Parametros Generales Semana CMg Tope (US$/MWh) Resolución SIE-055-2013 127.47 CMg Prom (US$/MWh) Semanal 89.75 Orden Unidad (MW) (US$/MWh) Horas 44.31 1 AES ANDRES 300.0 33.35 168 2 ITABO 2 420.0 34.47 166 DICIEMBRE 2014 - ENERO 2015 CMg Max US$/MWh CMg Min US$/MWh Promedio US$/MWh 3 ITABO 1 540.0 35.62 168 Saturday, December 27, 2014 88.08 82.35 83.60 4 LOS MINA 6 645.0 54.57 168 Sunday, December 28, 2014 85.21 75.72 81.34 5 LOS MINA 5 750.0 55.03 168 Monday, December 29, 2014 144.77 74.29 94.53 6 BARAHONA CARBON 793.0 56.71 168 Tuesday, December 30, 2014 100.51 82.46 88.54 7 ESTRELLA DEL MAR 2 CFO 886.4 71.51 168 Wednesday, December 31, 2014 157.74 79.31 101.23 8 METALDOM 927.4 74.05 168 Thursday, January 1, 2015 127.53 83.99 94.44 9 QUISQUEYA 2 1,139.4 74.19 168 Friday, January 2, 2015 101.75 74.40 84.57 10 PIMENTEL 3 1,190.6 75.08 142 11 PIMENTEL 2 1,218.6 78.59 118 12 PIMENTEL 1 1,250.0 79.38 118 DICIEMBRE 2014 - ENERO 2015 Fuel No. 6 US$/bbl Fuel No.2 US$/bbl Gas Natural US$/MMBtu Carbón US$/Ton 13 SULTANA DEL ESTE 1,326.0 80.29 88 Saturday, December 27, 2014 43.96 63.65 3.19 66.08 14 PALAMARA 1,422.0 82.48 140 Sunday, December 28, 2014 43.96 63.65 3.19 66.08 15 LA VEGA 1,507.0 83.14 143 Monday, December 29, 2014 43.96 63.65 3.19 65.74 16 MONTE RIO 1,600.0 86.40 85 Tuesday, December 30, 2014 43.82 68.16 3.09 65.74 17 BERSAL 1,624.0 90.59 34 Wednesday, December 31, 2014 42.96 71.53 2.89 65.74 18 CEPP 1 1,639.0 97.74 23 Thursday, January 1, 2015 Feriado Año Nuevo Feriado Año Nuevo Feriado Año Nuevo Feriado Año Nuevo 19 CEPP 2 1,680.6 99.02 23 Friday, January 2, 2015 42.16 71.03 3.00 65.74 20 INCA KM22 1,695.0 102.15 14 21 LOS ORIGENES 1,753.9 124.77 122 22 CESPM 2 1,941.9 137.50 9 23 RIO SAN JUAN 2,037.8 190.75 118 24 HAINA TG 2,127.8 316.14 1 Fuente: Organismo Coordinador del Sistema Electrico Nacional Interconectado Tipo de Generación Energía (MWh) Porcentaje Total Hidráulica 18,858.43 6.89% Total Eólica 6,549.44 2.39% Total Térmica 248,334.58 90.72% Total Generado 273,742.45 Tipo de Demanda Potencia (MW) Fecha Demanda Pico 2,068.66 31-Dec, a las 19:00 Demanda Valle 1,189.22 02-Jan, a las 06:00 Causa Condiciones Físicas Inadecuadas Bajo Nivel de Combustible Mantenimiento Programado Orden Administrativa Preparado por: [[email protected]] HAINA TG (F.O.#2) 85.0 105.0 105.0 HAINA I & II (F.O.#6), PUERTO PLATA I & II (F.O.#6) 212.0 51.2 28.0 Evolución y Comportamiento del Costo Marginal: *El Costo Marginal (CMg) es el Costo Variable necesario para producir una unidad adicional de energia considerando la demanda y el parque de generación disponible. 90.0 Resumen por Fuente Primaria de Generación: 93.0 1.9 Demanda SENI: 41.6 (MW) 300.0 120.0 120.0 41.0 105.0 93.4 Precios Platt's Fuel Oil, Gas Natural y Carbón: 14.4 58.9 24.0 15.0 31.4 76.0 96.0 94.0 * Generadora Estrella del Mar 2 tiene cuatro (4) Modalidades de Operacion con Costos Variables de Despacho distintos para cada modo que se utilice. Central y Tipo de Combustible SAN PEDRO VAPOR (F.O.#6), SAN LORENZO 1 (GAS NATURAL), HAINA 4 (F.O.#6), SULTANA DEL ESTE (F.O.#6), PIMENTEL 1, 2 Y 3 (F.O.#6), LOS ORIGENES (GAS NATURAL), SAN FELIPE (F.O.#2), LOS MINA 6 (GAS NATURAL) Indisponibilidad Programada de Unidades: ESTRELLA DEL MAR 2 SFO & CFO, SGN. Horas Despachadas Dirección Mercado Eléctrico Mayorista | Gerencia de Monitoreo MEM Mayor Potencia Disponible a Potencia Bruta Potencia Disponible Acumulada a Potencia Bruta Costo Variable de Despacho Semana 1 de 53 REPORTE DE GENERACIÓN Y PRECIOS Semana del 27 de diciembre 2014 al 2 de enero 2015 LISTA DE MÉRITO PROGRAMADA PARA DESPACHO DE UNIDADES DE GENERACION *El mercado de combustibles abre de lunes a viernes, por lo tanto, los precios de sábado y domingo corresponde al viernes previo. 0.0 500.0 1,000.0 1,500.0 2,000.0 2,500.0 0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 Lista de Mérito Programada para la Semana CMg Tope Costo Variable de Despacho Potencia Disponible Acumulada a Potencia Bruta Potencia Disponible Acumulada (MW) CMG tope = 127.47 US$/MWh Potencia Disponible Acumulada (MW) Costo Variable de Despacho (US$/MWh) CVD (US$/MWh) 6.89% 2.39% 18.30% 29.64% 42.48% 0.30% Generación por tipo de Combustible (MWh) Agua Viento Carbón Gas Natural Fuel Oil #6 Fuel Oil #2
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Parametros Generales SemanaCMg Tope (US$/MWh)
Resolución SIE-055-2013127.47
CMg Prom (US$/MWh)
Semanal 89.75 Orden Unidad (MW) (US$/MWh) Horas
44.31 1 AES ANDRES 300.0 33.35 168
2 ITABO 2 420.0 34.47 166
DICIEMBRE 2014 - ENERO 2015 CMg Max US$/MWh CMg Min US$/MWh Promedio US$/MWh 3 ITABO 1 540.0 35.62 168
Saturday, December 27, 2014 88.08 82.35 83.60 4 LOS MINA 6 645.0 54.57 168
Sunday, December 28, 2014 85.21 75.72 81.34 5 LOS MINA 5 750.0 55.03 168
HAINA I & II (F.O.#6), PUERTO PLATA I & II (F.O.#6)
212.0
51.2
28.0
Evolución y Comportamiento del Costo Marginal:
*El Costo Marginal (CMg) es el Costo Variable necesario para producir una unidad adicional de energia considerando la demanda y el parque de generación disponible.
90.0
Resumen por Fuente Primaria de Generación:
93.0
1.9
Demanda SENI:
41.6
(MW)
300.0
120.0
120.0
41.0
105.0
93.4
Precios Platt's Fuel Oil, Gas Natural y Carbón:
14.4
58.9
24.0
15.0
31.4
76.0
96.0
94.0
* Generadora Estrella del Mar 2 tiene cuatro (4) Modalidades de Operacion con Costos Variables de
Despacho distintos para cada modo que se utilice.
Central y Tipo de Combustible
SAN PEDRO VAPOR (F.O.#6), SAN LORENZO 1 (GAS
NATURAL), HAINA 4 (F.O.#6), SULTANA DEL ESTE (F.O.#6),
PIMENTEL 1, 2 Y 3 (F.O.#6), LOS ORIGENES (GAS
NATURAL), SAN FELIPE (F.O.#2), LOS MINA 6 (GAS
NATURAL)
Indisponibilidad Programada de Unidades:
ESTRELLA DEL MAR 2 SFO & CFO, SGN.
Horas Despachadas
Dirección Mercado Eléctrico Mayorista | Gerencia de Monitoreo MEM
Mayor Potencia
Disponible a Potencia
Bruta
Potencia
Disponible
Acumulada a
Potencia Bruta
Costo Variable
de DespachoSemana 1 de 53
REPORTE DE GENERACIÓN Y PRECIOS
Semana del 27 de diciembre 2014 al 2 de enero 2015
LISTA DE MÉRITO PROGRAMADA PARA DESPACHO DE UNIDADES DE GENERACION
*El mercado de combustibles abre de lunes a viernes, por lo tanto, los precios de sábado y domingo corresponde al viernes previo.
Potencia Disp. Acumulada (MW)
0.0
500.0
1,000.0
1,500.0
2,000.0
2,500.0
0.0
50.0
100.0
150.0
200.0
250.0
300.0
350.0
400.0
450.0
Lista de Mérito Programada para la Semana
CMg Tope Costo Variable de Despacho Potencia Disponible Acumulada a Potencia Bruta
Potencia Disponible Acumulada (MW)
CMG tope = 127.47 US$/MWh
Po
ten
ciaD
ispo
nib
le Acu
mu
lada (M
W)
Co
sto
Var
iab
le d
e D
esp
ach
o (
US$
/MW
h)
CVD (US$/MWh)
6.89%2.39%
18.30%
29.64%
42.48%
0.30%
Generación por tipo de Combustible (MWh)
Agua Viento Carbón Gas Natural Fuel Oil #6 Fuel Oil #2
Parametros Generales SemanaCMg Tope (US$/MWh)
Resolución SIE-055-2013127.47
CMg Prom (US$/MWh)
Semanal 100.38 Orden Unidad (MW) (US$/MWh) Horas
44.34 1 AES ANDRES 300.0 33.34 168
2 ITABO 2 420.0 34.44 168
ENERO 2015 CMg Max US$/MWh CMg Min US$/MWh Promedio US$/MWh 3 ITABO 1 540.0 35.58 152
Saturday, January 3, 2015 85.72 74.30 79.95 4 LOS MINA 6 645.0 54.38 48
Sunday, January 4, 2015 85.20 74.17 80.57 5 LOS MINA 5 750.0 54.93 168
Dirección Mercado Eléctrico Mayorista | Gerencia de Monitoreo MEM
Mayor Potencia
Disponible a Potencia
Bruta
Potencia
Disponible
Acumulada a
Potencia Bruta
Costo Variable
de DespachoSemana 2 de 53
REPORTE DE GENERACIÓN Y PRECIOS
Semana del 3 al 9 de enero 2015
LISTA DE MÉRITO PROGRAMADA PARA DESPACHO DE UNIDADES DE GENERACION
*El mercado de combustibles abre de lunes a viernes, por lo tanto, los precios de sábado y domingo corresponde al viernes previo.
Precios Platt's Fuel Oil, Gas Natural y Carbón:
24.0
15.0
0.0
85.0
76.0
0.0
28.0
41.6
* Generadora Estrella del Mar 2 tiene cuatro (4) Modalidades de Operacion con Costos Variables de
Despacho distintos para cada modo que se utilice.
Central y Tipo de Combustible
SAN PEDRO VAPOR (F.O.#6), SAN LORENZO 1 (GAS
NATURAL), HAINA 4 (F.O.#6), SULTANA DEL ESTE (F.O.#6),
PIMENTEL 1, 2 Y 3 (F.O.#6), LOS ORIGENES (GAS
NATURAL), SAN FELIPE (F.O.#2)
Indisponibilidad Programada de Unidades:
ESTRELLA DEL MAR 2 SFO & CFO, SGN.
93.0
(MW)
300.0
120.0
120.0
41.0
105.0
93.4
HAINA TG (F.O.#2)
31.4
105.0
105.0
HAINA I & II (F.O.#6), PUERTO PLATA I & II (F.O.#6)
0.0
224.0
51.2
Evolución y Comportamiento del Costo Marginal:
*El Costo Marginal (CMg) es el Costo Variable necesario para producir una unidad adicional de energia considerando la demanda y el parque de generación disponible.
90.0
Resumen por Fuente Primaria de Generación:
96.0
14.4
Demanda SENI:
Potencia Disp. Acumulada (MW)
0.0
500.0
1,000.0
1,500.0
2,000.0
2,500.0
0.0
50.0
100.0
150.0
200.0
250.0
300.0
350.0
400.0
450.0
Lista de Mérito Programada para la Semana
CMg Tope Costo Variable de Despacho Potencia Disponible Acumulada a Potencia Bruta
Potencia Disponible Acumulada (MW)
CMG tope = 127.47 US$/MWh
Po
tencia
Disp
on
ible A
cum
ulad
a (MW
)
Co
sto
Var
iab
le d
e D
esp
ach
o (
US$
/MW
h)
CVD (US$/MWh)
6.43%2.99%
17.32%
25.15%
45.09%
3.03%
Generación por tipo de Combustible (MWh)
Agua Viento Carbón Gas Natural Fuel Oil #6 Fuel Oil #2
1/19/2015 4:49 PM
Parametros Generales SemanaCMg Tope (US$/MWh)
Resolución SIE-055-2013127.47
CMg Prom (US$/MWh)
Semanal 105.45 Orden Unidad (MW) (US$/MWh) Horas
44.41 1 AES ANDRES 300.0 33.24 168
2 ITABO 1 420.0 38.59 168
ENERO 2015 CMg Max US$/MWh CMg Min US$/MWh Promedio US$/MWh 3 ITABO 2 540.0 38.74 163
Saturday, January 10, 2015 127.70 79.59 109.45 4 LOS MINA 6 645.0 53.80 105
Sunday, January 11, 2015 99.79 78.12 83.80 5 LOS MINA 5 750.0 54.95 168
HAINA I & II (F.O.#6), PUERTO PLATA I & II (F.O.#6)
51.2
41.0
28.0
Evolución y Comportamiento del Costo Marginal:
*El Costo Marginal (CMg) es el Costo Variable necesario para producir una unidad adicional de energia considerando la demanda y el parque de generación disponible.
Resumen por Fuente Primaria de Generación:
85.0
14.4
Demanda SENI:
46.8
Precios Platt's Fuel Oil, Gas Natural y Carbón:
24.0
15.0
(MW)
300.0
120.0
120.0
34.0
105.0
37.4
105.0
105.0
51.0
212.0
31.4
56.1
* Generadora Estrella del Mar 2 tiene cuatro (4) Modalidades de Operacion con Costos Variables de
Despacho distintos para cada modo que se utilice.
Central y Tipo de Combustible
SAN PEDRO VAPOR (F.O.#6), SAN LORENZO 1 (GAS
NATURAL), HAINA 4 (F.O.#6), SULTANA DEL ESTE (F.O.#6),
PIMENTEL 1, 2 Y 3 (F.O.#6), LOS ORIGENES (GAS
NATURAL), SAN FELIPE (F.O.#2), HAINA TG (F.O.#2)
Indisponibilidad Programada de Unidades:
ESTRELLA DEL MAR 2 SFO & CFO, SGN., CESPM 1 & 2.
LOS MINA 6 (GAS NATURAL, 105 MW)
96.0
*El mercado de combustibles abre de lunes a viernes, por lo tanto, los precios de sábado y domingo corresponde al viernes previo.
58.9
0.0
1.9
83.0
90.0
Horas Despachadas
Dirección Mercado Eléctrico Mayorista | Gerencia de Monitoreo MEM
Mayor Potencia
Disponible a Potencia
Bruta
Potencia
Disponible
Acumulada a
Potencia Bruta
Costo Variable
de DespachoSemana 3 de 53
REPORTE DE GENERACIÓN Y PRECIOS
Semana del 10 al 16 de enero 2015
LISTA DE MÉRITO PROGRAMADA PARA DESPACHO DE UNIDADES DE GENERACION
93.0
Potencia Disp. Acumulada (MW)
0.0
500.0
1,000.0
1,500.0
2,000.0
2,500.0
0.0
50.0
100.0
150.0
200.0
250.0
300.0
350.0
400.0
450.0
Lista de Mérito Programada para la Semana
CMg Tope Costo Variable de Despacho Potencia Disponible Acumulada a Potencia Bruta
Potencia Disponible Acumulada (MW)
CMG tope = 127.47 US$/MWh
Po
ten
ciaD
ispo
nib
le Acu
mu
lada (M
W)
Co
sto
Var
iab
le d
e D
esp
ach
o (
US$
/MW
h)
CVD (US$/MWh)
5.76%
1.88%
17.26%
28.20%
44.68%
2.22%
Generación por tipo de Combustible (MWh)
Agua Viento Carbón Gas Natural Fuel Oil #6 Fuel Oil #2
1/27/2015 7:46 PM
Parametros Generales SemanaCMg Tope (US$/MWh)
Resolución SIE-055-2013127.47
CMg Prom (US$/MWh)
Semanal 108.24 Orden Unidad (MW) (US$/MWh) Horas
44.56 1 AES ANDRES 300.0 32.27 28
2 ITABO 2 420.0 35.79 168
ENERO 2015 CMg Max US$/MWh CMg Min US$/MWh Promedio US$/MWh 3 ITABO 1 540.0 36.41 168
Saturday, January 17, 2015 127.94 73.25 87.07 4 LOS MINA 6 645.0 54.24 168
Sunday, January 18, 2015 127.94 76.10 110.28 5 LOS MINA 5 750.0 55.34 168
Dirección Mercado Eléctrico Mayorista | Gerencia de Monitoreo MEM
Mayor Potencia
Disponible a Potencia
Bruta
Potencia
Disponible
Acumulada a
Potencia Bruta
Costo Variable
de DespachoSemana 4 de 53
REPORTE DE GENERACIÓN Y PRECIOS
Semana del 17 al 23 de enero 2015
LISTA DE MÉRITO PROGRAMADA PARA DESPACHO DE UNIDADES DE GENERACION
85.0
*El mercado de combustibles abre de lunes a viernes, por lo tanto, los precios de sábado y domingo corresponde al viernes previo.
0.0
1.9
90.0
46.8
0.0
76.0
* Generadora Estrella del Mar 2 tiene cuatro (4) Modalidades de Operacion con Costos Variables de
Despacho distintos para cada modo que se utilice.
Central y Tipo de Combustible
SAN PEDRO VAPOR (F.O.#6), SAN LORENZO 1 (GAS
NATURAL), HAINA 4 (F.O.#6), SULTANA DEL ESTE (F.O.#6),
PIMENTEL 1, 2 Y 3 (F.O.#6), LOS ORIGENES (GAS
NATURAL), SAN FELIPE (F.O.#2), HAINA TG (F.O.#2)
Indisponibilidad Programada de Unidades:
ESTRELLA DEL MAR 2 CFO, CESPM 2 & 3.
HAINA I (F.O.#6)
28.0
96.0
(MW)
300.0
120.0
120.0
212.0
105.0
37.6
105.0
105.0
HAINA II (F.O.#6), PUERTO PLATA I & II (F.O.#6)
41.0
10.0
51.2
Evolución y Comportamiento del Costo Marginal:
*El Costo Marginal (CMg) es el Costo Variable necesario para producir una unidad adicional de energia considerando la demanda y el parque de generación disponible.
Resumen por Fuente Primaria de Generación:
31.4
58.9
Demanda SENI:
14.4
93.0
24.0
Precios Platt's Fuel Oil, Gas Natural y Carbón:
56.4
Potencia Disp. Acumulada (MW)
0.0
500.0
1,000.0
1,500.0
2,000.0
2,500.0
0.0
50.0
100.0
150.0
200.0
250.0
300.0
350.0
400.0
450.0
Lista de Mérito Programada para la Semana
CMg Tope Costo Variable de Despacho Potencia Disponible Acumulada a Potencia Bruta
Potencia Disponible Acumulada (MW)
CMG tope = 127.47 US$/MWh
Po
tencia
Disp
on
ible A
cum
ulad
a (MW
)
Co
sto
Var
iab
le d
e D
esp
ach
o (
US$
/MW
h)
CVD (US$/MWh)
6.07%
0.53%
18.21%
17.15%50.71%
7.33%
Generación por tipo de Combustible (MWh)
Agua Viento Carbón Gas Natural Fuel Oil #6 Fuel Oil #2
2/2/2015 5:50 PM
Parametros Generales SemanaCMg Tope (US$/MWh)
Resolución SIE-055-2013127.47
CMg Prom (US$/MWh)
Semanal 114.85 Orden Unidad (MW) (US$/MWh) Horas
44.63 1 ITABO 2 120.0 35.02 168
2 ITABO 1 240.0 35.63 168
ENERO 2015 CMg Max US$/MWh CMg Min US$/MWh Promedio US$/MWh 3 LOS MINA 6 345.0 54.08 168
Saturday, January 24, 2015 127.96 75.77 118.76 4 LOS MINA 5 450.0 55.19 123
*El mercado de combustibles abre de lunes a viernes, por lo tanto, los precios de sábado y domingo corresponde al viernes previo.
Horas Despachadas
Dirección Mercado Eléctrico Mayorista | Gerencia de Monitoreo MEM
Mayor Potencia
Disponible a Potencia
Bruta
Potencia
Disponible
Acumulada a
Potencia Bruta
Costo Variable
de DespachoSemana 5 de 53
REPORTE DE GENERACIÓN Y PRECIOS
Semana del 24 al 30 de enero 2015
LISTA DE MÉRITO PROGRAMADA PARA DESPACHO DE UNIDADES DE GENERACION
1.9
90.0
83.0
28.0
96.0
* Generadora Estrella del Mar 2 tiene cuatro (4) Modalidades de Operacion con Costos Variables de
Despacho distintos para cada modo que se utilice.
Central y Tipo de Combustible
SAN PEDRO VAPOR (F.O.#6), SAN LORENZO 1 (GAS
NATURAL), HAINA 4 (F.O.#6), PIMENTEL 1, 2 Y 3 (F.O.#6),
LOS ORIGENES (GAS NATURAL), SAN FELIPE (F.O.#2),
HAINA TG (F.O.#2)
Indisponibilidad Programada de Unidades:
ESTRELLA DEL MAR 2 SFO & SGN, CESPM 1 & 2.
AES ANDRES (GAS NATURAL)
31.4
56.1
24.0
(MW)
120.0
120.0
105.0
74.8
105.0
212.0
105.0
43.0
HAINA I & II (F.O.#6), PUERTO PLATA I & II (F.O.#6)
10.0
46.8
51.2
Evolución y Comportamiento del Costo Marginal:
*El Costo Marginal (CMg) es el Costo Variable necesario para producir una unidad adicional de energia considerando la demanda y el parque de generación disponible.
Resumen por Fuente Primaria de Generación:
85.0
94.0
Demanda SENI:
0.0
14.4
58.9
Precios Platt's Fuel Oil, Gas Natural y Carbón:
93.0
Potencia Disp. Acumulada (MW)
0.0
200.0
400.0
600.0
800.0
1,000.0
1,200.0
1,400.0
1,600.0
1,800.0
0.0
50.0
100.0
150.0
200.0
250.0
300.0
350.0
400.0
450.0
Lista de Mérito Programada para la Semana
CMg Tope Costo Variable de Despacho Potencia Disponible Acumulada a Potencia Bruta
Potencia Disponible Acumulada (MW)
CMG tope = 127.47 US$/MWh
Po
ten
ciaD
ispo
nib
le Acu
mu
lada (M
W)C
ost
o V
aria
ble
de
Des
pac
ho
(U
S$/M
Wh
)
CVD (US$/MWh)
6.24%
0.57%
17.83%
13.06%
51.10%
11.20%
Generación por tipo de Combustible (MWh)
Agua Viento Carbón Gas Natural Fuel Oil #6 Fuel Oil #2