Overview
History
Status Regulation
Standards Baseline Eurocontrol Specification Community Specification
ESSIP This will provide a planning tool for stakeholder implementation as
well as a mechanism for stakeholder implementation progress to be monitored
ProgrammeProgrammeObjectivesObjectives
ProgrammeProgrammeObjectivesObjectives
LINK 2000+ Objectives
Implementing En-route CPDLC over ATN/VDL2 Baseline ICAO standards Forward compatible with new services/technology
O perational
20152013
Above FL285
ACL – ATC Clearances
ACM – ATC Microphone Check
ACM – ATC Communications Management
PioneersPioneersIncentivesIncentivesMandate Mandate
PioneersPioneersIncentivesIncentivesMandate Mandate
• Pioneers– Objective: 100+ aircraft equipped/ MAAS UAC– Achieved: 400+ aircraft recruited/ MAAS UAC operational
• Incentives – Objective: accelerate Airborne equipage to gain early
benefits, return on investment– EU agrees in principle
• Mandatory Implementation (SES IR)– For Operators and ANSPs– Objective: more than 75% of flights in LINK airspace by
2014
1111
2222
3333
3 - Step Approach to Implementation
Rockwell, Honeywell and Airbus all Certified
Pioneer Success
LufthansaLufthansa
Lufthansa CityLineLufthansa CityLine
15 Airlines > 400 Airframes (many more are VDL M2)
b – Route Charge scheme
2 - Step Incentive Scheme
25%
75%
equipage
2008/9 2011 2015
Pioneers
Incentives
Forward fit Retro fit
2013
Combined Scheme
a – Public funds - first 25%
MandatoryCarriage
ANSPs
•Earlier Benefits•Better flight profiles•Less misunderstandings•Higher Productivity•Less delay
Always part of the LINK 2000+ implementation strategy
Single European Sky provided the mechanism
- and it also applies to the ANSPs!
Mandatory Implementation
It Took 3 Years 5 Months
May 2005 EC gave EUROCONTROL a Mandate to Develop an Implementing Rule (IR) for Datalink Services
AdoptionDELIVERY
InitialPlan
Feb 06
RA Consult
Regulatory Approach
May 06RA Delivery
Draft IR
Q2 07IR Consult
SSC
LAW
RU Update
Q3 07IR Delivery
Done!
IR Key Dates
2009 2010 2011 2012 2013 20162015
1st Jan 2011 5th Feb 2015
Aircraft Forward Fit
2014
Aircraft Retrofit Fit
ANSPs Whole of EU
ANSPs LINK/Core Region
7th Feb 2013
New aircraft conform
Datalink IR Dates
LINK Region Feb 2013
All of EU Feb 2015
Forward Fit Jan 2011
Retrofit Feb 2015
Old a/c reg before Dec 97 Dec 2017
New FANS a/c Jan 2014
Transport-type State a/c Jan 2014 (if equiping)
Standards Baseline
Doc 9705 ed. 2 with PDRs
Link Baseline 1.2/1.4
Eurocontrol Specification