Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

Oct 04, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco
Page 2: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

2

Drone Footage: https://youtu.be/boJqkqZ1L-Y

Page 3: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

3

Project Goals: • Improve connectivity for bicycles

and pedestrians.

• Reduce future traffic congestion.

• Improve safety

• Enhance accessibility toDowntown Evergreen with additional parking and shared-use paths.

Page 4: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

4

Page 5: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

5

Bicycle and Pedestrian Facilities • Narrow shoulders • No bike lanes • Minimal sidewalks at the north and south end of project area • Stairs to active roadwayshoulders • Social paths on top of existing rock walls

Page 6: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

6

Parking

• Gravel lots • No delineated parking

Page 7: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

7

Deficient Roadway Safety Features

• Rock outcroppings limit driver sight distances • Insufficient turn lanes for properties and approach roadways • Steep roadside embankments

Page 8: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

8

Page 9: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

9

Page 10: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

10

Corridor Crash History January 1, 2014 through December 31, 2018

Page 11: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

11

Page 12: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

12

Page 13: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

13

Looking North Towards Downtown Evergreen

Page 14: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

14

• Increased left-turn lane storage forBuffalo Park Road. • Lengthen merge area for Northbound JC-73 lane drop.

Page 15: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

• Maintains existing driveways. • Provides designated left turn lanes to properties. • Minimizes impact to creek. • Lengthen merge areafor Northbound JC-73 lane drop.

15

Page 16: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

16

• Dedicated parking areas • 8-foot Shared use path on the creek side. • Alignment shift for improved sight lines. • Intersection improvements at Little Cub Creek.

Page 17: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

17

• Excavation of rock outcropping and improved driver sightlines. • Dedicated parking area. • 8-foot Shared use pathto Downtown Evergreen. • 5-foot sidewalk on creek side. • Construct retaining wall on east. • Extend existing boxculvert.

Page 18: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

18

Looking North Towards Downtown Evergreen

Page 19: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

• Increased left-turn lane storage for Buffalo Park Road. • Exterior southbound lane transitions into a right turn to BuffaloPark Road.

19

Page 20: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

20

• Maintains existing driveways. • Provides designated left turn lanes to properties. • Minimizes impact to creek. • 8-foot Shared use path on the creek side.

Page 21: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

21

areas.

• Intersection

Cub Creek.

• Dedicated parking

• 8-foot Shared use path on the creek side. • Construct retaining walls and excavate rock outcropping along west side.

improvements at Little

Page 22: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

22

• Excavation of rock outcropping and improved driver sightlines. • Dedicated parking area. • 8-foot Shared use path to Downtown Evergreen. • 5-foot sidewalk on creek side. • Construct retainingwall on west and east side. • Extend existing boxculvert and reroute creek.

Page 23: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

23

Page 24: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

24

*Jefferson County will coordinate with property owners once the preferred alternative is identified and the project moves to preliminary design.

Page 25: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

25

Page 26: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

26

+ Positive Outcome, - Negative Outcome, Neutral

Page 27: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

27

Page 28: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

28

Benefits • Driver familiarity • Improvement to delays with optimization of traffic signals. • Smaller footprint

Shortcomings • Higher maintenance costs compared to a roundabout intersection • Additional vehicle conflict points

Traffic Level of Service • AM: LOS B • PM: LOS C

Page 29: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

29

Benefits • Reduces accident severity • Lower vehicle speeds • Lower maintenance costs compared to

traditional • Safer pedestrian crossings.

Shortcomings • Less gaps between vehicles to enter • Large footprint

Traffic Level of Service • AM: LOS A • PM: LOS C

Page 30: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

30

Page 31: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

31

Page 32: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

32

+ Positive Outcome, - Negative Outcome, Neutral

Page 33: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

• One-way front-in angledparking east of Church. • Parallel parking west side, south of JC-73/ SH-74 intersection.

33

Page 34: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

34

• One-way back-in angledparking east of Fire Station. • Parallel parking westside, south of JC-73/ SH-74 intersection.

Page 35: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

35

Suggested Locations: • In front of church in the 3-lane concept. • At the bend south of the JC-73/JC-74 intersection.

Benefits: • Cars can fit in smaller parking spaces. • Visibility of all road users when parking.

Shortcomings: Provides less parking spaces compared to angled parking options.

Figure 1: Source: Google 2020 Downtown Evergreen, Colorado

Figure 2: Source: Google 2020 Golden, CO

Page 36: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

36

Suggested Location: Across from Church

Benefits: • Angled parking provides moreparking spaces compared toparallel parking. • Conventional driving maneuver.

Shortcomings: • Limited visibility of approaching vehicles, bicyclists and otherroad users.

Figure 1: Source: Google 2020 Downtown Evergreen, Colorado

Figure 2: Source: Google 2020 Golden, CO

Page 37: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

Suggested Location: • Across from existing fire station in both concepts.

Benefits: • Improved visibility of approachingbicyclists and on-coming traffic existing parking spot. • Reduces bike/car crash potential. • Provides more parking spaces compared to parallel parking.

Shortcomings: • Limited driver experience maneuver.

Figure 1: Source: Google 2020 Columbia, Canada

E. 7th Avenue and Logan Street

Boulder, CO 80302

Figure 2: Source: City of Kelowna, British

37

Denver, CO 80203

Figure 3: Source: Google 2020University Avenue between 17th Street and Broadway Figure 4: Source: T. Boulanger, Transportation

Services, City of Vancouver, WA.

Page 38: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

38 Project Schedule

Page 39: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

39

Public Feedback Survey: https://www.surveymonkey.com/r/JC-73

Project Website: https://www.jeffco.us/jc-73

Jefferson County Contact: Brad Bauer, PE

Jefferson County Project Manager

100 Jefferson County Parkway

Golden, CO 80419

Tel 303-271-8795

[email protected]

Page 40: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

40

3-Lane Cross Section Fact Sheet

• 1-Northbound and 1-Southbound Lane • 1 Two-way center left turn lane • Southbound JC-73 bike lane • 8-foot shared-use path on thenorthbound creek side • Establishes four parking lots:

• One-way front-in angle parking across from Church • Parallel parking in front of Church • Back-in angle parking across from Fire Station • Parallel parking south of JC-73/SH-74 intersection

+Additional parking lots +Lower property impacts +Maintains and improves access to residences and businesses. +Lower cost -Fewer environmental impacts oMinimal congestion improvement oSomewhat efficient construction phasing.

Page 41: Link to JC-73 Public Meeting Presentation PDF 772 MB - Jeffco

41

5-Lane Cross Section Fact Sheet

• 2-Northbound and 2-Southbound Lane • 1 Two-way center left turn lane • Southbound JC-73 bike lane • 8-foot shared-use path on thenorthbound creek side • Establishes three parking lots:

• One-way front-in angle parking across from Church • Back-in angle parking across from Fire Station • Parallel parking south of JC-73/SH-74 intersection

+Additional parking lots +Enhanced congestion improvement +More efficient construction phasing -High property impacts -May require removalof Plettner Lane but improves accessto residences and businesses elsewhere. -High environmental impacts -High cost