Dec 31, 2015
PB_ 000_JJJJ_MM/ 2 / 19.04.23 21:20
Dipl. Ing. Heinz Marsau-RierlSenior Project Manager Data Link Systems / NILETelefon : +49 421 457 3707Fax : +49 421 457 2038E-Mail : [email protected]
The following sheets are property of Atlas Elektronik GmbH Bremen GermanyReproduction, utilization, or disclosure to third parties in any form whatsoever,
is not permitted without written consent of the proprietor.
INTERNATIONAL DATA LINK SYMPOSIUM 2003NEWBURY, 30 SEP TO 2 OCT 2003
PB_ 000_JJJJ_MM/ 3 / 19.04.23 21:20
Outline
Company Profile
ATLAS Data Link Experience
Advantages and Key Aspects of the national Link 22 Development
Areas of Development in the Link 22 System
Development Realisation DLP
Relevant Specifications
Main Areas of DLP Functionality / Performance
Planed Link 22 Activities in the ISS Phase
Conclusion / Results of the national Procedure
Demonstration of a Link 22 System Chain (incl. a DLP Link 22) in a simulated NILE Network / Scenario
PB_ 000_JJJJ_MM/ 4 / 19.04.23 21:20
History of the Company
1989TST-Telefunken
Systemtechnik GmbH
1989TST-Telefunken
Systemtechnik GmbH
1989MBB-UM
1989MBB-UM
Bremer Vulkan Verbund
1994STN ATLAS Elektronik GmbH
1994STN ATLAS Elektronik GmbH
100% BAE SYSTEMS2003
ATLAS ELEKTRONIK GmbH2003
ATLAS ELEKTRONIK GmbH
1966Fried. Krupp GmbH
1966Fried. Krupp GmbH KRUPP
Rheinmetall BAE SYSTEMS1997
STN ATLAS Elektronik GmbH1997
STN ATLAS Elektronik GmbH
1981MBB - Messerschmitt-Bölkow-Blohm GmbH
1981MBB - Messerschmitt-Bölkow-Blohm GmbH
1883AEG - Allgemeine
Elektrizitätsgesellschaft AG(founded as
DEG - DeutscheEdison Gesellschaft)
1883AEG - Allgemeine
Elektrizitätsgesellschaft AG(founded as
DEG - DeutscheEdison Gesellschaft)
1902Norddeutsche
Maschinen- und Armaturfabrik GmbH
1902Norddeutsche
Maschinen- und Armaturfabrik GmbH1924
Focke Wulf
1924Focke Wulf
1911Atlas Werke
1911Atlas Werke
1983Krupp Atlas Elektronik GmbH
1983Krupp Atlas Elektronik GmbH
1964VFW - Vereinigte
Flugtechnische Werke
1964VFW - Vereinigte
Flugtechnische Werke
1991Atlas Elektronik GmbH
1991Atlas Elektronik GmbH
1992 STN Systemtechnik Nord GmbH
1992 STN Systemtechnik Nord GmbH
1990DMT
Marinetechnik GmbH
1990DMT
Marinetechnik GmbH1990
MSG - Marine- undSondertechnik GmbH
1990MSG - Marine- und
Sondertechnik GmbH
DASA Deutsche Aerospace
PB_ 000_JJJJ_MM/ 5 / 19.04.23 21:20
Surface Ship Systems
Submarine Systems
Mine Warfare Systems
Vessel Traffic Systems /Coastal Surveillance
Hydrographic Systems
Paramilitary / Commercial Market
Market Segments
Systems Services and Support
AUVs
PB_ 000_JJJJ_MM/ 6 / 19.04.23 21:20
Hull Mounted Sonar SystemsActivated Towed Array SonarsACTAS
Combat Systems COSYS
Tactical NavigationSystems-WECDIS
Navigation Radars
Integrated Navigation
Surface Ship Systems
PB_ 000_JJJJ_MM/ 7 / 19.04.23 21:20
ATLAS Experience
Projects in Data Link
LINK-11 Integration FPB S143
LINK-11 Specification and Integration for S143A FPB / F122 Frigate(AEG-, R&S-, R&C-Equipment) incl. Integration -Software
LINK-11 Integration Belgian Frigate(AEG HF Tx/Rx -, R&C - Equipm. ) incl. L 11 Interface Sim. Software
Study: HF- Components / LINK-11- Remote Control - CRO - Baltic Sea
JMCIS Joint Maritime Command Information System F124 Integration
MULUS Multi Link Subsystem Studies
Link 11 Integration into Submarines ( e.g. SAURO Italy )
Link Y Integration into OPV Royal Malaysian Navy
PB_ 000_JJJJ_MM/ 8 / 19.04.23 21:20
ATLAS Experience
Contracts Project NILE
Scope of Work: System Analysis, Simulations (protocol, network), Engineering Work,Development, Consulting MOD
Concept phase Analysis 4,8 KB/S HF- Communication1985 Follow on study LINK-11-Improvement HF
Automatic channel selection, propagation analysis in HF band
Definition phase ECM - Resistance in HF- Communication from 1987 Technical Investigations, LINK-11- Improvement
Definition phase
D&D-Subphase I Special Investigations NILE Design & from 1993 Development Subphase One (incl. OPNET Sim.)
D&D Subphase II Predevelopment National Asset Link 22from 1998 NNR-Kernel System (National NILE Reference System)- ongoing
ISS Phase National Asset Link 22, Extension Message Implementation DLPfrom 2003
PB_ 000_JJJJ_MM/ 9 / 19.04.23 21:20
Areas of ongoing national NILE Development
Fixed Freq. HF Radio*
ECCM HF Radio*
Fixed Freq. UHF Radio*
ECCMUHF Radio*
SignalProcessor
Controller(s)(SPC)*Modems
Net TimingRadio Control
CMS
System&
NetworkController
(SNC)*
DLPLINK-22CRYPTO
LLC*
STANAG-5522
Protocols
Time-of-Day
* NCE NILE Communications Equipment
CMS_SIM DLP SNC_SIM
Link 22 - Capabilities
PB_ 000_JJJJ_MM/ 10 / 19.04.23 21:20
ATLAS Link 22 Development
Procedure
Starting early Investigations and Studies ( 1985 until Now ) Scope of Work: System Analysis, Simulations (protocol, network), Engineering
Work,Development, Consulting MOD Beginning Predevelopment DLP Link 22 Mid 1998 Key aspects and advantages of the national NILE program
Use of know how and results of the past NILE studies / contracts Use of existing specifications produced in NILE D&D Subphase I + II Parallel Development national / multinational
Predevelopment DLP Demonstrator/NNRS (national) - FAT 07/03 SNC (multinational NILE PMO) NRS (multinational NILE PMO) MLTT Multi Link Test Tool (multinational NILE PMO)
Being prepared for Kick Off of national SNC Platform and LLC-Simulator Integration and Assembly Link 22 chain
Consideration of future Multi Link Subsystem requirements
PB_ 000_JJJJ_MM/ 12 / 19.04.23 21:20
Software DevelopmentSoftware Development
Specification, Development and Integration in accordance with MIL-STD-498
Documentation Language English
Programming Language is C++
Operating System is Windows NT /XP
Object Oriented Programming
Software is prepared for future Extension
Link 22 - Capabilities
PB_ 000_JJJJ_MM/ 13 / 19.04.23 21:20
Main SpecificationsMain Specifications
STANAG 5522/ED1 Tactical Data Exchange Link 22
LGN 156-15-001 Interface Design Description for the DataFinal Link Processing Segment and the System
Network Controller for the NATOImproved Link Eleven (NILE) Program
CP11205 CDE(IDS)84-19 Command and Control Processor to Rev 8 Combat REV 8 Direction System Model 5
Interface Design Specification (IDS) (U)
DLP FRS Functional Requirement Specification forVersion 1.0 the Data Link Processing Segment of the Link 22 (NILE) System
Link 22 - Capabilities
PB_ 000_JJJJ_MM/ 14 / 19.04.23 21:20
DLP Main Areas of FunctionalityDLP Main Areas of Functionality
Database Track Store TSR Queue SRID List References STANAG 5522 TR/UR SN Directory
Tact. Interface
CMSInterf.
Messages
CMS_SIM DLP SNC_SIM
SNCInterf.
N-SeriesMessages
C&S InterfaceMessages
Link 22 - Capabilities
(Super) Network Establishment
L22 Message Management
Conversion N-Series <-> L22
PB_ 000_JJJJ_MM/ 15 / 19.04.23 21:20
Functional Model of CDS SimulatorFunctional Model of CDS Simulator
N-series messages
InterfaceCDS_SIM Functionality
n-series
messages
DLPCDS_SIM
1452
1451
14501447
1455
14571454
1453
1456
•Generation dynamic tactical scenario•Exchange of tactical and control data with CSCI DLP•Data extraction•Data analysis•Process up to 100 tracks (local/remote)
Link 22 - Capabilities
PB_ 000_JJJJ_MM/ 16 / 19.04.23 21:20
Functional Model of SNC SimulatorFunctional Model of SNC Simulator
Tactical Interface Messages
Interface Network_SIMSNC_SIM Functionality
NCS
SN Directory
Message Delivery
Message Reception
C & S Interface Messages
(3 n 5)
NU(2)
NU(n)
DLP SNC_SIM
Link 22 - Capabilities
PB_ 000_JJJJ_MM/ 17 / 19.04.23 21:20
DLP Link 22 Message ImplementationDLP Link 22 Message Implementation
The following subset of Link 22 messages (according to STANAG 5522) will be processed by the DLP
Surveillance Implementation e.g.
AIR POS, AIR CAS (F2, F5-0)
SUR POS, SUR CAS (F3, F5-1)
SUB POS, SUB CAS (F4-0. F4-1)
PLI POS (F1-1)
PLI IFF (F02.1-0)
Link 22 - Capabilities
PB_ 000_JJJJ_MM/ 18 / 19.04.23 21:20
DLP N-Series Message ImplementationDLP N-Series Message Implementation
The following subset of N-Series messages (following CP 11205 CDE 84-19) will be processed by the DLP e.g.
Air PPLI, Surface PPLI, Subsurface PPLI, Land Point PPLI, Land Track PPLI
Air Track, Surface Track, Subsurface Track
Link 22 - Capabilities
Area of Propability
Track Management
New defined Messages
Network Parameter (OPTASK Link)
DLP Info
Comm Control
PB_ 000_JJJJ_MM/ 19 / 19.04.23 21:20
CDS Simulator Development (Test Tool to verify the DLP) Generation of tactical scenarios Data Exchange between CDS-SIM and DLP via N-Series Messages
following CP11205 CDE(IDS)84-19 Rev 8 Data Logging of all data passing CDS_SIM - DLP Interface
Conclusion / Results of the national ProcedureConclusion / Results of the national Procedure
SNC Simulator Development (Test Tool to verify the DLP) Data Exchange between SNC_SIM and DLP via Tactical Interface Msgs and C&S Messages in accordance to IDD DLP-SNC Realization of SNC Functions Simulation of up to 4 NILE Networks (to build a virtual Super Network) Data Logging
of all data passing SNC_SIM-DLP Interface of all data passing simulated Interfaces (NU1 to/from simulated NUs)
Link 22 - Capabilities
PB_ 000_JJJJ_MM/ 20 / 19.04.23 21:20
DLP Link 22 Development
Conclusion / Results of the national ProcedureConclusion / Results of the national Procedure
Realization of a CDS-DLP Link 22 Interface (N-Series Message Format)
Realization of a DLP-NCE Interface in accordance to IDD DLP-SNC Final
(Super) Network Establishment (SN and individual networks) in
accordance to DLP FRS Version 1.0
Link 22 Message Management in accordance to DLP FRS Version 1.0
Implementation of Link 22 Messages
Transmission Rules and Update Rates (STANAG 5522)
TSR Management
Mapping of Link 22 Messages to N-Series Messages and vice versa
Factory Acceptance Test successfully performed in July 2003
Federal Office of the Bundeswehr Information Management/Info Technology
and German Navy
Link 22 - Capabilities
PB_ 000_JJJJ_MM/ 21 / 19.04.23 21:20
National NILE Reference System
1452
1451
14501447
1455
14571454
1453
1456
•Generation dynamic tactical scenario•Exchange of tactical and control data with CSCI DLP•Data extraction•Data analysis
NU1NU1
NU1
NU3
NU2
NU5
NU5
•DLP Interface incl. Data - Extraction •Message Processing. + SN Management•NILE Network Sim.of ”NILE Units” + tactical scenarios.
Conversion N-Series <-> L22
Link 22 Message Handling
External Management/ TSR Handling
CDS-Sim DLP SNC-Sim
N-Series MessagesC&S MessagesLink 22 Messages
Database Track Store TSR Queue SRID List References STANAG 5522 TR/UR SN Directory
Link 22 - Capabilities
PB_ 000_JJJJ_MM/ 22 / 19.04.23 21:20
Extension Message Implementation F / FJ - series STANAG 5522, Extension C&S Messages I/F DLP – SNC
DLP Control. HMI
. CORBA I/F
ISS - Phase Follow on Development DLP Link 22 (national)
Link 22 - Capabilities
PB_ 000_JJJJ_MM/ 23 / 19.04.23 21:20
Multi Link Enhancement Link 22Multi Link Enhancement Link 22
DTSLink 11
Data Link ProcessorLink 11
Data Base ManagementProcessing
CMS InterfaceProcessing
CMS
SNC
Data Link ProcessorLink 22 (NILE)
Multi Link Subsystem
Link 16 LVT
Data Link Management Processing
Data Link ProcessorLink 16
Link 22 - Capabilities
PB_ 000_JJJJ_MM/ 24 / 19.04.23 21:20
Generic Interface DLP - CMS Interim Solution DLP Link 22 CORBA I/F integration into F 123 SATIR
National NILE System Integration
Link 22 - Capabilities
PB_ 000_JJJJ_MM/ 25 / 19.04.23 21:20
AN/UYK 43 Host Computer
OSM with CORBA
I/O
Fast Ethernet (redundant)
CORBA CORBACORBA
Link 11
Link 16 Link 22
Network Design Tool Multi Link Proc. with Link 22-Extension
MIDS - LVT
KG40SNC
LLC
SPCDTS
ADatP-3
IRIS/AMH
MCCIS (ICS)
CORBA Plattformrepository from F124
OTH-T Gold
COMMSApplikations-
Server
CORBA
Trackstore
Applikations-Server
CORBA
OO-Trackstore
CORBA
Future MULTI - LINK - Solution
Link 22 - Capabilities
PB_ 000_JJJJ_MM/ 26 / 19.04.23 21:20
Future Trials and Tests GE NavCCSysCom with real Platform Reference Systems incl. MLTT
NU4 NU1NU1
NU3NU5NU1
NU3Interrupt Slot
NU2NN1 – HF FF
1
2
3
4
5
6
7
MLTT
e.g. Reference System F123
e.g.Reference System F124NU2
Link 22 - Capabilities
PB_ 000_JJJJ_MM/ 27 / 19.04.23 21:20
Demonstration Link 22 System
1452
1451
14501447
1455
14571454
1453
1456
•Generation dynamic tactical scenario•Exchange of tactical and control data with CSCI DLP•Data extraction•Data analysis
NU1NU1
NU1
NU3
NU2
NU5
NU5
•DLP Interface inkl. Daten - Extraktion •Message Bearbeitg. + SN Management•NILE Network Sim.von ”NILE Units” + taktischen Objekten.
Conversion N-Series <-> L22
Link 22 Message Handling
External Management/ TSR Handling
CDS-Sim DLP SNC-Sim
N-Series MessagesC&S MessagesLink 22 Messages
Database Track Store TSR Queue SRID List References STANAG 5522 TR/UR SN Directory
Link 22 - Capabilities
PB_ 000_JJJJ_MM/ 28 / 19.04.23 21:20
Link 22 System DemonstrationLink 22 System DemonstrationLink 22 - Capabilities
PB_ 000_JJJJ_MM/ 29 / 19.04.23 21:20
Scenario Example for the DemonstrationScenario Example for the Demonstration
Link 22 - Capabilities
NU2NU2
NU1
NU3NU2NU1NU3
NU1 PI Slot
NU2
NU5NU4
NU1
NU1NU4NU5NU4
NU1 PI Slot
NU5
NU1: Multi Network Node
NN1
NN2
PB_ 000_JJJJ_MM/ 30 / 19.04.23 21:20
Link 22 - SolutionLink 22 - Solution
Fixed Freq. HF Radio*
ECCM HF Radio*
Fixed Freq. UHF Radio*
ECCMUHF Radio*
SignalProcessor
Controller(s)(SPC)*
CMS
System&
NetworkController
DLP Link 22
LINK-22CRYPTO
LLC*
Link 22 Products
• Data Link Processor Hardware / Software• SNC I/F Simulator
Link 22 Engineering
• Studies• Data Link System Simulation • Development• Integration of Data Link Systems
NILE UNIT
Contact: ATLAS Elektronik GmbHDipl. Ing. Heinz Marsau-RierlSenior Project Manager NILETelefon : + 49 421 457 3707Fax : + 49 421 457 2038Mobile : + 49 171 766 57 72E-Mail : [email protected]