor; manipulrile materialului necesar execuiei cofrajelor;
verificarea dimensiunilor elementelor cofrate; curirea i
depozitarea, n antier, a materialelor recuperate.Prin proiect i
Caietul de sarcini se specific elementele pentru care se cere o fa
vzut deosebit.m2112B12BCOFRAJE CURBE PENTRU ELEVATII - OBISNUITESe
pltete la metru ptrat (m2)In pre se includ: procurarea materialelor
necesare confecionrii cofrajelor inclusiv schelele si esafodajele;
confecionarea cofrajelor; montarea i demontarea cofrajelor, a
schelelor i eafodajelor; transportul materialului necesar
cofrajelor, schelelor i eafodajelor; manipulrile materialului
necesar execuiei cofrajelor, schelelor i eafodajelor; verificarea
dimensiunilor elementelor cofrate; curirea i depozitarea, n antier,
a materialelor recuperate.Prin proiect i Caietul de sarcini se
specific elementele pentru care se cere o fa vzut deosebit. In
acest caz preul se va stabili separat pentru fiecare tip de cofraj,
defalcnd prin adugarea unui indice la codul
articolului.m2122B21A1HIDROIZOLATIE PE SUPRAFETELE DE BETON IN
CONTACT CU PAMANTULSe pltete la metru ptrat (m2) de suprafa pe care
se aplic hidroizolaiaIn pre se includ: procurarea, transportul si
manipularea materialelor necesare; pregatirea stratului suport;
aplicarea a doua straturi de solutie bituminoasa; protectia
suprafetei stratului bituminos pe parcursul executarii
umpluturilor, daca se cere;Prin proiect i Caietul de sarcini se
precizeaz tipul materialului.km132C1A2AGRINZI PREF. PREC. CU
ARMATURA ADERENTA L=8,20M H=0,42MSe pltete la bucat (buc)In pre se
includ: procurarea grinzilor prefabricate precomprimate;
transportul grinzilor prefabricate precomprimate; manipularea
grinzilor prefabricate precomprimate; depozitarea pe platform a
grinzilor prefabricate precomprimate; riparea grinzilor pe platform
i pe infrastructur; lansarea grinzilor n lungul cii; montarea
grinzilor; asigurarea stabilitii grinzilor pe platform, n timpul i
dup montaj; aezarea pe aparatele de reazem.buc142C9AARMATURA OB37
IN SUPRASTRUCTURASe pltete la ton (t)In pre se includ: procurarea
oelului beton; confecionarea de bare sau carcase; transportul i
manipulrile oelului beton i barelor sau carcaselor confecionate;
mbinrile ntre bare; verificarea poziiei conform
proiectului.t152C9BARMATURA PC 52 IN SUPRASTRUCTURASe pltete la ton
(t)In pre se includ: procurarea oelului beton; confecionarea de
bare sau carcase; transportul i manipulrile oelului beton i barelor
sau carcaselor confecionate; mbinrile ntre bare; verificarea
poziiei conform proiectului.t162C10FBETON TURNAT MONOLIT IN
SUPRASTRUCTURA CLASA C30/37Se pltete la metru cub (m3)In pre se
includ: procurarea agregatelor necesare preparrii betonului;
procurarea cimentului; procurarea adaosurilor; prepararea betonului
conform prescripiilor din Caietul de sarcini; transportul betonului
de la staia de preparare la antier i manipulri; punerea n oper a
betonului.Prin proiect i Caietul de sarcini se vor preciza clasa
betonului i sorturile agregatelor, calitatea cimentului, adaosurile
etc.buc172C8ACOFRAJE PLANE PENTRU SUPRASTRUCTURA - OBISNUITESe
pltete la metru ptrat (m2)Se vor evalua preuri separate,
difereniate dup tipul de cofraj (obinuit, de fa vzut etc.)In pre se
includ: procurarea materialelor necesare realizrii cofrajelor;
confecionarea cofrajelor; procurarea schelelor i eafodajelor;
montarea i demontarea cofrajelor, a schelelor i eafodajelor;
transportul i manipulrile cofrajelor, schelelor i eafodajelor;
verificarea dimensiunilor elementelor cofrate. Prin proiect sau
Caietul de sarcini speciale se va specifica calitatea fetei vazute
a elementelor.km6029182C11HIDROIZOLATIESe pltete la metru ptrat
(m2)In pre se includ: procurarea materialelor necesare
hidroizolrii; prepararea; transportul i manipulrile materialelor;
execuia hidroizolaiei; execuia proteciei hidroizolaiei; nchiderea
marginilor hidroizolaiei cu materiale elastice.Prin proiect i
Caietul de sarcini se precizeaz dimensiunile, alctuirea i calitatea
materialelor care trebuie respectate la execuia
hidroizolaiei.km27306192C26A3BORDURI 15X20CMSe pltete la metru
liniar (m) de bordurIn pre se include: procurarea bordurilor i a
mortarului de poz; transportul i manipularea bordurilor i a
mortarului de poz; aezarea bordurilor n poziiile i la cotele
prevzute n proiect n conformitate cu prevederile din Caietul de
sarcini.m202C12CALEA PE PODSe pltete la metru ptrat (m2) de suprafa
ntre borduriIn pre se includ: procurarea materialelor necesare
execuiei cii pe pod; prepararea; transportul i manipulrile; execuia
cii. nchiderea caii cu materiale elastice.Prin proiect i Caietul de
sarcini se precizeaz alctuirea cii.m2212C16DPARAPET METALIC
DIRECTIONAL TIP FOARTE GREU PE SUPRASTRUCTURASe pltete la metru
liniar (m) de parapetIn pre se includ: procurarea parapetului;
transportul i manipulrile panourilor de parapet; asamblarea i
montarea panourilor de parapet; verificarea execuiei conform
proiectului.Prin proiect i Caietul de sarcini se vor specifica
caracteristicile, alctuirea i materialele pentru executarea
parapetului.m222C15ADISPOZITIVE DE ACOPERIRE A ROSTURILOR DE
DILATATIE DE 20 MMSe pltete la metru liniar (m) de rostIn pre se
includ: procurarea rostului de dilataie sau a materialelor cu care
se execut rostul; transportul materialelor; manipulrile elementelor
de rost; montajul dispozitivului de acoperire a rostului;
verificarea poziionrii rostului conform proiectului.Prin proiect
sau Caietul de sarcini se va preciza tipul rostului de
dilataie.m232B18APLACI DE RACORDARE L=3.00MSe pltete la bucat
(buc)In pre se includ: procurarea plcilor prefabricate; procurarea
materialelor pentru fundaie i grinda de rezemare, transportul,
manipulrile, execuia fundaiei i a grinzii de rezemare; montajul
plcilor de racordare, inclusiv rosturile de racordare i protecia
plcilor.Prin proiect i Caietul de sarcini se vor preciza
dimensiunile plcilor de racordare, dimensiunile i alctuirea
fundaiei i a grinzii de rezemare.buc242B17DREN DIN PIATRA BRUTASe
pltete la metru cub (m3)In pre se includ: procurarea materialelor
necesare execuiei drenului; transportul materialelor; manipulrile
materialelor; execuia drenului.Prin proiect i Caietul de sarcini se
precizeaz dimensiunile drenului i natura pietrei
brute.m3252B21HIDROIZOLATII PE CULEI SI PLACILE DE RACORDARESe
pltete la metru ptrat (m2) de suprafa pe care se aplic
hidroizolaiaIn pre se includ: procurarea materialului pentru
hidroizolaie; procurarea stratului suport al hidroizolaiei din
bitum filerizat; transportul i depozitarea materialelor;
manipulrile necesare; amorsarea suprafeei; prepararea amestecului;
aternerea n unul sau dou straturi a hidroizolaiei aa cum este
prevzut n proiect.Prin proiect i Caietul de sarcini se precizeaz
tipul materialului.m2262C16APARAPET METALIC PIETONAL DIN TEAVA
RECTANGULARA PE SUPRASTRUCTURASe pltete la metru liniar (m) de
parapetIn pre se includ: procurare parapet si vopsea; transportul i
manipulrile panourilor de parapet si a vopselei; asamblarea i
montarea panourilor de parapet; vopsirea parapetului; verificarea
execuiei conform proiectului.Prin proiect i Caietul de sarcini se
vor specifica caracteristicile, alctuirea i materialele pentru
executarea parapetului.m272A1DRUMURI TEHNOLOGICESe pltete la
kilometru (km)In pre se includ: sparea stratului vegetal;
profilarea terasamentelor cu o nlime maxim de 1,00 m, compensnd
necesarul de umplutur prin transportul pmntului n lungul amprizei
drumului; nivelarea i finisarea platformei, execuia sistemului
rutier; verificarea profilului proiectat, desfacerea drumului
tehnologic i redarea terenului n circuitul agricol.Prin proiect i
Caietul de sarcini se vor preciza caracteristicile geometrice ale
drumului tehnologic i alctuirea sistemului rutier.km282B4BFORAREA
PILOTILOR DE DIAMETRU MARE - F=1500MMSe pltete la metru liniar (m)
de forajIn pre se includ: amenajarea suplimentar a platformei
pentru poziionarea instalaiei de forat; amenajrile necesare
execuiei forajului; deplasarea instalaiei de forare de la un pilot
la altul i de la o fundaie la alta; forarea pilotului de la nivelul
platformei pn la vrful pilotului; transportul materialului rezultat
din forare; mprtierea materialului n depozitul de antier;
desfacerea i evacuarea amenajrilor necesitate de foraj; verificarea
cotei de fundare i natura terenului de fundare.Prin proiect i
Caietul de antier se vor preciza: diametrul i lungimea pilotului;
tehnologia de forare i categoria de teren.m292B8AARMATURA OB37 IN
FUNDATII (RADIERE)Se pltete la ton (t)In pre se includ: procurarea
oelului beton; confecionarea de bare sau carcase; transportul
armturilor; manipulrile oelului beton, barelor i carcaselor;
montarea barelor sau carcaselor precum i nndirea acestora prin
sudur sau prin petrecere; verificarea poziiei conform
proiectului.t302B8BARMATURA PC52 IN FUNDATII (RADIERE)Se pltete la
ton (t)In pre se includ: procurarea oelului beton; confecionarea de
bare sau carcase; transportul armturilor; manipulrile oelului
beton, barelor i carcaselor; montarea barelor sau carcaselor precum
i nndirea acestora prin sudur sau prin petrecere; verificarea
poziiei conform proiectului.t312B9AARMATURA OB37 IN PILOTI FORATI
DE DIAMETRU MARESe pltete la ton (t)In pre se includ: procurarea
oelului beton; procurarea evilor pentru control i injectare;
procurarea tablei pentru toba de injecie; confecionarea
tronsoanelor de carcas cu evile i toba de injectare; transportul
materialelor; manipulrile barelor de armtur i a carcaselor;
montajul carcasei de armtur; mbinrile ntre tronsoanele carcasei;
susinerea carcasei n timpul mbinrilor dintre tronsoane i n final n
timpul betonrii; verificarea dimensiunilor carcasei i a poziiei
acesteia n gaura de foraj.t322C10DBETON TURNAT MONOLIT IN
SUPRASTRUCTURA CLASA C25/30Se pltete la metru cub (m3)In pre se
includ: procurarea agregatelor necesare preparrii betonului;
procurarea cimentului; procurarea adaosurilor; prepararea betonului
conform prescripiilor din Caietul de sarcini; transportul betonului
de la staia de preparare la antier i manipulri; punerea n oper a
betonului.Prin proiect i Caietul de sarcini se vor preciza clasa
betonului i sorturile agregatelor, calitatea cimentului, adaosurile
etc.m3332C11HIDROIZOLATIESe pltete la metru ptrat (m2)In pre se
includ: procurarea materialelor necesare hidroizolrii; prepararea;
transportul i manipulrile materialelor; execuia hidroizolaiei;
execuia proteciei hidroizolaiei; nchiderea marginilor hidroizolaiei
cu materiale elastice.Prin proiect i Caietul de sarcini se
precizeaz dimensiunile, alctuirea i calitatea materialelor care
trebuie respectate la execuia hidroizolaiei.m2342C12CALEA PE PODSe
pltete la metru ptrat (m2) de suprafa ntre borduriIn pre se includ:
procurarea materialelor necesare execuiei cii pe pod; prepararea;
transportul i manipulrile; execuia cii. nchiderea caii cu materiale
elastice.Prin proiect i Caietul de sarcini se precizeaz alctuirea
cii.m2352C13ATROTUAR PE SUPRASTRUCTURA, LATIME T=1,00MSe pltete la
metru liniar (m) de trotuarIn pre se includ: procurarea i
transportul materialelor necesare realizrii umpluturii la trotuare,
inclusiv bordurile prefabricate; manipulrile materialelor;
prepararea betonului, transportul i aternerea betonului de
umplutur, montarea tuburilor pentru golurile necesare cablurilor de
telecomunicaii; montarea bordurilor; aternerea asfaltului turnat pe
trotuare; realizarea cordoanelor de mastic la marginea
asfaltului.Preul include i bordura nalt sau bordura obinuit aa cum
este prevzut n proiect.m362C15CDISPOZITIVE DE ACOPERIRE A
ROSTURILOR DE DILATATIE DE 50 MMSe pltete la metru liniar (m) de
rostIn pre se includ: procurarea rostului de dilataie sau a
materialelor cu care se execut rostul; transportul materialelor;
manipulrile elementelor de rost; montajul dispozitivului de
acoperire a rostului; verificarea poziionrii rostului conform
proiectului.Prin proiect sau Caietul de sarcini se va preciza tipul
rostului de dilataie.m372C16APARAPET METALIC PIETONAL DIN TEAVA
RECTANGULARA PE SUPRASTRUCTURASe pltete la metru liniar (m) de
parapetIn pre se includ: procurare parapet si vopsea; transportul i
manipulrile panourilor de parapet si a vopselei; asamblarea i
montarea panourilor de parapet; vopsirea parapetului; verificarea
execuiei conform proiectului.Prin proiect i Caietul de sarcini se
vor specifica caracteristicile, alctuirea i materialele pentru
executarea parapetului.m382C16BPARAPET METALIC DIRECTIONAL PE
SUPRASTRUCTURASe pltete la metru liniar (m) de parapetIn pre se
includ: procurarea parapetului; transportul i manipulrile
panourilor de parapet; asamblarea i montarea panourilor de parapet;
verificarea execuiei conform proiectului.Prin proiect i Caietul de
sarcini se vor specifica caracteristicile, alctuirea i materialele
pentru executarea parapetului.m392C16DPARAPET METALIC DIRECTIONAL
TIP FOARTE GREU PE SUPRASTRUCTURASe pltete la metru liniar (m) de
parapetIn pre se includ: procurarea parapetului; transportul i
manipulrile panourilor de parapet; asamblarea i montarea panourilor
de parapet; verificarea execuiei conform proiectului.Prin proiect i
Caietul de sarcini se vor specifica caracteristicile, alctuirea i
materialele pentru executarea parapetului.m402C1A12GRINZI PREF.
PREC. CU ARMATURA ADERENTA L=21,00M H=0,93MSe pltete la bucat
(buc)In pre se includ: procurarea grinzilor prefabricate
precomprimate; transportul grinzilor prefabricate precomprimate;
manipularea grinzilor prefabricate precomprimate; depozitarea pe
platform a grinzilor prefabricate precomprimate; riparea grinzilor
pe platform i pe infrastructur; lansarea grinzilor n lungul cii;
montarea grinzilor; asigurarea stabilitii grinzilor pe platform, n
timpul i dup montaj; aezarea pe aparatele de
reazem.buc412C1A17GRINZI PREF. PREC. CU ARMATURA ADERENTA L=24,00M
H=1,00MSe pltete la bucat (buc)In pre se includ: procurarea
grinzilor prefabricate precomprimate; transportul grinzilor
prefabricate precomprimate; manipularea grinzilor prefabricate
precomprimate; depozitarea pe platform a grinzilor prefabricate
precomprimate; riparea grinzilor pe platform i pe infrastructur;
lansarea grinzilor n lungul cii; montarea grinzilor; asigurarea
stabilitii grinzilor pe platform, n timpul i dup montaj; aezarea pe
aparatele de reazem.buc422C1B1GRINZI PREF. TRONSONATE
POSTCOMPRIMATE L=30,00M H=1,03MSe pltete la bucat (buc)In pre se
includ: procurarea, transportul, manipulrile, amenajarea platformei
pentru rezemarea tronsoanelor; aezarea tronsoanelor pe platform i
asamblarea acestora; riparea tronsoanelor i a grinzilor asamblate;
lansarea grinzilor; montarea grinzilor; asigurarea stabilitii
grinzilor pe platform la montaj i dup montare; aezarea pe aparatele
de reazem.Nu se includ armturile postntinse i ancorajele
aferente.buc432C1B1AGRINZI PREF. TRONSONATE POSTCOMPRIMATE L=27,00M
H=1,03MSe pltete la bucat (buc)In pre se includ: procurarea,
transportul, manipulrile, amenajarea platformei pentru rezemarea
tronsoanelor; aezarea tronsoanelor pe platform i asamblarea
acestora; riparea tronsoanelor i a grinzilor asamblate; lansarea
grinzilor; montarea grinzilor; asigurarea stabilitii grinzilor pe
platform la montaj i dup montare; aezarea pe aparatele de reazem.Nu
se includ armturile postntinse i ancorajele
aferente.buc442C1B2GRINZI PREF. TRONSONATE POSTCOMPRIMATE L=24,00M
H=1,60MSe pltete la bucat (buc)In pre se includ: procurarea,
transportul, manipulrile, amenajarea platformei pentru rezemarea
tronsoanelor; aezarea tronsoanelor pe platform i asamblarea
acestora; riparea tronsoanelor i a grinzilor asamblate; lansarea
grinzilor; montarea grinzilor; asigurarea stabilitii grinzilor pe
platform la montaj i dup montare; aezarea pe aparatele de reazem.Nu
se includ armturile postntinse i ancorajele
aferente.buc452C1B3GRINZI PREF. TRONSONATE POSTCOMPRIMATE L=27,00M
H=1,60MSe pltete la bucat (buc)In pre se includ: procurarea,
transportul, manipulrile, amenajarea platformei pentru rezemarea
tronsoanelor; aezarea tronsoanelor pe platform i asamblarea
acestora; riparea tronsoanelor i a grinzilor asamblate; lansarea
grinzilor; montarea grinzilor; asigurarea stabilitii grinzilor pe
platform la montaj i dup montare; aezarea pe aparatele de reazem.Nu
se include armturile postntinse i ancorajele
aferente.buc462C1B4GRINZI PREF. TRONSONATE POSTCOMPRIMATE L=30,00M
H=1,80MSe pltete la bucat (buc)In pre se includ: procurarea,
transportul, manipulrile, amenajarea platformei pentru rezemarea
tronsoanelor; aezarea tronsoanelor pe platform i asamblarea
acestora; riparea tronsoanelor i a grinzilor asamblate; lansarea
grinzilor; montarea grinzilor; asigurarea stabilitii grinzilor pe
platform la montaj i dup montare; aezarea pe aparatele de reazem.Nu
se includ armturile postntinse i ancorajele
aferente.buc472C26A1BORDURI 20X25CMSe pltete la metru liniar (m) de
bordurIn pre se include: procurarea bordurilor i a mortarului de
poz; transportul i manipularea bordurilor i a mortarului de poz;
aezarea bordurilor n poziiile i la cotele prevzute n proiect n
conformitate cu prevederile din Caietul de sarcini.m482C26A2BORDURI
25X30CMSe pltete la metru liniar (m) de bordurIn pre se include:
procurarea bordurilor i a mortarului de poz; transportul i
manipularea bordurilor i a mortarului de poz; aezarea bordurilor n
poziiile i la cotele prevzute n proiect n conformitate cu
prevederile din Caietul de sarcini.m492C26B1BORDURI INALTE
CURENTESe pltete la metru liniar (m) de bordur executatIn pre se
includ: aprovizionarea cu agregate i borduri prefabricate din
beton; transportul la locul de punere n oper; realizarea efectiv a
lucrrii.Realizarea lucrrii const din: prepararea mortarului de
ciment; executarea stratului de mortar de min. 2cm ; aezarea
bordurilor; rostuirea lor cu mortar de ciment.m502C26B2BORDURI
INALTE DE CAPATSe pltete la metru liniar (m) de bordur executatIn
pre se includ: aprovizionarea cu agregate i borduri prefabricate
din beton; transportul la locul de punere n oper; realizarea
efectiv a lucrrii.Realizarea lucrrii const din: prepararea
mortarului de ciment; executarea stratului de mortar de min. 2cm ;
aezarea bordurilor; rostuirea lor cu mortar de
ciment.m512C26CPREFABRICAT DE B.A. PENTRU PARAPET DE SIGURANTASe
pltete la bucata (buc) masurata pe santier In pret se include:-
aprovizionarea cu agregate si ciment;- fabricarea sau
aprovizionarea cu prefabricate, inclusiv transporturile aferente;-
trasarea pentru montarea prefabricatelor cu parapet de siguranta
aliniat;- preparare amestec de mortar cu ciment;- plasarea
prefabricatelor pe mortar de poza si imbinarea lor cu mortar de
ciment;- curatarea locului de muncaTotul in conformitate cu
alinierea si cotele din proiect sau stabilite de inginer
consultant.buc522C6FASCICULE DIN CABLE SBP ISe pltete la metru
liniar (m) de cabluSe vor evalua preuri separate, difereniate dup
alctuirea cablelor.In pre se includ: procurarea cablelor SBPI;
transportul cablelor pn la antier; manipularea cablelor; montajul
cablelor la poziiile din proiect; tensionarea i injectarea cu
mortar de cimentPrin proiect se va specifica alctuirea
cablelor.m532C7AANCORAJE ACTIVE PENTRU FASCICULE DIN SBP ISe pltete
la bucat (buc)In pre se includ: procurarea ancorajelor; transportul
ancorajelor; manipulrile ancorajelor; montajul i acoperirea cu
beton a ancorajului.buc542C7BANCORAJE PASIVE PENTRU FASCICULE DIN
SBP ISe pltete la bucat (buc)In pre se includ: procurarea
ancorajelor; transportul ancorajelor; manipulrile ancorajelor;
montajul i acoperirea cu beton a ancorajului.buc552C8ACOFRAJE PLANE
PENTRU SUPRASTRUCTURA - OBISNUITESe pltete la metru ptrat (m2)Se
vor evalua preuri separate, difereniate dup tipul de cofraj
(obinuit, de fa vzut etc.)In pre se includ: procurarea materialelor
necesare realizrii cofrajelor; confecionarea cofrajelor; procurarea
schelelor i eafodajelor; montarea i demontarea cofrajelor, a
schelelor i eafodajelor; transportul i manipulrile cofrajelor,
schelelor i eafodajelor; verificarea dimensiunilor elementelor
cofrate. Prin proiect sau Caietul de sarcini speciale se va
specifica calitatea fetei vazute a elementelor.m2562C9AARMATURA
OB37 IN SUPRASTRUCTURASe pltete la ton (t)In pre se includ:
procurarea oelului beton; confecionarea de bare sau carcase;
transportul i manipulrile oelului beton i barelor sau carcaselor
confecionate; mbinrile ntre bare; verificarea poziiei conform
proiectului.t572C9BARMATURA PC 52 IN SUPRASTRUCTURASe pltete la ton
(t)In pre se includ: procurarea oelului beton; confecionarea de
bare sau carcase; transportul i manipulrile oelului beton i barelor
sau carcaselor confecionate; mbinrile ntre bare; verificarea
poziiei conform proiectului.t
&LDESCRIERI DE PRET&CPage &P of 4&RS.C.LUCA WAY
S.R.L.
Corelare BP_DPCODDESCRIEREUMPRET/UM01232A1Drumuri tehnologiceSe
pltete la kilometru (km)In pre se includ: sparea stratului vegetal;
profilarea terasamentelor cu o nlime maxim de 1,00 m, compensnd
necesarul de umplutur prin transportul pmntului n lungul amprizei
drumului; nivelarea i finisarea platformei, execuia sistemului
rutier; verificarea profilului proiectat, desfacerea drumului
tehnologic i redarea terenului n circuitul agricol.Prin proiect i
Caietul de sarcini se vor preciza caracteristicile geometrice ale
drumului tehnologic i alctuirea sistemului
rutier.km2A1Technological roadsPaid per kilometre (km)The price
includes: - digging of the vegetal layer;- earthworks profiling
with a maximum hight of 1.00 m, compensating the necessary of
filling through the earth transport along the road territory; -
platform levelling and finishing, pavement execution;- checking of
the designed profile, demolition of the technological road and
restoring to the agricultural use.The Project and the Technical
Specifications will provide the geometrical characteristics of the
technological road and the pavement design.km2A1Drumuri
tehnologiceTechnological roadskmkm19,200.002A10Umplutur pentru
profilarea albieiSe pltete la metru cub (m3)In pre se includ:
trasarea profilului umpluturii; cota parte a batardoului pentru
scoaterea de sub nivelul apei i epuismente; sparea pmntului n
groapa de mprumut sau n depozitul intermediar; transportul
pmntului; mprtierea i compactarea la profil a materialului;
verificarea calitii materialului dup compactare;In Caietul de
sarcini se precizeaz tehnologia de compactare i caracteristicile
materialului compactat.m32A10Filling for the water bed
profilingPaid at cubic metre (m3)The price includes:- setting-out
of the filling profile;- quota of the cofferdam for dewatering and
pumping-out;- earth digging into the borrow pit or into the
intermediary storage;- earth transport;- scaterring and profile
compaction of the material;- checking of the material quality after
compaction;The Technical Specifications provide the compaction
technology and the characteristics of the compacted
material.m32A10Umplutura pentru profilarea albieiFilling for the
water bed profilingm3m33.402A11Finisarea suprafeelorSe pltete la
metru ptrat (m2)In pre se includ: ablonarea; nivelarea suprafeelor
nclinate prin sparea i umplerea denivelrilor pn la 10 cm;
compactarea; verificarea suprafeelor executate.m22A11Surfaces
finishingPaid per square metre (m2)The price includes:- gauging;-
quota of the cofferdam for dewatering and pumping-out;- levelling
of inclined surfaces by digging and filling the dislevelments up to
10 cm;- compaction;- checking of executed surfaces.m22A11Finisarea
suprafetelorSurfaces finishingm2m25.102A12Strat drenant din
balastSe pltete la metru ptrat (m2)In pre se includ: procurarea i
transportul materialelor; manipularea materialelor; execuia
stratului drenant.In proiect se precizeaz grosimea stratului
drenant.Prin Caietul de sarcini se precizeaz calitatea materialelor
i condiiile de punere n oper.m22A12Ballast drain layerPaid at
square metre (m2)The price includes:- materials procurement and
transport;- materials handling;- the part of costs for caison to
take out of the water;- ballast draining layer execution;The
thickness of drain layer will be stipulated in ProjectQuality of
materials and conditions of execution works will be stipulated in
Technical Specification.m22A12Strat drenant din balastBallast drain
layerm2m24.152A13Pereu cu grosimea de 15 cm, din piatr brutSe
pltete la metru ptrat (m2)In pre se includ: trasarea pereului;
procurarea materialelor; transportul i manipulrile; execuia
pereului; execuia grinzilor de ncastrare, din beton.Prin Caietul de
sarcini se precizeaz calitatea materialelor.m22A13Pitching with a
thickness of 15 cm of coarse stonePaid per square metre (m2)The
price includes:- pitching setting-out;- quota of the cofferdam for
dewatering and pumping-out;- materials supply;- transport and
handling;- execution of the pitching;- execution of embedding beams
of concrete.The Technical Specifications provide the materials
quality.m22A13Pereu cu grosimea de 15cm, din piatra brutaPitching
with a thickness of 15cm of coarse stonem2m224.302A13APereu cu
grosimea de 20 cm, din piatr brutSe pltete la metru ptrat (m2)In
pre se includ: trasarea pereului; cota parte a batardoului pentru
scoaterea de sub nivelul apei i epuismentele; procurarea
materialelor; transportul i manipulrile; execuia pereului; execuia
grinzilor de ncastrare, din beton.Prin Caietul de sarcini se
precizeaz calitatea materialelor.m22A13APitching with a thickness
of 20cm of coarse stonePaid per square metre (m2)The price
includes:- pitching setting-out;- quota of the cofferdam for
dewatering and pumping-out;- materials supply;- transport and
handling;- execution of the pitching;- execution of embedding beams
of concrete.The Technical Specifications provide the materials
quality.m22A13APereu cu grosimea de 20cm, din piatra brutaPitching
with a thickness of 20cm of coarse stonem2m224.302A13CPereu cu
grosimea de 30 cm, din piatr brutSe pltete la metru ptrat (m2)In
pre se includ: trasarea pereului; cota parte a batardoului pentru
scoaterea de sub nivelul apei i epuismentele; procurarea
materialelor; transportul i manipulrile; execuia pereului; execuia
grinzilor de ncastrare, din beton.Prin Caietul de sarcini se
precizeaz calitatea materialelor.m22A13CPitching with a thickness
of 30 cm of coarse stonePaid per square metre (m2)The price
includes:- pitching setting-out;- quota of the cofferdam for
dewatering and pumping-out;- materials supply;- transport and
handling;- execution of the pitching;- execution of embedding beams
of concrete.The Technical Specifications provide the materials
quality.m22A13CPereu cu grosimea de 30cm, din piatra brutaPitching
with a thickness of 30 cm of coarse stonem2m224.302A13DPereu cu
grosimea de 20cm, din betonSe pltete la metru ptrat (m2)In pre se
includ: trasarea , saparea , indepartarea si transportul pamantului
intr-un depozit;- procurarea nisipului si betonului si transportul
lor la locul de punere in opera;- asternerea nisipului la sablon si
pilonarea acestuia;- turnarea betonului cu realizarea rosturilor
dintre dale;- protejarea betonului turnat si colmatarea rosturilor
cu bitum filerizat.m22A13DPitching with a thickness of 20cm of
concretePaid at square metre (m2)The price includes: assignement,
digging and transport the earth in the store ; supply and transport
the sand ans concrete on the work side; handling the materials;
leveling and compaction the sand ; casting the concrete and the
execution the joints between the prefabricated concrete; protection
the concrete and execution the joints;m22A13DPereu cu grosimea de
20cm, din betonPitching with a thickness of 20cm of
concretem2m227.322A14Reparaii pereu la sferturile de conSe pltete
la metru ptrat (m2)In pre se includ: transportul i manipulrile
materialelor; buciardarea betonului degradat; curarea zonei
degradate prin suflare cu aer com2rimat; ncrcarea, transportul i
m2rstierea n depozit a materialului rezultat din demolare;
procurarea i prepararea mortarului special conform instruciunilor
productorului; aplicarea mortarului special pentru refacerea
elementului din beton la dimensiunile iniiale; finisarea
suprafeelor;Prin Caietul de sarcini se precizeaz calitatea
materialelor.m22A14Pitching repairing at cone-quartersPaid per
square metre (m2)The price includes:- transport and handling the
materials;- bush hammering of bad concrete;- cleaning the joints by
air compressed;- loading, transport ant deposit the results of
materials;- supplying and prepairing the special mortar;- applying
the special mortar for repairing the elements in conformity with
the dimension;- surface finishing.The Technical Specifications
provide the materials quality.m22A14Reparaii pereu la sferturi de
conPitching repairing at cone-quartersm2m211.422A14ARefacere pereu
degradatSe pltete la metru ptrat (m2)In pre se includ: transportul
i manipulrile materialelor; desfacerea pereului pe zonele degradate
inclusiv sortarea materialelor; curarea zonei degradate prin
suflare cu aer com2rimat; ncrcarea, transportul i m2rstierea n
depozit a materialului rezultat din demolare; procurarea sau
prepararea mortarului de ciment si a pietrei brute conform proiect;
refacerea pereului degradat (refacerea substratului de nisip si
aezarea pietrei brute la cot); rostuira pereului cu mortar de
ciment; finisarea suprafeelor;Prin Caietul de sarcini se precizeaz
calitatea materialelor.m22A14AImprovement of degraded stone
facingPaid per cubic metre (m3)The price includes:- transport and
materials handling;- demolation of stone facing including to sort
it;- cleaning degraded area with compressed air;- loading,
transport, and leveling in storage materials from demolation;-
supply and prepearing the cement plaster and the stone according
with execution project- improvement of degraded stone facing
(improvement the sand layer and execution of stone facing to the
level)- jointing stone facing with cement plaster surfaces
finishingThe quality of materials will be stipulated in Technical
Specification.m22A14ARefacere pereu degradatImpruvement of degraded
pitchingm2m27.102A15Reparaii rosturi pereu la sferturile de conSe
pltete la metru liniar de rost (m)In pre se includ: transportul i
manipulrile materialelor; ndeprtarea depunerilor din rosturi;
curarea rosturilor prin suflare cu aer com2rimat; ncrcarea,
transportul i m2rstierea n depozit a materialului rezultat din
curire; procurarea i prepararea bitumului; aplicarea bitumului
pentru colmatarea rostului;Prin Caietul de sarcini se precizeaz
calitatea materialelor.m2A15Pitching joints repairing for the cone
quarters Paid per linear metre (m)The price includes:- transport
and handling the materials;- taking out the rest of materials in
the joints;- cleaning the joints by air compressed;- loading,
transport ant deposit the results of materials;- supplying and
prepairing the bitumen;- applying the bitumen in to the joints;The
Technical Specifications provide the materials
quality.m2A15Reparatii rosturi pereu la sferturi de conPitching
joints repairing for the cone quartersmm1.092A15ARostuire zidarie
uscataSe pltete la metru patrat (m2)In pre se includ: transportul i
manipulrile materialelor; ndeprtarea depunerilor din rosturi;
curarea rosturilor prin suflare cu aer com2rimat; ncrcarea,
transportul i m2rstierea n depozit a materialului rezultat din
curire; procurarea sau prepararea mortarului pentru rostuire;
rostuirea propriu-zisa; verificarea suprafetei rostuite;Prin
Caietul de sarcini se precizeaz calitatea
materialelor.m22A15Am22A15ARostuire zidarie
uscatam2m23.922A16Montare dispozitive reflectorizate la parapetii
directionali pe pod si rampeSe pltete la bucata (buc)In pre se
includ: procurarea materialelor; transportul i manipulrile
materialelor; desfacerea piulitelor si suruburilor parapetului
pentru prinderea dispozitivelor reflectorizante; prinderea
dispozitivelor reflectorizante i refacerea prinderii;Prin Caietul
de sarcini se precizeaz calitatea
materialelor.buc2A16buc2A16Montare dispozitive reflectorizante la
parapetibuc.pcs.2A17Mana curenta la scarile de pe taluzSe pltete la
metru liniar (m)In pre se includ: procurarea materialelor necesare
executiei parapetului; transportul i manipularea materialelor;
execuia fundatiei parapetului; execuia si vopsirea parapetului.Prin
proiect i Caietul de sarcini se precizeaz elementele geometrice i
alctuirea parapetului.m2A17m2A17Mana curenta la scarile de pe
taluzmm9.272A18Amenajari la podee in trepte amonte i avalSe pltete
la metru cub (m3)In pre se includ:- trasarea spturii;- procurarea
materialelor, inclusiv manipularile si transportul la locul de
punere in opera;- executia sapaturii, transportul pamantului in
afara zonei de lucru si im2rastierea acestuia;- confectionarea si
montarea cofrajelor;- transportul materialelor;- procurarea sau
prepararea betonului, transportul pana la locul de punere in
opera;Prin detaliile de executie si Caietul de sarcini se precizeaz
cota de fundare i natura terenului de fundare, clasa
betonului.m32A18Arrangements at culverts with steps upstream and
downstreamPaid per cubic metre (m3)The price includes:- drawing of
digging;- supplay materials, handle and transport at working
place;- digging, soil transport and leseling it in storage;-
execution and mounting shuttering;- material transportation;-
supplay and concrete prepearing, transport to the working place;The
level of foundation, the ground foundation and the concrete class
will be according technical specification.m32A18Amenajari la podete
in trepte amonte si avalArrangements at culverts with steps
upstream and downstreamm3m3116.352A19Obtinerea terenului
(exproprieri)Se pltete la hectar (ha)In pre se includ:- cheltuieli
efetuate pentru cum2rarea de terenuri;- plata concesiunii pe durata
realizarii lucrrilor;- exproprieri;- despgubiri;- schimbarea
regimului juridic al terenului;- scoaterea tem2orar sau definitiv
din circuitul agricol;- alte cheltuieli de acceai natur.ha2A19Land
acquisition (expropriations)Paid per expropiate hectare (ha) The
price includes:- expences for acquisition the land expropiate;-
payment for concession during the execution work expropriates;-
damages;- changing of juridical conditions;- taking out temporary
of definitive from agriculture use;- other expences in condition
with land expropiate.ha2A19Obtinerea terenului (exproprieri)Land
acquisition (expropriations)haha70,000.002A1AVarianta provizorie de
circulatieSe pltete la kilometru (km)In pre se includ: sparea
stratului vegetal; profilarea terasamentelor cu o nlime maxim de
1,00 m, com2ensnd necesarul de um2lutur prin transportul pmntului n
lungul am2rizei drumului; nivelarea i finisarea platformei, execuia
sistemului rutier; verificarea profilului proiectat, desfacerea
variantei provizorii de circualtie i redarea terenului n circuitul
agricol.Prin proiect i Caietul de sarcini se vor preciza
caracteristicile geometrice ale variantei provizorii de circulatie
i alctuirea sistemului rutier.km2A1AProvisional traffic variantPaid
per kilometre (km)The price includes:- digging of the vegetal
soil;- earthworks profiling with a maximum hight of 1,0 m
compensating the necessary of filling through the earth transport
along the road territoty;-platform leveling and finishing;-
pavement execution;- checking of the designed profile, demolition
of the technological road and restorningto the agricultural use;-
The Project and the Technical Specifications will be provide the
geometrical characteristics of the temporary road and the pavement
design.km2A1AVarianta provizorie de circulatieProvisional traffic
variantkmkm400,000.002A2Umpluturi la platformeSe pltete la metru
cub (m3) de umplutur, msurat dup commactareIn pre se includ:
decopertarea stratului vegetal i compactarea amprizei umpluturii;
sptura n groapa de mprumut; transportul materialului rezultat din
sptur; mprtierea i compactarea pmntului n umplutur; finisarea
platformei i verificarea cotelor proiectate, precum i desfacerea
platformei; transportul materialului rezultat n depozit i redarea
terenului n circuitul agricol la terminarea lucrrilor.Prin proiect
i Caietul de sarcini se vor preciza tehnologia de compactare i
caracteristicile materialului compactat.m32A2Platform fillingsPaid
per cubic metre (m3) of filling, measured after compactionThe price
includes:- removal of the vegetal layer and compaction of the
filling territory;- digging in the borrow pit;- transport of the
material resulted from the digging;- earth scattering and
compaction into the filling;- platform finishing and checking of
the designed quotas, as well as platform demolition;- transport of
the material resulted in the deposit and land restoring to the
agricultural use upon works completion.The Project and Technical
Specifications will provide the compaction technology and the
characteristics of the compacted material.m32A2Umpluturi la
platformePlatform fillingm3m33.602A20Amenajarea terenuluiSe pltete
la metru ptrt (m2)In pre se includ:- cheltuieli efetuate la
inceperea lucrrilor pentru pregtirea am2lasamentului;- demolri;-
defrisri;- evacuri materiale rezultate din devieri retele utiliti
din am2lsament, sistematizri pe vertical, drenajeepuismente
(exclusiv cele aferente realizrii pentru investitia de baz) -
devieri de cursuri de ap;- stramutri de localitai sau de monumente
istorice.m22A20Land arrangementPaid per square metre (m2)The price
includes: - demolations;- cutting trees;- materials evacuate
results from replacement and protection the utilities,
drainage,landscaping;- deviate of river way;- displacement of
localities of history monuments.m22A20Amenajarea terenuluiLand
arrangementm2m22.002A3Sistemul rutier la platformeSe pltete la
metru ptrat (m2)In pre se includ: procurarea materialelor;
transportul materialelor; manipularea materialelor; realizarea
sistemului rutier; desfacerea i transportul materialelor rezultate,
dup terminarea lucrrilor.Prin proiect i Caietul de sarcini se
precizeaz alctuirea sistemului rutier.m22A3Platform pavementPaid
per square metre (m2)The price includes:- materials supply;-
materials transport;- materials handling;- pavement carrying out; -
removal and transport of resulted materials, upon works
completion.The Project and Technical Specifications provide the
pavement design.m22A3Sistemul rutier la platformePlatform
pavementm2m23.732A4Umpluturi la sferturi de conSe pltete la metru
cub (m3)In pre se includ: sptur n groapa de mprumut sau n depozit
intermediar; transportul materialului rezultat din sptur; mprtierea
materialului n sferturi de con n straturi de 10 cm; compactarea
pmntului cu maiul mecanic; finisarea i verificarea suprafeelor
realizate n conformitate cu prevederile din desene i specificaii
tehnice; verificarea calitii umpluturii dup compactare.Prin proiect
i Caietul de sarcini se vor preciza tehnologia de compactare i
caracteristicile materialului compactat.m32A4Fillings at cone
quarters Paid per cubic metre (m3)The price includes:- digging in
the borrow pit or in an intermediary storage;- transport of the
material resulted from the digging;- materials scaterring into cone
quarters in layers of 10 cm;- earth compaction with the mechanic
rammer;- finishing and checking of the surfaces caried out in
conformity with the provisions from the Drawings and the Technical
Specifications;- checking of the filling quality after
compaction.The project and Technical Specifications will provide
the compaction technology and the characteristics of the compacted
material. Filling around the foundation, with the earth resulted
after digging and its compaction till a min 95%ProctorThe price
includes digging in borrow pit or intermediary storage, transport,
scattering and compaction of the earth, finishing and verification
areas according to the Technical Specifications.m32A4Umpluturi la
sferturi de conFillings at cone quartersm3m34.932A5Pereu la
sferturile de conSe pltete la metru ptrat (m2)In pre se includ:
trasarea i sptura pentru fundaia sfertului de con; transportul i
mprtierea materialului rezultat din sptur; procurarea materialelor
pentru pereu; transportul i manipularea materialelor; cofrarea i
betonarea fundaiei sfertului de con; execuia pereului, inclusiv a
substratelor.Prin proiect i Caietul de sarcini se precizeaz
dimensiunile fundaiei, clasa betonului din fundaie i alctuirea
pereului.m22A5Pitching at the cone quartersPaid per square metre
(m2)The price includes:- setting out and digging for the cone
quarters foundation;- transport and scaterring of the material
resulted from the digging;- materials supply for the pitching;-
materials transport and handling;- forming and concreting of the
cone quarters foundation;- execution of the pitching, including the
sub-layers.The Project and the Technical Specifications provide the
dimensions of the foundation, the class of the foundation concrete
and the pitching structure.m22A5Pereu la sferturi de conPitching at
the cone quartersm2m224.192A6Scri pe taluz, inclusiv mana curentaSe
pltete la metru liniar (m) de scar msurat pe taluzIn pre se includ:
sptura necesar pe taluz pentru montarea scrilor; procurarea
materialelor; transportul i manipularea materialelor; execuia
fundaiei scrii la piciorul taluzului; execuia treptelor; execuia
parapetului.Prin proiect i Caietul de sarcini se precizeaz
elementele geometrice i alctuirea treptelor i
parapetului.m2A6Stairs on the slope, including handrail Paid per
linear metre (lm) of stair measured on the slope- necessary digging
on the slope for stairs mounting;- materials supply;- materials
transport and handling;- execution of the stair foundation at the
slope foot;- steps execution;- guardrail execution.The Project and
the Technical Specifications provide the geometric elements and the
structure of the steps and the guardrail.m2A6Scari pe taluz,
inclusiv mana curentaStairs on slopes, including
hand-railmm128.602A7Casiuri pe taluzSe pltete la metru liniar (m)
de casiu msurat pe taluzIn pre se includ: sptura pe taluz necesar
executrii casiului; procurarea materialelor necesare realizrii
casiului; transportul i manipularea materialelor; execuia fundaiei
la piciorul taluzului pentru realizarea camerei de colectare a
apelor; execuia casiului i a racordrii acestuia la platforma
drumului i la sistemul de colectare a apelor de la piciorul
taluzului.Prin proiect i Caietul de sarcini se precizeaz elementele
geometrice i alctuirea casiului.m2A7Side ditches on the slope Paid
per linear metre (m) of side-ditch measured on the slopeThe price
includes:- digging in the slope necessary to the side-ditch
execution;- supply of the materials necessary to the execution of
the side-ditch;- materials transport and handling;- execution of
the foundation at the slope foot for the execution of the waters
cllection chamber;- execution of the side-ditch and of its
connection to the road platform and to the waters collection system
at the slope foot.The Project and the Technical Specifications
provide the geometrical elements and the side-dich
structure.m2A7Casiuri pe taluzSide ditches on
slopemm29.402A8Demolare sfert de conSe pltete la metru cub (m3)In
pre se includ: demolarea pereului din beton sau piatr brut al
sfertului de con existent; sptura pentru desfacerea umpluturii
sfertului de con; ncrcarea materialului rezultat din demolarea
sfertului de con i din sptura pentru desfacerea umpluturii
sfertului de con; transportul materialului rezultat din sptur i
demolare; descrcarea i mprtierea n depozit a materialului
rezultat.m32A8Cone-quarter demolitionPaide per cubic metre (m3)The
price includes:- demolition of the ptiching of concrete or crushed
stone of the existing cone quarter;- digging for the removal of the
cone quarter filling;- loading of the material resulted from the
demolition of the cone quarter and from the digging for the removal
of the cone quarter;- transport of the material resulted from the
digging and the demoliton;- unloading an scaterring into the
storage of the resulted material.m32A8Demolare sfert de
conCone-quarter demolitionm3m32.352A9Sptur pentru profilarea albiei
amonte si avalSe pltete la metru cub (m3)In pre se includ: trasarea
profilului spturii; sparea pmntului n exces; evacuarea n depozit a
materialului necorespunztor pentru umpluturi; transportul,
mprtierea la profil i compactarea materialului n umpluturi;
verificarea calitii materialului dup compactare;In Caietul de
sarcini se precizeaz tehnologia de compactare i caracteristicile
materialului compactat.m32A9Digging for the water bed profiling
upstream and downstreamPaid per cubic metre (m3)The price
includes:- setting-out of the foundation;- digging of the exceeding
earth; - evacuation into the storage of the material inappropriate
for fillings;- transport, profile scaterring and compaction of the
material into fillings;- checking of the material quality after
compaction;The Technical Specifications provide the compaction
technology and the characteristics of the compacted
material.m32A9Sapatura pentru profilarea albiei amonte si
avalDigging for bed of river forming upstream and
downstreamm3m32.702B1Sptura cu adncimea mai mic de 4,00 mSe pltete
la metru cub (m3)In pre se includ: sptura n groapa de fundaie;
evacuarea, transportul i m2rtierea n depozit a pmntului rezultat
din sptur; procurarea, transportul i manipularea materialelor
necesare sprijinirilor pereilor gropilor de fundaie; execuia
sprijinirilor; epuizarea apelor; recuperarea materialelor de
sprijinire dup execuia lucrrilor; curirea i transportul
materialelor recuperate n depozitul de antier; verificarea cotei de
fundare i a naturii terenului de fundare.m32B1Digging up to a depth
of 4 mPaid per cubic metre (m3)Includes:- marking of the
foundation;- excavation in the foundation ditch;- earth evacuation,
transport and spreading in deposit;- water pumping out;-
procurement, transport and handling of the shoring materials;-
shoring execution;- shoring materials recovery after works period;-
construction and demolition of the temporary roads and work
platforms;- restoring to the original condition of the site area
after the end work.m32B1Sapatura cu adancimea 4,00mDigging with a
depth of 4.00 m and morem3m310.902B20ADemontarea parapetului
metalic existent avnd greutatea de 25 kg/mSe pltete la metru liniar
(m) de parapet metalic de pe culei i suprastructurIn pre se includ:
desfacerea uruburilor de prindere a stlpilor; tierea cu flacra
oxiacetilenic a pieselor metalice; separarea n piese sau n grupuri
de piese; ncrcarea n mijloace de transport i transportul n depozit;
descrcarea; sortarea pe dimensiuni i depozitarea pe
sorturi.m2B20ADismantling of the existing metallic guardrail with a
weight of 25kg/m Paid per linear metre (m) of metallic guardrail on
the abutments and superstructureThe price includes: removal of the
poles connection screws; cutting with the oxyacetiyene flame of the
metallic pieces; separation in pieces or in groups of pieces;
loading in means of transport and transport to the storage yard;
unloading; sorting on dimensions and depositing on
grades.m2B20ADemontarea parapetului metalic existent g=25
kg/mDismantling of the existing metallic guardrail with a weight of
25kg/mmm4.702B20BDemontarea parapetului metalic existent avnd
greutatea de 20 kg/mSe pltete la metru liniar (m) de parapet
metalic de pe culei i suprastructurIn pre se includ: desfacerea
uruburilor de prindere a stlpilor; tierea cu flacra oxiacetilenic a
pieselor metalice; separarea n piese sau n grupuri de piese;
ncrcarea n mijloace de transport i transportul n depozit;
descrcarea; sortarea pe dimensiuni i depozitarea pe
sorturi.m2B20BDismantling of the existing metallic guardrail with a
weight of 20kg/m Paid per linear metre (m) of metallic guardrail on
the abutments and superstructureThe price includes: removal of the
poles connection screws; cutting with the oxyacetiyene flame of the
metallic pieces; separation in pieces or in groups of pieces;
loading in means of transport and transport to the storage yard;
unloading; sorting on dimensions and depositing on
grades.m2B20BDemontarea parapetului metalic existent g=20
kg/mDismantling of the existing metallic guardrail with a weight of
20 kg/mmm1.872B20CDemontarea parapetului metalic avnd greutatea de
30 kg/mlSe pltete la metru liniar (m) de parapet metalic de pe
culei i suprastructurIn pre se includ: desfacerea uruburilor de
prindere a stlpilor; tierea cu flacra oxiacetilenic a pieselor
metalice; separarea n piese sau n grupuri de piese; ncrcarea n
mijloace de transport i transportul n depozit; descrcarea; sortarea
pe dimensiuni i depozitarea pe sorturi.m2B20CDismantling of the
existing metallic guardrail with a weight of 30kg/m Paid per linear
metre (m) of metallic guardrail on the abutments and
superstructureThe price includes: removal of the poles connection
screws; cutting with the oxyacetiyene flame of the metallic pieces;
separation in pieces or in groups of pieces; loading in means of
transport and transport to the storage yard; unloading; sorting on
dimensions and depositing on grades.m2B20CDemontarea parapetului
metalic existent g=30 kg/mDismantling of the existing metallic
guardrail with a weight of 30kg/mmm4.712B21Hidroizolaii pe culei i
plcile de racordareSe pltete la metru ptrat (m2) de suprafa pe care
se aplic hidroizolaiaIn pre se includ: procurarea materialului
pentru hidroizolaie, inclusiv betonul de umplutur pe plcile de
racordare; procurarea stratului suport al hidroizolaiei din bitum
filerizat; transportul i depozitarea materialelor; manipulrile
necesare; amorsarea suprafeei; prepararea amestecului; aternerea n
unul sau dou straturi a hidroizolaiei aa cum este prevzut n
proiect.Prin proiect i Caietul de sarcini se precizeaz tipul
materialului.m22B21Waterproofing on the abutments and precast
trasition slabsPaid per square metre (m2) of surface on which it is
applied the waterproofing The price includes: supply of the
material for waterproofing, including the filling concrete on the
connection plates; supply of the hydroinsulation support layer of
filerized bitumen; transport and depositing of materials; necessary
handlings; surface priming; mix preparation; waterproofing placing
in one or two layers as provided in the project. The Project and
Technical Specifications provide the material
type.m22B21Hidroizolatii pe culei si placile de
racordareWaterproofing on the abutments and precast trasition
slabsm2m25.802B22Cale pe culeiSe pltete la metru ptrat (m2)In pre
se includ: procurarea materialelor i transportul lor; manipulrile
materialelor; prepararea i aternerea stratului de beton armat sau
din mortar asfaltic de protecie a hidroizolaiei; aternerea
stratului de asfalt i realizarea cordoanelor de mastic la marginea
asfaltului, aa cum este indicat n proiect.m22B22Carriageway on the
abutmentsPaide per square metre (m2)The price includes:- supply of
materials and transport;- handlings of materials;- preparation and
casting of the reinforced concrete of asphalt mortar layer for the
protection of the hydroinsulation;- casting of the asphalt layer
and carrying-out of of mastic cords at the asphalt edge, as
indicated in the Project.m22B22Cale pe culeiCarriageway on the
abutmentsm2m212.462B23ATrotuar pe culei, latime T=1.00 mSe pltete
la metru (m) de trotuarIn pre se includ: procurarea i transportul
materialelor necesare preparrii betonului, precum i a tuburilor din
PVC pentru cablurile Tc, inclusiv a bordurilor; manipularea
materialelor; prepararea betonului; transportul i aternerea
betonului de umplutur i montarea tuburilor din PVC pentru
realizarea golurilor necesare cablurilor Tc; montarea bordurilor;
aternerea asfaltului turnat pe trotuare i realizarea cordoanelor de
mastic la marginea asfaltului.m2B23AFootway on abutments with a
width of T = 1.00 mPaid per linear metre (m) of sidewalkThe price
includes:- supply and transport of the materials necessary to the
preparation of concrete and PVC pipes for the Tc cables, including
kerbs;- materials handling;- concrete preparation;- transport and
casting od the filling concrete and mounting of PVC pipes for the
carrying-out of holes necessary to the Tc cables;- mounting of
kerbs;- laying of the asphalt cast on sidewalks and carrying-out of
mastic cords at the asphalt edge.m2B23ATrotuar pe culei, latime
T=1,00mFootway on abutments with a width of T = 1.00
mmm42.402B23BTrotuare cu limea de T = 1,50 mSe pltete la metru (m)
de trotuarIn pre se includ: procurarea i transportul materialelor
necesare preparrii betonului, precum i a tuburilor din PVC pentru
cablurile Tc, inclusiv a bordurilor; manipularea materialelor;
prepararea betonului; transportul i aternerea betonului de umplutur
i montarea tuburilor din PVC pentru realizarea golurilor necesare
cablurilor Tc; montarea bordurilor; aternerea asfaltului turnat pe
trotuare i realizarea cordoanelor de mastic la marginea
asfaltului.m2B23BFootway on abutments with a width of T = 1.50
mPaid per metre (m) of sidewalkThe price includes:- supply and
transport of the materials necessary to the preparation of concrete
and PVC pipes for the Tc cables, including kerbs;- materials
handling;- concrete preparation;- transport and casting od the
filling concrete and mounting of PVC pipes for the carrying-out of
holes necessary to the Tc cables;- mounting of kerbs;- laying of
the asphalt cast on sidewalks and carrying-out of mastic cords at
the asphalt edge.m2B23BTrotuar pe culei, latime T=1,50mFootway on
abutments with a width of T = 1.50 mmm80.562B23CTrotuare cu limea
de T = 2,00 mSe pltete la metru (m) de trotuarIn pre se includ:
procurarea i transportul materialelor necesare preparrii betonului,
precum i a tuburilor din PVC pentru cablurile Tc, inclusiv a
bordurilor; manipularea materialelor; prepararea betonului;
transportul i aternerea betonului de umplutur i montarea tuburilor
din PVC pentru realizarea golurilor necesare cablurilor Tc;
montarea bordurilor; aternerea asfaltului turnat pe trotuare i
realizarea cordoanelor de mastic la marginea
asfaltului.m2B23Cm2B23CTrotuar pe culei, latime T=2,00mFootway on
abutments with a width of T = 2.00 mmm107.072B23DTrotuare cu limea
de T = 2,50 mSe pltete la metru liniar (m) de trotuarIn pre se
includ: procurarea i transportul materialelor necesare preparrii
betonului, precum i a tuburilor din PVC pentru cablurile Tc,
inclusiv a bordurilor; manipularea materialelor; prepararea
betonului; transportul i aternerea betonului de umplutur i montarea
tuburilor din PVC pentru realizarea golurilor necesare cablurilor
Tc; montarea bordurilor; aternerea asfaltului turnat pe trotuare i
realizarea cordoanelor de mastic la marginea
asfaltului.m2B23Dm2B23DTrotuar pe culei, latime T=2,50mFootway on
abutments with a width of T = 2.50 mmm2B24Torcretare
infrastructuriSe pltete la metru ptrat (m2)In pre se includ:
curirea suprafeelor de beton degradat, suflarea cu jet de ap i aer
comprimat; strngerea n grmezi a materialului decapat, ncrcarea n
mijloace auto; transportul i descrcarea n depozit a materialului
decapat; procurarea cofrajelor; eafodajele necesare realizrii
torcretului; transportul materialelor necesare realizrii
torcretrii, precum i a instalaiilor de torcretare; montarea i
demontarea instalaiilor de torcretare; prepararea amestecului
necesar torcretrii; procurarea i montarea armturilor, precum i
asigurarea poziiei armturilor prin boluri mpucate cte 4 pe mp;
punerea n oper a plasei de rabi; punerea n oper a betonului
torcretat; prelucrarea feei vzute;Prin proiect i Caietul de sarcini
se precizeaz tipul materialului.m22B24Substructure injection of
concretePaid per square metre (m2)The price includes:- surfaces
cleaning of damaged concrete, blowing with air jet and compressed
air;- collection in piles of the removed material, loading into
means of transport;- transport and unloading in the storage yard of
the removed material;- supply of formworks;- scaffolds necessary to
the execution of the guniting;- transport of the materials
necessary to the execution of the guniting, as well as of the
guniting installations;- mounting and dismantling of the guniting
installations;- preparation of the mixture necessary to the
guniting;- supply and mounting of reinforcements, as well as fixing
of the position of reinforcements through shot bolts, 4 per sq.m;-
placing in the work of the rabitz plastering net;- placing in the
work of the gunited concrete;- processing of the visible face;The
Project and Technical Specifications provide the material
type.m22B24Torcretare infrastructuriSubstructure injection of
concretem2m240.792B25ForajeSe pltete la metru liniar (m)In pre se
includ: amenajarea platformelor pentru instalaia de forare;
aducerea instalaiei de forare pe poziie; mutarea instalaiei de
forare de la o pil sau culee la alta n cadrul aceluiai pod;
executarea forajelor; strngerea n grmezi a materialului rezultat i
ncrcarea lui n mijloace de transport; transportul i mprtierea n
depozit a materialului rezultat din foraje; prepararea materialului
de injecie i injectarea conform prevederilor din
proiect.m2B25m2B25ForajeDrillingsmm2B25AForaje D=75 mmSe pltete la
metru liniar (m)In pre se includ: amenajarea platformelor pentru
instalaia de forare; aducerea instalaiei de forare pe poziie;
mutarea instalaiei de forare de la o pil sau culee la alta n cadrul
aceluiai pod; executarea forajelor; strngerea n grmezi a
materialului rezultat i ncrcarea lui n mijloace de transport;
transportul i mprtierea n depozit a materialului rezultat din
foraje; prepararea materialului de injecie i injectarea conform
prevederilor din proiect.m2B25ADrillings D=75 mmm2B25AForaje D=75
mmDrillings D=75 mmmm50.912B25A1Foraje D=120 mmDrillings D=120
mmmm110.642B25BForaje D=150 mmSe pltete la metru liniar (m)In pre
se includ: amenajarea platformelor pentru instalaia de forare;
aducerea instalaiei de forare pe poziie; mutarea instalaiei de
forare de la o pil sau culee la alta n cadrul aceluiai pod;
executarea forajelor; strngerea n grmezi a materialului rezultat i
ncrcarea lui n mijloace de transport; transportul i mprtierea n
depozit a materialului rezultat din foraje; prepararea materialului
de injecie i injectarea conform prevederilor din
proiect.m2B25BDrillings D=150 mmm2B25BForaje D=150 mmDrillings
D=150 mmmm150.452B26piuirea n cmp continuuSe pltete la metru ptrat
(m2)In pre se includ: aprovizionarea, transportul la lucrare i de
la lucrare a schelelor metalice tubulare pentru lucru; montarea i
demontarea schelelor metalice; prelucrarea suprafeelor de beton
existente prin piuire n cmp continuu cu unelte de mn pe o adncime
de 0,5 cm de la nivelul suprafeei actuale.m22B26Chiselling in
continuous fieldm22B26Spituire in camp continuuChiselling in
continuous fieldm2m23.862B27Perforri pentru introducerea
ancorajelorSe pltete la metru liniar (m)In pre se includ: aducerea
utilajului de forare pe poziie; mutarea utilajului de forare de la
o pil la alta la acelai pod; realizarea instalaiei de alimentare cu
energie; schelele i eafodajele necesare (procurare, montare,
demontare); executarea perforrii i curirea prin suflare cu aer
comprimat.m2B27Punching for anchors introductionPaid per linear
metre (m)The price includes:- bringing of the punching installation
on position; - moving of the punching installation from one pier to
another at the same bridge;- execution of the energy supply
installation;- necessary scaffolds (supply, mounting,
dismantling);- execution of the punching and cleaning by blowing
compressed air.m2B27Perforari pentru introducerea ancorelorPunching
for anchors introductionmm1.172B27AGuri n fii la partea inferioarSe
pltete la metru liniar (m)In pre se includ: procurarea schelelor de
lucru; montarea i demontarea schelelor de lucru; executarea gurilor
cu f=20 mm.m2B27AHoles in beams at inferior sidePaid per linear
metre (lm)The price includes:- supply of working scaffolds;-
mounting and dismantling of the working scaffolds;- execution of
boxes with f=20 mm.m2B27AGauri in fasii la partea inferioaraHoles
in beams at inferior sidemm14.742B28Ancore matate cu mortar de
ciment M100 n guri perforateSe pltete la metru liniar (m) de
ancorIn pre se includ: procurarea oelului beton pentru ancore i
confecionarea acestora; procurarea mortarului pentru matare;
transportul la locul de punere n oper; udarea gurilor; umplerea
gurilor cu mortar; introducerea i fixarea ancorelor n guri,
inclusiv meninerea acestora n poziia din proiect.Prin proiect i
Caietul de sarcini se dau diametrul ancorelor i compoziia
mortarului.m2B28Anchors caulked with cement mortar M100 in drilled
holes Paid per linear metre (m) of anchor The price includes:
supply of concrete steel for anchors and manufacturing of anchors;
supply of mortar for filling; transport to the placing in the work;
holes watering; holes filling with mortar; setting and fixing of
anchors in holes, including maintaining them in the position in the
project. The Project and Technical Specifications provide the
anchors diametre and the mortar composition.m2B28Ancore matate cu
mortar de ciment M100 in gauri perforateAnchors caulked with cement
mortar M100 in drilled holesmm1.872B28AAncore D=12 mm matate cu
rasina in gauri perforateAnchors D=12mm caulked with rezine in
punched holesmm1.872B29Matarea fisurilor la culei i pile Se pltete
la metru liniar (m) de fisurIn pre se includ: aprovizionarea
materialelor pentru matare; transportul materialelor; prepararea i
punerea n oper a materialelor necesare matrii fisurilor
(crpturilor), inclusiv prelucrarea marginilor acestora nainte de
matare conform prevederilor din Caietul de sarcini; procurarea,
transportul, montarea i demontarea schelelor de lucru.m2B29Cracks
caulking at abutments and piers Paid per linear metre (m) of anchor
The price includes: supply of concrete steel for anchors and
manufacturing of anchors; supply of mortar for filling; transport
to the placing in the work; holes watering; holes filling with
mortar; setting and fixing of anchors in holes, including
maintaining them in the position in the project. The Project and
Technical Specifications provide the anchors diametre and the
mortar composition.m2B29Matarea fisurilor la culei si pileCracks
caulking at abutments and piersmm10.732B3Sptur n chesoane deschise
Se pltete la metru cub (m3)In pre se includ: sptura n interiorul
chesonului; evacuarea i transportul pmntului rezultat din sptur;
m2rtierea pmntului n depozit; epuizarea apelor din cheson; lucrrile
necesare meninerii chesonului n poziie vertical pe msura avansrii;
verificarea cotei de fundare i a naturii terenului de
fundare.m32B3Digging in open caissons Paid per cubic metre (m3)In
the price shall be included:- digging in the caisson inner;-
removal and transportation of the soil resulted from the digging;-
soil spreading in the store;- dewatering from the caisson;- the
works necessary for the caisson maintenance in vertical position
during the advancing;- checking of the setting quota and of the
setting ground nature.m32B3Sapatura in chesoane deschiseDigging in
open caissonsm3m314.182B30Demolare beton elevaieSe pltete la metru
cub (m3)In pre se includ: montarea i demontarea schelelor de lucru;
demolarea betonului simplu sau armat la cotele prevzute n proiect;
curirea i ndreptarea armturilor ce se pstreaz i poziionarea lor
conform proiectului; piuirea i curarea suprafeei betonului ce nu se
demoleaz; strngerea materialului demolat, ncrcarea n mijloace de
transport, transportul, descrcarea i mprtierea n
depozit.m32B30Elevation concrete demolition Paid per cubic metre
(m3)The price includes: mouting and dismantling of working
scaffolding; demolition of the simple or reinforced concrete at the
levels provided in the project; cleaning and correction of
reinforcements that are maintained and their positioning according
to the project; chiselling and cleaning of the concrete surface
that is not demolished; collection of the demolished material,
loading into means of transport, transport, unloading and
scaterring in the storage yard.m32B30Demolare beton
elevatieElevation concrete demolitionm3m331.862B31Recondiionarea
aparatelor de reazem existenteSe pltete la bucat (buc)In pre se
includ: procurarea, transportul, manipularea i punerea n oper a
materialelor necesare recondiionrii; procurarea schelelor de lucru;
montarea i demontarea schelelor de lucru; ndeprtarea vopselei
vechi; degresarea suprafeelor metalice; curirea pn la luciu metalic
a pieselor metalice; vopsirea cu un strat de miniu de plumb;
vopsirea cu dou straturi de vopsea; ungerea cu
vaselin.buc2B31Repairing existing bearing and execution Paid per
piece (pcs)The price includes:- supplay, transport, handeling and
work execution;- supplay, work scaffolding;- mounting and
dismounting work scaffolding;- cleaning the old paint degreassing
of metallic pieces;- paint whit minium;- paint in two layer;-
lubricate whit grease.pcs2B31Reconditionare aparate de reazem
existenteRepairing existing bearing and
executionbuc.pcs.17.552B31ARecondiionarea aparatelor de reazem
existenteSe pltete la bucat (buc)In pre se includ: procurarea,
transportul, manipularea i punerea n oper a materialelor necesare
recondiionrii; procurarea schelelor de lucru; montarea i demontarea
schelelor de lucru; ndeprtarea vopselei vechi; degresarea
suprafeelor metalice; curirea pn la luciu metalic a pieselor
metalice; vopsirea cu un strat de miniu de plumb; vopsirea cu dou
straturi de vopsea; ungerea cu vaselin.buc2B31ARepairing existing
bearing and execution Paid per piece (pcs)The price includes:-
supplay, transport, handeling and work execution;- supplay, work
scaffolding;- mounting and dismounting work scaffolding;- cleaning
the old paint degreassing of metallic pieces;- paint whit minium;-
paint in two layer;- lubricate whit grease.pcs2B31BDemontarea,
recondiionarea si remontarea aparatelor de reazem metalice
existenteSe pltete la bucat (buc)In pre se includ: procurarea,
transportul, manipularea i punerea n oper a materialelor necesare
recondiionrii; procurarea schelelor de lucru; montarea i demontarea
schelelor de lucru; demontarea aparatelor de reazem; ndeprtarea
vopselei vechi; degresarea suprafeelor metalice; curirea pn la
luciu metalic a pieselor metalice; remontarea aparatelor de reazem
conform proiect; vopsirea cu un strat de miniu de plumb; vopsirea
cu dou straturi de vopsea; ungerea cu vaselin.buc2B31BDismounting,
repairing and mounting the existing metallic bearing
devicespcs2B31BDemontarea, reconditionarea si remontarea aparatelor
de reazem metalice existenteDismounting, repairing and mounting the
existing metallic bearing devicesbuc.pcs.39.702B32Injecii pentru
consolidare infrastructuriSe pltete la metru liniar (m)In pre se
includ: amenajarea platformei pentru instalaia de forare;
executarea forajelor f < 76 mm; strngerea n grmezi a
materialului rezultat i ncrcarea n mijloacele de transport;
transportul i mprtierea n depozit a materialului; introducerea
tuburilor metalice perforate f < 76 mm; prepararea materialului
de injecie i injectarea conform prevederilor din
proiect.m2B32Injections for substructures
consolidationm2B32Injectii pentru consolidare
infrastructuriInjections for substructures
consolidationmm46.572B33Demolarea betonului din trotuareSe pltete
la metru cub (m3)In pre se includ: desfacerea bordurilor existente;
decaparea asfaltului de pe trotuare; demolarea betonului de
umplutur de la trotuare; demontarea plcilor de acoperire a
golurilor pentru cabluri; demontarea dispozitivelor de acoperire a
rosturilor de dilataie pe trotuare; desfacerea hidroizolaiei i a
stratului suport al acesteia; strngerea materialului rezultat din
demolri, ncrcarea n mijloace de transport, transportul, descrcarea
i mprtierea n depozitul de antier.m32B33Footway concrete
demolitionm32B33Demolarea betonului din trotuareFootway concrete
demolitionm3m329.362B33AMortar special pentru refacerea betonului
degradat Se pltete la metru patrat (m2) de fisuraIn pre se includ:
procurarea, transportul si manipularea materialelor; amenajarea si
demontarea schelelor de acces; indepartarea tencuielilor, a
betonului superficial degradat, curatirea armaturilor; procurarea
sau prepararea mortarului special, inclusiv transportul; prelevare
de probe si testarea in laborator; aplicarea mortarului conform
tehnologiei producatorului si finisarea suprafetei; tratarea si
protejarea suprafetei dupa aplicare.Toate operatiie se vor executa
in conformitate cu specificatiile tehnice din Caietul de
sarcini.m22B33Am22B34Mortar pentru injectiiSe pltete la metru
liniar (m)In pre se includ: procurarea sau prepararea mortarului
pentru injectii, inclusiv transportul acestuia la locul de punere
in opera; procurarea, transportul, montarea si demontarea schelei
de lucru; identificara tuturor fisurilor; montarea stuturilor de
injectare; matarea fisurilor; injectarea fisurilor, inclusiv
verificara acestora.m2B34Mortar grounting in cracksm2B34Mortar
pentru injectiiMortar grounting in cracksmm18.502B35TencuialSe
pltete la metru ptrat (m2)In pre se includ: procurarea
materialelor; transportul schelelor de lucru, al utilajelor pentru
realizarea tencuielii i al materialelor; montarea i demontarea
schelelor; aplicarea
tencuielii.m22B35Coatingm22B35TencuialaCoatingm2m22.142B36Reparatii
betoane cu mortare specialeSe plateste la metru patrat (m2)Sunt
incluse: procurarea, transportul si manipularea schelelor de lucru;
montarea si demontarea schelelor; diagnosticarea si marcarea
zonelor degradate; spituirea betonului existent degradat pana la
betonul sanatos cu unelte de mana, conform precizarilor din
proiect; sablarea suprafetei spituite si apoi curatarea prin
suflare cu jet de aer sau cu apa sub presiune; incarcarea,
transportul si imprastierea in depozit a materialului rezultat din
demolare; procurarea si prepararea mortarului special conform
instructiunilor producatorului; aplicarea mortarului special pentru
refacerea elementului din beton la dimensiunile initiale; finisarea
suprafetelor; transportul in depozit si depozitarea schelelor de
lucru; redarea terenului din depozit in circuitul agricol la
terminarea lucrarilor.m22B36Repair of the concrete surfaces with
special mortarsPaid per square metre (m2)There are included:-
supply, transport and handling of the firing platforms;- the firing
platforms withdrawal;- diagnostic and demarcation of the damaged
areas;- chisseling of the existing damaged concrete up to the
non-damaged one with hand tools, according to the project's
stipulations;- sandblast cleaning of the chisseling surface and
then cleaning by bubble aeration or by pressurized water;- loading,
transport and spreading in the store of the material resulted from
the demolition;- special binder supply and preparation according to
the producer's instructions;- special binder application for the
concrete unit recovery at the initial dimensions;- surfaces
finishing;- transport in the store and firing platforms storage;-
reclaiming of the ground from the store at the end of the
works.m22B36Reparatii betoane cu mortare specialeRepair of the
concrete surfaces with special mortarsm2m216.402B37Schela metalica
pentru reparatii la infrastructuriSe pltete la metru patrat (m2) de
schela metalicaIn pre se includ: procurarea, transportul dus i
ntors, depozitarea la antier i manipularea materialelor; pregtirea,
asamblarea i montarea materialelor i subansamblelor conform
proiectului; executarea paleelor din piloi metalici btui sau nfipi
n teren prin vibrare; executarea schelei de lucru din lemn;
demontarea lemnriei din schel i transportul n depozit; demontarea
paleelor metalice i transportul n depozit.Prin proiect i Caietul de
sarcini se vor preciza detaliile i condiiile tehnice de
execuie.m22B37Metallic schaffolding for rehabilitations to
substructuresPaid per square metre (m2) of iron frameThe price
includes:- supply, transport for one way and back, storage to site
and materials handling;- preparation, assembly and mounting of
materials and of the subassemblies according to the project;- bents
execution of driven or thrusted in the ground by vibration metallic
piles ;- execution of the wood firing platform;- timber dismounting
from the structural frame and transport to the store;- dismounting
of the metallic bents and transport to the store.The project and
the Technical Specifications shall specify the details and the
execution technical terms.m22B37Schela metalica pentru reparatii la
infrastructuriMetallic schaffolding for rehabilitations to
substructuresm2m218.512B38Rostuire pereu existent din piatra
brutaSe pltete la metru patrat (m2) de suprafata rostuitaIn pre se
includ: curatirea rosturilor pe o adncime de 3 cm; spalarea cu apa
a rosturilor; procurarea sau prepararea mortarului de ciment,
inclusiv transportul la locul de punere in opera; prelevare de
probe si testarea lor in laborator si santier; umplerea rosturilor
cu mortar de ciment; netezirea mortarului de ciment cu vergele de
rostuit.Prin Caietul de sarcini se vor preciza caracteristicile
mortarului de ciment.m22B38Joint the existing pitching rough
stonePaid per square metre (m2) of the square jointingThe price
includes: - cleaning the joints of high 3 cm;- washing with water
the joints;- supplying or prepparing and transport on the site of
the cement mortar;- taking and testing in laboratory and on the
site the cement mortar and rough stone- filling the joints with
cement mortar;- leveling the joints.m22B38Rostuire pereu existent
din piatra brutaJoint the existing pitching rough
stonem2m23.272B39Rostuire placaj existent din piatra la culei si
pileSe pltete la metru liniar (m) de rostIn pre se includ:
curatirea rosturilor; procurarea sau prepararea mortarului de
ciment, inclusiv transportul la locul de punere in opera; prelevare
de probe si testarea lor in laborator si santier; rostuirea
propriu-zisa a mortarului de ciment; netezirea fetei vazute si
indepartarea materialului ramas in exces; finisarea fetei
vazute.m2B39m2B39Rostuire placaj existent din piatra la culei si
pilemm1.252B4Forarea piloilor (se va specifica diametrul pilotului,
lungimea unui pilot i tipul instalaiei de forat)Se pltete la metru
liniar (m) de forajIn pre se includ: amenajarea suplimentar a
platformei pentru poziionarea instalaiei de forat; amenajrile
necesare execuiei forajului; deplasarea instalaiei de forare de la
un pilot la altul i de la o fundaie la alta; forarea pilotului de
la nivelul platformei pn la vrful pilotului; transportul
materialului rezultat din forare; mprtierea materialului n
depozitul de antier; desfacerea i evacuarea amenajrilor necesitate
de foraj; verificarea cotei de fundare i natura terenului de
fundare.Prin proiect i Caietul de antier se vor preciza: diametrul
i lungimea pilotului; tehnologia de forare i categoria de teren.In
cazul n care n cadrul unei lucrri apar mai multe tipuri de forri,
se va stabili un pre de forare pentru fiecare diametru i tehnologie
de forare.m2B4m2B40Refacerea zidariei degradateSe pltete la metru
cub (m3) de zidarieIn pre se includ: procurarea materialelor si
transportul lor; procurarea sau prepararea mortarului de ciment,
inclusiv transportul la locul de punere in opera; transportul,
montarea si demontarea schelelor; pregatirea suprafetei prin
degajarea spatiului fiecarui molon ce se inlocuieste, inclusiv a
mortarului prins in moloanele adiacente; alegerea moloanelor
(pietrelor) la dimensiunea potrivita si prelucrarea lor partiala;
udarea abundenta a golului si a pietrei ce urmraza a fi montata;
aplicarea mortarului in golul pentru fiecare molon; introducerea si
fixarea molonului; prelevare de probe si testarea lor in laborator
si santier; rostuirea propriu-zisa a
moloanelor.m32B40m32B40Refacerea zidariei
degradatem3m371.822B41Schela de lucru suspendataSe pltete la metru
patrat (m2) de schelaIn pre se includ: procurarea, transportul dus
i ntors, depozitarea la antier i manipularea materialelor;
pregtirea materialelor si subansamblelor din lemn si metal;
montarea platformei de lucru din lemn si a fierariei de prindere;
demontarea lemnriei din schel, a fierariei de prindere i
transportul n depozit;Prin proiect i Caietul de sarcini se vor
preciza detaliile i condiiile tehnice de execuie.m22B41m22B41Schela
metalica suspendatam2m218.512B42Curatirea betonului la
infrastructura (bancheta cuzinetilor, etc.)Se pltete la metru
patrat (m2)In pre se includ: curirea suprafeei betonului cu peria
de srm si suflare cu aer; splarea cu jet de ap a suprafeei
betonului; strngerea resturilor de materiale rezultate din
curatirea suprafetei, ncrcarea n mijloace de transport,
transportul, descrcarea i mprtierea n depozitul de
antier.m22B42m22B42Curatirea betonului la infrastructuri (bancheta
cuzinetilor, etc.)m2m22.432B4AForarea piloilor cu diametrul mare -
D=1080mmSe pltete la metru liniar (m) de forajIn pre se includ:
amenajarea suplimentar a platformei pentru poziionarea instalaiei
de forat; amenajrile necesare execuiei forajului; deplasarea
instalaiei de forare de la un pilot la altul i de la o fundaie la
alta; forarea pilotului de la nivelul platformei pn la vrful
pilotului; transportul materialului rezultat din forare; mprtierea
materialului n depozitul de antier; desfacerea i evacuarea
amenajrilor necesitate de foraj; verificarea cotei de fundare i
natura terenului de fundare.Prin proiect i Caietul de antier se vor
preciza: diametrul i lungimea pilotului; tehnologia de forare i
categoria de teren.In cazul n care n cadrul unei lucrri apar mai
multe tipuri de forri, se va stabili un pre de forare pentru
fiecare diametru i tehnologie de forare.m2B4ADrilling of piles with
a large diametre - D= 1080 mmPaid per linear metre (m) of
drilling.The price includes:- supplementary arrangement of the
platform for the positioning of the drilling installation;-
arrangements necessary to the execution of the drilling;- moving of
the drilling installation from one pile to another and from one
foundation to another;- pile drilling from the platform level to
the pile top;- transport of the material resulted from drilling;-
scaterring of the material into the site storage;- removal and
evacuation of the arrangements required by the drilling;- checking
of the foundation quota and of the nature of the foundation
soil.The Project and Site Book will provide:- the diametre and
length of the pile;- the drilling ctegory and the soil category.In
the case when within a work there appear more typs of driilings, it
will be set a drilling price for each diametre and drilling
technology.m2B4AForarea pilotilor de diametru mare -
F=1080mmDrilling of piles with a large diametre - D= 1080
mmmm123.572B4BForarea piloilor cu diametrul mare - D=1500mmSe
pltete la metru liniar (m) de forajIn pre se includ: amenajarea
suplimentar a platformei pentru poziionarea instalaiei de forat;
amenajrile necesare execuiei forajului; deplasarea instalaiei de
forare de la un pilot la altul i de la o fundaie la alta; forarea
pilotului de la nivelul platformei pn la vrful pilotului;
transportul materialului rezultat din forare; mprtierea
materialului n depozitul de antier; desfacerea i evacuarea
amenajrilor necesitate de foraj; verificarea cotei de fundare i
natura terenului de fundare.Prin proiect i Caietul de antier se vor
preciza: diametrul i lungimea pilotului; tehnologia de forare i
categoria de teren.In cazul n care n cadrul unei lucrri apar mai
multe tipuri de forri, se va stabili un pre de forare pentru
fiecare diametru i tehnologie de forare.m2B4Bm2B4BForarea pilotilor
de diametru mare - F=1500mmDrilling of big diametre
columnmm0.002B4CForarea piloilor cu diametrul mare - D=2000mmSe
pltete la metru liniar (m) de forajIn pre se includ: amenajarea
suplimentar a platformei pentru poziionarea instalaiei de forat;
amenajrile necesare execuiei forajului; deplasarea instalaiei de
forare de la un pilot la altul i de la o fundaie la alta; forarea
pi