Top Banner
32

LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

Feb 12, 2018

Download

Documents

tranthuan
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted
Page 2: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

LiDAR AT PennDOTMichael Loose, C.P.

BOPD – Photogrammetry and Surveys

2

Page 3: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

3

I. What is LiDAR?II. Benefits of LiDARIII. PennDOT Case StudiesIV. Best Practices/Lessons LearnedV. Questions

Page 4: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

4

Page 5: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

LiDAR for Engineering(LIght Detection And Ranging)

5

Page 6: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

LiDAR Photogrammetry

Airborne LiDAR

Mobile LiDAR

Static LiDAR

6

Page 7: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

Airborne LiDAR

PAMAP (PASDA)

7

Page 8: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

Static LiDAR (Terrestrial LiDAR)

8

Page 9: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

Static LiDAR AT PennDOT

• PennDOT was the first DOT to adopt the new technology in 1999

• First big project was completed in 2000

• Used primarily for smaller projects where high levels of detail are required, or safe capture of topos too dangerous for traditional survey

Page 10: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

Mobile LiDAR

10

Page 11: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

Sensor Configuration

Page 12: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

12

Page 13: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

Mobile LiDAR AT PennDOT

• First project completed in 2010

• Conducted a test to validate Mobile LiDAR in 2013

• Resulted in a research paper and a national magazine article

• Led to replacement of other technology

Page 14: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

14

Page 15: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

15

Page 16: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

16

LiDAR Benefits (continued)

Page 17: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

17

Page 18: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

Static LiDAR Projects:Bridge Emergencies

• Birmingham Bridge • Dysart Bridge • Paxton Street Bridge • I 81 Bridge Fire 18

Page 19: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

Static LiDAR Projects:Bridge Emergencies (continued)

Page 20: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

20

Static LiDAR Projects:Bridge Emergencies (continued)

Page 21: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

Static LiDAR:Schuylkill River Bridge, Hamburg

As-Builts for Widening (continued)

21

Due to complexity of the survey, Static LiDAR was completed in 270 hours versus the conventional estimate of 720 hours (which would also have required bridge cranes)

Page 22: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

Static LiDAR:Inaccessible Areas

SR 28 – Allegheny County:Unstable cut/inaccessible

SR 239 – Luzerne County: Merged with Photogrammetry

SR 2002 and 3023 pipe archs SR 6 – Bradford County:

o Calculated clearanceo Recorded beam condition

22

Page 23: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

Integrated Topo – Mobile LiDAR

23

• Over 30 projects completed.• Approximately 20 projects

combining ground survey, Photogrammetry and Mobile LiDAR

• Requires planning ahead• Includes photo products/orthos• I84-282 is a great example

and actually used all four technologies discussed including Static LiDAR

Page 24: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

24

SR 84 Section 282:Replacement or Rehabilitation of Three

Structures and Widening to Three Lanes in Each Direction

Page 25: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

Fort Pitt Tunnel – District 11Safety for Surveyors, No Lane Closures

25

• Survey for designated historic structure

• High traffic volume• Very few “shadow” areas. • Scan of entire tunnel

structure prior to removal of ceiling

• Arranged for stoppage of traffic for only a few minutes to allow for mobile LiDAR scan vehicle to proceed without traffic interference.

Cross Sections

Point Cloud View

Page 26: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

26

Page 27: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

Lessons Learned Best Practice

On smaller projects where data must be captured…

In difficult to access areas (slopes, tunnels, structures etc.)

In unsafe areas (high traffic or steep terrain)

In very high detail

Static LiDAR may be helpful Contact your Survey Chief Photogrammetry and Surveys

may complete the request or oversee man-hours and quality of data from provider

27

Page 28: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

Lessons Learned Best Practice

Mobile LiDAR is not always necessary.

If: o High levels of accuracy o Safe roadway collection o High levels of detail are

required,

Mobile LiDAR may be necessary Other technologies may

satisfy project requirements

Get your Survey Chief involved as early as possible to determine what is really necessary

28

Page 29: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

Requires primary control every ~800’ using GPS for horizontal and differential leveling for vertical

R.O.W. baseline must be established conventionally

Drainage must be captured conventionally

Get your Survey Chief involved as early as possible to control and schedule these activities

29

Lessons Learned Best Practice

Everything Starts witha Ground Survey

Page 30: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

Data is only accurate to about 30 feet from the corridor

Data is unreliable on downslopes

Data is line of sight and vegetation will be collected

Many features helpful to the designer may not be collected from the clouds

Get your Survey Chief involved as early as possible!!!

The best topographic map is one collected from multiple sources.

Photogrammetry and Ortho-photos

Discuss special requirements ahead of time

30

Lessons Learned Best Practice

Page 31: LiDAR AT PennDOT - APC/PennDOT Fall Seminarapcfallseminar.com/wp-content/uploads/2016/11/TECH1_Loose.pdf · Mobile LiDAR AT PennDOT • First project completed in 2010 • Conducted

31

Mobile LiDARSingle Best Practice

Look ahead on the TIP or other sources for upcoming projects to determine well ahead of time what projects may benefit from mapping

Work with your Survey Chief to determine what is needed

Your Survey Chief and, if needed, the Photogrammetry and Surveys Section will plan a mapping project to be completed BEFORE your project goes to design!