Top Banner

of 53

Life Assesment of Boilers

Jun 03, 2018

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 8/13/2019 Life Assesment of Boilers

    1/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    e come

    Committed to making a better world

  • 8/13/2019 Life Assesment of Boilers

    2/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    resen a on rrangemen

    . n ro uc on

    2. Module of a typical RLA Study3. BHEL contribution in the area of RLA4. ni T t F iliti t BHE

    5. Current developments in BHEL in the

    Committed to making a better world

  • 8/13/2019 Life Assesment of Boilers

    3/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    LEP

    N on-pres su re Part s Pres s ure Part s

    RLAPETCondit ion As sessm en t

    R&M Pro osal

    Committed to making a better world

  • 8/13/2019 Life Assesment of Boilers

    4/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    RESIDUAL LIFE ASSESSMENT STUDY

    s u y con uc e as ca y o n ou :

    pressure parts and piping

    To determine the remaining left out life of thepressure parts

    Enable to take Run, Re air and Re lacement decisionsProvide technically sound and viable input for R&M

    Committed to making a better world

  • 8/13/2019 Life Assesment of Boilers

    5/53

  • 8/13/2019 Life Assesment of Boilers

    6/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    Why RLA Study

    pera on o o er a e eva e

    temperatures more than design limit Variations in coal quality

    ev a ons n a er em s ry

    Committed to making a better world

  • 8/13/2019 Life Assesment of Boilers

    7/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    Why RLA Study

    ros on on on e ou er sur ace o e rum ue o

    steam leakage

    Committed to making a better world

  • 8/13/2019 Life Assesment of Boilers

    8/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    Why RLA Study

    Sagged Header

    Committed to making a better world

  • 8/13/2019 Life Assesment of Boilers

    9/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    Why RLA Study

    Foreign Body inside RH Inlet Header

    Committed to making a better world

  • 8/13/2019 Life Assesment of Boilers

    10/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    y u ySeawater Corrosion in S-Panel

    Committed to making a better world

  • 8/13/2019 Life Assesment of Boilers

    11/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    RLA Study Aims At

    Evaluation of present condition of pressure

    par s p p ng

    Avoiding premature pressure parts failuresand associated unforeseen outages

    Identification of problem areas

    Analysis of root cause of problems

    Providing technically sound and viable

    Committed to making a better world

  • 8/13/2019 Life Assesment of Boilers

    12/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    RLA of What?

    Pressure parts

    Highly varying duty

    Varying Load, Cyclic Load

    Fuel Quality Variations

    Carried out extensively

    Structural parts Limited study

    Need based

    Visual examination gives good clue Non pressure parts

    Mostly maintenance oriented

    Committed to making a better world

    an e assesse eas y

  • 8/13/2019 Life Assesment of Boilers

    13/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    RLA STUDY

    Pre-Site Study Phase Site Study Post-Site Study Phase

    Tender Review/

    Review of requirements based

    on available information

    Review of Operational History Laboratory Analysis

    -

    Replica Evaluation

    Discussions with Utility Scheduling of Activities Review & Finalisation

    Scope Finalisation Preparatory Works Report Preparation &

    o ecommen a ons

    Submission of Offer Study & Preliminary proposals for improvement

    Submission

    Committed to making a better world

    Report Submission

  • 8/13/2019 Life Assesment of Boilers

    14/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    Steam Generating Unit

    PRESSURE PARTS

    HIGH TEMP (>400 C) HIGH THICKNESSSH HEADERS, DeSH

    MS HRH & PRDS PIPINGS

    LOW TEMP (

  • 8/13/2019 Life Assesment of Boilers

    15/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    erv ce ours enera on ecor s a n enance ecor s

    o. o ar -ups va a y ep acemen ecor s

    Transient Conditions PLF Design Changes

    Steady State Conditions

    Excursions

    Failure History Inspection Records

    RLA/CA/PET

    Committed to making a better world

  • 8/13/2019 Life Assesment of Boilers

    16/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    Stages of Residual Life Assessment

    Re ie of ast o erational &

    maintenance data of the plant including

    water chemistry variations

    Field testing

    Laboratory testing

    Committed to making a better world

  • 8/13/2019 Life Assesment of Boilers

    17/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    Review Of Past Data

    Plant operation

    Number of start-ups & shut downs

    O eratin conditions

    Operating practice

    a n enance an repa rFailures and repairs

    Review of root cause analysis

    Committed to making a better world

  • 8/13/2019 Life Assesment of Boilers

    18/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    sua nspec on

    Erosion, corrosionSwelling, scaling

    ,

    Supports, pipe hangers etc

    Dimensional checks

    ThicknessOutside diameter

    Committed to making a better world

  • 8/13/2019 Life Assesment of Boilers

    19/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    Field Testin

    Non destructive examination

    Penetrant testing including fluorescent type

    Ma netic article ins ection Wetfluorescent & Dry)

    Ultrasonic

    In-situ hardness checks

    Tube sampling - WW internal deposits

    WW H2 embr ttlement

    Committed to making a better world

  • 8/13/2019 Life Assesment of Boilers

    20/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    ,

    Metallography In situ metallographic examination

    roscop c nspec on S ot chemical check when needed

    Committed to making a better world

  • 8/13/2019 Life Assesment of Boilers

    21/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    T ical Tests Done for RLA

    Hi h tem erature headers & i in

    Ultrasonic, dye-penetrant tests

    roscopy, rep cas

    Other inspections like

    Dimensions, Internal inspection

    In-situ hardness

    Committed to making a better world

  • 8/13/2019 Life Assesment of Boilers

    22/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    uper ea er e ea er u es

    Tube samples, ultrasonic test OD & Thickness

    Deposit Analysis

    Steam side oxide scale thickness Life prediction

    Attemperators

    Ultrasonic, dye penetrant tests Replication, hardness

    Fibroscopy

    Committed to making a better world

  • 8/13/2019 Life Assesment of Boilers

    23/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    rums owncomers

    Ultrasonic d e- enetrant tests

    MPI (Wet fluorescent & Dry)

    Fibroscopy

    Tube samples, ultrasonic testDeposit analysis (Internal & External)

    Committed to making a better world

  • 8/13/2019 Life Assesment of Boilers

    24/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    Visual Inspection

    ep ca on, n-s u ar ness

    OD & thickness angers uppor s nspec on

    Stress analysis to identify the most stressed points

    enera gu e nes or se ect ng nspect on po nts High turbulence or velocity zones

    on ensa on po n s

    Dead ends & high stressed points

    points

    All su orts

    Committed to making a better world

    Bh H El l L d h ll

  • 8/13/2019 Life Assesment of Boilers

    25/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    Tubes samples from high heat flux zone

    Detailed dimensional measurements

    Presence of internal deposits covering

    epos con en

    Constituents of deposit

    o ven se ec on c ean ng s necessary

    Presence of external and internal corrosion

    Micro structure analysis (hydrogen damage)

    Committed to making a better world

    Bh t H El t i l Li it d Ti hi lli

  • 8/13/2019 Life Assesment of Boilers

    26/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    Microscopy & SEM)

    Deposit analysis ( Internal & External)

    cce erate creep rupture test ng

    Committed to making a better world

    Bh t H El t i l Li it d Ti hi lli

  • 8/13/2019 Life Assesment of Boilers

    27/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    Scope of RLA as per IBR 391 A

    Component Visual

    Ultrasonic

    testing

    particel

    testing

    penetrant

    inspection Replication Sampling

    Deposit

    Analysis

    Drum (Steam) Yes Yes No * Yes Yes No Yes

    Water Drum Yes Yes No * Yes Yes No Yes

    *

    Attemperator Header Yes Yes No * Yes Yes No No

    High Temp Header Yes No No * No No Yes No

    Low temp eco tubes Yes No No * No No Yes No

    Convection SH coils Yes No No * No No Yes Yes

    Primary SH coils Yes No No * No No Yes No

    Prefinal SH coils Yes No No * No No Yes No

    Final SH Coils Yes No No * No No Yes No

    Reheater coils Yes No No * No No Yes NoHigh temp header Yes Yes No * Yes Yes No No

    Final SH header 'Yes Yes No * Yes Yes No No

    Reheater Header Yes Yes No * Yes Yes No No

    a n s eam p p ng es o o o es o o

    Platen SH header Yes Yes No * Yes Yes No No

    Primary SH header Yes Yes No * Yes Yes No No

    Economizer header Yes No No * Yes No No No

    Auxiliaries Yes No No * No No No No

    Boiler bank tubes Yes No No * No No No NoWater wall Yes No No * No No Yes No

    Furnace water walls Yes No No * No No Yes No

    * MPI will be done on case to case basis

    ** Oxide scale based life prediction will be done based on operational history and failures

    *** UT for checkin inte rit of butt welds

    Committed to making a better world

    $ Header internal inspection by fiberscope

    Bharat Heavy Electricals Limited Tiruchirapalli

  • 8/13/2019 Life Assesment of Boilers

    28/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    Microstructural Evaluation By Replication

    Sampling Thick Walled Components Is

    Non-destructive Technique Adopted

    or va ua on s ep ca on. To examine s heroidisation and

    cavitation level

    Committed to making a better world

    Bharat Heavy Electricals Limited Tiruchirapalli

  • 8/13/2019 Life Assesment of Boilers

    29/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    Re lica Techni ue

    The material surface preparation by

    grinding, polishing and etching

    e p as c se rep ca s app e rm y

    to the surface

    After curing, the replica can be removed

    an go spu ere e opograp ca

    image of the micro structure is examined

    Committed to making a better world

    Bharat Heavy Electricals Limited Tiruchirapalli

  • 8/13/2019 Life Assesment of Boilers

    30/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    Committed to making a better world

    Bharat Heavy Electricals Limited Tiruchirapalli

  • 8/13/2019 Life Assesment of Boilers

    31/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    Committed to making a better world

    Bharat Heavy Electricals Limited Tiruchirapalli

  • 8/13/2019 Life Assesment of Boilers

    32/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    Committed to making a better world

    Bharat Heavy Electricals Limited Tiruchirapalli

  • 8/13/2019 Life Assesment of Boilers

    33/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    Committed to making a better world

    o pu ere ep ca

    Bharat Heavy Electricals Limited, Tiruchirapalli

  • 8/13/2019 Life Assesment of Boilers

    34/53

    Bharat Heavy Electricals Limited, Tiruchirapalli

    Cree Cavit Level Classification S stem Pro osed

    by Wedel & Neubauer

    Committed to making a better world

    Bharat Heavy Electricals Limited, Tiruchirapalli

  • 8/13/2019 Life Assesment of Boilers

    35/53

    y , p

    Indian Boiler Re ulationsASME

    ANSI

    DIN

    Committed to making a better world

    Bharat Heavy Electricals Limited, Tiruchirapalli

  • 8/13/2019 Life Assesment of Boilers

    36/53

    y p

    Organisation for RLA in BHEL

    R&M department Supporting Depts Service After Sales

    Scope of Work

    Technical ,Report Preparation

    FES, WRI

    Central LabNDTL

    Offer Submission

    Order ReceiptReport to Customer &

    ar ca on , orp o er nspec ora e

    Committed to making a better world

    Bharat Heavy Electricals Limited, Tiruchirapalli

  • 8/13/2019 Life Assesment of Boilers

    37/53

    y p

    Supporting Depts

    For

    NDE TUBE FAILURE ANALYSIS WATER CHEMISTRY &OXIDE SCALE THICKNESS

    INSITU METALLOGRAPHY

    Specialised Work

    NDTL,SAS CENTRAL LAB Corp. R&D

    ACCELERATED

    CREEP RUPTURE TEST

    CENTRAL LAB,

    WRI

    Committed to making a better world

    Bharat Heavy Electricals Limited, Tiruchirapalli

  • 8/13/2019 Life Assesment of Boilers

    38/53

    Expert PanelFor RLA

    Engineering& R&D Metallurgical

    Analysis

    NDE

    Doctorates : 5Post Graduates : 50

    Doctorates : 6Post Graduates : 10

    Level I : 43Level II : 136

    Graduates : 250 Graduates : 10 Level III : 6

    eve , as per -

    Techniques UT, RT, MT, PT, Eddy Current(ET), & Leak Test (LT)

    Committed to making a better world

    Bharat Heavy Electricals Limited, Tiruchirapalli

  • 8/13/2019 Life Assesment of Boilers

    39/53

    National NDT Award from ISNT 4 times

    Two Registered Assessors Qualified from

    ns u e o eg s ere er e

    Assessors (IRCA, UK)

    Committed to making a better world

    Bharat Heavy Electricals Limited, Tiruchirapalli

  • 8/13/2019 Life Assesment of Boilers

    40/53

    spec a con r u on n e area o

    Personnel, Boiler Inspectorate Personnel and

    Customers Personnel HRD Training Program on RLA Being

    Conducted for Education of BHEL En ineers

    Customer Engineers & Boiler Inspectors WRI & BHEL Indo-German Pro ram

    Encompasses RLA also

    Boilers Including Piping & Industrial Boilers &

    other Com onents

    Committed to making a better world

    Bharat Heavy Electricals Limited, Tiruchirapalli

  • 8/13/2019 Life Assesment of Boilers

    41/53

    (cont.)

    Training of BHEL executives in the field of RLA at

    ,

    Field Training at Chandrapura TPS by EPRI, USA

    o er ea er o ca on w

    Material Based on Assessment by RLA Techniques

    Being Met When Called for

    SAIL, Bokaro in Full Agreement Technically

    Committed to making a better world

    Bharat Heavy Electricals Limited, Tiruchirapalli

  • 8/13/2019 Life Assesment of Boilers

    42/53

    Special NDT techniques developed by BHEL

    Detection of hydrogen damage by UT Measurement of oxide scale thickness by

    .

    Microstructural evaluation by replication

    A new technique called VAPINE'.

    by UT.

    Committed to making a better world

    Bharat Heavy Electricals Limited, Tiruchirapalli

  • 8/13/2019 Life Assesment of Boilers

    43/53

    Post Ex osture Uni-Axial Accelerated cree testin

    In-Situ Hardness Tester

    -

    Digital Strain Measurement Gauge

    Portable Microscope for Insitu MetallurgicalExamination

    Portable Alloy Analyser

    with microprocessor

    Committed to making a better world

    Bharat Heavy Electricals Limited, Tiruchirapalli

  • 8/13/2019 Life Assesment of Boilers

    44/53

    Unique Test Facilities at BHEL (Cont)

    Impact test facility up to minus 196 deg C

    Scanning Electron Micro Scope

    Atomic Absorption Spectrometer Portable Stress Anal ser

    Video Fibrescope

    Committed to making a better world

    Bharat Heavy Electricals Limited, Tiruchirapalli

  • 8/13/2019 Life Assesment of Boilers

    45/53

    Scannin Electron Micro Sco e

    Committed to making a better world

    Bharat Heavy Electricals Limited, Tiruchirapalli

  • 8/13/2019 Life Assesment of Boilers

    46/53

    -

    Committed to making a better world

    Bharat Heavy Electricals Limited, Tiruchirapalli

  • 8/13/2019 Life Assesment of Boilers

    47/53

    Li ament Crack Detection b UT

    Committed to making a better world

    Bharat Heavy Electricals Limited, Tiruchirapalli

  • 8/13/2019 Life Assesment of Boilers

    48/53

    ecommen at ons ormat yp ca

    Residual life ins ection intervals of components

    ar s nee ng rep acemen s

    Parts needin re airs

    Chemical cleaning advice & procedure

    o cat ons requ re or e extens on

    Committed to making a better world

    Bharat Heavy Electricals Limited, Tiruchirapalli

  • 8/13/2019 Life Assesment of Boilers

    49/53

    Advice on water regimes Improvements in operational methods

    Retrofits / improvements in control &

    instrumentation

    Committed to making a better world

    Bharat Heavy Electricals Limited, Tiruchirapalli

  • 8/13/2019 Life Assesment of Boilers

    50/53

    stu es arr e out y

    Total Number of studies carried out : 208Power Boilers : 138

    Process/Industrial Boilers : 70

    Committed to making a better world

    Bharat Heavy Electricals Limited, Tiruchirapalli

  • 8/13/2019 Life Assesment of Boilers

    51/53

    Run Repair Replace

    RLA

    Evaluates For All Phases

    Committed to making a better world

    Bharat Heavy Electricals Limited, Tiruchirapalli

    Currentworking ofBHELin the RLA Field

  • 8/13/2019 Life Assesment of Boilers

    52/53

    Current working of BHEL in the RLA Field

    Working on a comprehensive Advanced RLA software to evaluate pressure part creep and Fatique life

    assessment called ALIAS.

    and accurate. Planning to use in site with data

    .

    Strain measurement to Evaluate the safety factor of

    Drum as per ASME code Section 8UG L101.

    Drum with the ASME design safety margin for the

    Committed to making a better world

    .

    Bharat Heavy Electricals Limited, Tiruchirapalli

  • 8/13/2019 Life Assesment of Boilers

    53/53

    Committed to making a better world