Top Banner
! . ! . ! . ! . ! . k j EGGERT LYNDAKER NELLIST AUSTIN BANE Lighthouse Wind ® Author: HVS Coordinate System: NAD 1983 StatePlane New York West FIPS 3103 Feet Projection: Transverse Mercator Datum: North American 1983 Units: Foot US 0 1 2 0.5 Kilometers 0 0.8 1.6 0.4 Miles ! . MetTower, Operating ! . MetTower, Proposed k j Sodar, Operating Parcel Boundary Project Boundary Existing and Proposed Meteorlogical Tower (MetTower) Locations
24

Lighthouse Wind

Dec 03, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Lighthouse Wind

!.

!.

!.

!.

!.

kj

EGGERT

LYNDAKER

NELLIST

AUSTIN

BANE

Lighthouse Wind

®

Author: HVSCoordinate System: NAD 1983 StatePlane New York West FIPS 3103 FeetProjection: Transverse MercatorDatum: North American 1983Units: Foot US

0 1 20.5Kilometers

0 0.8 1.60.4Miles

!.MetTower, Operating

!.MetTower,Proposed

kjSodar, Operating

Parcel Boundary Project Boundary

Existing and Proposed Meteorlogical Tower (MetTower)

Locations

Page 2: Lighthouse Wind

MET Location Exhibit

Location of parcel boundaries and features shown on map are approximate and subject to final survey.

¯

County Parcel!. MetTower, Proposed

V

V V

V

VV Parcel Setback (295.3 ft. or 90 m)

0 260 520 780 1,040130Feet

Docu

ment

Path:

\\192

.168.2

.4\Da

ta\GI

S\GI

S_DB

\NY\

Proje

cts\10

66_S

OM\M

XDs\L

ando

wners

hip\E

xhibi

ts\Lig

hthou

se_M

ET_E

xhibi

t_Nell

ist_0

9052

014.m

xd

Page 3: Lighthouse Wind

Proposed MET Location ExhibitBane, Donna Rae

Location of parcel boundaries and features shown on map are approximate and subject to final survey.

!. Proposed MET Tower (60m)Anchor Pts. (125 ft. from MET Tower)

! Parking and Loading Area! Point of Enrty and Exit

County Parcel

VV

VV Parcel Setback (295.3 ft. or 90 m)Access RoadWetlandSlope >= 5%

0 210 420 630 840105Feet

Docu

ment

Path:

\\ACE

-File\

GIS\

GIS_

DB\N

Y\Pr

ojects

\1066

_SOM

\MXD

s\Lan

down

ership

\Exh

ibits\

Lighth

ouse

_MET

_Exh

ibit_B

ane_

0302

2015

.mxd

Date: 3/3/2015

¯

Page 4: Lighthouse Wind

Proposed MET Location ExhibitEggert, Barbara R

Location of parcel boundaries and features shown on map are approximate and subject to final survey.

!.MET Tower, ProposedAnchor Points (125 ft from MET Tower)

! Parking and Loading Area! Point of Enrty and Exit

County Parcel

VV

VParcel Setback (295.3 ft. or 90 m)Proposed Access RoadWetlandSlope > 5%Railroad

0 330 660 990 1,320165Feet

Docu

ment

Path:

\\ACE

-RA-

FS1\d

ata\G

IS\_P

rojec

ts\SO

M_Lig

hthou

se\M

XD\P

rojec

t\Ligh

thous

e_ME

T_Ex

hibit_

Egge

rt_20

1601

06.m

xd

Date: 1/7/2016

¯

Page 5: Lighthouse Wind

Proposed MET Location ExhibitLyndaker, Charles E

Location of parcel boundaries and features shown on map are approximate and subject to final survey.

!.MET Tower, ProposedAnchor Points (125 ft from MET Tower)

!Parking and Loading Area!Point of Enrty and Exit

County Parcel

VV

VParcel Setback (295.3 ft. or 90 m)Proposed Access RoadWetlandSlope > 5%

0 370 740 1,110 1,480185Feet

Docu

ment

Path:

\\ACE

-RA-

FS1\d

ata\G

IS\_P

rojec

ts\SO

M_Lig

hthou

se\M

XD\P

rojec

t\Ligh

thous

e_ME

T_Ex

hibit_

Lynd

aker_

2016

0106

.mxd

Date: 1/7/2016

¯

Page 6: Lighthouse Wind

62 NRG_60m_and_50m_XHD_TallTower_Installation_Manual_and_Specifications_Rev_2.02.docx 18 April 2011

60m XHD with Standard Footprint

Tower Layout

Page 7: Lighthouse Wind

63 NRG_60m_and_50m_XHD_TallTower_Installation_Manual_and_Specifications_Rev_2.02.docx 18 April 2011

60m XHD with Standard Footprint

Site Layout

Page 8: Lighthouse Wind

64 NRG_60m_and_50m_XHD_TallTower_Installation_Manual_and_Specifications_Rev_2.02.docx 18 April 2011

60m XHD with Standard Footprint

Code Compliance Curve – Imperial Units

Page 9: Lighthouse Wind

65 NRG_60m_and_50m_XHD_TallTower_Installation_Manual_and_Specifications_Rev_2.02.docx 18 April 2011

60m XHD with Standard Footprint

Code Compliance Curve – SI Units

Page 10: Lighthouse Wind

66 NRG_60m_and_50m_XHD_TallTower_Installation_Manual_and_Specifications_Rev_2.02.docx 18 April 2011

60m XHD with Standard Footprint

Stamped Drawing

Page 11: Lighthouse Wind

67 NRG_60m_and_50m_XHD_TallTower_Installation_Manual_and_Specifications_Rev_2.02.docx 18 April 2011

60m XHD with Standard Footprint

Anchor Loads – Imperial Units (The loads shown on the graph apply to each of the anchors)

Page 12: Lighthouse Wind

62 NRG_60m_and_50m_XHD_TallTower_Installation_Manual_and_Specifications_Rev_2.02.docx 18 April 2011

60m XHD with Standard Footprint

Tower Layout

Page 13: Lighthouse Wind

63 NRG_60m_and_50m_XHD_TallTower_Installation_Manual_and_Specifications_Rev_2.02.docx 18 April 2011

60m XHD with Standard Footprint

Site Layout

Page 14: Lighthouse Wind

64 NRG_60m_and_50m_XHD_TallTower_Installation_Manual_and_Specifications_Rev_2.02.docx 18 April 2011

60m XHD with Standard Footprint

Code Compliance Curve – Imperial Units

Page 15: Lighthouse Wind

65 NRG_60m_and_50m_XHD_TallTower_Installation_Manual_and_Specifications_Rev_2.02.docx 18 April 2011

60m XHD with Standard Footprint

Code Compliance Curve – SI Units

Page 16: Lighthouse Wind

66 NRG_60m_and_50m_XHD_TallTower_Installation_Manual_and_Specifications_Rev_2.02.docx 18 April 2011

60m XHD with Standard Footprint

Stamped Drawing

Page 17: Lighthouse Wind

67 NRG_60m_and_50m_XHD_TallTower_Installation_Manual_and_Specifications_Rev_2.02.docx 18 April 2011

60m XHD with Standard Footprint

Anchor Loads – Imperial Units (The loads shown on the graph apply to each of the anchors)

Page 18: Lighthouse Wind

68 NRG_60m_and_50m_XHD_TallTower_Installation_Manual_and_Specifications_Rev_2.02.docx 18 April 2011

60m XHD with Standard Footprint

Page 19: Lighthouse Wind

69 NRG_60m_and_50m_XHD_TallTower_Installation_Manual_and_Specifications_Rev_2.02.docx 18 April 2011

60m XHD with Standard Footprint

Anchor Loads – SI Units (The loads shown on the graph apply to each of the anchors)

Page 20: Lighthouse Wind

70 NRG_60m_and_50m_XHD_TallTower_Installation_Manual_and_Specifications_Rev_2.02.docx 18 April 2011

60m XHD with Standard Footprint

Baseplate Loads – Imperial Units

Page 21: Lighthouse Wind

71 NRG_60m_and_50m_XHD_TallTower_Installation_Manual_and_Specifications_Rev_2.02.docx 18 April 2011

60m XHD with Standard Footprint

Baseplate Loads – SI Units

Page 22: Lighthouse Wind

72 NRG_60m_and_50m_XHD_TallTower_Installation_Manual_and_Specifications_Rev_2.02.docx 18 April 2011

60m XHD with Standard Footprint

Tower Erection Forces (tower only) EIA-222-F wind velocity

Horizontal base reaction Winch anchor reaction (b)

0 m/s (0 mph) 23.1 kN (5200 lbs.) (a) 32.0 kN (7200 lbs) @ 44° from Horizontal Load spread between the 3 anchors or 10.7 kN (2400 lbs) per anchor

Tower Erection Forces (with typical NOW System – 2 booms at 40 m, 3 booms at 50 m, 3 booms at 58 m, cables) EIA-222-F wind velocity

Horizontal base reaction Winch anchor reaction (b)

0 m/s (0 mph) 25.8 kN (5800 lbs.) (a) 35.6 kN (8000 lbs) @ 44° from Horizontal Load spread between the 3 anchors or 11.9 kN (2667 lbs) per anchor

Notes: a) The maximum horizontal reaction occurs when the tower is just off the ground. b) Maximum force on the winch anchor during tower erection (occurs when tower is just above the ground). c) These values assume no safety factor.

Page 23: Lighthouse Wind

73 NRG_60m_and_50m_XHD_TallTower_Installation_Manual_and_Specifications_Rev_2.02.docx 18 April 2011

60m XHD with Standard Footprint

Baseplate Geometry

Page 24: Lighthouse Wind

74 NRG_60m_and_50m_XHD_TallTower_Installation_Manual_and_Specifications_Rev_2.02.docx 18 April 2011

60m XHD with Standard Footprint