List of Public Private Partnership (PPP) Projects (Punjab) Implementation Stage Sr. No Project Length Project Details Status Map (Km) 1 Service Areas - 10 Nos. (M-2) - Establishment of Ten (10) Service Areas under a 15 Years Concession Period - ON BOT BASIS Concession of M/s DAEWOO completed, now handed over to M/s MORE as part of M-2 Concession. Map View 2 Overlay and Modernization of Lahore-Islamabad Motorway (M2) 357 Overlay and application of Total Solution / Intelligent Transportation System (ITS) on 357 km long existing 6-lane Motorway - ON BOT BASIS Concessionaire : M/s MORE, Pakistan - Under Construction Map View 3 Habibabad Bridge (N-5) 2 Construction of new 4-lane Railway Overhead Bridge on N-5 with 2 Km approach roads - ON BOT BASIS Concessionaire : M/s HOME, Pakistan - Construction Completed Map View
8
Embed
List of Public Private Partnership (PPP) Projects …nha.gov.pk/wp-content/uploads/2016/04/Bot-Punjab-Final.pdfList of Public Private Partnership (PPP) Projects ... a 15 Years Concession
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
List of Public Private Partnership (PPP) Projects (Punjab)
Implementation Stage
Sr. No Project
Length Project Details Status Map
(Km)
1 Service Areas - 10 Nos. (M-2) -Establishment of Ten (10) Service Areas under
a 15 Years Concession Period - ON BOT BASIS
Concession of M/s DAEWOO completed, now handed over to M/s MORE as part of M-2 Concession.
Map View
2Overlay and Modernization of Lahore-Islamabad Motorway (M2)
357
Overlay and application of Total Solution / Intelligent Transportation System (ITS) on 357 km long existing 6-lane Motorway - ON BOT BASIS
Concessionaire: M/s MORE, Pakistan - Under Construction
Map View
3 Habibabad Bridge (N-5) 2 Construction of new 4-lane Railway Overhead
Bridge on N-5 with 2 Km approach roads - ON BOT BASIS
Concessionaire: M/s HOME, Pakistan -Construction Completed
Map View
List of Public Private Partnership (PPP) Projects (Punjab)
Development Stage -Upcoming Projects
1 Tarnol-FatehJang (N80) 32 Conversion of existing 2- lane carriageway into a 4-
2 Two Service Areas on M-4 -Construction of Two Service Areas on Faisalabad -
Gojra Section of M-4 Project Preparation Stage Map View
3 Operating Concessions of N-5 etc.Operating Concession of identified stretch of National
Highways and Motorways Project Preparation Stage Map View
Procurement StageSr.No
ProjectLength
Project Details Status Map(Km)
1 Tarnol - Taxila (N-5) 20
Improvement/widening of existing N-5 segment of 20 Kms length to provide a fast track facility of international standard. Scope of work also includes a flyover at Tarnol railway crossing - 6-Lane Facility.
Concession Negotiation stage
Map View
2Multan - Muzaffargarh - D.G. Khan (N-70)
80 Conversion of existing 2-lane highway into 4-Lane
divided facility including Bridge at Ghazi GhatConcession Negotiation stage