List of Cases to be submitted before 1st Consent Appraisal Committee Meeting Scheduled on 16.04.2012 at 15:00 Hrs. Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmitted Agenda 1 M/s. Sona Alloys Pvt. Ltd., Plot No. C- 1, MIDC Lonanad, Tal. Khandala, Dist. Satara 432.06 Crs. Renewal JD(APC) 1 to 12 2 M/s. Sona Alloys Pvt. Ltd., Plot No. C- 1, MIDC Lonanad, Tal. Khandala, Dist. Satara 389.75 Crs. Renewal JD(APC) 13-40 3 M/s. Spicer India Limited, 29, Milestone, Pune-Nashik Road, Village Kuruli, Tal. Khed, Dist. Pune 140.56 Crs. Renewal JD(APC) 41-60 4 M/s. Mercedes-Benz India Private Limited, Plot No. E-3, MIDC Chakan, Phase-III, Kuruli and Nighoje, Tal. Khed, Dist. Pune 248.84 Crs. Renewal JD(APC) 61-79 5 M/s. Bharat Forge Ltd., Gat No. 635, Kuruli, Tal. Khed, Dist. Pune 154.60 Crs. Renewal JD(APC) 80-94 6 M/s. Mahalaxmi TMT Pvt. Ltd., C-2, B-1/4, Deoli MIDC, Tal. Deoli, Dist. Wardha (Reduced Briquette Sponge Iron 200 TPD Plant) 162.59 Crs. 1st Operate JD(APC) 95-105 7 M/s. Western Coalfields Ltd., Padmapur Open Cast Sub-Area, P.O. Padmapur, Dist. Chandrapur 172.92 Crs. Renewal JD(APC) 106- 121 8 M/s. Ultratech Cement Ltd., P.O. Awarpur, Tal. Korpana, Dist. Chandrapur 961.59 Crs. Renewal with Amalgamation of existing consent & Expansion in cement production JD(APC) 122- 140 9 M/s. ISTA Hospitality, Sr. No. 206-A/1 to E. Pune-Nagar Road, Pune 203.00 Crs. Renewal AS(T) 141- 159 10 M/s. Chalet Hotels Ltd., CTS No. 71A, 72B/A, 72B/C, 72A/B, 72B/B & 71B Village Paspoli, Near Chinmayanand Ashram, Saki Vihar Road, Powai, Mumbai 893.23 Crs. Renewal with Amalgamation AS(T) 160- 184 11 M/s. Ascent Hotels Pvt. Ltd., 32/1 A & B, Weikfield IT Park, Wadgaonsheri, Tal. Haveli, Pune 387.19 Crs. 1st Operate AS(T) 185- 204 Fresh Agenda 12 M/s. Earnest Towers Pvt. Ltd., Proposed "International Financial Centre" at Plot C 54 & 55, G-Block, Bandra Kurla Complex, Bandra (E), Mumbai. 1784.00 Crs. 1st Operate RO(HQ) 205- 211
63

List of Cases to be submitted before 1st Consent Appraisal

Feb 09, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: List of Cases to be submitted before 1st Consent Appraisal

List of Cases to be submitted before 1st Consent Appraisal Committee Meeting Scheduled on 16.04.2012 at 15:00 Hrs.

Sr. No. Name & Address Capital

Investment Applied For Section Page No. Remarks

Resubmitted Agenda 1 M/s. Sona Alloys Pvt. Ltd., Plot No. C-

1, MIDC Lonanad, Tal. Khandala, Dist. Satara

432.06 Crs. Renewal JD(APC) 1 to 12

2 M/s. Sona Alloys Pvt. Ltd., Plot No. C-1, MIDC Lonanad, Tal. Khandala, Dist. Satara

389.75 Crs. Renewal JD(APC) 13-40

3 M/s. Spicer India Limited, 29, Milestone, Pune-Nashik Road, Village Kuruli, Tal. Khed, Dist. Pune

140.56 Crs. Renewal JD(APC) 41-60

4 M/s. Mercedes-Benz India Private Limited, Plot No. E-3, MIDC Chakan, Phase-III, Kuruli and Nighoje, Tal. Khed, Dist. Pune

248.84 Crs. Renewal JD(APC) 61-79

5 M/s. Bharat Forge Ltd., Gat No. 635, Kuruli, Tal. Khed, Dist. Pune

154.60 Crs. Renewal JD(APC) 80-94

6 M/s. Mahalaxmi TMT Pvt. Ltd., C-2, B-1/4, Deoli MIDC, Tal. Deoli, Dist. Wardha (Reduced Briquette Sponge Iron 200 TPD Plant)

162.59 Crs. 1st Operate JD(APC) 95-105

7 M/s. Western Coalfields Ltd., Padmapur Open Cast Sub-Area, P.O. Padmapur, Dist. Chandrapur

172.92 Crs. Renewal JD(APC) 106-121

8 M/s. Ultratech Cement Ltd., P.O. Awarpur, Tal. Korpana, Dist. Chandrapur

961.59 Crs. Renewal with Amalgamation

of existing consent &

Expansion in cement

production

JD(APC) 122-140

9 M/s. ISTA Hospitality, Sr. No. 206-A/1 to E. Pune-Nagar Road, Pune

203.00 Crs. Renewal AS(T) 141-159

10 M/s. Chalet Hotels Ltd., CTS No. 71A, 72B/A, 72B/C, 72A/B, 72B/B & 71B Village Paspoli, Near Chinmayanand Ashram, Saki Vihar Road, Powai, Mumbai

893.23 Crs. Renewal with Amalgamation

AS(T) 160-184

11 M/s. Ascent Hotels Pvt. Ltd., 32/1 A & B, Weikfield IT Park, Wadgaonsheri, Tal. Haveli, Pune

387.19 Crs. 1st Operate AS(T) 185-204

Fresh Agenda

12 M/s. Earnest Towers Pvt. Ltd., Proposed "International Financial Centre" at Plot C 54 & 55, G-Block, Bandra Kurla Complex, Bandra (E), Mumbai.

1784.00 Crs. 1st Operate RO(HQ) 205-211

Page 2: List of Cases to be submitted before 1st Consent Appraisal

13 M/s. Jalgaon Municipal Corporation, Jalgaon, Tal. & Dist. Jalgaon

- Renewal (Authorization)

RO(HQ) 212-216

14 M/s. Richa Realtors, Mhada New PMGP C.H.S. Ltd., Sai Surya CHS and OM Sai CHS, Survey No. 386, CTS No. 386, CTS No. 1320A(PT) of Village Mulund Eastern Express Highway, Mulund (E), Mumbai

616.00 Crs. Establish (Expansion)

RO(HQ) 217-222

15 M/s. Natural Sugar & Allied Industries (Distillery), Sai Nagar Ranjani, Dist. Osmanabad

152.42 Crs. Renewal JD(WPC) 223-229

16 M/s. Natural Sugar & Allied Industries (Sugar & Co-gen), Sai Nagar Ranjani, Dist. Osmanabad

121.47 Crs. Renewal JD(WPC) 230-238

17 M/s. Vikas SSK Ltd. (Cogen), Vaishali Nagar, Tal. & Dist. Latur

127.11 Crs. Renewal JD(WPC) 239-255

18 M/s. Bhima SSK Ltd., Madhukarnagar, Patas, Tal. Daund, Dist. Pune

147.48 Crs. Renewal JD(WPC) 256-267

19 M/s. Brintons Carpets Asia Pvt. Ltd., Village Urawade, Tal. Mulshi, Dist. Pune

110.70 Crs. Establish (Expansion)

JD(WPC) 268-280

20 M/s. Tuljai SFAC Ltd., (Sugar & Co-Generation Unit) Gat No. 116, 122, 123 & 126, Village Shingoli, dist Osmanabad

120.00 Crs. Establish JD(WPC) 281-291

21 M/s. Pench Hydel Power Generation, MPSEB, Totladoh, Tal. Ramtek, Dist.Nagpur

149.53 Crs. Renewal JD(APC) 292-297

22 M/s. Maharashtra State Power Generation Co. Ltd., Nashik Thermal Power Station, P.O. Eklahare, Dist. Nashik

700.89 Crs. Renewal JD(APC) 298-311

23 M/s. Shree Sidhbali Ispat Ltd., Plot No. C-2 & 3, MIDC Tadali Growth Center, Tadali, Tal. & Dist. Chandrapur

230.17 Crs. Renewal with Amalgamation

JD(APC) 312-324

24 M/s. Amba River Coke Ltd., (Pellet Plant), Village Dolvi, Tal. Pen, Dist. Raigad

723.00 Crs. Establish JD(APC) 325-336

25 M/s. Amba River Coke Ltd., (Down Stream Project, CRM) Village Dolvi, Wadkhal, Tal. Pen, Dist. Raigad

301.00 Crs. Establish JD(APC) 337-348

26 M/s. Maharashtra Seamless Ltd., Plot No. D-114, MIDC Vile Bhagad, Tal. Managaon, Dist. Raigad

309.55 Crs. 1st Operate JD(APC) 349-361

27 M/s. Hindalco Industries Limited , Sr. No. 95/1, 95/2, Village Daheli, Tal. Mouda, Dist. Nagpur

197.34 Crs. Establish (Expansion)

JD(APC) 362-374

28 M/s. POSCO Maharashtsra Steel Pvt. Ltd., Plot No. C-1, MIDC Bhagad, Tal. Mangaon, Dist. Raigad

894.16 Crs. 1st Operate JD(APC) 375-387

29 M/s. Piaggio Vehicles, E-2, F-1, MIDC Baramati, Tal. Baramati, Dist - Pune

693.24 Crs. Amalgamation of Renewal & 1st operate (Expansion)

JD(APC) 388-397

Page 3: List of Cases to be submitted before 1st Consent Appraisal

30 M/s. Piaggio Vehicles, F- 19, MIDC Baramati, Tal- Baramati, Dist - Pune

180.00 Crs. 1st operate JD(APC) 398-405

31 M/s. J.C.B. India Ltd., Plot No. A & B, Talegaon, Floriculture & Industrial Park, Vill- Ambi Navlakh, Umbre, Tal- Maval, Dist- Pune

361.65 Crs. Establish ( Expansion)

JD(APC) 406-414

32 M/s. Zamil Steel Building (I) Pvt. Ltd., Plot No. B-32/2, MIDC Ranjangaon, Pune

102.94 Crs. Renewal JD(APC) 415-424

33 M/s. Wokhardt Hospitals Pvt. Ltd., Dr. Anand Rao Nair Marg, Byculla, Mumbai

208.00 Crs. Establish AS(T) 425-449

Agenda Part-II

Resubmitted Agenda

1 M/s. Gail India Ltd., (LPG Recovery Plant), Malyan at Usar, Tal. Alibaug, Dist. Raigad

314. 94 Crs. Renewal JD(PAMS) 1 to 9

2 M/s. Bharat Petroleum Corporation Ltd., Refinery, Mahul, Mumbai

4826.48 Crs. Renewal JD(PAMS) 10 to 22

3 Hotel Leela Kempiniski Sahar Mumbai--59, Andheri Kural Road , Andheri Sahar Mumbai

541.90 Crs. Renewal AS(T) 23 to 58

4 Kumbhi Kasari SSk Ltd., (Sugar) Kuditre, Tal.- karveer, Dist.- Kolhapur.

123.20 Crs. Establish (Expansion)

JD(WPC) 59-113

5 Bombay Rayon Fashion Ltd., Plot No. -C-6 & C-7 MIDC Tarapur, Tal.- Palghar, Dist.- Thane

751.01 Crs. Renewal JD(WPC) 114-133

6 Ruchi Soya Industries Ltd., Patalganaga, At- Esambe, Savroli – Kharpada Road, Tal.- Khalapur, Dist.- Raigad.

223.81 Crs. 1st Operate (Expansion)

with Amalgamation

JD(WPC) 134-178

7 Pudumjee Pulp & Paper Mills Ltd., Plot No.- K-5, MIDC Addl. Mahad Industrial Area, Mahad, Dist.- Raigad.

22.36 Crs. Renewal JD(WPC) 179-192

8 Bombay Rayon Fashion Ltd., Plot No. –G-95 MIDC Tarapur, Tal.- Palghar, Dist.- Thane

263.8 Crs. 1st Operate JD(WPC) 193-218

Fresh Agenda 9 M/s. Mazda Colours Ltd., Plot No.

121/1, MIDC Dhatav, Tal. Roha, Dist. Raigad

182.40 Crs. Establish JD(PAMS) 219-227

10 M/s. Alkyl Amines Chemicals Ltd., Plot No. D-6/1 & D-6/2, MIDC, Kurkumbh, Tal. Daund. Dist. Pune

101.45 Crs. Amendment with

Amalgamation of consent

JD(PAMS) 228-236

11 M/s. Wockhard Ltd. (Bio-Tech Park), H-14/2, MIDC, Waluj, Aurangabad

432.66 Crs. Amendment (Operate)

JD(PAMS) 237-247

12 M/s. Jubilant Life Science Ltd., Village Nibut-Nira, Tal. Baramati, Dist. Pune

307.80 Crs. 1st Operate with

Amalgamation

JD(PAMS) 248-260

13 M/s. Hindustan Petroleum Corporation Ltd., B.D. Patil Marg, Mahul, Mumbai

5951.48 Crs. Amendment (Operate)

JD(PAMS) 261-283

Page 4: List of Cases to be submitted before 1st Consent Appraisal

14 M/s. Rashtriya Chemicals & Fertilizers Ltd., Trombay Unit, Mahul Village Road, Chembur, Mumbai

1496.26 Crs. Amendment (Renewal)

JD(PAMS) 284-299

15 M/s. Praxair India Ltd., Plot No. A-3/2, MIDC Murbad, Dist. Thane

150.00 Crs. Renewal JD(PAMS) 300-311

16 M/s. National Rayon Corporation Ltd., Post. Mohane, Tal. Kalyan, Dist. Thane

153.14 Crs. Status of Closed Industry

JD(PAMS) 312-317

17 M/s. Pegasus Properties Pvt. Ltd., Plot No. R-1/1, R-1/2, R-1/3, R-1/4, Rajiv Gandhi Infotech Park-III, Hinjewadi, Village Man & Boirwada, Tal. Mulshi, Dist. Pune

115.50 Crs. 1st Operate (Part)

RO(HQ) 318-325

18 M/s. Neptune Venture & Develoers Pvt. Ltd., (Magnet Mall), Plot bearing CTS No. 372, 372/1 to 65, LBS Marg, Village Kanjur, Tal. Kurla, Mumbai.

455.68 Crs. Renewal with Expansion

RO(HQ) 326-334

19 Dyneshwar SSK Ltd., (Co-Gen) At.- Dyneshwar Nagar, Post- Bhende, Dist – Ahmednagar.

180.20 Crs Renewal JD(WPC) 335-346

20 Sanjivani (Takli ) SSk Ltd., Sahajanandnagar, Tal.- Kopargaon, Dist.- Ahmednagar.

219.36 Crs Renewal with 1st Operate

(Co-gen) amalgamation

JD(WPC) 347-366

21 Biltube Industries Ltd., Part – II, Gat No.- 1172-1178, At Post.- Kodoli, Tal.- Panhala, Dist.- Kolhapur.

178.11 Crs Renewal JD(WPC) 367-374

22 Ballarpur Indutries Ltd., (Ashti), Tal.- Charmorshi, Dist.- Gadchiroli.

310.20 Crs. Renewal JD(WPC) 375-390

23 WCL, Durgapur Open cast Mine, Durgapur Sub area, Chandrapur

196.35 Crs Renewal JD(APC) 391-401

24 WCL Mungoli Opencast Mine, Po. Sakhara (Kolgaon), Mungoli Sub Area, Dist. Yavatmal

110.81 Crs. Renewal (Expansion)

JD(APC) 402-413

25 POSCO Maharashtra Steel Pvt. Ltd., (CRC Plant), Plot No. C-1, MIDC Bhagad, Tal. Mangaon, Dist. Raigad.

949.58 Crs. Amendment (Establish)

JD(APC) 414-431

26 Ghatge Patil Industries Ltd., S.No. 362A, 365A, 4B, Uchgaon, Tal. Karveer, Dist. Kolhapur

109.76 Crs Establish (Expansion)

JD(APC) 432-439

27 Gangamai Industries and Construction Ltd., harinagar, Najik Babhulgaon, Tal.- Shevgaon, Dist.- Ahmednagar

… Permission for Trial Run

JD(WPC) 440-449

28 Procedure for reconsideration of cases after Refusal of consent

… … SLO(D) 450-459

29 Issuance of Directions/SCN/conducting hearing of industries operating without valid consent of the Board

… … SLO(D) 460-466

 

Page 5: List of Cases to be submitted before 1st Consent Appraisal

AGENDA PART - I

CAC Item No. 01 Name of the industry : M/s. Sona Alloys Pvt. Ltd.

Plot No. C-1, MIDC Lonand, Tal. Khandala, Dist. Satara

HOD Remarks :- • Applied for renewal of consent to operate

• Application received at SRO- Satara on dtd 29/09/2011 and at HQ on 13/02/2012.

• Previous consent was valid up to 30/11/2011

• Industrial effluent is NIL

• Domestic effluent generation is 20.0 CMD. For which sewage treatment plant

provided

• SRO –Satara reported that industry located an air pollution potential prone industry,

where there is lot of fugitive emissions observed at various stages/place of mfg right

from raw material , storage, loading/unloading & its feeding point to final product

• Industry has provided air pollution control system as an ESP to main exhaust &

Cooler/crusher unit and deducting units with bag filters at various place, however its

operation & maintenance is not satisfactory.

• SRO reported that lot of complaint received from Sarpanch Grampanchyat Golegaon

village, Panchayat Samiti Khandala & SDO Wai about the air pollution problem.

• RO Pune has recommended the case for grant of renewal of consent by imposing the condition given in interim direction.

• The case was discussed in the Consent Appraisal Committee meeting held on

20/03/2012 and the Consent Appraisal Committee has decided to issue SCN for

refusal of consent due to non-compliance of conditions stipulated in consent and

Environmental Clearance specifically regarding provision of secondary emission

control system. Also, the stack emission level highly exceed the norms. SCN issued

on 28/03/2012

• Industry replied the same on 02/04/2012

• We may grant the consent with condition that

1. To provide secondary emission control system within next 1 year with B.G. of Rs. 10 Lakhs

2. To provide adequate APC at all material handling units , junction box, strigent water sprinkling arrangement within next 4 months with B.G. of Rs. 5 Lakhs

Page 6: List of Cases to be submitted before 1st Consent Appraisal

3. To provide opacity meters to all the steps & CAAQM within next 4 months with B.G. of Rs. 2 Lakhs

4. To take B.G. of Rs.. 5 lakhs towards achievement of consented standards

We may place the consent application before CAC for further consideration.

CAC Item No. 02

Name of the industry : M/s. Sona Alloys Pvt. Ltd. Plot No. C-1, MIDC Lonand, Tal. Khandala, Dist. Satara

HOD Remarks :-

• Applied for renewal of consent

• Application received at SRO- Satara on dtd 18/12/2011 and at HQ on 01/03/2012.

• Previous consent was valid up to 30/11/2011

• Industrial effluent is 34 CMD. For which ETP provided

• Domestic effluent generation is 0.76 CMD. For which sewage treatment plant provided

• industrial effluent generated form cooling blow down, D.M. plant regeneration is utilize for hot slag cooling at slag granulation pond.

• RO –Pune reported that industry located an air pollution potential prone industry, & lot of complaint received from Sarpanch Grampanchyat Golegaon village, Panchayat Samiti Khandala & SDO Wai about the air pollution problem.

• RO Pune has recommended the case for grant of renewal with amalgamation subject to submission of Rs. 25000/- towards increase in capital investment & commitments towards provision of air pollution control system at boiler stack

• The case was discussed in the Consent Appraisal Committee meeting held on 20/03/2012 and the Consent Appraisal Committee has decided to issue SCN for refusal of consent due to non-compliance of conditions stipulated in consent and Environmental Clearance specifically regarding provision of secondary emission control system. Also, the stack emission level highly exceed the norms. SCN issued on 28/03/2012

• Industry replied the same on 02/04/2012

• We may grant the consent & amalgamate with main plant consent

• We may place the consent application before CAC for further consideration.

Page 7: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 03 Name of the industry : M/s. Spicer India Limited,

29, Milestone, Pune- Nashik Road, Vill. Kuruli, Tal.Khed. dist. Pune

HOD Remarks :-

• Applied for renewal of consent

• Application received at SRO- Pune on dtd 27/01/2012 and at HQ on 06/03/2012

• Previous consent was valid up to 31/03/2012

• Industry is generating 19 CMD effluents for which Industry has provided two no.ETP. up to secondary stage.

• Industry is generating 62.0 CMD of domestic effluent for which Industry has provided STP

• Industrial treated industrial effluent after secondary treatment is mixed with domestic effluent before filtration stage.

• Industry has provided necessary air pollution control system to D.G. Set and LPG fired furnace

• Industry not provided VOC control system to paint booth

• Regional officer of Pune has recommended for refusal of consent

• The case was discussed in the Consent Appraisal Committee meeting held on 20/03/2012 and the Consent Appraisal Committee has decided to issue SCN for refusal of consent for non-disposal of H.W. to CHWTSDF and not providing APC system to paint booth as per consent conditions. SCN issued on 28/03/2012

• Industry replied the same 02/04/2012

• We may grant the consent for period up to 31/03/2017 with condition that 1) Industry shall obtain the Membership of CHWTSDF Ranjangaon within 3 weeks with B.G. of Rs. 1 Lakhs. 2) Industry shall provide APC to paint Booth within next 4 months with B.G. of RS. 5 Lakhs

• We may place the consent application before CAC for further consideration.

Page 8: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 04

Name of the industry : M/s. Mercedes-Benz India Private Limited, Plot No. E-3, MIDC Chakan, Phase-III, Kuruli and Nighoje, Tal. Khed, Dist. Pune 410 501

HOD Remarks :- • Applied for renewal of consent

• Application received at SRO- Pune on dtd 10/02/2012 and at HQ on 03/03/2012

• Previous consent was valid up to 28/02/2012

• Industrial effluent increased from 1 CMD to 10 CMD which is due to washing of stocked car

• Domestic effluents increased from 70 CMD to 100 CMD which is due to increased in staff/workers

• JVS analysis result of Moef approved lab on dated 31/03/2011 is under prescribed limit

• Industry has not provided APC to paint booth

• RO Pune has recommended the case for grant of renewal of consent for period up to 28/02/2015 by extending personal hearing about above non compliances.

• The case was discussed in Consent Appraisal Committee held on 20/03/2012 & decided to issue SCN for refusal of consent as industry has not provided air pollution control system to the paint booth and H.W. quantities in Form -IV are not commensurate with the production quantities. SCN Issued on 28/03/2012.

• Industry replied the same on 02/04/2012

• We may grant the consent up to 28/02/2015 with condition that Unit shall provide adequate APC system to control VOC within next 4 months with B.G. of 5 Lakhs.

• We may place the consent application before CAC for further consideration.

Page 9: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 05  

Name of the industry : M/s. Bharat Forge Ltd. Gat No. 635, Kuruli, Tal. Khed, Dist Pune

HOD Remarks :-

• Applied for renewal of consent

• Application received at SRO- Pune on dtd 22/10/2011 and at HQ on 06/03/2012.

• Previous consent was valid up to 30/11/2011

• Generation of industrial effluent is 8 CMD. Industry has provided 30 CMD capacity ETP.

• Generation of industrial effluent is 28 CMD for which industry has provided 50 CMD STP

• JVS result of submitted on dated 31/05/2011 & 09/03/2011. In which shows that parameter BOD, COD & sulphate level is exceeding the prescribed limit.

• Industry has provided dust collector system to shot blasting machine

• RO Pune has reported that industry has installed over designed ETP & STP & not in operation as per recent visit report & need to be revamping.

• RO Pune recommended the case for grant of renewal of consent by extending personal hearing above mentioned non compliance.

•  The case was discussed in the Consent Appraisal Committee meeting held on 20/03/2012 and the Consent Appraisal Committee has decided to issue SCN for refusal of consent for over-designing of ETP/STP and non-operating the same and having inadequate land for disposal of treated effluent. SCN issued on 28/03/2012

• Industry replied the same on 02/04/2012

• We may grant the consent up to 31/11/2013 with the condition that unit shall revamp the STP/ETP within next 3 months period with BG of Rs. 5 Lakhs

• We may place the consent application before CAC for further consideration.

Page 10: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 06  

Name of the Industry : M/s. Mahalaxmi TMT Pvt. Ltd., C-2, B-1/4, Deoli MIDC, Tal: Deoli, Dist: Wardha.

HOD Remarks : - 1. Applied for Consent to 1st Operate for Reduced Briquette Sponge Iron – 200 TPD

Plant. RED/LSI Category.

2. Industry has obtained consent to establish for reduced briquette sponge Iron – 800

TPD and Iron Ore Benefication Plant. Both plant are located in same factory premises.

3. Regional Officer, Nagpur vide letter dated 24.01.2012 has recommended forfeiture of

bank guarantee of Rs.5 Lakhs due to following non-compliances;

i) Analysis results of stack monitoring are exceeding the standards.

ii) Industry has not provided secondary emission control system. During the visit of

Board officials, gaseous emission from the secondary process was emitted into

the environment from the shed of the factory.

4. I/c. SRO, Nagpur-II reported that Board official visited to the industry and observed

that they have erected two kilns and these kilns are ready for commissioning. Industry

proposed to use producer gas as a fuel in the kiln and they have provided falsifier for

the same. Bag filter followed by chimney is provided for air pollution control system.

5. Capital Investment of reduced briquette sponge iron plant of 200TPD is Rs.45 Crore.

Total capital invest of the industry is Rs.162.59 Crore. Industry has submitted consent

fee of Rs.70,000/-. However, additional consent fee of Rs.5,000/- required to be

submitted by industry for the consent period up to 31.01.2013 as per the revised

consent fee circular dated 25.08.2011.

6. Discussed in CAC dated 02.03.2012 and it was decided to issue SCN for refusal of

consent for non-compliance of consent conditions. Accordingly the Show Cause

Notice was issued vide letter No. BO/ MPCB/JD(APC)/NG-6113-11/SCN/TB-1/B-1602

dated 14.03.2012.

7. Industry submitted the reply of show cause notice stating that;

i) Work of installation of Secondary Emission Control System of existing SMS unit is in final stage of completion and will be completed before 05.04.2012.

ii) Ordered the CAAQMS and online Stack monitoring system will be installed within 4 months

In view of above Recommended for grant of consent Operate for Reduced Briqutte Sponge Iron 200 TPD for the period up to 31.01.2013 with Conditional Bank Guarantee of Rs.5,00,000/- towards operation and maintenance.

Page 11: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 07 Name of the Industry: M/s. Western Coalfields Ltd.,

Padmapur Open Cast Sub-Area, P.O.: Padmapur, Dist: Chandrapur.

HOD Remarks : -

1. Applied for plain renewal of Consent for 3 years with no change in consented coal

production i.e. 2.5 Million Ton/Year.

2. Earlier consent for mining of coal 2.5 MTPA was valid up to 31.03.2012.

3. Capital Investment of the Industry increased from Rs.167.10 to Rs.172.92 Cores.

Industry has submitted consent fee of Rs.40,97,520/- for the period up to 31.3.2015.

4. Domestic Effluent is 24 CMD. Septic Tank provided. Industrial Effluent is 4125 CMD

including mine discharge. Mine water is used for spraying of water on roads and

balance water is discharged into nearby nalla after treatment in sedimentation tank.

ETP is provided for workshop effluent.

5. Analysis results of ambient air quality monitoring carried out between 21.1.2011 to

23.06.2011, shows parameter RSPM & SPM are exceeding the standards hence

mine authority needs to improve the O & M of existing pollution control system.

6. Earlier the case was discussed in CAC dated 2.3.2012 and it was decided to issue SCN for refusal of consent as industry is exceeding AAQM results and thereto non compliance of consent conditions.

7. Accordingly, Board had issued SCN vide letter dated 14.3.2012. 8. Industry has submitted the reply of SCN vide letter dated 3.4.2012.

Recommended renewal of consent for the period up to 31.03.2015 with conditional BG of Rs.10.0 Lakhs towards O & M of Pollution control system.

 

Page 12: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 08

Name & Address of the Industry : M/s. Ultratech Cement Ltd., P.O. Awarpur, Tal korpana, Dist. Chandrapur

HOD Remarks :-

1. Industry has applied for renewal of consent along with amalgamation of two consents for existing cement & Coal washery unit respectively with expansion in cement production.

Industry has applied for amalgamation of the consents for the following products for three years i.e for the period up to 31.3.2015.

a) Portland Cement 3,73,000 MT/Month (I.e 4.48 Million Ton per Year)

b) Lime Stone 4,16,500 MT/Month (I.e 5.0 Million Ton per Year)

c) Electricity 3 X 23 MW.

d) Clean Coal 59,167 Mt/Month (I.e 0.71Million Ton per Year)

e) Middling 31,667 Mt/Month (I.e 0.38Million Ton per Year)

f) Rejects 9,166 Mt/Month (I.e 0.11Million Ton per Year)

2. Industry has proposed to increase in cement production from 3.9 Million metric Ton per Year to 4.48 Million metric Ton per Year ( net increase is 0.58 Million metric Ton per Year)by increasing fly ash addition by investing additional investment of Rs 8.34 Crores and obtained Environmental Clearance from the MoEF, GOI ,vide letter dated 2/08/2010.

3. Total Gross Block of Fixed Assets of entire industry has shown in Rs. 9,615,906,810.29 as per CA certificate. Submitted consent fee of Rs 57,69,644/- for three years as per new Consent Fee GR dated 25.8.2011.

4. Since Gross Block investment is increase from Rs 851.16 Crores to 961.59 Crores, additional consent fee of Rs. 2,20,868/- for increase in capital investment of Rs. 110.43 crore shall be submitted by industry.

5. Earlier the case was discussed in CAC meeting held on 2.3.2012 and it was decided to issue show cause notice for refusal of consent as the industry is exceeding the stack and AAQM results to consented norms and thereto non-compliance of Consent Conditions.

6. Accordingly Board has issued Show Cause Notice vide letter dated 14.03.2012.

7. Industry has submitted the reply vide letter dated 22.3.2012 received on 28.03.2012.

In view of above we may renew the Consent up to 31.03.2015 with the condition that the unit shall submit the Bank Guarantee of Rs.50 Lakhs against the achievement of Standards within next 2 years and completion of all the above works within 2 years.

Page 13: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 09 Name of the Industry: M/s. ISTA Hospitality,

Sr. No. 206-A/1 to E,

Pune-Nagar Road, Pune.

HOD Remarks:

1. Applied for grant of Renewal of consent for hotel activity Swimming Pool & Laundry

activity (209 Rooms) for built-up area is 12809.43 sq. m.

2. Application received at RO on 02.09.2011 and at HQ on 02.01.2012.

3. Previous consent was valid upto 31.08.2011.

4. The sewage effluent generated is 286 CMD, which is treated in their STP (capacity-

300 CMD) which comprises bar screen, ET, aeration tank, clarifier, filter press, ACF,

PSF & SDB and the treated effluent is reused for flushing & gardening purpose. SRO

has not submitted the JVS analysis results.

5. The bio-degradable waste generated is treated in organic converter and used as

manure for gardening.

6. SRO reported that applicant have provided oil catchers to kitchen exhaust.

7. Also, reported that C.I. increased from Rs. 122 Crs. to Rs. 203 Crs. and

accordingly, consent fees for consent to establish & 1st operate needs to recover

from applicant. Applicant have not paid adequate consent fees presently.

8. RO-Pune issued SCN to the applicant on 26.12.2011 for not submitting CA-

certificate, not paying fees, details of ETP/STP, Env. Stmt., Cess returns/payment

details, etc.

9. The case was discussed during CAC meeting held on 31.01.2012 and it was decided

to issue SCN for refusal of consent as applicant have not replied to the SCN issued

by RO on 26.12.2011 and not paid the consent fees. SCN was issued on 06.02.2012.

Further it was discussed in CAC meeting held on 02.03.2012 and it was decided to

process the reply received and resubmit the case in next CAC.

10. SRO-Pune-I forwarded the industry reply wherein mentioned that increase in gross

block C.I. is due to the reason that project was not completed. Now, total hotel

building and internal work is completed, hence, investment is raised to Rs. 203 Crs.

and paying differencial consent fees on increased investment. There is no increase in

total area & no. of rooms that were mentioned in consent dtd. 04.01.2011.

11. UV-Plant for treatment of swimming pool is already provided.

12. Consent may be granted upto 31.08.2012 after payment of consent fees as per

revised consent fee circular dtd. 25.08.2011

Page 14: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 10 Name of the Industry: M/s. Chalet Hotels Ltd.,

CTS No. 71A, 72B/A, 72B/C, 72A/B,

72B/B, and 71B Villae Paspoli,

Near Chinmayanand Ashram,

Saki Vihar Road, Powai, Mumbai

HOD Remarks:

1. Applied for grant of consent for hotel activity for Amalgamation of Renewal of consent (Phase-I & II) for residential hotel activity having 764 rooms including restaurant and

banquet hall.

2. Application received at SRO on 04.10.2011 and at HQ on 19.01.2012.

3. The case was discussed during CAC meeting held on 31.01.2012 and it was decided to

issue SCN for refusal of consent as applicant have not provided ETP & STP of adequate

capacity and exceeding the norms and for non-payment of consent fees. Also, call RO report

regarding ETP/STP details i.e. treatment & disposal of effluent phase-wise. SCN for refusal

of consent was issued on 06.02.2012 & RO/SRO report was called on 06.02.2012 &

28.02.2012.

4. Applicant have submitted the reply on 17.02.2012 and 02.04.2012 and corrected details

regarding no. of phases, consent obtained, effluent generation & treatment, consent fees are

noted.

5. Obtained Environmental Clearance for Phase-III includes addition of 4 floors over building

no. (2), building no. (3) and hotel building no. (4).

6. As per EC, C.I. of phase-III is Rs. 553.80 Crs. and in consent to Establish it is mentioned as

Rs. 533.80 Crs. The same was clarified by applicant during the discussion on 29.03.2012

and informed that total C.I. of phase-III project is Rs. 553.80 Crs., hence, consent fees of Rs.

20,000/- for consent to Establish needs to be obtained.

7. Applicant have informed that part of phase-III of 44 no. of rooms having C.I. Rs. 15.41 Crs.

was taken in operation from 2008 and obtained the consent in phase-II only but C.I. of part

was not covered in consent. Hence, consent fees of Rs. 50,000/- per year from 2008-2011

needs to be obtained.

8. Applicant has submitted the DR receipt of Rs. 17.5 Lakhs paid at RO-Mumbai on

01.04.2010.

9. We may call industry representative for clarification of point no. (3), (5), (6) & ETP/STP

treatment before CAC, if approved Consent may be granted upto 28.02.2014.

Page 15: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 11

Name of the Industry: M/s. Ascent Hotels Pvt. Ltd.,

32/1A&B, Weikfield IT Park,

Wadgaonsheri, Tal. Haveli, Pune.

HOD Remarks:

1. Applied for grant of consent for hotel activity for 5-star hotel having swimming pool &

Laundry activity for built-up area is 27,403.21 sq.m. and total plot area of 15,224 sq.m.

2. Application received at SRO on 03.03.2011 and at HQ on 02.01.2012.

3. The consent to Establish was granted on 02.06.2006 for hotel with the condition of

obtaining Env. Clearance, as per EIA Notification, 2006 and the applicant have obtained

Environment Clearance for the same on 23.01.2007.

4. The sewage effluent generated is 189 CMD, which will be treated in their STP and trade

effluent 7.40 CMD will be treated by primary followed by tertiary treatment and further it

is mixed in STP. The treated effluent is reused/recycled for flushing & gardening

purpose. The area available for disposal of treated effluent is 15,224 sq.m. i.e. 3.76

acres.

5. Industry has provided ozonation treatment for swimming pool.

6. The bio-degradable waste generated will be treated by composting.

7. SRO had issued letter to induatry on 18.03.2011 & 20.04.2011 for non-compliances and

RO has issued SCN for operating hotel without consent & without provision of ETP.

Industry has replied the SCN and RO reported that they have provided necessary

pollution control system. Further, RO has called explanation from SRO-Pune-I for

forwarding application to RO after 9 months period.

8. CA-certificate dtd. 05.01.2011 shows that C.I. is Rs. 264.47 Crs. and accordingly paid the fees. However, CA-certificate dtd. 05.01.2010 shows that C.I. is Rs. 387.19 Crs.

9. The case was referred to CAO on 04/01/2012 for guidance on which CA-Certificate is

correct. checking the CA Certificate and he has recommended that now C.I. of industry is

increased compare to the consent to Establish, hence, called previous C.I. details of

industry. Letter issued to the industry on 17.01.2012, reply not yet received.

10. The case was discussed during CAC meeting held on 02.03.2012 and it was decided to

process the reply and resubmit the case in next CAC.

11. Applicant has submitted the reply vide letter dtd. 02.03.2012 & 03.04.2012, wherein

mentioned that they do not have details of C.I. which was given at the time of C to E.

Now, their total project cost increased due to increase in material costing and total C.I. is

Rs. 332.49 Crs. Submitted CA certificate. They are ready to pay necessary difference in

fees.

Page 16: List of Cases to be submitted before 1st Consent Appraisal

12. Meanwhile, RO-Pune has forwarded file with the recommendation for initiation of

stringent action due to non-compliance of non-submission of reply to SCN, non-payment

of cess, etc.

13. Consent may be granted upto 15.03.2013 after obtaining necessary consent fees.

CAC Item No. 12   

Name of Industry : M/s. Earnest Towers Pvt. Ltd. At Plot C 54 and 55, G- Block, Bandra Kurla Complex, Bandra(E), Mumbai

HOD Remarks : -

1. Application for 1st consent to operate

2. Application Received at SRO on 13/03/2012 and at HQ on 22/03/2012

3. The project proponent has obtained C to E issued vide No. 17 dt 19/11/2011 for; Plot area-8075.81 M2 Total BUA-41396.76 M2

4. Now applied for 1st C to O for ; Plot area-8075.81 M2

Total BUA-41396.76 M2

5. The industry has provided Bio-composting for compostable waste. The Dry waste will be disposed of to local body dumping site.

6. Sewage generation is 180.0 M3/day. Industry has proposed STPof 200.0 M3/day

7. The project proponent has obtained EC vide No.SEAC- 2010CR.412/TC.2

dt.04/01/2010

8. RO Mumbai has recommended the case for grant of consent to operate.

9. Consent may be granted upto 30/06/2014, with the condition of obtaining BG of Rs. 10 lacs .

Page 17: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 13  

Name of Industry/Local Body : Jalgaon Municipal Corporation,

Jalgaon

HOD Remarks : -

1. Applied for renewal of Authorization under MSW Rules-2000 . 2. Application Received at SRO on 24/01/2012 and at HQ on 30/03/2012

3. Waste generation- 220 MT/day

4. Treatment method- Windrow composting

5. SRO has recommended the case for grant of authorization

6. Authorisation may be granted.

 

Page 18: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 14 Name of Industry : M/s. Richa Realtors, Mhada New PMGP C.H.S. Ltd., Sai Surya CHS and OM sai CHS Survey No. 386, CTS No. 386, CTS. No. 1320A(PT) of Village Mulund Eastern Express Highway, Mulund (E), Mumbai HOD Remarks :-

1. Application amendment/expansion for residential complex

2. Application Received at SRO on 21/02/2012 and at HQ on 27/03/2012

3. The project proponent has obtained C to E No. BO/RO(P&P)/EIC-No.MU1149-09/E/CC-313 dt. 27/08/2009, for

Plot area is - 100002.0 M2 Total BUA- 136263.67 M2

4. Now applied for; Plot area is - 100002.0 M2

Total BUA - 2.09,406.72 M2

i.e. Additional BUA of 73143.05 M2

5. The industry has proposed Bio-composting for compostable waste. The Dry waste will be local disposed of to local body dumping site. Sludge will be used as manure

6. Sewage generation is 1825.31 M3/day. Industry has proposed STP 1830 M3/day .

7. The applicant has not submitted EC/CRZ clearance. However SRO reports that, public hearing has been conducted for grant of EC

8. RO Mumbai has recommended the case for grant of consent to Establish.

9. Consent may be granted with overriding effect to the earlier consent to Establish with the condition of obtaining BG of Rs. 10 lacs and subject to condition that no activity on the site for additional construction area shall be carried out and C to E shall be valid subject to obtaining Environmental Clearance for the additional BUAfor providing STP and MSW processing plant.

Page 19: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 15 Name of industry : M/s. Natural sugar & Allied industries (Distillery).

Sainagar,Ranjani, Dist. Osmanabad. HOD Remarks :-

• Applied for renewal of Consent . Distillery Industry. • Application received at SRO Latur 21.04..2011 and at HQ 13.03.2012. • Industrial Effluent (Spent wash) is send to Reboiler and then to new Bio digester

followed by composting yard. • 30 days storage in impervious lagoon (Pucca Lagoon) for storage of spent wash and

compost yard for Bio composting on 13 acres provided. • CREP Complied industry . • We may renew consent..

Page 20: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 16

Name of industry : M/s. Natural sugar & Allied industries, Sainagar,Ranjani, Dist. Osmanabad.

HOD Remarks : -

• Applied for renewal of Consent . Sugar Industry. • Application received at SRO Latur 22.02..2012 and at HQ 13.03.2012. • Provided Secondary & tert. treatment plant. Treated effluent is used on land. Available

land for disposal is 60 Hectores. • JVS results are within limits • We may renew the consent with amalgamation of this consent .

• The B.G of Rs 5.0 lakhs to be obtained.

Page 21: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 17 Name of industry : M/s. Vikas SSK Ltd. (Cogen), Vaishali Nagar, Tq. & Dist. Latur HOD Remarks : -

• Applied for renewal of Consent . Cogen industry. • Application received at SRO Latur 15.03.2012 and at HQ 27.03.2012. • Provided Secondary & tert. treatment plant. Treated effluent is used on land. Available

land for disposal is 45 Hectores. • JVS results are within fluctuating. • We may renew the consent with amalgamation of this consent with Sugar consent upto

31.10.2012.

• The B.G of Rs 5.0 lakhs & 2.0 Lakhs submitted..

Page 22: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 18 Name of the Industry : M/s. Bhima SSK Ltd (Sugar Unit),

Madhukarnagar, -Patas, Tal. Daund, Dist.- Pune

HOD Remarks : -

• Applied for Consent to Operate (Renewal) Sugar unit. • Application received at SRO on 20.03.2012 and at HQ on 02.04.2012. • Industrial effluent generation is 580 CMD and D.E is 80 CMD. • ETP provided with secondary treatment and SDB. • Disposal of the treated effluent is on land for gardening and land available is @ 25

Hec. • Dust collector is provided to 5 nos. of Boilers. • SRO reported the non compliance i.e Industry has not complied the CREP

guidelines, ingress of Bagasse is observed in the effluent. • Board has issued the PD dt. 23/06/2011 and Conditional Direction on dt. 08/11/2011. • Industry has submitted the BG of Rs. 3.0 Lakhs towards the compliance of the

Conditional Direction issued. • SRO reported that complaints were received from news reporter from Solapur district

regarding fish kill in the river Bhima. • During the visit of Board officials on 23/03/2012 the discharge of the untreated

effluent was observed into Bhima river. • RO has issued voluntary Closure direction on dt. 26/03/2012 for discharge of

substandard effluent, for inadequate pollution control devices which were not found in operation and JVS are exceeding the consented limits.

• SRO/RO has recommended for refusal of the consent as the industry is grossly violating the consent conditions.

• The Industry is discharging effluent directly to Bhima river. • RO has issued closure direction on 26.03.2012. • JVS exceeding to Standards. • We may refuse the Consent.

Page 23: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 19 Name of the Industry : M/s. Brintons Carpets Asia Pvt. Ltd.,

Gat No.- 414/415/416, Vill.- Urawade, Tal. Mulshi, Dist. Pune.

HOD Remarks : -

• Applied for C to E for expansion for Dyed Yarn by 25 MT/M and Carpet production by 25000 Sq. mtrs.

• Application received at SRO on Dt.20.10.2011 and at HQ on 02.03.2012. • C.I of the proposed expansion is Rs. 8.57 Cr. (C.I of existing unit is Rs. 102.13 Cr;

Total C.I of the Industry is Rs.110.7 Cr.) • Existing consent for Dyed yarn-150 MT/M, Carpet production -95000 Sq. mtrs. and

spinning of yarn 261 MT/M is valid upto 31/12/2013. • Located at 3.00 Km away from Mula river (A-2). • Industrial effluent generation is to the tune of 25 CMD and D.E is 5CMD in addition

to exiting I.E -152 CMD. • Industry has provided ETP with secondary & Tertiary treatment. • For the treatment of D.E provided 3 packaged STP’s. • Disposal of the treated effluent is on land for gardening, land available is @ 12

Acres. • Obtained membership of CHWTSDF, M/s. MEPL, Ranjangaon. • JVS results are not confirming to the consented standards w.r.t BOD. • RO Pune has recommended for grant of C to E by imposing appropriate Bank

Guarantee towards O & M of ETP. • We may grant C to E subject to provide augmentation of existing ETP or recycle

effluent.

Page 24: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 20 Name of industry : M/s. Tuljai SFAC Ltd.,

Gat No 116,122,123,&126, Village Shingoli, Dist. Osmanabad.

HOD Remarks : -

• Applied for grant of Consent to establish Sugar & Co-gen. • Application received at SRO Solapur 18.02.2012 & HQ 19.03.2012.. • Proposed Capital investment 120 crores. • Industrial effluent generation 350CMD . Proposed Secondary & Tert. Treatment. • Treated effluent is used on land for gardening. Land vailable 39 acres. • ESP Proposed as an APC. • SRO & RO recommended for grant of consent to establish. • We may grant Consent to establish

Page 25: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 21

Name of the Industry : M/s. Pench Hydel Power Generation, MPSEB, Totladoh, Tal: Ramtek, Dist: Nagpur.   HOD Remarks : - 1. Applied for renewal of consent.

2. Earlier consent for electricity generation (Hydel Power Plant) - 160 MW was valid up to

31.07.2010.

3. Capital investment of the industry is Rs.149.53 Crores. Industry has paid Consent fee of

Rs.4,48,590/- for the period up to 31.07.2012, as new Consent fee GR dated

25.08.2012.

4. Domestic Effluent – 5.3CMD. Industry has provided STP. Disposal on land for

gardening. Industrial Effluent – Nil.

The consent may be renewed for the period up to 31/07/2012.

Page 26: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 22 Name of the Industry :  M/s. Maharashtra State Power Generation Co. Ltd., Nashik Thermal Power Station, P.O. Eklahare, Dist: Nashik. HOD Remarks :- 1. Applied for renewal of consent for electricity generation (125 MW x 2 & 210 MW x 3).

SRO, Nashik reported that Unit No.1 & 2 of 125 MW each are decommissioned and

only unit no.3,4,5 of 210 Mw each are in operation .

2. Earlier consent for electricity generation- 880 MW was valid up to 31.12.2011.

3. Capital investment of the industry is increased from Rs.613.09 Crores to Rs.700.89

Crores (i.e. Rs.87.80 Crores.). Industry has paid Consent fee of Rs.28,03,575/- along

with application. However, industry required to submit Consent to Establish fee of

Rs.1,25,000/- for increase in capital investment of Rs.87.80 crores.

4. Domestic Effluent – 2500 CMD. Industry has provided STP. Industrial Effluent – 37285

CMD. ETP provided. 20% effluent is used for gardening & 80% effluent is used for ash

slurry.

5. ESP provided to Unit no.3,4,5. The unit No.1 & 2 are closed.

6. Augmentation of ESP is completed for unit no.3 and augmentation of ESTP for unit no.4

& 5 is not done.

7. CAAQM Station is not yet installed.

8. Analysis results of Stack monitoring are exceeding the standards. 9. Regional Officer, Nashik reported that Board had issued directions vide letter No.

MPCB/APAE/TB-2/B-1884 dated 29.03.2011 and directed the industry to comply with

these directions in stipulated period and submit the Bank Guarantee of Rs.1.0 Crore

towards compliance of these directions (detail report is enclosed herewith). But Industry

has failed to submit the said Bank Guarantee. In view of above the application is

submitted herewith for the consideration and further disposal, please.

In view of non compliance of Consent Conditions / Interim Directions, we may issue Show Cause Notice for refusal of the Consent.

Page 27: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 23 Name of the Industry: M/s. Shree Sidhbali Ispat Ltd.,

Plot No.C-2 & 3, MIDC Tadali Growth Center, Tadali, Tal & Dist: Chandrapur.

HOD Remarks : -

1. Applied for renewal of Consent with amalgamation of both the consent.

2. Earlier consent was valid up to 31.12.2011.

3. Total Capital investment of the industry is Rs.230.17 crores. Industry has paid consent

fee of Rs.4,60,440/- for the consent period up to 31.12.2012 as per new consent fee

GR dated 25.08.2012.

4. Domestic Effluent – 12.4 CMD. Septic tank, soak pit provided. Effluent is disposed on

land for gardening. Industrial Effluent – 139.5 CMD. Effluent is disposed for ash

quenching / Dust suppression after primary treatment.

5. Separate ESP is provided for Kiln-1.2 & 3. ESP provided to 20 MW CPP Boiler.

Scrubber provided to induction furnace. Bag house provided to coal crushing and iron

ore crusher, cooler discharge and product house.

6. WHRB are provided to all kilns.

7. Analysis results of AAQM carried out between 2.2.2010 to 18.07.2011 shows the

parameter RSPM & SPM are exceeding the standards most of the times.

8. Analysis results of stack monitoring carried out between 09.03.2010 to 18.07.2011

shows the parameter SPM is exceeding the standard most of the times.

9. Regional Officer, Chandrapur reported that;

i) Air Pollution Control System provided to induction furnace is inadequate and not

operating satisfactorily.

ii) Industry needs improvement in Operation and maintenance of existing APC system.

iii) Industry has not submitted compliance regarding provision of CAAQM and CMS at

Kiln and Boiler stacks.

In view of non compliance of consent conditions/ analysis results of stack, ambient are exceeding, we may issue show cause notice for refusal.

Page 28: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 24 Name of the Industry: M/s. Amba River Coke Ltd., (Down Stream Project, CRM)

Village: Dolvi, Wadkhal, Tal. Pen, Dist –Raigad.

.

HOD Remarks : -

1. Applied for grant of consent to Establish.

2. Application for grant of consent to establish received to HQ on 19.03.2012.

3. Query letter send to industry on 02.04.2012.

4. Industry has paid consent fees Rs.6, 02,000/-as per revised G.R.25.08.2011.

5. As per EIA Notification-2006, Environmental Clearance is applicable to the

manufacturing of the above products.

6. RO- Raigad has recommended case for grant of consent to establish subject to

case in High Court and Environmental Clearance/MCZMA Clearance.

7. Consent to establish may be granted without prejudice to the decision of the

Hon’ble High Court, Mumbai in PIL No.87/2006 in WP 47/2010

Page 29: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 25

Name of the Industry: M/s. Amba River Coke Ltd. (Pellet plant), Village: Dolvi, Tal: Pen, Dist. Raigad.

. HOD Remarks : -

1. Applied for grant of consent to Establish.

2. Application for grant of consent to establish received to HQ on 19.03.2012.

3. Query letter send to industry on 02.04.2012.

4. Industry has paid consent fees Rs. Rs.14,46,000/-as per revised

G.R.25.08.2011.

5. As per EIA Notification-2006, Environmental Clearance is applicable to the

manufacturing of the above products.

6. RO- Raigad has recommended case for grant of consent to establish subject to

case in High Court and Environmental Clearance/MCZMA Clearance..

7. Consent to establish may be granted without prejudice to the decision of the

Hon’ble High Court, Mumbai in PIL No.87/2006 in WP 47/2010.

Page 30: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 26 Name of the Industry : M/s. Maharashtra Seamless Ltd., Plot no.D-114, MIDC Vile Bhagad, Tal: Mangaon, Dist: Raigad. . HOD Remarks : -

1. Applied for grant of consent to operate.

2. Application for grant of consent to operate received to HQ on 19.03.2012.

3. Query letter send to industry on 29.03.2012.

4. Industry has submitted reply on 30.03.2012.

5. Industry has paid consent fees Rs.6,19,207/- + Rs.1,00,000/-as per revised

G.R.25.08.2011.

6. RO- Raigad has recommended case for grant of consent to operate after

clarification about Environmental Clearance.

7. Manufacturing of seamless steel pipes and ERW pipes are not covered in the

list of the processes requiring Environmental Clearance as per MoEF, GOI’s

EIA Notification 2006 and amendment thereof.

8. Recommended for grant of consent up to 31.03.2013.

Page 31: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 27 Name of the Industry : M/s Hindalco Industries Limited, (Expansion Project), Sr. No. 95/1, 95/2, Village Daheli, Tq. Mouda, Dist. Nagpur

HOD Remarks : -

1. Existing RED/LSI unit of manufacturing of Aluminium strips & sheets – 3250 MT/Month having valid consent for the period up to 31.12.2012.

2. Now applied consent to establish for expansion for manufacturing of additional products of Aluminium Strips,Sheets,Foils and Aluminium Laminated and Printed Products -2250 Mt/month.

3. Capital investment of the proposed expansion is Rs.197.34 crore. Capital Investment of the existing unit is Rs.198.8/-crore. ( Total C.I. is Rs. 396.14/-crore)

4. Industry has paid consent to Establish fee of Rs. 3,94,780/- as per New Consent Feee GR dated 25.8.2011.

5. Industry does not satisfy RRZ policy as Kanhan River is about 350 meter from plant, hence industry required to submit the pollution load certificate for existing and expansion activity.

The unit does not satisfied RRZ policy. Only 350 Mtrs. away. In view of non-compliance to RRZ we may refuse the Consent to Establish (Expansion) of the unit.

 

Page 32: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 28 Name of the Industry : M/s. POSCO Maharashtra Steel Pvt. Ltd,

Plot No. C-1, MIDC Bhagad, Tal: Mangaon, Dist –Raigad.

. HOD Remarks : -

1. Applied for grant of 1st consent to operate.

2. Application for grant of consent to operate received to HQ on 29.03.2012.

3. Compliance report in respect of the industry called from SRO-Mahad on

31.03.2012.

4. SRO-Mahad has submitted reply on 02.04.2012.

5. Industry has obtained Environmental Clearance from GoM for the same

product.

6. Industry has paid consent fees Rs. 35, 76,738 /-as per revised

G.R.25.08.2011.

7. RO- Raigad has recommended case for grant of consent to operate subject

to, industry shall provide full-fledged ETP and STP for treatment of

industrial and domestic effluent.

8. Industry has provided ETP to treat the domestic and industrial effluent.

9. Recommended case for grant of consent to operate for the period up to

28.02.2014 subject to following conditions:

I. Industry shall install STP within 6 months period and submit the B.G. of

Rs.5 Lacs towards installation of the same.

II. Industry shall achieve 5 BOD standard all time with the operational

B.G.of Rs.5 Lacs.

III. Industry shall provide 3 CAQMS within next 4 months with the B.G. of

Rs.5 Lacs.

Page 33: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 29 Name of the industry : M/s. Piaggio Vehicles Pvt. Ltd.,

E-2 & F-1, MIDC Baramati, Tal. Baramati, Dist. Pune 413 133

HOD Remarks :-

• Applied for renewal of consent and 1st consent to operate for expansion with amalgamation

• Application received at SRO-Pune-I on dtd 06/02/2012 and at HQ on 30/03/2012.

• Industrial effluent is 490 CMD for which ETP provided.

• Domestic effluent 326 CMD treated in STP

• Industry has submitted JVS water analysis result dated 31/08/2011, 12/07/2011 & 29/09/2011. This is under prescribed limit.

• RO Pune has recommended the case for consent to operate with amalgamation by extending personal hearing at HQ level & imposing appropriate B.G towards the timely compliances of on line monitoring system to the major stack & CAAQM system.

• We may grant the 1st consent to operate for period upto 31/03/2013 with condition 1) Industry shall install necessary APC to paint booth within next 3 months with B.G. of RS. 2 Lakhs 2) the unit shall install CAAQM within 4 months with B.G. of Rs. 5 Lakhs

• We may place the consent application before CAC for further consideration.

Page 34: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 30 Name of the industry : M/s. Piaggio Vehicles Pvt. Ltd.

F-19, MIDc Baramati, Tal. Baramati, Dist. Pune 413 133

HOD Remarks : -

• Applied for 1st consent to operate

• Application received at SRO-Pune-I on dtd 05/01/2012 and at HQ on 30/03/2012.

• Industrial effluent is 60.30 CMD for which ETP provided.

• Domestic effluent 45 CMD treated in STP

• RO Pune has recommended the case for 1st consent to operate by extending personal hearing at HQ level & imposing appropriate B.G. towards the timely compliances of on line monitoring system to the major stack & CAAQM system.

• We may grant the 1st consent to operate for period upto 31/03/2013

• We may place the consent application before CAC for further consideration.

Page 35: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 31 Name of the industry : M/s. J.C.B. India Limited,

Plot No. A & B, Talegaon, Floriculture & Industrial Park, Vill. Ambi Navlakh Umbre Tal. Maval, Dist. Pune

HOD Remarks :-

• Applied for consent to establish for expansion

• Application received at SRO- Pune-II on dtd 28/12/2011 and at HQ on 22/03/2012.

• Existing plant consent is valid up to 31/07/2013

• Generation of industrial effluent will be NIL

• Domestic effluent generation is (existing 108 CMD + Proposed 72 CMD)

• Industry has proposed to provided sewage treatment plant of 100 CMD for treatment of Domestic effluent

• JVS analysis result on dated 14/11/2011 is under prescribed limit of existing unit

• Industry has proposed to provide necessary air pollution control system

• RO Pune has recommended the case for grant of consent to establish for expansion in existing unit

• We may grant consent to establish for expansion

• We may place the consent application before CAC for further consideration.

Page 36: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 32

Name of the Industry : M/s. Zamil Steel Building (I) Pvt. Ltd. Plot No. B-32/2, MIDC, Ranjangaon, Pune 412 209

HOD Remarks : -

• Applied for Renewal of consent

• Application received at SRO-Pune on dtd 05/12/2011 and at HQ on 22/03/2012.

• Previous consent was valid up to 30/11/2008

• Industrial Effluent is NIL

• Domestic Effluent Generation 30 CMD for which industry has provided sewage treatment plant

• Industry has submitted JVS water analysis result of dated 15/02/2012 Which is under prescribed limit.

• Industry has provided air pollution control system

• Industry has provided Dry scrubber provided to paint booth & dust collector & bag filter for shot blasting section

• RO Pune has recommended for grant of renewal of consent for period up to 30/11/2012

• We may grant the consent for period up to 30/11/2012 with condition B.G. of 5 Lakhs towards Operation & maintenance of pollution control system

• We may place the consent application before CAC for further consideration.

Page 37: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 33

Name of the Industry: M/s. Wokhardt Hospitals Pvt. Ltd.,

Dr. Anand Rao Nair Marg,

Byculla, Mumbai.

HOD Remarks:

a. Applied for grant of consent to Establish for construction of Hospital (320 No. of Beds and Cafeteria/canteen).

b. Application received at SRO on 3.11.2011 and at HQ on 17.03.2012. c. The total built-up area 25,015.26 sq.m. and total plot area is 3586.98 sq.m.

d. Applicant requires to obtain Environmental Clearance as per EIA Notification, 2006

and obtained the same.

e. Applicant have started construction activity without obtaining consent as previously

they had approved plan for 7,868.06 sq.m. BUA and said does not require

Environmental Clearance. SRO reported that they have completed 21 storey building

of hospital with partly plumbing/ flooring. And SRO recommended to issue SCN for

the same.

f. The effluent generated from the said activity will be sewage – 242 CMD and

proposed to provide STP (capacity-325 CMD) and treated effluent will be reused for

flushing, cooling purpose and remaining treated effluent is disposed off into the

sewer line.

g. The bio-degradable waste generated will be segregated and disposed to MCGM.

And non-biodegradable waste will be send to authorized vendor. They have

proposed to provide vermin-composting pits for biodegradable waste.

h. RO reported that applicant have proposed rain water harvesting.

i. The C.I. of project mentioned in EC is Rs. 100 Crs. and in the application it is

mentioned as Rs. 208 Crs. Applicant have submitted the clarification as earlier

medical equipment cost did not included in C.I. and escalation in project cost is due

to the time lapsed between 2008 and now and paid consent fees accordingly.

j. As this is the construction of Hospital with canteen, category of consent and consent

granting authority needs to be defined. As per CPCB revised product category,

Hospital comes under RED category. There are similar activities in Hospital & Hotel

such as laundry activity, canteen, sewage waste, biodegradable waste. So, we may

consider hospital in Red category and Hotel.

k. Consent may be granted upto commissioning of the unit.

Page 38: List of Cases to be submitted before 1st Consent Appraisal

AGENDA PART – II

CAC Item No. 01

Name of Industry : M/s. GAIL India Ltd (LPG Recovery Plant) Malyan at USar, Tal-Alibuag, Dist – Raigad

HOD Remarks : -

1. Application received at RO Raigad 16/01/2012 2. Application recd at HQ 16/03/2012 3. Product- Mfg of LPG. 4. Earlier the case was discussed in CAC meeting held on 20.03.2012, the case

was deferred, and it was decided to submit in next CAC. 5. Industry reported that, at present there is no liquid effluent is generated due to

not receiving of Natural Gas in full capacity. It is operating 35 % of installed capacity.

6. Primary and Secondary system provided for treatment. 7. Disposal- For gardening within premises, land available 50 Hectors. 8. SRO Raigad -II has recommended for renewal of consent.

Consent may be renewed upto 28.02.2013 .

Page 39: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 02

Name of Industry : M/s. Bharat Petroleum Corporation Limited, Refinery, Mahul, Mumbai.

HOD Remarks : - - An existing industry, applied for renewal. - CI is Rs. 4826.48/- Crore - Consent valid up to 30/04/2012. -T he industry has provided treatment facility up to tertiary level followed by RO for

generation of indl. efflt.2856 CMD from process,458186CMD sea water blow down ,& 146319 CMD Sea cooling water blow down. Disposal- partly reused & partly discharged in to Mahul creek.

- Generation of domestic effluent is 235 CMD, . JVS results are fluctuating, ie BOD, COD & SS are in higher side. disposal in to Mahul creek. HW. Disposal by CHWTSDF.

- Water cess paid up to June 11. - The Board Officials observed various non compliances viz.Industry has discontinued

operation since last three years, ETP O & M is poor, domestic waste water discharged directly in to Mahul Creek, Untreated Sea cooling water discharged in to Mahul creek. Industry has not taken adequate measures for controlling emissions of VOC etc. RO Mumbai has issued SCN vide letter dtdf 14.02.2012. Industry has not submitted reply accordingly.

- compliance report asked to submit regarding SCN which is awaited from RO Mumbai vide this office letter dtd30.03.2012

- Consent fees paid for one year period. - The case can be consider after receipt of RO’s report.

Page 40: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 03

Name of the Industry: M/s. The Leela Kempinski Sahar,

Plot No. 1407(pt), 1405(pt), 1404(pt),

Sahar, Andheri(E), Mumbai.

HOD Remarks:

1. Applied for grant of Renewal of consent for hotel activity including 395 rooms

including lodging activity.

2. Application received at SRO on 21.10.2011 and at HQ on 07.01.2012.

3. Previous consent was valid upto 31.08.2011.

4. The trade effluent generated from the said activity is 132 CMD (Previous consent-

126.5 CMD), which is being treated in primary ETP and then connected to STP. The

domestic effluent is 196 CMD (previous consent- 300 CMD), which is being treated in

the STP and the total treated effluent is reused for flushing, cooling purpose and

remaining treated effluent is disposed off into the sewer line.

5. JVS analysis results dtd. 14.07.2010, 15.10.2011 found within norms.

6. Provided stack of adequate height to DG Set, Boiler.

7. Provided adequate exhaust system at all sections/points The bio-degradable waste

generated is disposed to MCGM.

8. Applicant have submitted Environmental Statement for period 2009-10 and Cess

paid upto 22.06.2011.

9. SRO has communicated certain discrepancies to the applicant on 11.11.2011

regarding increase in C.I. & other details but they have not replied the same till date.

10. RO/SRO recommended the case for grant of renewal of consent after receipt of audited annual balance sheet and obtaining necessary consent fees.

11. The case was discussed during CAC meeting held on 23.01.2012 and during the

meeting, it was decided to issue SCN for refusal of consent as industry has not

replied to letter issued by the SRO on 11.11.2011. SCN issued on 06.02.2012 and

industry has submitted the reply on 27.02.2012 & 03.04.2012, following points are

noted;

a) Submitted CA certificates from 2007 to till date, however, C.I. mentioned is found

reduced to previous year and they have mentioned that the difference in gross

block C.I. over the years is due to fluctuation of the foreign exchange rate of the

assets purchased under foreign loans. They are ready to pay the requisite

consent fees. Current year C.I. is Rs. 318.34 Crs.

b) C.I. is increased from Rs. 196 Crs. to 318.34 Crs. but there is no

modernization/expansion of the hotel.

Page 41: List of Cases to be submitted before 1st Consent Appraisal

c) submitted revised water budget. Trade effluent is 128 CMD and domestic effluent

is 196 CMD and total 150 CMD treated effluent is being recycled in the hotel.

12. File referred to CAO for verification of point no. (a) & (b) and he remarked that C.I.

shown in schedule of fixed assets of balance sheet do not match with total gross

block of fixed asset shown in CA-certificate.

13. Consent may be granted upto 31.08.2014 after verification of C.I. and obtaining

necessary consent fees 

CAC Item No. 04

Name of industry : M/s. Kumbhi Kasari SSK Ltd. Kuditre, Tal- Karveer, Dist- Kolhapur

HOD Remarks :-

• Applied for Consent to Establish for expansion of sugar & Consent to establish for co- generation -19.5 MW

• Application received at SRO on 08.07.2011 and at HQ on 27.09.2011.

• Industry has applied for Mfg. of Sugar- 5217 MT/M, Molassea- 3937 MT/M-1313 MT/M, Bagasse- 13463 MT/M & Pressmud- 4200 MT/M & Electricity – 19.5 MW

• Industrial effluent generation is 360 CMD after modernization of existing unit..

• Industry has proposed to treat effluent generated from expansion activity in existing sugar unit ETP.

• Industry has submitted ‘No Increased in Pollution Load’ certificate from VSI, Pune.

• As per CAC Minutes Dtd.02.03.2012 JD(PAMS) and AS(T) brought to the notice that there is increase in pollution load as per report of Vasant Dada Sugar Institute, Pune and it does not satisfy RRZ Policy, Hence, it was decided to refuse the consent to establish.

• Refusal of consent was grated on 14.03.2012 a2 as per minutes of CAC Dat.02.03.2012

• Industry has requested to give opportunity for detailed presentation of No Increased in pollution Load.

• The case was further discussed in CAC dated 20.03.2012 & it was decided to call industry for presentation in next CAC and meanwhile call verification report of RO-Kolhapur w.r.t. VSI report and industry report.

• Report of RO Kolhapur received & it is acceptable. • The industry has called for presentation as per decision of CAC.

Page 42: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 05

Name of industry : M/s. Bombay Rayon Fashion Ltd., Plot No. B-95,, MIDC, Tarapur,

Tal. Palghar, Dist. Thane

HOD Remarks : -

• Industry has applied for Consent to ist. Operate .. • Textile Processing industry. • Application received at SRO Tarapur 24.05.2010 and at HQ 10.08.2010. • Provided Primary & tert. treatment facility. Treated effluent will be recycled/reused

for cooling tower, toilet flushing. • Dust Collector to Coal fired Boiler • Member of CHWTSDF. • Consent was refused • Ind will achieve Zero discharge. • Effluent recycled to Humidification , toilet flushing,& cooling tower. • We may reconsider the request & grant consent to operate. .

Page 43: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 06

Name of industry : M/s. Ruchi Soya Industries Ltd., Patalganga, At –Esambe – Kharpada Road, Tal. – Khalapur, Dist. - Raigad

HOD Remarks : -

• Applied for 1st Operate for increase in production and amalgamation with exiting

Consent which is valid till 31/10/2012. • Application received at SRO on Dt.17/11/2011 and at HQ on 23/02/2012. • Edible oil refinery with increased in production quantity (from 17500 T/M to 35000

T/M). • The Capital Investment of the Industry is Rs. 223.81 Crore. • Industry has obtained C to E on 11/10/2011 for refined oil- 17500 MT/M. • Industrial effluent generation -90 CMD, including cooling tower blow down. • Provided Secondary and tertiary treatment facility, for existing unit. • JVS results are not meeting the consented standards. • Treated effluent is sent to PRIA CETP. • For coal fired Boiler Dust Collection System provided. • As per report of SRO closure direction were issued on 16/09/2011. • SRO and RO reported that the up gradation work of secondary treatment system is

not yet completed. Industry has not submitted any proposal for ash utilization. • JVS results are not meeting the consent standard. • As per the decision of CAC, SCN was issued to refusal of consent. • Industry submitted reply, reply of RO, SRO not received. • Industry stated that no additional effluent is generated. • BG of Rs.2 + Rs. 01 is extended. • We may grant consent to operate with amalgamation.

Page 44: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 07

Name of Industry : M/s. Pudumjee Pulp & Paper Mills Ltd., ( Formerly Known as M/s. Global Board Ltd) K-5, Additional MIDC, Mahad, Dist- Raigad

HOD Remarks: -

• Applied for renewal of consent to operate • Application received at SRO on 05.07.2011 and at HQ on 31.01.2012 • It is engaged in Mfg. of duplex board- 2400 MT/M, Art Board & Art paper –

1200 MT/M, specialty Board -1450 MT/M & Cast Coated Board -600 MT/M. • Total water consumption is 6000 CMD in which domestic effluent generation is

135 CMD. Used for gardening and industrial effluent is 4650 CMD. • Unit was closed from Mar -2008. Unit had valid consent upto 30.04.2009 &

industry had applied for renewal of consent for 1 year, but was not granted to industry.

• Previously M/s. Global Board Ltd has investment of Rs.17000 Lakh & had valid consent upto 30.04.2009. But now the Industry has been bought by M/s. Pudumjee Pulp and Paper Mills Ltd., and they have applied for renewal of Rs. 2236 Lacs only.

• AS per the decision of the CAC Dt. 14.02.2012 SCN for revocation/ refusal of earlier consent /closure due to having invalid corroded ETP and no arrangement for the disposal of the treated effluent as CETP is inadequate to handle the load.

• In reply to the SCN issued to the Industry, industry has stated that they have purchased second hand industry hence Capital Investment is decreased. Industrial effluent generation is 4 MLD

• CETP Mahad has no capacity to accumulate 4 MLD effluent. • Industry was operating till 2008-09. • Decision may be taken in view of disposal of the treated effluent.

Page 45: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 08

Name of industry : M/s. Bombay Rayon Fashion Ltd., Plot No. C-6 & C-7, MIDC, Tarapur, Tal. Palghar, Dist. Thane

HOD Remarks : -

• Industry has applied for Renewal of Consent.. • Textile Processing industry. • Application received at SRO Tarapur 13.12.2011 and at HQ 14.03.2012. • Provided Pri Secondary & tert. Treatment facility • Treated effluent is recycled/reused to 20% • Multi cyclone dust collectors wih bag filter provided. • SCN was issued for non compliance as per decision of CAC. • Ind submitted reply communicated that the increase in C.I is due to addition of

machineries which will improve performance of fabric & will not generate additional effluent.

• Production will remain same. • We may consider the case & grant renewal of Consent with B.G. of Rs 5.0 Lakhs.

Page 46: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 09

Name of Industry: M/s. MAZDA COLOURS Ltd. Plot No 121/1, MIDC Dhatav,Tal- Roha, Dist - Raigad

HOD Remarks : -

1. Application received at RO Raigad 16/03/2012 2. Application recd at HQ 28/03/2012 3. Product- Pigments and intermediates. 4. I.E. 3135 CMD, D.E. 25 CMD. Primary and Secondary system proposed. 5. Disposal- 200 CMD will be used in the process and 2960 CMD will be sent to

CETP. 6. Earlier Board has issued NOC to the unit with condition that, the effluent

quantity Phase-I 1080 CMD shall be treated by providing MEE & RO System. The Phase-II with remaining effluent is to be linked with proposed expansion of CETP.

7. Industry has already applied for EC and submitted minutes of 41st meeting of SEIAA.

8. NOC for CETP membership obtained. 9. RO Raigad has recommended for grant of consent to establish.

Consent to Establish may be granted with incorporating of NOC conditions.

Page 47: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 10

Name of Industry : M/s. Alkyl Ammines Chemicals Ltd., Plot No D-6/1 & D-6/2, MIDC, Kurkumbh, Tal- Daund, Dist : Pune

HOD Remarks : -

1. Application received at RO Pune 03/02/2012 2. Application recd at HQ 13/03/2012 3. Product- Chemicals. 4. Applied for Consent to amalgamation and amendment for addition of new

coal / bagasse fired boiler. 5. Existing unit holding two consents valid upto 30.06. 2014 & 30.09.2014. 6. I.E. 417 CMD, D.E. 39 CMD. Primary, Secondary and Tertiary system

treatment provided. 7. Disposal- Out of 417 CMD, 161 CMD strong streams is treated in ETP of 200

CMD capacity and remaining 256 CMD weak stream mainly generated from cooling tower blow down and boiler blow down is directly mixed with final collection tank of treated water and which is disposed into CETP drain.

8. Industry has stated that, after change in fuel sulphur dioxide is reduced by 331 Kg/day for coal and 2000 kg/day for bagasse.

9. Industry submitted Justification for increased C.I. of Rs 4.18 Cr due to installation of new coal/bagasse boiler.

10. RO Pune has recommended for amalgamation of two-consent up-to 30.09.2014.

We may grant amalgamation & amendment for addition of new coal / bagasse fired boiler.

Page 48: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 11

Name of Industr y: M/s. Wockhard Ltd (Bio- Tech Park) H-14/2, MIDC, Waluj Aurangabad.

HOD Remarks : - 1) Letter from RO for Amendment in Consent.

2) This is Bulk drug & Pharmaceutical Formulation (Tablets) Manufacturing industry.

3) CAC dtd-31/01/2012 decided to amalgamate the Consent. With condition that-Industry

shall submit BG of Rs. 5 Lakhs for O & M of ETP so as to achieve the consented

standards including BOD.

4) Accordingly Consent was granted valid up to-30/06/2014.

5) Industry has submitted B.G of 5 lakh as per Consent Condition.

6) RO Aurangabad as requested vide letter dtd- 13/03/2012 to amend the consent with

some correction and addition of two products.

7) The products 1) Antihuman Tumer Necrosis Factors (GCSF’s) -125 gm/A & 2) Tablets

(Formulation Only) -4.0 Billion /year, were covered in previously granted consents under

Red and Orange Category respectively. But not reflected in last processing & consent

renewed on 14/2/2012. Hence, applied for amendment in consent.

8) Considering this, the amendment may be granted.

9) Submitted for decision of CAC.

 

 

 

 

 

Page 49: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 12

Name of the Industry : M/s Jubilant Life Science Ltd., Village Nimbut-Nira, Tal-Baramati, Dist-Pune

HOD Remarks : -

• Application recd to RO Pune 02/01/2012. • Application recd at HQ on 03/03/2012. • Mfg of chemicals. • The industry location is in RRZ restricted area (Nira river A-IV Zone) • In the same premises industry has holding 5 consents for various products Existing

I.E. – 1804 CMD, proposed IE-163. Total IE 1967 CMD. • Earlier board has granted consent to establish in 22/08/2008 and accordingly

industry has obtained EC from MoEF. Now Industry has applied Phase-wise consent to 1st Operate only for the mfg of acetic anhydride 125 MT/Day with IE 163 CMD.

• RO Pune has reported compliance of existing industries and recommended for 1st Operate with amalgamation of existing consent.

We may be consider for grant of 1st Consent to operate with amalgamation as per EC conditions.

Page 50: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 13

Name of the Industry : M/s. Hindustan Petroleum Corporation Limited. B. D. Patil Marg,Mahul, Mumbai. HOD Remarks : -

- Application for renewal of consent was discussed in CAC meeting dtd.2.3.12 and as per decision consent was renewed subject to conditions I. e. Renewal only for one year.

- Refinery to submit action plan for improvement, duly signed by occupier Director (ops), within 3 months.

- BG of Rs. 5.0/- Lakhs each towards effluent, air and HW issues referred in notice.

- Review by team of MPCB officers for the compliance in May 2012. - Industry has submitted a letter for amendment vide letter dtd21.3.2012

states that th industry has decommissioned their old ETP-I & II and has commissioned integrated effluent treatment plant in June-2010 which is to be incorporated instead of ETP- I & II. Also requested for effluent discharge of 30 CM per hour from the purge treatment unit .The industry has switching over to natural gas firing in the fired equipment in view of this there is need for revision with respect to refinery gas/natural gas quantity i.e. 850 T/D.

- Industry had submitted requisite consent fess for the period up to 31/12/2013 ie for two years. And Board was granted consent period for one year subject to BG and other conditions like industry shall submit action plan for improvement duly signed by Director (operation) et.. now industry has requested for amendment to wave the BG condition and consent period.

Page 51: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 14

Name of Industry : M/s. Rashtriya Chemicals And Fertilizers Ltd., Trombay Unit, Mahul Village Road, Chembur, Mumbai-74.

HOD Remarks: - - Recently applied for Renewal with Expansion (product mix) and as per

CAC Meeting dtd. 7/12/2012 consent granted for the period up to 01/08/2016. Now application submitted for modification in plants for pollution control & energy conservation..

- Industry has propose to modify in plants vz.

- Installation of vapour absorption machine at the suction of turbo air compressors in medium pressure Nitric acid plant.

- Installation of spin flash for Ammonium Bicarbonate plant.

- Changeover from present adiabatic conversion reactors to isothermal reactors in methanol plant etc.

- Du to proposed to modification in plants which production level of Methanol will increase from 69960 MT/Y TO 1,00,000 MT/Y and ammonium Bicarbonate – 25000 MT/Y TO 35000 MT/Y. Industry states that the pollution load will remain below the consented limits.

- As per amendment in EIA Notification dtd 14.12.2006, in cases of change in product mix, changes in the quantities or number of products may be allowed without prior EC by the concern SPCB provided such changes in the quantities of products are in the same category & are within the previously granted overall total limits.

- They may be advised to submit regular application with fees.

Page 52: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 15

Name of Industry : M/s. Praxair India Ltd. Plot No. A-3/2, MIDC Murbad, Dist. Thane. HOD Remarks : -

1. Application for Renewal of Consent to Operate. 2. Products- storage of various liquid gases & chemicals. And Manufacture of Gases

i.e. Helium & Helium base Mixture Cylinders. 3. Application received at SRO on 17/02/2012 and at HQ on 03/04/2012. 4. IE generation is Nil. 5. Industry has obtained Consent to Establish for expansion with CI Rs. 150 Crore vide

No. CAC-183 dtd. 19/01/2012. 6. CI of existing unit is Rs. 7.25 Cr. 7. Industry covers under CAC List at Sr. No. 599. 8. Industry had applied for renewal of consent for three years along with consent fees

of Rs. 60,000/- for period up to 31/03/2013. Then again paid Rs. 40,000/- for additional two years i.e. up to 31/03/2015. But consent granted for one year in the year 2009 with storage quantities different than application. Hence industry has requested to issue consent up to 31.03.2015 with corrected quantities of production & storage vide letter dtd. 12/04/2011. Now industry has applied for renewal up to 31/03/2015 and paid difference consent fees of Rs. 15,000/- as per revised fee structure) and requested to grant consent with corrected production & storage quantities.

9. Considering this Renewal of consent with amended quantities may be granted.

10. Submitted for CAC Consideration

Page 53: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 16

Name of Industry: M/s. National Rayon Corporation Ltd., Post. Mohane, Tal. Kalyan, Dist. Thane HOD Remarks : -

1. Status of Closed Industry. 2. Industry covers under CAC list at Sr. No. 288. 3. Product- The unit was engaged in manufacturing various chemicals such as

Sodium Hydroxide, Chlorine, Compressed Hydrogen, Sulphuric Acid, Hydrochloric Acid, Carbon-di sulphide, Nylon etc.

4. Proposal is submitted by RO Kalyan on 29/02/2012. 5. Additional information was called from RO Kalyan vide E-mail letter dtd.

09/03/2012. RO Kalyan has submitted the present status report vide letter dtd. 17/03/2012.

6. Industry has stopped its production since Nov. 2010, and Mercury Cell Plant was stopped in 1997 and scrapped there after. The Board had issued directions on 13/11/2007 followed by Interim Directions issued on 18/12/2007 which states that, the industry shall furnish concrete proposal duly prepared by the expert in the field in respect of present storage of mercury having 100 Tons in the landfill and suggesting the remedial measures, which is one of the conditional directions. And also submit the Bank Guarantee of Rs. 200000/- and which was submitted.

7. The industry shall get certified by the competent authority of the Government, such as Industrial Safety & Health Department that there is no storage of any hazardous chemical within the premises.

8. The Mercury waste lying in the landfill site shall be analyzed for its mercury content and then decision in this regard may be taken or an a expert may be nominated to carry out the duties.

Industry shall be directed to comply the above conditions in 3 months

Page 54: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 17

Name of Industry : M/s. Pegasus Properties P. Ltd.,

Plot No. R- 1/1, R-1/2, R-1/3, R-1/4, Rajiv Gandhi Infotech Park-III, Hinjewadi,

Village Man and Bhoirwada,Tal- Mulshi, Dist Pune

HOD Remarks : -

1. Applications for 1st consent to Operate in part

2. Application Received at SRO on 17/03/2012 and at HQ on 27/03/2012.

3. Industry has provided STP of capacity 600+350 CMD.

4. The firm has provided composting for Bio degradable solid waste

5. The firm has obtained EC vide No. SEAC-2010/CR.346/TC-2

6. RO has recommended the case for grant of consent to operate.

7. Consent may be granted with BG of Rs. 10 lacs.

Page 55: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 18

Name of Industry: M/s. Neptune Venture & Developers Pvt. Ltd. (Magnet Mall), Plot bearing CTS No. 372,372/1 to 65,

LBS Marg, Village Kanjur, Tal. Kurla, Mumbai - 400078

HOD Remarks : -

1. Applications for renewal of consent with expansion

2. Application Received at SRO on 02/01/2012 and at HQ on 22/03/2012.

3. Industry has provided STP of capacity 600+350 CMD.

4. The firm has not submitted the details of solid waste management, Environment Statement and Cess paid.

5. RO has recommended the case for grant of consent to operate.

6. Consent may be granted by obtaining lapse period fees and with BG of Rs. 10

lacs for operation of STP, MSW plant , and submission of Environmental

Statement and Cess paid details.

Page 56: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 19

Name of industry : M/s. Dyneshwar SSK Ltd,(Cogen) Dyneshwar nagar, A/P Bhende, Dist. Ahmednagar.

HOD Remarks : -

• Applied for renewal of Consent . Co-gen Industry • Application received at SRO Latur 24.02..2012 and at HQ 27.03.2012. • Provided Primary treatment. • Land available for disposal of effluent 30 Hectors. • Wet scrubber provided to Boiler • We may renew the consent & amalgamate with sugar consent upto 31.12.2012.

Page 57: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 20

Name of industry : M/s. Sanjivani Takali SSK Ltd., Shahajanand nagar, Tq. Kopargaon,

Dist. Ahemadnagar.

HOD Remarks : -

• Applied for Renewal ( √ ) with first Consent to Operate of Co-gen & amalgamation of consent

• Application received at SRO nagar 01.12.2011 and at HQ 11.04.2012. • Provided Secondary treatment . Treated effluent is used on land. Available land for disposal is 50Hectores. • JVS results are not meeting the standards.. • We may renew the consent with amalgamation of this consent with Sugar consent

upto 31.12.2012.

• The B.G of Rs 5.0 lakhs & 2.0 Lakhs to be obtained.

Page 58: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 21

Name of industry : M/s. Biltude Industries Ltd ( Part-II) Gat No. 1172 to 1178, A/p. Kodoli, Tal- Panhala, Dist- Kolhapur.

HOD Remarks : -

• Applied for renewal of Consent.

• Application received at SRO on 09.01.2012 and at HQ on 02.04.2012

• Industry has provided primary, Secondary & tertiary treatment ETP

• The treated effluent is recycle/reused for ash handling and dust suppression & achieved Zero Discharge as per consent condition. But as per SRO report industry is discharging the treated effluent outside the factory in own irrigation land.

• Industry has not submitted details regarding increased in capital investment from 49.90 Cr. To 178.11 Cr.

• Industry has provided Electrostatic Precipitator (ESP) to the Boiler with 50 Mtrs. Height of chimney as an APC system

• JVS analysis results dated 29.06.2011, 24.10.2011 & 17.09.2011 are exceeding the consent parameter.

• Industry has not provided dust collection system & automatic water sprinkling system for coal handing plant.

• SRO recommended the case for refusal of consent.

• Recommended for SCN for refusal.

Page 59: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 22

Name of Industry : M/s. Ballarpur Industries Ltd., (Ashti), Tal. Charmorshi, Dist.- Gadchiroli

HOD Remarks:-

• Applied for the Renewal of Consent for production of Writing and printing paper (White) – 5000 T/M. (based on readymade pulp & without bleaching) • Application received at SRO office on dt.09/12/2011 and at HQ on dt.

07/04/2012. • Capital Investment of the Industry is Rs. 310.20 Crs. • Industrial effluent generation shown is reduced to the tune of 5500 CMD against

the previous consented quantity of 6500 CMD. • Domestic effluent is 500 CMD towards the previous consented quantity of 300

CMD. • ETP of capacity 6000 CMD with secondary treatment is provided. • JVS results are provided which are within the consented limits. • SRO reported ESP is provided to Boiler. • Environmental statement is submitted for 2010-11 and cess returns are

submitted upto Feb, 2012. • Industry was asked to submit the BG of Rs. 50,000/- in directions of dt.

09/08/2010 within 15 days, the BG has not yet submitted. • Adequate APC for coal crusher not provided inspite of directions dt. 09/08/2010. • We may refuse the consent.

Page 60: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 23

Name of the Industry : M/s. Western Coalfields Ltd., Durgapur Open Cast Mine,

Durgapur Sub-Area, Chandrapur. HOD Remarks : -

1. Applied for plain renewal of consent for coal production 2.3 Million Ton/Year.

2. Earlier consent was valid up to 31.12.2011, for coal production of 2.3 Million ton per year.

3. Domestic Effluent-390 CMD, STP Provided. Industrial Effluent including Mine Water discharge- 100 CMD. Effluent disposed into nalla after primary treatment

4. Mobile water tankers for water spraying on haul roads provided. Mist type water sprinkler provided at C H P.

5. Analysis results of ambient air quality monitoring carried between 20.1.2011, 23.6.2011 shows the RSPM values are exceeding the standards.

6. RO Chandrapur recommended renewal of consent for the period up to period

31.12.2012 with directions to complete all environmental works in time bound manner and also recommended to forfeit the bank guarantee of Rs.1/- Lakh for not maintaining the ambient air quality standards.

7. The unit is not complying the consent conditions and exceeding the results. We may issue SCN for refusal of consent.

Page 61: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 24

Name of the Industry: M/s. WCL Mungoli Opencast Mine, Po-Sakhara(Kolgaon),Mungoli Sub Area, Dist. Yavatmal. HOD Remarks : -

1. Applied for renewal of consent with expansion from 1.5 Million ton per year to

4.0 Million ton per year.

2. Obtained Environmental Clearance for coal production 2.5 MTPA to 4.0 MTPA from MoEF GOI vide letter dated 30th March 2011, copy is enclosed.

3. Earlier consent was valid up to 31/12/2010, for coal production of 1.55 Million ton per year.

4. Regional Office Chandrapur vide letter dated 21/01/2012 demanded additional consent fee of Rs. 34,80,938/- including delay charges and balanced consent fee. Mine authority vide their letter dated 03/02/2012 has submitted that they are in process of depositing additional fee.

5. Coal Production for last three years is enclosed herewith. The Production for the year 2010-11 was 3.058 Million Ton.

6. The Board vide letterMPC/CRO/1366/2010 dated 05/08/2010 has issued interim directions to the mine. But said mine authority is non-complied with respect to these points.

a. Active O.B is about 50 meter away from notified Wardha river. The OB was slide in part and spread up to bank of river.

b. Operation & maintenance of existing air pollution control system, sewage treatment plant is very poor and thus affecting surrounding environment.

8. From the Ambient Air Monitoring Results carried in Jan/March/Oct, 2011 observed that results are exceeding.

9. Mine Lease boundary is adjacent to notified A-II class Wardha river ( 0.2 Km) and within two km from Notified A-II Class Penganga river. RRZ not satisfied for expansion of mine near the notified A-II class river.

10. The mine is not complying to the consent conditions/interim directions. The results are exceeding. Industry not satisfying the RRZ notification, hence we may refuse the consent for expansion unit and issue Show Cause Notice for refusal to the existing unit.

Page 62: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 25

Name of the Industry : M/s. POSCO Maharashtra Steel Pvt. Ltd., CRC plant, Plot No. C-1, MIDC Vile Bhagad,

Tal: Mangaon, Dist –Raigad. HOD Remarks : -

1. Applied for grant of Consent to Establish for manufacturing of Full Hard Coil and

Cold Rolled Coils.

2. Industry has obtained consent to establish for the production of Galvanized coils in

the same premises.

3. They have obtained Environmental Clearance for manufacturing Galvanizing coils.

4. Industry has informed that they have applied for environmental clearance to GoM

[SEAC] on 27.06.2011.

5. Application received at SRO, Mahad on 18.4.2011, received at AST section

24.08.2011 and JD (APC) section on 25.11.2011.

6. Query letter issued by this office on 02.12.2011.

7. Firm authority has submitted its reply to query letter on 02.01.2012.

8. SRO-Mahad has recommended for grant of consent to establish subject to

condition that industry shall submit the proposal of new ETP, STP and obtain

Environmental clearance.

9. Industry has paid consent fees Rs.9,49,580/-.+ Rs.9, 49,580/- as per new GR

dated 25.8.2011. 10. Board has granted Consent to establish on 18.01.2012 following the decision of

CAC meeting held on 10.01.2012. 11. As the land where the plant is located is having high rock terrain with the

mountains and hilly soils with less porosity & permeability, effluent disposed on

land may get percolated. Accumulated effluent may contaminate rain water during

monsoon and may enter into river/sea by surface runoff endangering life of flora

and funna. Hence, we may amend the consent and impose strict norms to achieve BOD -5

mg/L, similar to that imposed on galvanizing unit.

Page 63: List of Cases to be submitted before 1st Consent Appraisal

CAC Item No. 26

Name of the industry : M/s. Ghatge Patil Industries Ltd.

S. No. 362A,365A,4B, Uchgaon, tal:- karveer. Dist. Kolhapur.

HOD Remarks :-

• Expansion will be for product Grey Iron Casting & S.G. Iron Casting- 3929 MT/M. • Capital Investment for Expansion will be Rs.11.08 crores. Existing C.I. is

Rs. 98.68 crores. The total C.I. is Rs. 109.76 crores. • Requires EC, which is not obtained. • Industrial effluent will be 3.0CMD, ETP will be provided. Proposal submitted.

Existing effluent is 5.39 CMD, having ETP. Domestic effluent will be 22CMD, STP will be provided, proposal submitted. Existing effluent is 30.9 CMD.

• Cupola Furnaces will be provided with Wet Scrubbers, Shot Blasting section will be provided with Cyclone Separator, Bag Filter Aluminium foundry with Cyclone separator. And paint booth will be in closed cabin with water curtain and mist arrester.

• As the capital investment is Rs. 109.76 crores, we may place the application before CAC for further discussions.