Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks 1 M/s. Hindalco Industries Ltd., (Exp. Project) Sr. No. 95/1, 95/2, Vill- Daheli, Tal- Mouda, Dist - Nagpur 197.34 Crs Establish (Expansion) JD(APC) 1 to 34 2 M/s. JSW Jaigad Port Ltd., Dhamankhol Bay, A/p- Jaigad, Tal & Dist - Ratnagiri 1644.10 Crs Establish (Expansion) JD(APC) 35 to 53 3 M/s. Trinity Landmarks LLP. S. No. 339 & Ors., Village Bhugaon, Tal. Mulshi, Dist. Pune 470.00 Crs. Establish RO(HQ) 54 to 61 4 M/s. Kirloskar Ferrous Industries Ltd., Gat No. 12 to 18/1 + 2 and 25/1, Shivshahi Solapur, Tal- North, Solapur 138.58 Crs Renewal JD(APC) 62 to 76 5 M/s. Godrej & Boyce Mfg. Co. Ltd., Gat No. 600,601,605, a/p- Wing, Tal- Khandala, Dist - Satara 137.78 Crs Renewal (Expansion) JD(APC) 77 to 95 6 M/s. Thyssenkrupp Electric Steel India Pvt. Ltd., A/p- Gonde, Vill- Wadivarhe, Tal- Igatpuri, Dist - Nashik 474.13 Crs Renewal JD(APC) 96 to 112 1 M/s. GE India Industrial Pvt. Ltd., Part of Plot No. F-27, Ranjangaon MIDC, Tal- Shirur, Dist - Pune 90.21 Crs 1st operate (Expansion & Amalgamatio n) JD(APC) 113 to 122 Resubmitted Agenda List of Cases to be submitted before 2nd Consent Appraisal Committee Meeting of 2013 scheduled on 31.05.2013 at 11.00 am Fresh Agenda
68

List of Cases to be submitted before 2nd Consent Appraisal

Sep 12, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: List of Cases to be submitted before 2nd Consent Appraisal

Sr. No. Name & Address Capital

Investment Applied For Section Page No. Remarks

1 M/s. Hindalco Industries Ltd., (Exp. Project) Sr. No. 95/1, 95/2, Vill- Daheli, Tal- Mouda, Dist - Nagpur

197.34 Crs Establish (Expansion)

JD(APC) 1 to 34

2 M/s. JSW Jaigad Port Ltd., Dhamankhol Bay, A/p- Jaigad, Tal & Dist - Ratnagiri

1644.10 Crs Establish (Expansion)

JD(APC) 35 to 53

3 M/s. Trinity Landmarks LLP. S. No. 339 & Ors., Village Bhugaon, Tal. Mulshi, Dist. Pune

470.00 Crs. Establish RO(HQ) 54 to 61

4 M/s. Kirloskar Ferrous Industries Ltd., Gat No. 12 to 18/1 + 2 and 25/1, Shivshahi Solapur, Tal- North, Solapur

138.58 Crs Renewal JD(APC) 62 to 76

5 M/s. Godrej & Boyce Mfg. Co. Ltd., Gat No. 600,601,605, a/p- Wing, Tal-Khandala, Dist - Satara

137.78 Crs Renewal (Expansion)

JD(APC) 77 to 95

6 M/s. Thyssenkrupp Electric Steel India Pvt. Ltd., A/p- Gonde, Vill- Wadivarhe, Tal- Igatpuri, Dist - Nashik

474.13 Crs Renewal JD(APC) 96 to 112

1 M/s. GE India Industrial Pvt. Ltd., Part of Plot No. F-27, Ranjangaon MIDC, Tal- Shirur, Dist - Pune

90.21 Crs 1st operate (Expansion

& Amalgamatio

n)

JD(APC) 113 to 122

Resubmitted Agenda

List of Cases to be submitted before 2nd Consent Appraisal Committee Meeting of 2013 scheduled on 31.05.2013 at 11.00 am

Fresh Agenda

Page 2: List of Cases to be submitted before 2nd Consent Appraisal

2 M/s. Enkel Wheels ( India) Ltd., Gat No. 1425, Vill- Shikrapur, Tal- Shirur, Dist - Pune

178.75 Crs Establish (Expansion)

JD(APC) 123 to 129

3 M/s. JSW Infrastructure Ltd., Vill- Nandgaon, Dist - Thane

117.50 Crs Establish JD(APC) 130 to139

4 M/s. Bekaert Industries Pvt. Ltd., B-1, MIDC Ranjangaon, Tal- Shirur, Dist - Pune

346.06 Crs Establish (Expansion)

JD(APC) 140 to 149

5 M/s. Bekaert Industries Pvt. Ltd., B-1, MIDC Ranjangaon , Tal- Shirur, Dist - Pune

249.26 Crs Renewal and 1st operate

for expansion

JD(APC) 150 to 158

6 M/s. MITC Rolling Mills Pvt. Ltd., B-1, MIDC Palkhed, Tal- Dindori, Dist - Nashik

92.3 Crs Establish JD(APC) 159 to 166

7 M/s. Hindustan National Glass & Industries Ltd., F-1, MIDC Malegaon Sinnar, Nashik

719.06 Crs Establish for change in

fuel

JD(APC) 167 to 175

8 M/s. Sudal Industries Ltd., B-11, MIDC Nardana, Tal-0 Sindhkheda, Dist - Dhule

104.55 Crs Establish JD(APC) 176 to 187

9 M/s. RSB Transmissions (I) Ltd., Gat No. 908, Nagar Road, Vill- Sanaswadi, Tal- Shirur, Dist - Pune

79.25 Crs 1st operate with

amalgamation

JD(APC) 188 to 197

10 M/s.Varroc Polymers Pvt. Ltd., (VPPL-II), E-88, MIDC Ranjangaon, Tal- Shirur, Dist - Pune

82.88 Crs Renewal with expansion

JD(APC) 198 to 206

11 M/s. Piaggio Vehicles Pvt. Ltd., E-2 & E-1, MIDC Baramti, Tal- Baramati, Dist - Pune

740.28 Crs Renewal JD(APC) 207 to 220

Page 3: List of Cases to be submitted before 2nd Consent Appraisal

12 M/s. Sandvik Asia Pvt. Ltd., Mumbai Pune Road, Dapodi, Pune

647.16 Crs Renewal JD(APC) 221 to 228

13 M/s. Piaggio Vehicles Pvt. Ltd., F-19, MIDC Baramati, Tal- Baramati, Dist - Pune

168.40 Crs Renewal JD(APC) 229 to 242

14 M/s. Forbes Marshal Pvt. Ltd., A-34/35, B- 15/16, H-Block, MIDC Pimpri, Pune

81.73 Crs Renewal JD(APC) 243 to 250

15 M/s. Viraj Profiles Ltd., Gut No. G-1/2, 1/3,2, MIDC Boisar-Tarapur, Tal- Palghar, Dist - Thane

299.03 Crs Renewal JD(APC) 251 to 260

16 M/s. Mutual Industries Pvt. Ltd., Gut No. 546/4 & 5, Vill- Shikrapur, Malthan Road, Tal- Shirur, Dist - Pune

84.06 Crs Renewal and 1st operate

for expansion

JD(APC) 261 to 270

17 M/s. Semco Electric Pvt. Ltd., (Unit-II), A-2, MIDC Chakan, Tal- Khed, Dist - Pune

82.65 Crs Renewal JD(APC) 271 to 282

18 M/s. Walchandnagar Industries Ltd., Walchandnagar, Tal- Indapur, Dist - Pune

186.17 Crs Renewal with expansion

JD(APC) 283 to 298

19 M/s. ISMT Ltd., ( Tube Plant) (B). B- 13, MIDC Baramati, Tal- Baramati, Dist - Pune

713.51 Crs Renewal JD(APC) 299 to 306

20 M/s. JBM MA Automotive Pvt. Ltd., C-1, (Part) MIDC Chakan Talegaon Road, Tal- Khed, Dist - Pune

214.53 Crs Renewal with expansion

JD(APC) 307 to 314

Page 4: List of Cases to be submitted before 2nd Consent Appraisal

21 M/s. Innoventive Industries Ltd., Gat No. 56/3,4,5, Shikrapur Chakan Road, Pimpale Jagtap, Tal- Shirur Dist - Pune

349.28 Crs Renewal and 1st operate

for expansion

JD(APC) 315 to 326

22 M/s. Tata Autocomp Systems Ltd., (Interior and Plastic Division), S No. 280 and 281, Vill- Man, Tal- Mulshi, Dist - Pune

75.41 Crs Renewal JD(APC) 327 to 334

23 M/s. Crompton Greaves Ltd., S. No. 1005, 1007-9, 1011,1013,1014,1019, Kanjurmarg E t M b i

280.06 Crs Renewal JD(APC) 335 to 353

24 M/s. Mahindra & Mahindra Ltd., Tractor Division, Akurli Road, Kandivali, Mumbai

783.79 Crs Renewal JD(APC) 354 to 372

25 M/s. Mahindra & Mahindra Ltd., S. No. 368,369 part 372 to 376, A/p- Talegaon, Tal- Iagatpuri, Dist - Nashik

319.77 Crs Renewal JD(APC) 373 to 382

26 M/s. ABB Ltd., Formerly known as ABB Global Services Ltd., Plot No. 79, MIDC Satpur, Tal & Dist - Nashik

106.76 Crs Renewal JD(APC) 383 to 390

27 M/s. Larsen and Toubro Ltd., Engineering Powai West Campus, Saki Vihar Road , Powai, Mumbai

347.50 Crs Renewal JD(APC) 391 to 406

28 M/s. Larsen and Toubro Ltd., Engineering Powai West Campus, Saki Vihar Road, Powai, Mumbai

286.27 Crs Renewal JD(APC) 407 to 420

Page 5: List of Cases to be submitted before 2nd Consent Appraisal

29 M/s. Jayaswal Neco Ltd., (Automotive Casting Division), Kh No. 70, 71-A, 71B and 76, Vill- Rhikhairi, 28/9, Mile Stone, Po-

168.79 Crs Renewal JD(APC) 421 to 431

30 M/s. Durabuild Technologies Pvt. Ltd., B-32/1, MIDC Area, Ranjangaon, Tal- Shirur, Dist - Pune

81.61 Crs Renewal JD(APC) 432 to 439

31 M/s. Virgo Engineers, Plot No. 278, Raisoni Park, Tal- Mulshi, Dist - Pune

92.05 Crs Renewal with expansion

JD(APC) 440 to 447

32 M/s. AAM India Mfg. Corporation Pvt. Ltd., Gat No. 787 & 788, Hanga, Tal- Parner, Dist - Ahmednagar

168.35 Crs Renewal JD(APC) 448 to 461

33 M/s. Everest Industries Ltd., 152 & 153, Lakhmapur, Tal- Dindori, Nashik

127.73 Crs Renewal JD(APC) 462 to 471

34 M/s. Endurance Technologies Ltd., Plot No. B-20, Chakan Indl. Area, Vill- Nighoje, Tal- Khed, Dist - Pune

86.34 Crs Renewal JD(APC) 472 to 481

35 M/s. Endurance Technologies Pvt. Ltd., L-6/3, MIDC Waluj, Aurangabad

98.10 Crs 1st operate (Expansion)

JD(APC) 482 to 491

36 M/s. Pimpri Chinchwad Municipal Corporation , EWS Project, Sector 17 & 19 (P), Chikhali, Pune

396.34 Crs. Operate (Part)

RO(HQ) 492 to 505

37 M/s. Pimpri Chinchwad Municipal Corporation Nigadi Project, Sector 22 at Nigadi, Pune

372.15 Crs. 1st Operate RO(HQ) 506 to 513

38 M/s. DSK Vishwa (D.D. Kulkarni Developers Ltd.), Kirkatwadi, Dhayri, Pune

331.73 Crs. 1st Operate (Part)

RO(HQ) 514 to 520

Page 6: List of Cases to be submitted before 2nd Consent Appraisal

39 M/s.Amit Enterprises Promoters & Builders Pvt. Ltd., Plot No. 16-1 to 16-32 and 16part, 16C part, 16JH part, 16part, 16KH part, 16G part, 16B part, 16CHH part, 16T part & 161 part, Baner, Pune

563.00 Crs. Establish RO(HQ) 521 to 528

40 M/s. Magus Estate & Hotels Ltd., CS No. 114 & extension on 1/136, 1A/136(pt), 1C/136, 1D/136, 1A/136 & 133(pt) & relocation of amenity plots + 13 pt, G/South ward, West, Mumbai

450.00 Crs. Establish RO(HQ) 529 to 540

41 M/s. N Kumar Projects & Infra Pvt. Ltd., VIP Road, Near Alankar Theater, Nagpur

77.98 Crs. Establish RO(HQ) 541 to 552

42 M/s. Neelam Hotel Pvt. Ltd., (Holiday Inn Shirdi), P. No. 106/2-3-4, Nimgaon Korhale, Shirdi, Tal. Rahata, Dist. Ahmednagar

93.18 Crs. Establish RO(HQ) 553 to 560

43 M/s. Nish Developers Pvt. Ltd., CTS No. 711/71…..3/52 to 53, New Islam Mill Compound Mahadev Palav Marg (Curry Road), Mumbai

595.10 Crs. Operate RO(HQ) 561 to 567

44 M/s. Eon Kharadi Infrastructure Pvt. Ltd., Plot No. 1, S, No, 77, Kharadi Knowledge Park, Kharadi, Pune

882.74 Crs. Renewal RO(HQ) 568 to 579

45 M/s. The Lalit Mumbai, M/s. Bharat Hotels Ltd., Sahara Airport Road, Andheri (E), Mumbai

241.08 Crs. Renewal RO(HQ) 580 to 588

46 M/s. Vamona Developers Pvt. Ltd., S. No. 33/2A/2, 33/ 2B/2 of Wadgon Sheri, Vimannagar, Opp. Giga Space, Pune

673.61 Crs. Renewal RO(HQ) 589 to 601

Page 7: List of Cases to be submitted before 2nd Consent Appraisal

47 M/s. Eco Motel Hotels Ltd. (Hotel Mercure), S. No. 78(pt) 3, Dasave Circle, Village Dasave, Tal. Mulshi, Dist. Pune

25.68 Crs, Operate AS(T) Lavasa

48 M/s. Ekaant Resort, S. No. 8/1, Village Padlaghar, Tal. Mulshi, Dist. Pune

6.79 Crs. Operate AS(T) Lavasa

49 M/s. Fortune Hotels Ltd., S. No. 42(pt), 43(pt), Vllage Dasave, Tal. Mulshi, Dist. Pune

40.15 Crs. Operate AS(T) Lavasa

50 M/s. Lavasa Bamboo Crafts Ltd., S. No. 60, Post Pathershet, Village Mugaon, Tal. Mulshi, Dist. Pune

1.56 Crs. Operate AS(T) Lavasa

51 M/s. Lavasa Corporation Ltd. (Hot Mix Plant), S. No. 3., Village Koloshi, Tal. Mulshi, Dist. Pune

30.68 Lacs Operate AS(T) Lavasa

52 M/s. Lavasa Corporation Ltd. (Ready Mix Concrete Plant), S. No. 30/4&5, Village Dasave, Tal. Mulshi, Dist. Pune

50.65 Lacs Operate AS(T) Lavasa

53 M/s. Spotless Laundary Services Ltd., S. No. 28, Village Bhoini, Tal. Mulshi, Dist. Pune

18.17 Crs. Operate AS(T) Lavasa

54 M/s. J W Marriot Hotel of Juhu Beach Resort Ltd., Juhu-Tara Road, Mumbai

350.36 Crs. Renewal RO(HQ) 678 to 685

55 M/s. Tata Consultancy Services Ltd., Yantra Park, Pokharan road No. 2, Thane

360.40 Crs. Renewal RO(HQ) 686 to 695

56 M/s. Upper Penganga Project (Sapli Dam), Sapli, Akkade, Belapur, Tal. Kalamnam, Dist. Hingoli

601.57 Crs. Establish RO(HQ) 696 to 703

57 M/s. Calcite Properties Developers Pvt. Ltd., Survey No. 145/2 & 2444, Vill. Nagaon, Tal. Alibag, Dist.

118.50 Crs. Establish RO(HQ) 704 to 711

602 to 677

Page 8: List of Cases to be submitted before 2nd Consent Appraisal

58 M/s. Bharati Vidyapeeth Educational Complex, Gat No. 1, Mauje Levale, Tal. Mulshi, Pune

451.00 Crs. Establish RO(HQ) 712 to 719

59 M/s. Syntel International P. Ltd.,B-1, B-2, Software Technology Park, Talwade, MIDC, Tal. Haveli, Dist. Pune

599.62 Crs. Renewal RO(HQ) 720 to 727

Section No. of CasesJD(APC) 40JD(WPC) 0AST 7RO(HQ) 18Total 65

Page 9: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    1 

RESUBMISSION AGENDA CAC Item No. 01

Name of the Industry: M/s. Hindalco Industries Limited (Expansion Project), Sr. No.95/1, 95/2, Village Daheli, Tal: Mouda,

Dist: Nagpur. Applied for Consent to Establish for Expansion.

1. Discussed in CAC dated 24.09.2012 and it was decided to review the assessment of pollution load proforma submitted by Industry thorough IIT, Mumbai regarding Certification on “No increase in pollution load” due to expansion.

2. The communication received from the unit on 29.11.2012 submitted that IIT Mumbai does not validate the pollution load increase and will take much time. The unit has requested for grant of consent to Establish based on commitment given by the industry and ready to undertake / implement any additional condition imposed by MPCB prior to commission of new equipment on the basis of IIT Mumbai at latter stage.

3. The case was again discussed in CAC dated 24.12.2012 and decided to keep the case in abeyance till self assessment report of industry for no increase in pollution load is received.

4. The was again discussed in CAC dated 5.3.2013 and it was decided to keep the case in abeyance and resubmit in next CAC after obtaining opinion from Shri Rakesh Kumar, NEERI regarding no increase in pollution load.

5. The proposal is examined by Dr. Rakesh Kumar, NEERI, Mumbai and informed that it is in line.

In view of above, we may put the modified proposal before CAC for further consideration on the grounds that there will not be any change in production quantity as per earlier granted one and decrease in water consumption.

Page 10: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    2 

CAC Item No. 02

Name of Industry:- M/s. JSW Jaigad Port Limited, Dhamankhol Bay, A/P:- Jaigad, Tal & Dist:- Ratnagiri The said case was discussed in CAC meeting haeld on 31/1/2012 & 14/2/2012. The

case was approved in CAC meeting of 31/1/2012 and was decided to grant the

consent to establish for Expansion. But the case was again discussed in CAC

meeting of 14/2/2012 as ther is applicability of Moratorium in Ratnagiri district and it

was decided to return the application as Board is unable to consider the case due to

moratorium. Now industry have resubmitted application alongwith the letter of MoEF

& Minutes of 122 Expert Appraisal committee, where in it is stated that this project is

considered as of National importance & is exempted from Moratoruim.

We may place the case before CAC for further discussions.

Page 11: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    3 

CAC Item No. 03

Name & Address M/s. Trinity Landmarks LLP,

S. No. 339 and others, Village Bhugaon,

Tal. Mulshi, Dist. Pune

1. Applied for C to E, residential and commercial complex for; Total Plot Area- 264939.00 M2

Total BUA - 425982.00 M2

2. Application received at 21/01/2013 and at HQ 26.03.2013

3. Water Requirement - 2187.00M3/day

Sewage generation - 1750.00 M3/day

8 STP’s proposed - 1760 M3/day

4. Solid Waste generation: Kg/Day

Biodegradable- 6458.00

Onsite segregation and Mechanical composting proposed.

Nonbiodegradable- 2768.0

Sale to authorized recycler.

5. RO has recommended the Case for C to E subject to condition of obtaining EC

6. The firm has not submitted/obtained EC.

7. The cases falls in the purview of CAC, and if considered, may be granted with BG of Rs. 10 lacs for providing STP and MSW processing plant, and no effective steps till EC is obtained.

Page 12: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    4 

CAC Item No. 04

Name of the Industry:-

M/s. Kirloskar Ferrous Industries Ltd. Gat No. 12 to 18/1 + 2 and 25/1

Shivshahi Solapur Tal. North Solapur 413 002

• Applied renewal of consent

• Application received at SRO- Solapur on dtd 10/12/2012 and at HQ on 28/01/2013.

• Industrial effluent (cooling) is 4.87 for which ETP provided

• Domestic effluent is 50 CMD from which they have provided STP

• Ventury scrubber to core oven section and wind turbo ventilators provided to different section for control of air pollution

• RO Pune has recommended for grant of consent to operate

• The case was discussed in CAC dt. 19/03/2013 and it was decided to keep the case in abeyance and put up in next CAC with clarification regarding increase in Capital investment and details of Bank guarantee. Accordingly, industry has submitted the same.

• We may grant of consent to operate up to 31/01/2016 with operational BG of Rs. 5/- Lakhs

• We may place the consent application before CAC for further consideration.

Page 13: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    5 

CAC Item No. 05

Name of the industry :- M/s. Godrej & Boyce mfg. Co. Ltd. Gat No. 600,601,605, A/P. Wing, Tal. Khandala, Dist. Satara 412 801

• Applied for renewal of consent with expansion

• Application received at SRO- Satara on dtd 01/11/2011 and at HQ on 03/11/2012

• Existing unit consent was valid up to 30/09/2012 & applied for renewal of consent

• Industry located @ 1.3 KM away from A-II class River NIRA. Not satisfy the RRZ distance criteria.

• Industrial Effluent Generation is Nil (existing 65 CMD) for which effluent treatment plant provided.

• Domestic Effluent Generation is NIL (existing 65 CMD) for which sewage treatment plant provided

• JVS analysis result of ETP dated 24/01/2012, 31/03/2012 and 15/10/2011are under prescribed limit.

• Adequate height of stack provided to DG set & various stack of existing unit & no additional air pollution control system are required as there is no additional fuel requirement.

• RO Pune has recommended the case for grant Consent

• The case has been discussed in the Consent Appraisal Committee meeting held on 31/01/2013 and decided to issue SCN for refusal for the unit running without consent for last 3 years for the product. SRO Satara submitted the reply 04/04/2013

• We may issue plain renewal of consent & refuse the expansion due to RRZ issue

• We may place the consent application before CAC for further consideration.

Page 14: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    6 

CAC Item No. 06

Name of the Industry: Thyssenkrupp Electric Steel India Pvt Ltd. A/p –Gonde, Vill: Wadivarhe, Tal: Igatpuri, Dist: Nashik. 1. Applied for grant of renewal of Consent to Operate on 24.12.2012.

2. Application grant of renewal of Consent to operate at H.Q. on 28.01.2013.

3. Paid Consent fee of Rs.48, 66,310/-.

4. Water Cess paid up to Sept-2012.

5. Environment Statement for the year 2011-2012 submitted.

6. SRO/RO Nashik recommended for grant of renewal of Consent to Operate up to

28.02.2018.

7. This case was discussed in the CAC meeting held on 19.03.2013 and it was

decided to keep case in abeyance and put up in next CAC with verification of C.I.

8. Industry has submitted justification vide letter dated 05.04.2013.Copy of letter is

enclosed.

9. Recommended for grant of renewal of consent to operate up to 28.02.2018 with

submission of operational BG of RS.10 Lakhs.

Page 15: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    7 

FRESH AGENDA

CAC Item No. 01

Name of the industry: - M/s. GE India Industrial Private Ltd Part of Plot No. F-27, Ranjangaon MIDC, Tal. Shirur, Dist. Pune

• Applied 1st Consent operate for expansion with amalgamtion

• Application received at SRO- Pune on dtd 28/01/2013 on 16/03/2013

• Existing plant Consent is valid upto 30/04/2015 in GREEN Category & C to E for expansion granted on 27/12/2012

• Industry is located @ 10 KM away from A-II Class River Ghod. Satisfy river distance criteria

• Industrial effluent will be generated from washing activity for which primary treatment is proposed and the treated effluent will be discharged into CETP Ranjangaon.

• For domestic effluent STP of the capacity 15 CMD, treated sewage used on land for gardening within premises.

• Adequate height provided to existing DG Set.

• Industry obtained the member of CHWTSDF MEPL Ranjangaon.

• Regional Officer, Pune, has recommended for the 1st Consent operate for expansion

• We may grant 1st consent to operate for expansion with amalgamation up to 30/04/2014 with imposing BG of 5/- Lakhs towards Operation & Maintenance of pollution control system

• We may place the consent application before CC for further consideration.

Page 16: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    8 

CAC Item No. 02

Name of the industry :- M/s. Enkel Wheel (India ) Ltd. Gat No. 1425, Village Shikrapur, Tal. Shirur, Dist Pune 412 208

• Applied for consent to establish for expansion

• Application received at SRO- Pune on dtd 06/02/2013 and at HQ on 14/03/2013

• Existing consent is valid up to 30/04/2014

• Existing domestic effluent qty is 80 CMD( Proposed 1.0 CMD) which will be treated in existing STP having capacity 125 CMD.

• APCS will be provided to Furnace and new DG Set.

• SRO reported that As per existing consent condition industry submitted operational BG of Rs 5/- lacs which is valid up to 30.04.2014.

• Regional officer Pune has recommended the case for grant of C to E for expansion.

• We may grant the consent to establish for expansion.

• We may place the consent application before CAC for further consideration.

Page 17: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    9 

CAC Item No. 03

Name of the Industry: M/s. JSW Infrastructure Ltd., Vill. Nandgaon, Dist. Thane.

1. Applied for Consent to establish for construction of cargo Port requiring total plot area is 470 Ha (390 Ha for port and 80 Ha for connectivity by road & rail.).

2. Application received at SRO-Tarapur-I on dtd 13/9/2012 and at HQ on dtd 07/01/2013.

3. Industrial effluent will be nil. 4. Domestic effluent will be 75 CMD. Provided STP. 5. Proposed to provide composting facility for treatment MSW. 6. “Boisar Vikas Manch” has submitted the letter dtd 16.11.2012 in regards,

environmental violation inability of MPCB of grant NOC to Nangaon Port Project of M/s. JSW infrastructure Ltd..

7. SRO reported, project proponent has applied to MoEF for EC accordingly public hearing is conducted on 7.10.2012. And work of construction is not yet started.

8. This office issued query Letter to industry dtd. 12.3.2013 for submission of MMB document & industry has submitted the same.

9. RO/SRO recommended for grant of consent to establish with subject to obtaining EC from MoEF with a condition that Project proponent shall not take any effective step before obtaining EC.

10. HOD Remark – we may grant of consent to establish subject to E.C / MCZMA approval.

We may pace the consent application before CAC for further consideration.

Page 18: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    10 

CAC Item No. 04

Name of the industry :- M/s. Bekaert Industries Pvt. Ltd. Plot No. B-1, MIDC Ranjagaon, Tal. Shirur, Dist. Pune

• Applied for consent to establish for expansion

• Application received at SRO- Pune on dtd 27/02/2012 and at HQ on 18/04/2012

• Previous consent was valid up to 31/03/2013

• Industry is located @ Ranjangaon MIDC which is 10.0 K.M. from notified river Ghod(Class-A-II) which satisfying RRZ criteria

• Industrial effluent generation will be increased by 6.0 CMD for which they have proposed to install additional Multi Effective Evaporator of 10 CMD capacity. Existing industrial effluent generation is 8 CMD for which they have already provided MEE of 10 CMD capacity.

• Domestic effluent generation will be increased by 2.0 CMD for which existing STP of 50 CMD capacity will be used for treatment. STP comprises of Bar Screen, Oil & Grease Trap, Equalization cum Holding Tank, MBBR Reactor, Tube Settler, PSF, ACF, Chlorination, Treated Water Tank. Treated industrial and domestic effluent will be used on land for gardening.

• As per the consent condition industry has submitted B. G. of Rs. 5 Lakhs which is valid upto 30.09.2013 towards operation and maintenance of ETP and air pollution control devices.

• RO Pune has recommended the case for grant of consent to establish for expansion

• We may grant consent to establish for expansion

• We may place the consent application before CAC for further consideration.

Page 19: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    11 

CAC Item No. 05

Name of the industry :- M/s. Bekaert Industries Pvt. Ltd. Plot No. B-1, MIDC Ranjagaon, Tal. Shirur, Dist. Pune

HOD Remarks:- • Applied for renewal of consent and 1st operate for expansion (Partly) with

amalgamation

• Application received at SRO- Pune on dtd 29/01/2012 and at HQ on 15/03/2012

• Previous consent was valid up to 31/03/2013

• Industry obtained consent to establish for expansion on dated 09/02/2009

• Industry stopped the Mfg of one product i.e. Filter cartridges/filter candles/filter elements

• Industrial effluent generation is 8 CMD for which they have provided multiple effect evaporator of capacity 10 CMD

• Sewage generation is 47 CMD for which industry has provided STP of capacity 50 CMD. Treated industrial and domestic effluent is used on land for gardening. Total Land available @ 6.0 Hector

• Industry has LPG base furnace with 18 Mtrs stack height. Further, 2 D. G. Set of 750 KVA and 500 KVA, are provided with HSD as fuel with 18 Mtrs stack height.

• As per the consent condition industry has submitted B. G. of Rs. 5 Lakhs which is valid upto 30.09.2013.

• RO Pune has recommended the case for grant of renewal of consent & 1st operate for expansion with amalgamation for the period upto 31.03.2014.

• We may grant renewal of consent with expansion with extension of existing of Rs. 5/- Lakh up to consent validity

• We may place the consent application before CAC for further consideration.

Page 20: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    12 

CAC Item No. 06 Name of Industry : M/s MITC Rolling Mills Pvt.Ltd,

Plot no.B-1, MIDC Palkhed, Tal: Dindori, Dist: Nashik.

1. Application for grant of renewal of consent to operate submitted by industry on 04.11.2012.

2. Application received at H.Q. on 09.01.2013. 3. Recommended case for grant of consent to establish subject to Industry shall

obtain Environmental Clearance

Recommended for grant of consent to establish subject to Industry shall obtain Environmental Clearance.

Page 21: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    13 

CAC Item No. 07

Name of Industry : M/s Hindustan National Glass & Industries Ltd, Plot no.F-1, MIDC Malegaon, Sinner,

Nashik, Dist: Nashik.

1. Application for consent to establish for change in fuel submitted by industry on 04.12.2012.

2. Application received at H.Q. on 28.01.2013. 3. Industry is having valid consent up to 31.10.2013. 4. SRO- Nashik has recommended case for consent to establish. 5. Recommended case for grant of consent to establish for change in fuel with

condition that industry shall submit the BG of Rs.5 Lakhs towards compliances of consent conditions

Page 22: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    14 

CAC Item No. 08

Name of the Industry: M/s. Sudal Industries Ltd. Plot no.B-11, MIDC, Nardana, Tal :Sindhkheda,Dist:Dhule.

1. Applied on 10.12.2012 for grant of consent to establish.

2. Application received to HQ on 02.02.2013.

3. RO-Nashik recommended for grant of consent to establish with the

condition of EC.

4. Industry has applied for mfg of Aluminium Alloy, rods, Billets, clad steel

wire products - 96,000 T/Year.[> 30,000 T/A].In the mfg process they

have proposed to use Alluminium ingot and Alluminium Scrap as a raw

material. mainly The mfg process mainly consisting furnace charging

,degassing/grain refiring and hot top casting activity. They have propose

to use 4 nos. of oil fired skelner type furnace –capacity of each furnace -

15 T ,Hence case was referred to committee constituted by the Board to

confirm applicability of EC .

5. Consent to establish may be granted after decision of Boards EC

committee regarding applicability of EC.

Page 23: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    15 

CAC Item No. 09

Name of Industry : M/s. RSB Transmissions (I) Ltd., Gat No. 908 Nagar Road, Village Sanaswadi,

Tal. Shirur, Dist. Pune 412 208

• Applied for 1st consent to operate with amalgamation

• Application received at SRO- Pune on dtd 24/12/2012 and at HQ on 13/02/2013.

• Existing consent is valid up to 30/06/2013 of M/s RSB Transmission.

• Now M/s Harnam Engineering merged with M/s RSB and M/s RSB has applied for 1st consent to operate for expansion

• The effluent generated from pre washing and post washing components, industry has provided ETP of 12 CMD capacity comprising collection, oil skimmer, filtration, treated effluent used on land for gardening.

• For domestic effluent STP of 30 CMD is provided and by clubbing M/s Harnam Engineering there is only increase in effluent by 1.6 CMD and total effluent is now become 26.6 CMD.

• Industry has provided fume extraction system with 30 mtrs stack height for existing heat treatment furnace and new addition of 4 furnaces, DG Set & shot blasting adequate height of stack provided.

• Shot blasting unit provided with in built dust collector. Dry paint booth provided with close room and vent.

• M/s Harnam Engineering submitted BG of Rs. 25000/- which is valid upto24.06.2013.

• Regional Officer, Pune, has forwarded the case regarding amalgamation of consent may be taken at HQ level.

• We may grant 1st consent to operate up to with amalgamation up to 30/06/2013 with forfeiting of exiting BG of Rs. 25000/- & taking another BG of Rs. 5/- Lakhs towards Operation & maintenance

• We may place the consent application before CAC for further consideration.

Page 24: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    16 

CAC Item No. 10

Name of the industry: M/s. Varroc Polymers Pvt. Ltd. (VPPL-II). E-88, MIDC Ranjangaon, Tal-Shirur, Dist-Pune.412 220

• Applied for renewal of consent with expansion

• Application received at SRO- Pune II on dtd 07/06/2012 and at HQ on 13/02/2013

• Previously consent was valid up to 31/05/2012

• Generation of Industrial effluent is 2.5 CMD & domestic effluent 61 CMD for which they have provided combine ETP & STP (Capacity of 70.0 CMD).

• APCS is provided to DG Set. Industry has shown the paint booth in application form, but as per visit report & their request letter they have stopped the painting activity.

• SRO Pune –II reported that, industry has already carried out expansion of the unit and started production without Boards consent to establish.

• Regional officer Pune has forwarded the case for Decision regarding grant of consent may be taken at HQ level as the industry has done expansion without obtaining consent to establish from the Board.

• We may issue SCN for refusal of consent

• We may place the consent application before CC for further consideration.

Page 25: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    17 

CAC Item No. 11

Name of the industry: M/s. Piaggio Vehicles Pvt. Ltd. E-2 & F-1, MIDC Baramati, Tal. Baramati, Dist. Pune 413 133

• Applied for renewal of consent

• Previous consent was valid up to 31/03/2013

• Application received at SRO-Pune-I on dtd 27/02/2013 and at HQ on 02/04/2013.

• Trade effluent generation is 623 CMD for which effluent treatment plant consisting of primary, secondary and tertiary treatment system provided.

• For domestic effluent 288 CMD sewage treatment plant provided

• Water curtain with scrubber to paint booth section provided.

• As per earlier consent condition industry has submitted B.G of 2.0Lakhs for provision of APC to paint booth which is valid up to 29/05/2013.

• Regional officer Pune recommended the case for grant of renewal of consent by imposing appropriate Bank guarantee towards operation & maintenance of ETP

• We may grant of renewal of consent with operational BG of Rs. 5/- Lakhs

• We may place the consent application before CAC for further consideration.

Page 26: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    18 

CAC Item No. 12

Name of the Industry: M/s. Sandvik Asia Privet Limited., Mumbai-Pune Road, Dapodi, Pune 412 220

• Applied renewal of consent

• Application received at SRO- PC on dtd 19/01/2013 and at HQ on 28/02/2013.

• Industry located @ 0.1 KM away from river Pawana (A-IV Class) attract RRZ

• Industrial effluent is 70.0 CMD & Domestic effluent is 180.0 CMD for which they have provided combine ETP & STP.

• Analysis results of JVS dated 30/03/2012,20/04/2012 are within the prescribed consent limits (copy enclosed).

• APC’s are provided to DG Set, process stack & paint booth section

• RO Pune has forwarded the case to HQ for Decision regarding grant of renewal of consent to operate with enhancement in C.I.

• We may issue SCN for refusal of consent.

• We may place the consent application before CAC for further consideration.

Page 27: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    19 

CAC Item No. 13

Name of the industry: M/s. Piaggio Vehicles Pvt. Ltd. F-19, MIDC Baramati, Tal. Baramati, Dist. Pune 413 133

• Applied for renewal of consent

• Application received at SRO-Pune-I on dtd 28/01/2013 and at HQ on 25/03/2013.

• Previous consent was valid up to 31/03/2013

• Indl. Effluent quantity increased from 60.30 CMD to 115 CMD for which they have provided effluent treatment plant and Dom. Effluent increased from 45 CMD to 65 CMD provided sewage treatment plant.

• Industry has provided water curtain with scrubber to paint booth section as APC.

• Regional officer Pune Recommended for grant of consent after submission details for increase in Indl. and Dom. Effluent

• We may grant of renewal of consent 31/03/2014 With operational BG OF Rs. 5/- Lakhs

• We may place the consent application before CAC for further consideration.

Page 28: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    20 

CAC Item No. 14

Name of the industry: M/s. Forbes Marshal Pvt.Ltd. Plot No.A-34/35,B-15/16,H-Block MIDC Pimpri,Dist-Pune 411 018

• Applied for renewal of consent

• Application received at SRO- Pune on dtd 20/12/2012 and at HQ on 28/01/2013

• Previously consent was valid up to 30/04/2011

• Generation of Industrial effluent is NIL

• Domestic effluent generation is 18 CMD. SRO Reported that industry has started the work of STP of capacity 30 CMD & said work will be completed by 15/01/2013.

• Industry is having closed dry type paint booth & to which bag filteration dust collector provided.

• Regional officer Pune has recommended for grant of renewal of consent to operate for period upto 30.04.2017.

• We may grant renewal of consent up to 30/04/2016 with operational BG of Rs. 5/- Lakhs & Company Board Resolution

• We may place the consent application before CC for further consideration.

Page 29: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    21 

CAC Item No. 15

Name of the Industry: M/s Viraj Profiles Ltd., Gut No. G – 1/2, 1/3, 2, MIDC Boisar – Tarapur, Tal. Palghar, Dist. Thane.

1. Applied for renewal of Consent to operate. 2. Application received at SRO-Tarapur-I on dtd 28.12.2012 and at HQ on dtd

20.2.2013. 3. Previous consent was valid upto 31/12/2012. 4. Industrial effluent is 61 CMD. Provided ETP disposal of MIDC drain connected

to CETP. 5. JVS results of Water sample on dtd 27.6.2012, 11.07.2012,. Which is

consented limit. 6. Domestic effluent is 9 CMD. Provided Septic tank and soak pit. 7. Industry has provided scrubber, dust collector & bag filter. 8. SRO reported that, 1) The industry is replacing the old induction furnace with

latest advance technology AVP auto induction furnace to control Air pollution. 2) P.D was issued vide No. MPCB/ROT/PD/80 dtd 10.01.2012 for fugitive emission and causing air pollution & Interim direction was issued vide no. MPCB/ROT/ID/B-333 dtd 7.02.2012 and submitted of B.G. of Rs. 8 lacs.

9. This office issued query Letter to industry dtd. 22/2/2013 for submission of consent fee & industry has submitted the same.

10. SRO recommended that grant of consent for 31.12.2013. 11. HOD Remark – we may grant renewal of consent upto 31/12/2013 with

the condition of extension of B.G. upto consent validity period. 12. We may pace the consent application before CAC for further

consideration.

Page 30: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    22 

CAC Item No. 16

Name of the Industry: M/s. Mutual Industries Pvt.Ltd. Gut no.546/4 & 5,Village-Shikrapur,Malthan Rd.

Tal-Shirur,Dist-Pune 412 208

• Applied for renewal of consent and 1st consent to operate for expansion with amalgamation

• Application received at SRO- Pune on dtd 30/01/2013 and at HQ on 02/04/2013.

• Previous consent was valid up to 31/01/2013 and obtained C to E for expansion on 10/10/2012.

• Industrial effluent generation is 19 CMD for which ETP of capacity 25 CMD consist of primary followed by tertiary treatment provided.

• Domestic effluent generation 6 CMD for STP Provided

• Treated industrial effluent is use for gardening along with treated domestic effluent.

• Adequate height of stack provided to DG Sets, water curtain with adequate height of stack provided to paint booth.

• Regional officer has recommended for grant of renewal of consent with amalgamation for expansion

• We may grant of renewal of consent with amalgamation with operational BG of Rs. 5/- Lakhs

• We may place the consent application before CAC for further consideration.

Page 31: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    23 

CAC Item No. 17

Name of the Industry: M/s. Semco Electric Pvt. Ltd. (Unit II), Plot No. A-2, MIDC Chakan, Tal- Khed, Dist- Pune 410 501

• Applied renewal of consent

• Application received at SRO- Pune on dtd 01/02/2013 and at HQ on 25/03/2013.

• Previous consent is valid up to 31/03/2013

• Generation of Industrial effluent is 97.70 CMD and Domestic Effluent generation is 100.90 CMD for which they have provided combine ETP for the treatment of industrial as well as domestic effluent. For the effluent generating from painting activities they have provided primary ETP and then it is taken to secondary and tertiary treatment. ETP consist of collection tank, oil trapper, reaction tank, tube settler, bio reactor, clarifier, treated water tank, pressure sand filter and SDB. Out of 97.7 CMD Treated effluent, 85 CMD recycled in process and remaining 12.7 CMD is used on land for gardening within premises

• Industry has provided water curtain with stack to paint booth, adequate height of stack to DG Set, Oven, meting furnace, shot blasting provided with dust collector and scrubber provided to pretreatment section.

• RO Pune has recommended the case for grant of renewal of consent to operate for the period upto 31.03.2014.

• We may grant consent to operate with imposing BG of 5/- Lakhs towards Operation & Maintenance of pollution control system

• We may place the consent application before CAC for further consideration.

Page 32: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    24 

CAC Item No. 18

Name of the industry : M/s. Walchandnagar Industries Ltd. Walchandnagar,Tal-Indapur,Dist-Pune 413 114

• Applied for renewal of consent with expansion

• Application received at SRO- Pune on dtd 09/08/2012 and at HQ on 02/04/2013

• Previous consent was valid up to 31/07/2011 in GREEN category.

• Generation industrial effluent such as coolent (Quantity not mentioned). SRO Pune -I reported that at present coolent is being discharged without treatment with domestic effluent.

• SRO reported that as per the consent, water consumption for domestic purpose is 2800 CMD and effluent generation is 454 CMD whereas actual water consumption for domestic purpose is an average 5728 CMD as per irrigation bill for the month of Nov. to Feb. 2012.

• Industry has near about 60-70 acres of land available for gardening purpose.

• For domestic effluent industry has provided following treatment facility at 06 locations.

• JVS result of on 30/10/2012 submitted in which one location parameter of BOD (140) COD (288) is exceeded the consented standards

• Industry has 02 nos.LDO fired furnace followed by 14 mtrs. Chimney.

• Industry has carried out shot blasting activity in temporary shed without any air pollution control system.

• RO Pune recommended for grant for renewal of consent after obtaining undertaking along with time bound programme form the industry to provide full-fledged STP for treatment of domestic sewerage generated from the industry.

• We may issue SCN for refusal of consent

• We may place the consent application before CAC for further consideration.

Page 33: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    25 

CAC Item No. 19

Name of the Industry: M/s. ISMT Ltd. Tube Plant (B), Plot No. B-13, MIDC Baramati, Tal- Baramati, Dist Pune 413133

• Applied renewal of consent

• Application received at SRO- Pune on dtd 17/01/2013 and at HQ on 14/03/2013.

• Previous consent was valid up to 31/10/2011

• Industrial effluent generation is 150 CMD for which ETP is provided with primary, secondary and tertiary treatment, SRO reported that tertiary treatment is not in operation.

• For 32 CMD domestic effluent industry has provided septic tank & soak pit.

• SRO Pune I reported that industry has not provided STP, even after issuance of notices/instructions, industry has not submitted the compliance of the same.

• JVS analysis result on 27/09/2012,22/08/2012 and 18/07/2012 submitted. parameter of pH, TDS,Chloride and sulphate not meeting the prescribed standards

• Industry has one Rotary Hearth Furnace,Thermic Fluid Heater,Quenching and Tempering furnaces each one is with adequate stack heights.

• Industry has installed scrubber at pickling section

• Industry has two nos. of D.G sets with adequate stack heights

• SRO Pune I reported that As per previous consent condition No.11 Industry has submitted BG of Rs1/- Lac which is valid up to 31/03/2013.

• RO Pune/SRO Pune-I recommended the case for grant of consent to renewal, subject to provision of STP, existing ETP upgradation and appropriate B.G for O&M of ETP and satisfactory reply of query

• We may place the consent application before CAC for further discussion.

Page 34: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    26 

CAC Item No. 20

Name of the Industry: M/s. JBM MA AUTOMOTIVE PVT.LTD., C - 1 (Part) MIDC Chakan Talegaon Road

Tal - Khed Dist – Pune 410 501

• Applied renewal of consent with expansion

• Application received at SRO- Pune on dtd 07/01/2013 and at HQ on 14/03/2013.

• Previous consent was valid up to 30/04/2012 in GREEN Category

• Now as per the revised CPCB guidelines sheet metal components with fabrication is under red category.

• Industry located @ 3.0 KM away from River Indrayani (A-II Class) Satisfy the distance criteria

• Industrial effluent generation is NIL

• For 40 CMD domestic effluent industry has provided septic tank & soak pit STP & industry has started work of STP and it will be completed up to April end

• RO Pune recommended the case for grant of Renewal of consent with expansion by obtaining BG for providing STP in time bound manner.

• As work is not completed of STP we may issue SCN for refusal of consent.

• We may place the consent application before CAC for further consideration.

Page 35: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    27 

CAC Item No. 21

Name of the industry : M/s. Innoventive Industries Ltd. Gat No. 56/3,4,5, Shikrapur Chakan Road, Pimpale Jagtap, Tal. Shirur, Dist Pune 412 208

• Applied for renewal of consent and 1st consent to operate for expansion with

amalgamation

• Application received at SRO- Pune on dtd 31/01/2013 and at HQ on 16/03/2013

• Existing plant consent was valid up to 30/01/2013 in Orange category

• Industry has obtained consent to establish for expansion 1st on 04/12/2012

• Industry located @ 2.5 KM away from River VEL. Satisfy the distance criteria.

• Industrial effluent generation is NIL (Existing NIL)

• Domestic effluent generation is 45 CMD for which sewage treatment plant provided.

• APCS in the form of stack of adequate height provided to DG Sets and Hot water generator.

• As per existing consent industry has submitted BG of Rs. 5 lac for O & M which is valid up to 28/05/2013 and also submitted Board resolution.

• We may grant renewal of consent with 1st consent to operate for expansion with amalgamation up to 31/12/2014

• We may place the consent application before CAC for further consideration.

Page 36: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    28 

CAC Item No. 22

Name of the industry : M/s. Tata Autocomp Systems Ltd. (Interior and Plastic Division), S.No. 280 and 281, Village- Mann,

Tal- Mulshi, Dist- Pune 411 057

• Applied for renewal of consent

• Application received at SRO- Pune on dtd 02/02/2013 and at HQ on 16/03/2013

• Previous consent was valid up to 31/03/2013

• Industrial effluent is 1.5 CMD for which they have provided ETP comprising of Primary, Secondary & Tertiary treatment.

• Domestic effluent is 28.0 CMD for which they have provided STP comprising primary, secondary & tertiary treatment facility.

• Industry has provided stack of 10.0 mtrs ht each for paint booth.

• DG Sets of 500 KVA- 2 Nos & 250 KVA installed for which stack of 4.5 mtrs above roof each provided along with aquatics enclosure.

• RO Pune has recommended the case for grant of renewal with enhancement in CI.

• We may grant renewal of consent upto 31/03/2016 with operational BG of Rs. 5/- Lakh

• We may place the consent application before CAC for further consideration.

Page 37: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    29 

CAC Item No. 23

Name of Industry : M/s. Crompton Greaves Ltd, Survey no.1005, 1007-9, 1011, 1013,1014,1017,1019 Kanjurmarg East, Mumbai-400042.

1. Application for grant of renewal of consent to operate submitted by industry on

21.12.2012.

2. Application received at H.Q. on 09.04.2013.

3. Industry has submitted Environmental statement for the period 2011-2012.

4. RO- Mumbai has recommended case for grant of consent to operate subject to

verification of no increase in production quantity.

5. Recommended to issue SCN for refusal for grant of consent to operate for non

provision of STP, Non submission of no increase in pollution load.

Page 38: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    30 

CAC Item No. 24

Name of Industry : M/s. Mahindra and Mahindra Ltd [Tractor Division], Akurli Road, Kandivali (E) Mumbai-400101.

1. Application for grant of renewal of consent to operate submitted by industry on 08.03.2013.

2. Application received at H.Q. on 18.04.2013. 3. Industry has submitted Environmental statement for the period 2011-2012. 4. RO- Mumbai has recommended case for grant of consent to operate up to

30.04.2015.

Recommended case for grant of renewal of consent to operate for up to 30.04.2015 with extension of existing BG up to consent validity period.

Page 39: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    31 

CAC Item No. 25

Name of Industry : M/s. Mahindra and Mahindra Ltd, Survey no.368, 369 part 372 to 376 A/p –Talegaon, Tal: Igatpuri, Dist: Nashik

1. Application for grant of renewal of consent to operate submitted by industry on 13.03.2013.

2. Application received at H.Q. on 09.04.2013. 3. Industry has submitted Environmental statement for the period 2011-2012. 4. RO- Nashik has recommended case for grant of consent to operate up to

30.09.2014 subject to submission of additional consent fees as per Sectorial approach circular.

5. Recommended case for grant of renewal of consent to operate for up to 30.09.2014 with condition that industry shall submit additional consent fees towards increase in CI and BG of Rs.5 Lakhs towards compliances of consent conditions.

Page 40: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    32 

CAC Item No. 26

Name of Industry : M/s. ABB Ltd, [Formerly known as ABB Global Services Ltd]

Plot no.79, MIDC, Satpur, Tal & Dist: Nashik

1. Application for grant of renewal of consent to operate submitted by industry on 02.02.2013.

2. Application received at H.Q. on 18.04.2013. 3. Industry has submitted Environmental statement for the period 2011-2012. 4. RO- Nashik has recommended case for grant of consent to operate up to

30.04.2016 subject to submission of additional consent fees. 5. Recommended case for grant of renewal of consent to operate for up to

30.04.2016 with condition that industry shall submit additional consent fees and extension of existing BG up to 30.04.2016.

Page 41: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    33 

CAC Item No. 27

Name of Industry : M/s. Larsen and Toubro Ltd. Powai East compus, Saki Vihar Road, Powai, Mumbai-400 072.

1. Application for renewal of consent to operate submitted by industry on 11.02.2013.

2. Application received at H.Q.on14.03.2013. 3. Industry has paid water cess up to 31.05.2012. 4. Industry has submitted Environment Statement for year 2011-12. 5. RO-Mumbai has recommended case for renewal of consent to operate up to

28.02.2015.

Recommended case for grant of renewal of consent to operate up to 28.02.2015 with condition that industry shall submit BG of Rs.5 Lakhs towards O &M of pollution control systems and submission of additional consent fees.

Page 42: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    34 

CAC Item No. 28

Name of Industry : M/s. Larsen and Toubro Ltd. Powai West compus, Saki Vihar Road, Powai, Mumbai-400 072.

1. Application for renewal of consent to operate submitted by industry on 07.12.2013.

2. Application received at H.Q. on 14.03.2013. 3. Industry has paid water cess up to 31.05.2012. 4. Industry has submitted Environment Statement for year 2011-12. 5. RO-Mumbai has recommended case for renewal of consent to operate subject

to submission of necessary information from industry. 6. Recommended case for grant of renewal of consent to operate up to

31.12.2015. With submission of BG of Rs.5 Lakhs towards operational and maintenance of pollution control systems and compliance of consent condition.

Page 43: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    35 

CAC Item No. 29

Name of the Industry: M/s. Jayaswal Neco Limited (Automotive Casting Division)Kh. Nos.70,71-A, 71B and 76, Vill: Ruikhairi, 28/9, Mile Stone, Mouza: Ruikhairi, PO: Butibori, Wardha Road, Dist: Nagpur. .

Applied for renewal of consent.

1. Earlier consent was valid up to 31.01.2013.

2. JVS results are exceeding the standards.

We may grant renewal up to 31.12.2014 with condition of forfeiting of existing

Bank Guarantee due to exceeding of JVS results and obtain additional Bank

Guarantee of Rs. 5/- Lakhs towards Operation and Maintenance of air pollution

control system. .

Page 44: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    36 

CAC Item No. 30

Name of the industry: M/s. Durabuild Technologies Pvt. Ltd. B-32/1, MIDC Aera , Ranjangoan, Tal. Shirur, Dist. Pune 412 220

• Applied for renewal of consent

• Application received at SRO-Pune-I on dtd 01/04/2013 and at HQ on 23/04/2013.

• Previous consent was valid up to 28/02/2013

• Indl. Effluent quantity 1.5 CMD for which they have provided effluent treatment plant and Dom. Effluent 7.5CMD provided sewage treatment plant.

• Industry has provided LPG base boiler with 14 Mtrs stack height. D. G. Set of 250 KVA with HSD as fuel with 6.0 Mtrs., stack height. Industry has two chambered incinerator having stack height of 20 Mtrs.

• Regional officer Pune recommended for grant of renewal of consent to operate

with enhancement in C.I. for the period upto 28.02.2014

• We may grant of renewal of consent 28/02/2014 With operational BG OF Rs. 5/- Lakhs

• We may place the consent application before CAC for further consideration.

Page 45: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    37 

CAC Item No. 31

Name of the industry: M/s. Virgo Engineers, Plot No. 278, Raisoni Park, Tal:- Mulshi, Dist:- Pune 411057

• Applied for renewal of consent with expansion.

• Application received at SRO-Pune-I on dtd 22/02/2013 and at HQ on 18/04/2013.

• Previous consent was valid up to 30/09/2011

• Indl. Effluent quantity 4.5 CMD for which they have provided effluent treatment plant of 5.0 CMD capacity and Dom. Effluent 41.0 CMD provided sewage treatment plant of 55 CMD capacity.

• Industry has provided APCs to paint booth, shot blasting unit and DG sets.

• Regional officer Pune recommended for grant of renewal of consent with expansion subject to submission of reply to queries raised by SRO.

• We may issue SCN for refusal of consent .

• We may place the consent application before CAC for further consideration.

Page 46: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    38 

CAC Item No. 32

Name of the Industry: M/s AAM India Manufacturing Corporation Pvt Ltd , Gat No. 787 & 788, Hanga, Tal- Parner Dist: Ahmadnagar.

1. Applied for grant of renewal of consent to operate with Amalgamation at SRO

Ahmednagar on 18.02.2013.

2. Application for grant of consent to operate received to HQ on 18.04.2013.

3. Industry is having valid consent up to 31.10.2013 and consent to establish.

4. SRO- Nashik has recommended case for grant of Renewal of consent to

operate and decision regarding the expansion may be taken at H.Q.level..

5. Renewal of consent to operate with expansion may be granted up to

31.03.2016 with the condition that submission of BG of Rs.5 Lakhs towards the

operation and maintenance of pollution control system.

Page 47: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    39 

CAC Item No. 33

Name of the Industry: M/s Everest Industries Ltd., 152 & 153, Lakhmapur, Tal- Dindori, Dist: Nashik.

1. Applied for grant of renewal of consent to operate with RO-Nashik on

29.01.2013.

2. Application for grant of consent to operate received to HQ on 09.04.2013.

3. Industry is having valid consent up to 31.10.2013.

4. Industry has paid water cess up to Aug-2012.

5. Industry has submitted Environmental statement for year 2011-2012.

6. Recommended grant of Renewal of consent to operate upto 31.03.2016 with

the condition that submission of BG of towards the operation and maintenance

of STP.

7. Recommended to issue SCN for refusal for grant of renewal of consent to operate.

Page 48: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    40 

CAC Item No. 34

Name of the Industry: M/s. Endurance Technologies Ltd. Plot no. B-20, Chakan Industrial Area,

Vill-Nighoje, Tal-Khed, Dist:- Pune 410 501

• Applied for renewal operate

• Application received at SRO- Pune on dtd 21/01/2013 and at HQ on 16/03/2013.

• Generation of Industrial effluent is 40.0 CMD

• Domestic Effluent is 45.0 CMD

• Combined ETP provided for the treatment of industrial and domestic effluent. Treated effluent is used for toilet flushing and remaining used on land for gardening within premises

• APCS in form of water curtain with stack provided to paint booth, dust collector followed by stack provided to shot blasting section, for degreasing fume extraction system with adequate height stack provided, acoustic enclosure with stack provided to DG Set,

• RO Pune has recommended the case for grant of renewal of consent to operate by imposing operational BG.

• We may grant consent to operate up to 28/02/2016 with imposing BG of 5/- Lakhs towards Operation & Maintenance of pollution control system

• We may place the consent application before CAC for further consideration.

Page 49: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    41 

CAC Item No. 35

Name of Industry: M/s. Endurance Technologies Pvt. Ltd. , Plot No. L-6/3, MIDC Waluj, Aurangabad.

1. Applied for renewal of consent with first operate for expansion. 2. Existing consent valid upto 28/2/2013 and have obtained consent to establish

for expansion. 3. The CI is Rs. 98.10 crores and existing CI including expansion was Rs. 85.5

crores, increase is of Rs. 12.60 crores, it is due to actual cost of expansion, 4. Provided ETP, JVS results are within limit. 5. Stack air monitoring results are exceeding the limits. 6. Ro recommended forfeiture of existing BG of Rs. 1.0 lacs and to obtain fresh

BG of Rs. 2.0 lacs. 7. We may forfeit the existing BG and obtain fresh BG of Rs. 5.0 lacs. 8. We may place the case before CAC for further discussions.

Page 50: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    42 

CAC Item No. 36

Name of the Industry: Pimpri Chinchwad Municipal Corporation EWS Project

Sector 17 and 19 (P) Chikhali, Pune

1. Application for consent to 1st Operate 114 nos. of buildings

Plot Area – 2,53,018.50 M2

Total BUA (FSI) – not furnished

Total Construction Area – not furnished

2. Application received at SRO 16/02/2013 at HQ on 16/04/2013

3. Water Consumption – Water requirement is - 4536 CMD

Sewage generation is – 3629 CMD

Separate STP is not provided and Corporation has proposed to treat the sewage generated at this site in their designated STPs provided for the area.

4. The Solid Waste generation -

Biodegradable -8232 kg/day- Composting

Non- Biodegradable -3528 kg/day

Separate MSW processing plant is not provided and Corporation has proposed to treat the MSW generated at this site in their designated Composting Plant at Moshi.

5. Consent may be granted with standard condition of BG

Page 51: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    43 

CAC Item No. 37

Name of the Industry: Pimpri Chinchwad Municipal Corporation Nigad Project

Sector 22, Nigadi, Pune

1. Application for consent to 1st Operate for for 35 Nos. of Buildings on;

Plot Area – 3,98,624.06 M2

Total BUA (FSI) – not furnished

Total Construction Area – not furnished

4. Application received at SRO 18/02/2013 at HQ on 16/04/2013

5. Water Consumption – Water requirement is - 1930.71 CMD

Sewage generation is – 1544.57 CMD

Separate STP is not provided and Corporation has proposed to treat the sewage generated at this site in their designated STPs provided for the area.

4. The Solid Waste generation -

Biodegradable -1960 kg/day- Composting

Non- Biodegradable -840 kg/day

Separate MSW processing plant is not provided and Corporation has proposed to treat the MSW generated at this site in their designated Composting Plant at Moshi.

5. Consent may be granted with standard condition of BG

Page 52: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    44 

CAC Item No. 38

Name of the Industry: M/s DSK Vishwa (D.D. Kulkarni Developers Ltd.) Kirkatwadi, Dhyari, Pune

1. Application for consent to 1st Operate in part for Plot Area – 3,73,754.20 M2

Total Construction Area – 2,28,727.37 M2

2. Application received at RO 04/03/2013 at HQ on 10/04/2013 3. EC obtained vide No. SEAC-2010/CR.880/TC.2 dt. 20/10/2011 for; Plot Area – 3,73,754.20 M2

Total BUA (FSI) – 3,08,143.20 M2 Total Construction Area – 4,61,458.32 M2

4. Water Consumption –

Water requirement is – 1889.00 CMD Sewage generation is – 1511.00 CMD STP provided – 2 STPs of capacity - 1000.00 + 1250 .00 CMD

5. The Solid Waste generation -

Biodegradable – 4405 kg/day- Onsite Composting provided

Non- Biodegradable –1907 kg/day 6. Ro has recommended the case for grant of consent to operate in part.

7. The case may considered with BG of Rs. 10 lacs for provision of MSW processing plant and STP

Page 53: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    45 

CAC Item No. 39

Name of Industry: M/s. Amit Enterprises Promoters & Builders Pvt. Ltd. , Plot. No. 16-1to16-32 and 16part, 16C part, 16JH part, 16part, 16KH part, 16G part, 16B part, 16CHH part, 16T part & 16J part, Baner, Pune.

1. Application for consent to establish for: Total Plot area – 70482.00 M2 Total Built up area – 136720.95 M2 Total Construction Area – 138261.00 M2

2. Application received at SRO on 02/03/2013 and at HQ on 16/04/2013 3. EC obtained vide No. SEAC-2011/CR-971/TC-2 dt. 27/11/2012 for;

Total Plot area – 70482.00 M2

BUA – 136720.95 M2

4. Water requirement is -698 CMD

Sewage generation is -539 CMD 2 Nos. of STPs proposed of capacity 400 CMD and 175 CMD.

5. MSW generation: Non –Biodegradable Waste - 784.8 kg/day Biodegradable Waste -1177.0 kg/day

Onsite MSW processing plant is proposed.

6. Regional Officer has recommended the case for establish. 7. Consent may be granted with the condition of obtaining BG of Rs. 10 lacs for providing MSW

processing plant and STP.

Page 54: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    46 

CAC Item No. 40

Name of Industry: M/s. Magus Estate & Hotels Ltd. S. No. 114 and extension on 1/136,1A/136(pt),1C/136,1D/136,1A/136 &133(pt) relocation of amenity plots+133 pt, G/South ward, Worli, Mumbai

1. Application for consent to establish (II Phase) for: Total Plot area – 17,243.43 M2 Total BUA (FSI) – 36,142.00 M2 Total Construction Area – 80,155.08 M2 (Height – 187.17 M)

CI - 45000.00 Lacs

2. Application received at SRO on 11/03/2013 and at HQ on 12/04/2013 3. EC obtained vide No. SEAC-2010/CR.562/TC.2 dt. 20/10/2011 for; Plot Area – 17,243.43 M2

Total BUA (FSI) – 36,142.00 M2 Total Construction Area – 80,155.00 M2 (Height – 186.17 M)

CI - 100000.00 Lacs

4. Water requirement is -127 CMD

Sewage generation is - CMD STP proposed -320 CMD

5. MSW generation: Biodegradable -233.43 kg/day- (Onsite composting proposed) Non- Biodegradable -213.56 kg/day

6. SRO reports that the firm has reduced the height of the building from 370 mtrs. to 187.17 mtrs. due to restriction by civil aviation, hence proposed capital investment in the II Phase of the project has been decreased to 450 Crs.

7. However EC is granted for 186.17 mtrs. with CI of Rs. 1000 Crs. 8. The firm has not submitted the details of existing Hotel activity such as;

a) Total plot and construction areas b) Whether any previous consent has been obtained or not, c) Details STP and MSW plant and d) Reduction in C.I.

9. RO has recommended the case for Establish 10. Submitted before CAC for decision

Page 55: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    47 

CAC Item No. 41

Name & Address of Industry M/s. N Kumar Projects & Infra. Pvt. Ltd VIP Road, Near Alankar Theater, Nagpur

1. Red/LSI/Proposed construction of Hotel, Restaurant and Swimming Pool activity (114 rooms) for:

Total Plot area is – Not furnished

Total Built up area - Not furnished

2. Application received at SRO on 04/05/2012 and at HQ on 19/05/2012

Water Consumption –

Domestic –153 CMD

Sewage generation –98 CMD

STP Proposed –Capacity not furnished

Cooling –30 CMD

3. The Solid Waste generation -24 Kg/Day

4. The case was placed before CC, meeting held on 04/01/2013. SCN was issued as per directions of CC on 01/02/2013. Thereafter reminder was issued on 08/04/2013, reply still awaited.

5. SRO has recommended the case for grant of consent to establish.

6. Application may be refused for non submission of reply to SCN and Reminder.

Page 56: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    48 

CAC Item No. 42

Name of the Industry: M/s. Neelam Hotel Pvt. Ltd.

(Holiday Inn Shirdi), P.No. 106/2-3-4, Nimgaon Korhale, Shirdi,

Tal- Rahata, Dist- Ahmednagar

1. Application for consent to Establsih for

Construction of Hotel Five Star with laundry and Swimming Pool activity (152 rooms) for:

Total Plot area is – 18,600.00 M2

Total Built up area - 6784.00 M2

3. Application received at SRO 20/03/2013 at HQ on 05/04/2013

4. Water Consumption – Domestic - 115 CMD

Sewage generation - 55 CMD

Industrial - 151 CMD

Effluent Gen. 34 CMD

STP Proposed – 200 CMD

5. The Solid Waste generation -

Bio degradable- 500 Kg/Day

Composting Proposed

Dry Garbage- 500 Kg/Day

6. Ro has recommended the case for C to E.

7. Consent may be granted with BG of Rs. 10 lacs for providing MSW processing plant and STP.

Page 57: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    49 

CAC Item No. 43

Name & Address of the Industry M/s. Nish Developers Pvt. Ltd. CTS No. 71 1/71…. 3/52 to 53, New Islam Mill Compound, Mahadev Palav Marg (Curry Road) Mumbai

1. Application for 1st consent to operate in part. 2. Application received at SRO on 25/03/2012 and at HQ 05/04/2013 3. C to E issued vide No.379 dt.11/09/2008 for; Total Plot area – 34,697.00 M2 BUA – 1,38,787.74 M2 4. EC obtained vide No. SEAC-2010/CR.880/TC.2 dt. 20/10/2011 for; Total Plot area – 34,697.00 M2 BUA – 1,38,787.74 M2 Total Construction Area – 3,75,113.13 M2

5. Now applied for: Plot Area – 26,247.12 M2 Construction Area – 18,627.62 M2

5. Water requirement is – 380.00 CMD Sewage generation is – 350.00 CMD STP provided – capacity not furnished

6. MSW generation: quantities not furnished 7. RO has recommended the case for grant of consent to operate in part.

8. Consent may be granted with BG of Rs. 10 Lakhs for O & M of STP and provision and thereafter

operation of MSW plant and submission of undertaking on part construction.

Page 58: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    50 

CAC Item No. 44

Name of Industry: M/s Eon Kharadi Infrastructure Pvt. Ltd., Plot no. 1`, S.No. 77, Kharadi Knowledge Park, Kharadi, Pune-411014

1. Proposal of Ro Pune for 1st C to O.

2. The application of the firm is not received with the proposal from the Pune. Letter has been issued to Ro Pune on 12/12/2011

3. Application Received at SRO on 23/12/10 and the proposal of Ro Pune is received at HQ

on 30/11/2011.

4. The project proponent has obtained EC of GOI vide No. 21-57/2006-IA.III dt. 17/05/2006.

5. The C to E is issued on 09/08/2010

6. Industry has provided adequate STP.

7. RO has recommended the case for grant of consent to operate.

8. Consent may be granted condition of obtaining BG of Rs. 10 lacs and necessary fees as

per GR dt.25/08/2011.

Page 59: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    51 

CAC Item No. 45

Name of Industry: The Lalit Mumbai,

M/s. Bharat Hotels Ltd.

Sahara Airport Road, Andheri (E), Mumbai

1. Resubmission case was placed before 31/01/2013; it was decided to issue SCN for refusal regarding clarification for ETP and decrease in CI.

2. Application received at SRO on 30/11/2012 and at HQ on 21/12/2012

3. The firm has replied to SCN vide letter dated 05/03/2013; wherein there is no clarification on the reasons for decrease in CI, shifting to ozonisation Method for Swimming Pool and also firm has not provided MSW processing plant.

4. RO has recommended upto 31/05/2014 after receipt of fees of rs. 2,41,080/-

5. Consent may be renewed with the condition of obtaining BG of Rs. 10 Lacs for operation and maintenance of STP and MSW processing plant and shifting to Ozonisation methods for Swimming Pool.

Page 60: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    52 

CAC Item No. 46

Name of Industry: M/s Vamona Developers Pvt. Ltd. ,

S.No. 33/ 2A/2, 33/ 2B/2 of Wadgon Sheri,

Vimannagar, Opp. Giga Space, Pune

1. Application for renewal of consent for

Total Plot area -- 79,881.00 M2

Total Construction area --60,436.28 M2

2. Application received at SRO on 28/02/2012 and at HQ on

3. Previous consent valid upto31/03/2013 for;

Total Plot area - 79,881.00 M2

Total Construction area - 60,436.28 M2

3. The firm has obtained EC vide No. SEAC 2010/CR.62/TC.2 dt. 30/06/2010.

4. The firm has not complied with the previous consent conditions of

a. Submitting Affidavit on built up area and total construction area in consensus with Environmental Clearance.

b. Environmental Statement

c. Water analysis report

d. Payment of CESS

e. Details on 80 % water recycling and affixing of separate meter therein for records.

5. The firm has shown increase in C.I. of the project from 54976 to Rs. 673.61 Crs., without any justification.

Page 61: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    53 

CAC Item No. 47 to CAC Item No. 53 (LAVASA)

Name of Industry: M/s. Lavasa Corporation Ltd., (Parent Organization) Tal. Mulshi & Velhe, Dist. Pune. Sub-Units/ Industries in development of Phase-I of Hill Station over 2,000 Ha. Area: 1.M/s Eco Motel Hotels Ltd. (Hotel Mercure ), S.No. 78(pt),3, Dasave Circle, Village Dasave, 2.M/s Ekaant Resort, S.No. 8/1, Village Padlaghar, 3.M/s Fortune Hotels Ltd., S.No. 42(pt),43(pt), Village Dasave, 4.M/s Lavasa Bamboo Crafts Ltd., S.No. 60, Post Pathershet, Village Mugaon, 5.M/s Lavasa Corporation Ltd.(Hot Mix Plant), S.No.3, Village Koloshi, 6.M/s Lavasa Corporation Ltd.(RMC Plant), S.No.30/4&5, Village Dasave, 7.M/s Spotless Laundary Services Ltd., S.No.28, Village Bhoini,

1. Application for grant of Consent to Establish/Operate for various Sub-Units / Industries in Phase-I of Lavasa Hill Station over 2,000 Ha. area by M/s Lavasa Corporation Ltd. at Tal. Mulshi Dist. Pune were received at R.O. (Pune) in between 9th July 2010 and

8th May 2012. 2. Board vide Consent No. BO/Pune-2/O/CC-3 dtd. 5/01/2005 has granted Consent to

Operate under “Orange” category with the validity upto 30/04/2014 to M/s Lavasa Corporation Ltd. for development of land of 17 villages as a Tourism Project on 6181.3743 Hectares with incidental utilities and services.

3. MoEF, GoI vide letter F. No. 21-9/2011-IA.III dtd. 9/11/2011 has accorded Environmental Clearance for development of 1st phase of Hill Station Township on a plot area of 2,000 Hectares at village Mulshi and Velhe Talukas, Dist. Pune, Maharashtra by M/s Lavasa Corporation Ltd.

4. Applications of the Hotels (3 Nos.) were handled by A.S.(Tech.) Section; applications of Hot Mix Plant, RMC Plant and Bamboo Craft Works were handled by J.D. (APC) Section and that of Laundry was handled by R.O.(HQ) Section.

5. These files were routed to Legal wing for opinion about applicability of RRZ Policy / EC and kept pending due to action initiated by MoEF on M/s Lavasa Corpn., Court cases

and absence of guidelines. 6. Upon receipt of written request dtd. 27/12/2012 from Chief Planner, Lavasa Corp. Ltd.

Page 62: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    54 

Hon’ble Chairman & Member Secretary has instructed to expedite the disposal of pending applications.

7. Hon’ble Member Secretary discussed the issues of pendency with SLO, AS(T), JD(APC) & RO(HQ) on 28/02/13 and entrusted job of preparing guidelines for quick disposal of the applications with SLO.

8. SLO has prepared guidelines on 14/03/13 and forwarded to Member Secretary through RO(HQ)/JD(APC)/JD(WPC).

9. Hon’ble Member Secretary instructed AS(T) on 2/04/13 to prepare combined agenda of the pending 7 Nos. applications of M/s Lavasa Corporation Ltd., Phase-I Hill station project for placing these cases in the ensuing CAC meeting for taking further decision of grant of Consent to Operate to these units.

10. R.O.(Pune) has forwarded these cases for taking suitable decision as the matter is also pending at CJM, Pune and High Court, Mumbai.

11. It is felt that we may treat M/S Lawasa Corporation Ltd. as a township and the activities which are being operated under separate management can be given separate consent as we issued in the corporation areas, as per the delegation of power. The remaining activities can be covered under Lawasa Corporation and can be issued combine consent for the entire project. The policy decision in this regards may be taken in CAC.

12. As far as responsibility for omission or non compliances in respect of waste management will be jointly and several. Also as per the consent condition no. 12, the proponent is suppose to pay the consent fees every after two year based on the investment made. However they have failed to do so. Hence as per the present fee calculations, the proponent needs to pay the consent fee of Rs. 27,23,500/-.

13. The consent to operate issued earlier to M/s. Lawasa Corporation Ltd. needs to be amended as per the E.C. granted to them. Fresh Consent to Operate may be granted pto 30/04/2014 to parent Company M/s Lavasa Corporation Ltd. for development of the Phase-I of the Hill Station over 2,000 Ha area as per Environmental Clearance granted by MoEF, GoI vide letter F. No. 21-9/2011-IA.III dtd. 9/11/2011 with overriding effects over earlier Consent to Operate granted by the Board dtd. 5/01/2005 after recovering difference of the Consent fees of Rs. 27,23,500/- subject to condition of compliance of the EC conditions and submission of B.G. of Rs. 10.0 Lakhs towards compliance of Consent conditions / 0&M of pollution control facility. Consent to Operate may also be granted for 7 Nos. sub-units / industries in Phase-I of Lavasa upto 30/04/2014 after recovering difference of the Consent fees as per Chart enclosed.

Page 63: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    55 

CAC Item No. 54

Name of Industry: M/s J W Marriot Hotel of Juhu Beach Resort Ltd, , Juhu - Tara Road, Mumbai-49

1. Application for Renewal of consent 2. Application received at SRO on 29/12/2012 and at HQ at 20/03/2013. 3. Resubmission Case, was placed before CAC of 19/03/2013, wherein it was decided

to keep the case in abeyance and put up to next CAC with reply to letters dated 04/01/2013, 16/01/2013 and 07/02/2013

4. Reminder letter written issued on 04/05/2013, reply awaited.

5. Submitted before CAC for decision

Page 64: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    56 

CAC Item No. 55

Name of Industry : M/s Tata Consultancy Services Ltd. , Yantra Park, Pokharan Road No.02, Thane

1. Application for renewal of consent 2. Application received at SRO on 30/09/2011 and at HQ on 30/03/2012.

3. Resubmission case was placed before CAC of 22/03/2013, wherein it was decided to keep the case in abeyance and put up to next CAC after examination of applicability of EIA notification

3. In minutes of discussion held in legal dept, on 25/02/2013 it is mentioned that the plinth has been completed prior to 2004 and on that basis Board has informed to firm that the project does not attracts EIA notification and MPCB has already granted consent to operate on 23/03/2010 valid upto 23/03/2012.

4. Submitted before CAC.

Page 65: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    57 

CAC Item No. 56

Name and Address of the Industry: Upper Penganga Project (Sapli Dam) Sapli, Akhada Balapur, Tq. Kalamnuri,

Dist. Hingoli

HOD Remarks:

1. Applied for consent to establish for proposed Sapli Dam, Upper Penganga Project.

2. Application received at SRO on 14/01/2013 and at HQ 01/02/2013

3. The firm has not obtained EC.

4. Waste water generation is Nil

5. Solid waste generation is Nil.

6. RO has recommended the case for C to E subject to condition of obtaining EC

7. Consent may be granted with BG of Rs. 10 lakhs for consent conditions and not ot take any effective steps till EC is obtained.

Page 66: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    58 

CAC Item No. 57

Name & Address of the Industry: Calcite Proprerties developer Pvt Ltd,

Survey No. 1452/2 & 2444,

Vill. Nagaon, Tal. Alibag, Dist. Raigad

HOD Remarks

1. Resubmission Case was placed before CAC of 12/03/2013, wherein it was decided to get clarification regarding recycling of effluent and plantation.

2. The application recived at SRO on 22/01/2013 and at HQ on 20/03/2013

3. The firm has sufficient land for reuse the treated effluent.

4. The firm has obtained EC vide No.11-62/2010-1A-III dated 26/12/2012

5. RO has recommended the case for grant of C to E

6. Consent may be granted with BG of Rs. 10 lakhs for provision of MSW processing plant and STP.

Page 67: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    59 

CAC Item No. 58

Name & Address M/s. Bharati Vidyapeeth Educational Complex,

Gat No. 1, Mauje Levale, Tal- Mulshi, Pune

1. Applied for C to E, Education complex Project Total Plot Area- 11,29,100 M2

Total Construction area - 18,526.98 M2

2. Application received at 08/11/2012 and at HQ 18/12/2012

3. Water Requirement: 1082 CMD

Effluent Generation: 710 CMD

STP Proposed 710 CMD

4. Solid Waste generation: Bio degradable: 1980.50 Kg/D

OWC Proposed.

Non-biodegradable: 1980.50 Kg/D

Sale to authorized party

STP Sludge: 710 Kg/D

Use as Manure

5. RO has recommended the Case for C to E.

6. RRZ clearance not submitted.

7. Consent may be granted with the condition of obtaining BG of Rs. 10 lakhs for Provision of STP and MSW processing plant and submission of RRZ clearance.

Page 68: List of Cases to be submitted before 2nd Consent Appraisal

 

Web agenda of 2nd CAC meeting of 2013‐14 dtd 31.05.2013    60 

CAC Item No. 59

Name of the Industry: M/s Syntel International P. Ltd.

B-1, B-2, Softaware Technology Park, Talwade, MIDC, Tal. Haveli, Dist. Pune

1. Resubmission Case, was placed before CAC of 08/01/2013 with decision to issue SCN for non Payment of Cess, non Submission of Environmental Statement, non submission of RRZ clearance, and not providing adequate Sewage treatment plant.

2. Application received at SRO on 20/09/2012 and at HQ 18/12/2012

3. The industry has replied vide letter dated 19/02/2013 wherein it is mentioned that, they have paid Cess, have submitted Env. Statement, Env. Clearance and rectified the problem involved with STP. The solid waste disposal arrangement is with PCMC for which they are paying the requisite fees to PCMC annually.

4. The project proponent has obtained EC vide No. SEAC 2010/CR.858/TC.2 dt.12/06/2012.

5. RO has Recommended for renewal of consent.

6. RRZ clearance not submitted.

7. Submitted before CAC further decision