Top Banner
Limonene 4.5ppb O3 20ppb 17.07.2009
11

Limonene 4.5ppb O3 20ppb 17.07.2009. 09:17 sampling chamber housing air.

Dec 22, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Limonene 4.5ppb O3 20ppb 17.07.2009. 09:17 sampling chamber housing air.

Limonene 4.5ppbO3 20ppb

17.07.2009

Page 2: Limonene 4.5ppb O3 20ppb 17.07.2009. 09:17 sampling chamber housing air.

09:17 sampling chamber housing air

Page 3: Limonene 4.5ppb O3 20ppb 17.07.2009. 09:17 sampling chamber housing air.

09:49 during a flush

Page 4: Limonene 4.5ppb O3 20ppb 17.07.2009. 09:17 sampling chamber housing air.

09:50 reduced the spike in particle number substantially by pushing the lower frame up about 30sec before the flush cycle was due to finish

(made sure the bag was operating at a slightly over pressure)

Page 5: Limonene 4.5ppb O3 20ppb 17.07.2009. 09:17 sampling chamber housing air.

9min ALO (10:19)

Page 6: Limonene 4.5ppb O3 20ppb 17.07.2009. 09:17 sampling chamber housing air.

20min ALO (mode is growing)

Page 7: Limonene 4.5ppb O3 20ppb 17.07.2009. 09:17 sampling chamber housing air.

40min ALO

Page 8: Limonene 4.5ppb O3 20ppb 17.07.2009. 09:17 sampling chamber housing air.

1 HOLA

Page 9: Limonene 4.5ppb O3 20ppb 17.07.2009. 09:17 sampling chamber housing air.

1h17min ALO another 10ppb Limonene were injected to test the lack of VOC detection by the

PTR. The screen shot is at 1h40min ALO

The three modes are 30, 47 and 66nm

Page 10: Limonene 4.5ppb O3 20ppb 17.07.2009. 09:17 sampling chamber housing air.

2h5min ALO

Page 11: Limonene 4.5ppb O3 20ppb 17.07.2009. 09:17 sampling chamber housing air.

13:34 Lights off (3h15min)