Top Banner
Southwestern Public Service Company Capital Cost Methodology Retirement Unt Catalog Test Year (October 1, 2019 through September 30, 2020) WP/H-5.1(CD) Page 1 of 19 Sponsor: Moeller 2021 TX Rate Case Line No. Description 1 Absorber Tower System 2 Absorber Tower System-Control 3 Absorber Tower System-Motor 4 Absorber Tower System-Station Piping 5 Absorber Tower System-Tank 6 Accumulator 7 Air Conditioner 8 Air Heater System 9 Air Heater System-Control 10 Air Heater System-Motor 11 Air Heater System-Station Piping 12 Air Heater System-Tank 13 Air Quality Control System 14 Air Quality Control System-Control 15 Air Quality Control System-Motor 16 Air Quality Control System-Station Piping 17 Alarm-Annunciator System 18 Analyzer 19 AR15 Communication Equip-EMS 20 AR15 Communication Equipment 21 AR15 Communication Equipment-AES 22 AR15 Communication Equip-Two Way 23 AR15 Laboratory Equipment 24 AR15 Miscellaneous Equipment 25 AR15 Network Equipment 26 AR15 Office Furniture & Equipment 27 AR15 Power Operated Equipment 28 AR15 Property-Life 25 Years 29 AR15 Stores Equipment 30 AR15 Tools/Shop/Garage Equipment 31 AR15 Transportation Eq-Automobiles 32 AR15 Transportation Eq-Heavy Trucks 33 AR15 Transportation Eq-Light Trucks 34 AR15 Transportation Eq-Trailers 35 ARC-Elec Distribution 36 ARC-Elec General 37 ARC-Elec Other Production 38 ARC-Elec Steam Production 39 ARC-Elec Transmission 40 Arrester 34.5Kvtem 41 Arrester 44Kv
23

Line No. Description

Feb 18, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Line No. Description

Southwestern Public Service CompanyCapital Cost MethodologyRetirement Unt CatalogTest Year (October 1, 2019 through September 30, 2020)

WP/H-5.1(CD)Page 1 of 19

Sponsor: Moeller2021 TX Rate Case

Line No. Description

1 Absorber Tower System2 Absorber Tower System-Control3 Absorber Tower System-Motor4 Absorber Tower System-Station Piping5 Absorber Tower System-Tank6 Accumulator7 Air Conditioner8 Air Heater System9 Air Heater System-Control10 Air Heater System-Motor11 Air Heater System-Station Piping12 Air Heater System-Tank13 Air Quality Control System14 Air Quality Control System-Control15 Air Quality Control System-Motor16 Air Quality Control System-Station Piping17 Alarm-Annunciator System18 Analyzer19 AR15 Communication Equip-EMS20 AR15 Communication Equipment21 AR15 Communication Equipment-AES22 AR15 Communication Equip-Two Way23 AR15 Laboratory Equipment24 AR15 Miscellaneous Equipment25 AR15 Network Equipment26 AR15 Office Furniture & Equipment27 AR15 Power Operated Equipment28 AR15 Property-Life 25 Years29 AR15 Stores Equipment30 AR15 Tools/Shop/Garage Equipment31 AR15 Transportation Eq-Automobiles32 AR15 Transportation Eq-Heavy Trucks33 AR15 Transportation Eq-Light Trucks34 AR15 Transportation Eq-Trailers35 ARC-Elec Distribution36 ARC-Elec General37 ARC-Elec Other Production38 ARC-Elec Steam Production39 ARC-Elec Transmission40 Arrester 34.5Kvtem41 Arrester 44Kv

Page 2: Line No. Description

Southwestern Public Service CompanyCapital Cost MethodologyRetirement Unt CatalogTest Year (October 1, 2019 through September 30, 2020)

WP/H-5.1(CD)Page 2 of 19

Sponsor: Moeller2021 TX Rate Case

Line No. Description

42 Arrester 69Kv43 Arrester 88Kv44 Arrester 115Kv45 Arrester 138Kv46 Arrester 161Kv47 Arrester 230Kv48 Arrester 345Kv49 Arrester 500Kv50 Arrester Distribution51 Arrester-Polarization Cell52 Auxiliary Boiler53 Auxiliary Boiler-Control54 Auxiliary Boiler-Motor55 Battery Storage56 Battery Storage Station57 Blowdown Cooling System58 Blowdown Cooling System-Control59 Blowdown Cooling System-Motor60 Blowdown Cooling System-Station Piping61 Blowdown Cooling System-Tank62 Boiler63 Boiler Blowdown System64 Boiler Blowdown System-Control65 Boiler Blowdown System-Motor66 Boiler Blowdown System-Station Piping67 Boiler Blowdown System-Tank68 Boiler-Control69 Bottom Ash System70 Bottom Ash System-Control71 Bottom Ash System-Motor72 Bottom Ash System-Station Piping73 Bottom Ash System-Tank74 Bridge75 Building Cooling Plant76 Building Garage77 Building Generating Station78 Building Maint Equip (Buffers, Floor Machines, Etc.)79 Building Office80 Building Other81 Building Station Control82 Capacitor Bank 34.5KV

Page 3: Line No. Description

Southwestern Public Service CompanyCapital Cost MethodologyRetirement Unt CatalogTest Year (October 1, 2019 through September 30, 2020)

WP/H-5.1(CD)Page 3 of 19

Sponsor: Moeller2021 TX Rate Case

Line No. Description

83 Capacitor Bank 44KV84 Capacitor Bank 69KV85 Capacitor Bank 88KV86 Capacitor Bank 115KV87 Capacitor Bank 138KV88 Capacitor Bank 161KV89 Capacitor Bank 230KV90 Capacitor Bank 345KV91 Capacitor Bank 500KV92 Capacitor Distribution93 Car Railroad Coal94 Charger Battery95 Charger Battery Station96 Chemical and Volume Control System97 Chemical and Volume Control System-Control98 Chemical and Volume Control System-Motor99 Chemical and Volume Control System-Station Piping100 Chemical and Volume Control System-Tank101 Chemical Feed System102 Chemical Feed System-Control103 Chemical Feed System-Motor104 Chemical Feed System-Station Piping105 Chemical Feed System-Tank106 Chromatograph107 Circuit Breaker 34.5KV108 Circuit Breaker 44KV109 Circuit Breaker 69KV110 Circuit Breaker 88KV111 Circuit Breaker 115KV112 Circuit Breaker 138KV113 Circuit Breaker 230KV114 Circuit Breaker 345KV115 Circuit Breaker 500KV116 Circuit Breaker Distribution117 Circulating Water System118 Circulating Water System-Control119 Circulating Water System-Motor120 Circulating Water System-Station Piping121 Coal Feeder System122 Coal Feeder System-Control123 Coal Feeder System-Motor

Page 4: Line No. Description

Southwestern Public Service CompanyCapital Cost MethodologyRetirement Unt CatalogTest Year (October 1, 2019 through September 30, 2020)

WP/H-5.1(CD)Page 4 of 19

Sponsor: Moeller2021 TX Rate Case

Line No. Description

124 Coal Handling System125 Coal Handling System-Control126 Coal Handling System-Conveyor127 Coal Handling System-Conveyor-Control128 Coal Handling System-Conveyor-Motor129 Coal Handling System-Hopper130 Coal Handling System-Motor131 Coal Handling System-Station Piping132 Coal Handling System-Tank133 Commercial Vapor System134 Commercial Vapor System-Control135 Commercial Vapor System-Motor136 Commercial Vapor System-Station Piping137 Component-Closed Cleaning Water System138 Component-Closed Cleaning Water System-Control139 Component-Closed Cleaning Water System-Motor140 Component-Closed Cleaning Water System-Station Piping141 Component-Closed Cleaning Water System-Tank142 Compressor Air143 Compressor Gas144 Compressor-Turbine Gas145 Computer Equipment146 Condensate Polishing System147 Condensate Polishing System-Control148 Condensate Polishing System-Motor149 Condensate Polishing System-Station Piping150 Condensate Polishing System-Tank151 Condensate Recovery System152 Condensate Recovery System-Control153 Condensate Recovery System-Motor154 Condensate Recovery System-Station Piping155 Condensate Recovery System-Tank156 Condensate System157 Condensate System-Control158 Condensate System-Motor159 Condensate System-Station Piping160 Condensate System-Tank161 Condenser162 Condenser-Control163 Condenser-Motor164 Condenser-Station Piping

Page 5: Line No. Description

Southwestern Public Service CompanyCapital Cost MethodologyRetirement Unt CatalogTest Year (October 1, 2019 through September 30, 2020)

WP/H-5.1(CD)Page 5 of 19

Sponsor: Moeller2021 TX Rate Case

Line No. Description

165 Conductor Overhead166 Conductor Overhead Secondary 167 Conductor Underground168 Conductor Underground Secondary169 Conduit170 Controls171 Controls Station172 Controls-Computer System-Plant Process173 Cooler Elec Trans174 Cooling Tower System175 Cooling Tower System-Control176 Cooling Tower System-Motor177 Cooling Tower System-Station Piping178 Cooling Tower System-Tank179 Cooling Water System180 Cooling Water System-Control181 Cooling Water System-Motor182 Cooling Water System-Station Piping183 Cooling Water System-Tank184 Cooling Water System-Well185 Crane and Hoist System186 Cubicle for Metal Clad Switchgear Distribution187 Dam188 Dam-Gravity Section189 Dampers190 Dam-Spillway191 Dam-Substructure192 Deaerator193 Dehydrator194 Dehydrator Air195 Dehydrator Gas196 Dehydrator Glycol197 Detector198 Device Potential199 Diesel Generator System200 Diesel Generator System-Control201 Diesel Generator System-Motor202 Diesel Generator System-Station Piping203 Diesel Generator System-Tank204 Ditch205 Dryer

Page 6: Line No. Description

Southwestern Public Service CompanyCapital Cost MethodologyRetirement Unt CatalogTest Year (October 1, 2019 through September 30, 2020)

WP/H-5.1(CD)Page 6 of 19

Sponsor: Moeller2021 TX Rate Case

Line No. Description

206 Duct Bank 207 Dust Collection System208 Dust Collection System-Control209 Dust Collection System-Motor210 Dust Collection System-Station Piping211 Dust Control System212 Dust Control System-Control213 Dust Control System-Motor214 Dust Control System-Station Piping215 Dust Control System-Tank216 Electro Hydraulic System217 Electro Hydraulic System-Control218 Electro Hydraulic System-Motor219 Electro Hydraulic System-Station Piping220 Equipment Farm221 Equipment Foundation222 Equipment Mechanical223 EV Charger224 Evaporator225 Exciter226 Exciter-Control227 Extraction Steam System228 Extraction Steam System-Control229 Extraction Steam System-Motor230 Extraction Steam System-Station Piping231 Fan/Blower, Complete232 Fault Interrupter Distribution233 Fault Interrupter 34.5KV234 Fault Interrupter 44KV235 Fault Interrupter 69KV236 Fault Interrupter 115KV237 Fault Interrupter 138KV238 Fault Interrupter 161KV239 Fault Interrupter 230KV240 Fault Interrupter 345KV241 Fault Interrupter 500KV242 Fault Interrupter 88KV243 Feedwater System244 Feedwater System-Control245 Feedwater System-Motor246 Feedwater System-Station Piping

Page 7: Line No. Description

Southwestern Public Service CompanyCapital Cost MethodologyRetirement Unt CatalogTest Year (October 1, 2019 through September 30, 2020)

WP/H-5.1(CD)Page 7 of 19

Sponsor: Moeller2021 TX Rate Case

Line No. Description

247 Fence248 Fence Protective249 Fiber Optic250 Filter-Separator-Strainer System251 Filter-Separator-Strainer System-Motor252 Fire Detection System253 Fire Protection System254 Fire Protection System-Control255 Fire Protection System-Motor256 Fire Protection System-Station Piping257 Fire Protection System-Tank258 Flue Gas Reheater System259 Flue Gas Reheater System-Control260 Flue Gas Reheater System-Motor261 Flue Gas Reheater System-Station Piping262 Flue Gas Reheater System-Tank263 Fly Ash Disposal System264 Fly Ash Disposal System265 Fly Ash Disposal System-Motor266 Fly Ash Disposal System-Station Piping267 Fly Ash Disposal System-Tank268 Forced Draft Fan System269 Forced Draft Fan System-Control270 Forced Draft Fan System-Motor271 Forced Draft Fan System-Station Piping272 Forced Draft Fan System-Tank273 Foundation Transformer Electric Distribution274 Franchises and Consents275 Fuel Transfer System276 Fuel Transfer System-Control277 Fuel Transfer System-Motor278 Fuel Transfer System-Station Piping279 Fuel Transfer System-Tank280 Fuel Treatment Equipment281 Fuel Treatment Equipment-Motor282 Fuel Treatment Equipment-Station Piping283 Fuel Treatment Equipment-Tank284 Fuse Mounting 34.5KV285 Fuse Mounting 44KV286 Fuse Mounting 69KV287 Fuse Mounting 88KV

Page 8: Line No. Description

Southwestern Public Service CompanyCapital Cost MethodologyRetirement Unt CatalogTest Year (October 1, 2019 through September 30, 2020)

WP/H-5.1(CD)Page 8 of 19

Sponsor: Moeller2021 TX Rate Case

Line No. Description

288 Fuse Mounting 115KV289 Fuse Mounting 138KV290 Fuse Mounting 161KV291 Fuse Mounting 230KV292 Fuse Mounting 345KV293 Fuse Mounting 500KV294 Fuse Mounting Distribution295 Gas Injection-Recirc Fan System296 Gas Injection-Recirc Fan System-Control297 Gas Injection-Recirc Fan System-Motor298 Gas Injection-Recirc Fan System-Station Piping299 Gas Injection-Recirc Fan System-Tank300 Gas Sampling System301 Gas Turbine302 Gas Turbine Air Cooling System303 Gas Turbine Air Cooling System-Control304 Gas Turbine Air Cooling System-Motor305 Gas Turbine Air Cooling System-Station Piping306 Gas Turbine Atomizing Air System307 Gas Turbine Atomizing Air System-Control308 Gas Turbine Atomizing Air System-Motor309 Gas Turbine Atomizing Air System-Station Piping310 Gas Turbine Lube Oil System311 Gas Turbine Lube Oil System-Control312 Gas Turbine Lube Oil System-Motor313 Gas Turbine Lube Oil System-Station Piping314 Gas Turbine Lube Oil System-Tank315 Gas Turbine-Control316 Gas Turbine-Motor317 Gas Turbine-Station Piping318 Generator319 Generator Cooling and Purge System320 Generator Cooling and Purge System-Control321 Generator Cooling and Purge System-Motor322 Generator Cooling and Purge System-Station Piping323 Generator Emergency Power Supply324 Generator Liquid Cooling System325 Generator Liquid Cooling System-Control326 Generator Liquid Cooling System-Motor327 Generator Liquid Cooling System-Station Piping328 Generator Liquid Cooling System-Tank

Page 9: Line No. Description

Southwestern Public Service CompanyCapital Cost MethodologyRetirement Unt CatalogTest Year (October 1, 2019 through September 30, 2020)

WP/H-5.1(CD)Page 9 of 19

Sponsor: Moeller2021 TX Rate Case

Line No. Description

329 Generator Seal Oil System330 Generator Seal Oil System-Control331 Generator Seal Oil System-Motor332 Generator Seal Oil System-Station Piping333 Generator Seal Oil System-Tank334 Generator Standby335 Generator-Control336 Generator-Motor337 Generator-Station Piping338 Guy Wire339 Headworks Equipment340 Headworks Equipment-Motor341 Headworks Equipment-Station Piping342 Heat Exchanger343 Heat Recovery Steam Generator344 Heat Recovery Steam Generator-Control345 Heat Recovery Steam Generator-Motor346 Heat Recovery Steam Generator-Station Piping347 Heat Recovery Steam Generator-Tank348 Heater Vents and Drains System349 Heater Vents and Drains System-Control350 Heater Vents and Drains System-Motor351 Heater Vents and Drains System-Station Piping352 Heater Vents and Drains System-Tank353 Heater-Gas Line354 Housing355 Hydrogen Supply System356 Hydrogen Supply System-Control357 Hydrogen Supply System-Motor358 Hydrogen Supply System-Station Piping359 Induced Draft Fan System360 Induced Draft Fan System-Control361 Induced Draft Fan System-Motor362 Induced Draft Fan System-Station Piping363 Installation Reactor364 Installation Transformer365 Installation Transformer366 Instrument Air System367 Instrument Air System-Gas368 Instrument Air System-Gas-Station Piping369 Instrument Air System-Station Piping

Page 10: Line No. Description

Southwestern Public Service CompanyCapital Cost MethodologyRetirement Unt CatalogTest Year (October 1, 2019 through September 30, 2020)

WP/H-5.1(CD)Page 10 of 19

Sponsor: Moeller2021 TX Rate Case

Line No. Description

370 Instrument Air System-Tank371 Insulator372 Intake Screens System373 Intake Screens System-Motor374 Intake Screens System-Station Piping375 Inverter376 Land and Rights (Non Depreciable)377 Land Owned In Fee (Non Depreciable)378 Launcher Receiver379 Licenses380 Limestone Handling System381 Limestone Handling System-Control382 Limestone Handling System-Motor383 Limestone Handling System-Station Piping384 Limestone Handling System-Tank385 LNG Storage Tank386 Locomotive387 LPG Process Control System388 Luminaire389 Main Gas Plastic 2 inch and under390 Main Gas Plastic over 10 inch to 12 inch391 Main Gas Plastic over 12 inch to 20 inch392 Main Gas Plastic over 2 inch to 4 inch393 Main Gas Plastic over 4 inch to 8 inch394 Main Gas Plastic over 8 inch to 10 inch395 Main Gas Steel 2 inch and under396 Main Gas Steel over 10 inch to 12 inch397 Main Gas Steel over 12 inch to 20 inch398 Main Gas Steel over 2 inch to 4 inch399 Main Gas Steel over 20 inch to 28 inch400 Main Gas Steel over 28 inch401 Main Gas Steel over 4 inch to 8 inch402 Main Gas Steel over 8 inch to 10 inch403 Main Line Connection Gas 404 Main Steam System405 Main Steam System-Control406 Main Steam System-Motor407 Main Water Coat or Wrap408 Main Water Plastic409 Material Handling Equipment410 Main Steam System-Station Piping

Page 11: Line No. Description

Southwestern Public Service CompanyCapital Cost MethodologyRetirement Unt CatalogTest Year (October 1, 2019 through September 30, 2020)

WP/H-5.1(CD)Page 11 of 19

Sponsor: Moeller2021 TX Rate Case

Line No. Description

411 Meter AMR412 Meter Electric413 Meter Electric ERT (Encoder, Recorder, Transmitter)414 Meter Gas ERT (Encoder, Recorder, Transmitter)415 Meter Gas Group 1416 Meter Gas Group 1 and 2 Installation417 Meter Gas Group 2418 Meter Gas Group 3419 Meter Gas Group 4420 Meter Gas Groups 3 and 4 Installation421 Meter Gas Orifice-Flow422 Meter Gas Orifice-Installation423 Meter Gas Rotary424 Meter Gas Rotary and Turbine-Installation425 Meter Gas Turbine426 Meters and Gauges (All Types)427 Minor Items-Pole Trussing428 Mobile Relay Panel429 Monitoring System430 Monitoring System - Environmental431 Monitoring System - Station432 Monitoring System - Weather433 Monitoring System-Continuous Emissions 434 Monitoring System-Emission Analyzer435 Motor Control Center436 Motor Control Center-Inverter437 Motor Generator Set438 Network Protector Distribution439 NOX Control Equipment440 NOX Control Equipment-Control441 NOX Control Equipment-Motor442 NOX Control Equipment-Station Piping443 Odorizing System444 Oil Firing System445 Oil Firing System-Control446 Oil Firing System-Motor447 Oil Firing System-Station Piping448 Oil Firing System-Tank449 Oil Storage System450 Oil Storage System-Control451 Oil Storage System-Motor

Page 12: Line No. Description

Southwestern Public Service CompanyCapital Cost MethodologyRetirement Unt CatalogTest Year (October 1, 2019 through September 30, 2020)

WP/H-5.1(CD)Page 12 of 19

Sponsor: Moeller2021 TX Rate Case

Line No. Description

452 Oil Storage System-Tank453 Oil Supply System454 Oil Supply System-Control455 Oil Supply System-Motor456 Oil Supply System-Station Piping457 Oil Supply System-Tank458 Pedestrian459 Petroleum Extraction Package Unit460 Photovoltaic Unit461 Pipe Transmission Line462 Plant Electrical Distribution System463 Pole Not Wood 464 Pole Wood465 Pole, Cross Arm466 Pole, Cross Arm467 Pole, Insulated Cross Arm468 Pole, Insulated Cross Arm469 Pond470 Pond471 Potable Water System472 Potable Water System-Control473 Potable Water System-Motor474 Potable Water System-Station Piping475 Potable Water System-Tank476 Potable Water System-Well477 Power Conditioning Unit478 Power Line Carrier Coupling Capacitor 34.5KV479 Power Line Carrier Coupling Capacitor 44KV480 Power Line Carrier Coupling Capacitor 69KV481 Power Line Carrier Coupling Capacitor 88KV482 Power Line Carrier Coupling Capacitor 115KV483 Power Line Carrier Coupling Capacitor 1161KV484 Power Line Carrier Coupling Capacitor 138KV485 Power Line Carrier Coupling Capacitor 230KV486 Power Line Carrier Coupling Capacitor 345KV487 Power Line Carrier Coupling Capacitor 500KV488 Power Line Carrier System489 Power Supply490 Power Supply Uninterruptible491 Precipitator/Ash Collection System492 Precipitator/Ash Collection System-Control

Page 13: Line No. Description

Southwestern Public Service CompanyCapital Cost MethodologyRetirement Unt CatalogTest Year (October 1, 2019 through September 30, 2020)

WP/H-5.1(CD)Page 13 of 19

Sponsor: Moeller2021 TX Rate Case

Line No. Description

493 Precipitator/Ash Collection System-Hopper494 Precipitator/Ash Collection System-Motor495 Pre-Warm Steam Turbine Bypass System496 Pre-Warm Steam Turbine Bypass System-Control497 Pre-Warm Steam Turbine Bypass System-Motor498 Pre-Warm Steam Turbine Bypass System-Station Piping499 Primary Air System500 Primary Air System-Control501 Primary Air System-Motor502 Pump503 Rail Car Unloading Building & Equipment504 Rail Car Unloading Building & Equipment-Control505 Rail Car Unloading Building & Equipment-Motor506 Railway System507 Reactor 34.5KV508 Reactor 69KV509 Reactor 88KV510 Reactor 115KV511 Reactor 138KV512 Reactor 161KV513 Reactor 230KV514 Reactor 345KV515 Reactor 500KV516 Reactor Distribution517 Recloser518 Recorder Electric Metering519 Rectifier520 Regulator Gas521 Regulator Voltage 69KV522 Regulator Voltage Auto Booster Distribution523 Regulator Voltage Single Phase Distribution524 Regulator Voltage Three Phase 44KV525 Regulator Voltage Three Phase Distribution526 Reheat Steam System527 Reheat Steam System-Control528 Reheat Steam System-Motor529 Reheat Steam System-Station Piping530 Reservoir531 Right of Way (Amortized)532 Right of Way (Depreciable)533 Right of Way (Non-Depreciable)

Page 14: Line No. Description

Southwestern Public Service CompanyCapital Cost MethodologyRetirement Unt CatalogTest Year (October 1, 2019 through September 30, 2020)

WP/H-5.1(CD)Page 14 of 19

Sponsor: Moeller2021 TX Rate Case

Line No. Description

534 Road535 Sampling System536 Sampling System-Control537 Sampling System-Station Piping538 Scale Platform539 Seal Air System540 Seal Air System-Control541 Seal Air System-Station Piping542 Sectionalizer Distribution543 Sectionalizer Oil Distribution544 Service Electric Overhead 545 Service Electric Underground 546 Service Gas Plastic547 Service Steel548 Service Water System549 Service Water System-Control550 Service Water System-Motor551 Service Water System-Station Piping552 Service Water System-Tank553 Site Grounding System554 Site Security System 555 Slurry Reclaim System556 Slurry Reclaim System-Control557 Slurry Reclaim System-Motor558 Slurry Reclaim System-Station Piping559 Slurry Reclaim System-Tank560 Software561 Soot Blowing System562 Soot Blowing System-Control563 Soot Blowing System-Station Piping564 Spillway565 Stack566 Stack-Control567 Stacker-Reclaimer System568 Stacker-Reclaimer System-Control569 Stacker-Reclaimer System-Motor570 Stack-Muffler/Silencer571 Standard572 Station Air System573 Station Air System-Motor574 Station Air System-Station Piping

Page 15: Line No. Description

Southwestern Public Service CompanyCapital Cost MethodologyRetirement Unt CatalogTest Year (October 1, 2019 through September 30, 2020)

WP/H-5.1(CD)Page 15 of 19

Sponsor: Moeller2021 TX Rate Case

Line No. Description

575 Station Controls576 Station Piping577 Station Wiring578 Station/Auxiliary Transformer579 Steam Turbine580 Steam Turbine-Piping Station581 Structure Substation Equipment and Bus 34.5KV582 Structure Substation Equipment and Bus 44KV583 Structure Substation Equipment and Bus 69KV584 Structure Substation Equipment and Bus 88KV585 Structure Substation Equipment and Bus 115KV586 Structure Substation Equipment and Bus 138KV587 Structure Substation Equipment and Bus 161KV588 Structure Substation Equipment and Bus 230KV589 Structure Substation Equipment and Bus 345KV590 Structure Substation Equipment and Bus 500KV591 Structure Substation Equipment and Bus Distribution592 Substation Package Unit 115KV593 Substation Package Unit 230KV594 Substation Package Unit 345KV595 Substation Package Unit 44KV596 Substation Package Unit 69KV597 Substation Package Unit Distribution598 Substation Package Unit-Mobile599 Substation Portable 115 69-44-13KV600 Substation Portable 115-25 13KV601 Substation Portable 115-69 13KV602 Substation Portable 44-25 4Kv 603 Substation Vault604 Switch Cabinet Distribution605 Switch Disconnect 34.5KV 606 Switch Disconnect 44KV 607 Switch Disconnect 69KV 608 Switch Disconnect 88KV 609 Switch Disconnect 115KV610 Switch Disconnect 138KV611 Switch Disconnect 161KV612 Switch Disconnect 230KV613 Switch Disconnect 345KV614 Switch Disconnect 500KV615 Switch Disconnect Distribution

Page 16: Line No. Description

Southwestern Public Service CompanyCapital Cost MethodologyRetirement Unt CatalogTest Year (October 1, 2019 through September 30, 2020)

WP/H-5.1(CD)Page 16 of 19

Sponsor: Moeller2021 TX Rate Case

Line No. Description

616 Switch Gang 34.5KV617 Switch Gang 44KV618 Switch Gang 69KV619 Switch Gang 88KV620 Switch Gang 115KV621 Switch Gang 138KV622 Switch Gang 161KV623 Switch Gang 230KV624 Switch Gang 345KV625 Switch Gang 500KV626 Switch Gang Distribution627 Switch Gang Grounding 34.5KV628 Switch Gang Grounding 44KV629 Switch Gang Grounding 69KV630 Switch Gang Grounding 88KV631 Switch Gang Grounding 115KV632 Switch Gang Grounding 138KV633 Switch Gang Grounding 161KV634 Switch Gang Grounding 230KV635 Switch Gang Grounding 300KV636 Switch Gang Grounding 345KV637 Switch Gang Oil Distribution638 Switch Oil Distribution639 Switch Radio Activated Service Interruption640 Switch Vacuum Capacitor 69KV641 Tank642 Termination643 Tower644 Tower Substation Deadend 34.5KV645 Tower Substation Deadend 44KV646 Tower Substation Deadend 69KV647 Tower Substation Deadend 88KV648 Tower Substation Deadend 115KV649 Tower Substation Deadend 138KV650 Tower Substation Deadend 161KV651 Tower Substation Deadend 230KV652 Tower Substation Deadend 345KV653 Tower Substation Deadend Distribution654 Transfer Piping System655 Transformer Auto 600V and Less656 Transformer Grounding Single Phase Distribution

Page 17: Line No. Description

Southwestern Public Service CompanyCapital Cost MethodologyRetirement Unt CatalogTest Year (October 1, 2019 through September 30, 2020)

WP/H-5.1(CD)Page 17 of 19

Sponsor: Moeller2021 TX Rate Case

Line No. Description

657 Transformer Grounding Three Phase Distribution658 Transformer Instrument Current Potential Voltage Constant Current Voltage659 Transformer Line Amortized660 Transformer Line Overhead Single Phase661 Transformer Line Overhead Three Phase662 Transformer Line Underground Single Phase663 Transformer Line Underground Three Phase664 Transformer Potential Device665 Transformer Single Phase 600V and Less 666 Transformer Special Auto Balance667 Transformer Special Auxiliary Phasing668 Transformer Special Control669 Transformer Special Ignition670 Transformer Special Insulating671 Transformer Special Isolating672 Transformer Special Low Voltage673 Transformer Special Phase Changing674 Transformer Special Phase Shifting675 Transformer Special Saturating Current676 Transformer Special Single phase677 Transformer Special Three phase678 Transformer Special Variable679 Transformer Special Voltage 230KV680 Transformer Special Voltage 345KV681 Transformer Start-up 682 Transformer Station/Aux683 Transformer Substation 44KV684 Transformer Substation 69KV685 Transformer Substation 88KV686 Transformer Substation 115KV687 Transformer Substation 138KV688 Transformer Substation 230KV689 Transformer Substation 345KV690 Transformer Substation 500KV691 Transformer Substation Auto 115KV692 Transformer Substation Auto 138KV693 Transformer Substation Auto 230KV694 Transformer Substation Auto 345KV695 Transformer Substation Auto 88KV696 Transformer Substation Single Phase Distribution697 Transformer Substation Three Phase Distribution

Page 18: Line No. Description

Southwestern Public Service CompanyCapital Cost MethodologyRetirement Unt CatalogTest Year (October 1, 2019 through September 30, 2020)

WP/H-5.1(CD)Page 18 of 19

Sponsor: Moeller2021 TX Rate Case

Line No. Description

698 Transformer Substation-Generation Step-up699 Tunnel700 Turbine701 Turbine Air Intake System702 Turbine Air Intake System-Control703 Turbine Air Intake System-Motor704 Turbine Crane705 Turbine Crane-Motor706 Turbine Gland Seal System707 Turbine Gland Seal System-Motor708 Turbine Gland Seal System-Station Piping709 Turbine Lube Oil System710 Turbine Lube Oil System-Control711 Turbine Lube Oil System-Motor712 Turbine Lube Oil System-Station Piping713 Turbine Lube Oil System-Tank714 Turbine Steam Pipe System-Control715 Turbine Steam Pipe System-Motor716 Turbine Steam Pipe System-Station Piping717 Turbine-Station Piping718 Turbine-Waterwheel719 Turbine-Waterwheel-Motor720 Turbine-Waterwheel-Station Piping721 Valve722 Valve Control723 Valve Set724 Valve Silencer725 Vault726 Warning System, Off-Site727 Waste Solid Disposal System728 Waste Solid Disposal System-Control729 Waste Solid Disposal System-Motor730 Waste Solid Disposal System-Station Piping731 Waste Solid Disposal System-Tank732 Water Management System733 Water Management System-Motor734 Water Management System-Penstock735 Water Management System-Spillway736 Water Management System-Station Piping737 Water Right738 Water Sampling System

Page 19: Line No. Description

Southwestern Public Service CompanyCapital Cost MethodologyRetirement Unt CatalogTest Year (October 1, 2019 through September 30, 2020)

WP/H-5.1(CD)Page 19 of 19

Sponsor: Moeller2021 TX Rate Case

Line No. Description

739 Water Sampling System-Control740 Water Sampling System-Motor741 Water Sampling System-Station Piping742 Water Supply System743 Water Supply System-Control744 Water Supply System-Motor745 Water Supply System-Station Piping746 Water Supply System-Tank747 Water Supply System-Well748 Water Treatment System749 Water Treatment System-Control750 Water Treatment System-Motor751 Water Treatment System-Station Piping752 Water Treatment System-Tank753 Waterfront Improvements754 Weather Package755 Weir756 Welding System, Central757 Well758 Well Disposal759 Well Environmental760 Well Gas761 Well Water762 Well Water-Motor763 Well Water-Station Piping764 Well Water-Well 765 Wind Turbine Blading766 Wind Turbine Gearbox767 Wind Turbine Generator768 Wind Turbine Structure769 Wind-Generation770 X-Brace771 Yard Improvements

Page 20: Line No. Description

 WP/H-11.2(CD) Page 1 of 3 Sponsor: Low 2021 TX Rate Case 

Maintenance Man-Hour Ratio

Data for the Test Year (October 1, 2019 through September 30, 2020) came from the SAP work management database implemented in February 2017 requiring this Business Objects Report.

The man-hours were provided for the following work order types:

Breakdown Maintenance (BD): Maintenance that is performed when the equipment has

failed and no longer performs the function that is was designed for.

Corrective Maintenance (CM): Maintenance that is performed when the equipment is

functional but has observed signs of improper operations. Equipment has something wrong,

but is still operating.

Preventive (Periodic) Maintenance (PM): Maintenance that is scheduled and performed on a

regular basis, and is either time or condition directed.

1. Run the Business Objects Report    

a. Public Folders 

b. SAP BW 

c. SAP WAM 

d. Corp 

e. WAM Secured Reports 

i. Maintenance Man‐Hour Ratio (Secured Report) 

Page 21: Line No. Description

 WP/H-11.2(CD) Page 1 of 3 Sponsor: Low 2021 TX Rate Case 

 

2. Run the report with the following parameters (this example captures the test year) 

 

3. Copy the report to Excel Spreadsheet 

a. Run a pivot table on the data  

Page 22: Line No. Description

 WP/H-11.2(CD) Page 1 of 3 Sponsor: Low 2021 TX Rate Case 

 

We need to filter WBS Hier. Lvl 2 to remove the hours from overhauls.  Uncheck those events 

that have an OM in the title (ex. CHC 2 OM: Cunningham 2) 

   

Please validate this with the financial analyst in making sure this is true with overhauls.  

4. Total the hours for the Plant as per the type of generation (coal, gas, CT) for breakdown, 

corrective and preventive maintenance.  

Page 23: Line No. Description

WP/H-11.3 Page 1 of 1

Sponsor: Low 2021 TX Rate Case

 

  

Schedule H-11.3 O&M Cost per MWh  

  

The source for generation values in Schedule H-11.3 is the Southwestern Public Service Company

(“SPS”) NERC GADS database (Meridium). The source for cost values is from spreadsheets

prepared by Corporate Finance using Xcel Energy corporate databases.

  Steam Power Generation (FERC Accounts)

Coal Units: Harrington & Tolk.

Gas Units: Cunningham 1&2, Jones 1&2, Maddox 1, Moore Co, Nichols, Plant X.

Operations costs included FERC Accounts 500, 502, 503, 504, 505, 506, 507, 508, and

509. Maintenance costs included FERC Accounts 510, 511, 512, 513, 514, and 515.  

  

Other Power Generation (FERC Accounts)  

Combustion Turbines (CT): Carlsbad, Cunningham 3&4, Jones 3&4, Maddox 2&3, Quay,

Riverview.

Other: Hale Wind, Celanese, Tucumcari  

Operations costs included FERC Accounts 546, 548, 549, 550 and 550.1.  

Maintenance costs included FERC Accounts 551, 552, 553, 554 and 554.1.

 

  

The general ledger data was used to sort expenses by plants and service organizations. An

allocation process was used to allocate service organization expenses to each plant. The data

was then summarized for each plant and the data was entered into the Schedule spreadsheet.

  

Generation data for the past five years and the Test Year (12 months ended September 2020) were

entered into Schedule H-11.3.

  

Using the generation and cost data in Schedule H-11.3, “Cost per MWh” was calculated for

Operations, Maintenance, and Total O&M. The information is sorted by Plant and grouped by

fuel type (coal, gas, CT, and other).