Page 1: LID Site Planning and Design - Narragansett Bay Research

LID Site Planning and Design

Scott MillarAdministrator, Sustainable Watersheds

DEM

Page 2: LID Site Planning and Design - Narragansett Bay Research

Low Impact Development

“LID is a more comprehensive approach to stormwater management that minimizes the impacts of development by using site planning and design techniques that infiltrate runoff as close as possible to where precipitation reaches the ground.”

Page 3: LID Site Planning and Design - Narragansett Bay Research

1. Avoid the Impacts

• Protect Natural Areas

• Protect Natural Drainage Areas

• Minimize Clearing & Grading

• Avoid Soil Compaction

Page 4: LID Site Planning and Design - Narragansett Bay Research
Page 5: LID Site Planning and Design - Narragansett Bay Research
Page 6: LID Site Planning and Design - Narragansett Bay Research
Page 7: LID Site Planning and Design - Narragansett Bay Research
Page 8: LID Site Planning and Design - Narragansett Bay Research

Burlingame Estates Existing Conditions

Page 9: LID Site Planning and Design - Narragansett Bay Research

Burlingame Estates Yield Plan

Page 10: LID Site Planning and Design - Narragansett Bay Research

Burlingame Estates Conservation Plan

Page 11: LID Site Planning and Design - Narragansett Bay Research

Comparisons

Conventional Plan

3 acres9,059 ft.

1.4%

Conservation Plan

0.52 acres3,720 ft.

82%

Average Lot AreaLength of Street

Open Space

Page 12: LID Site Planning and Design - Narragansett Bay Research
Page 13: LID Site Planning and Design - Narragansett Bay Research

2. Reduce the Impacts

• Roads• Driveways• Sidewalks• Cul-de-sacs• Parking

Minimize Impervious Surfaces

Page 14: LID Site Planning and Design - Narragansett Bay Research
Page 15: LID Site Planning and Design - Narragansett Bay Research
Page 16: LID Site Planning and Design - Narragansett Bay Research
Page 17: LID Site Planning and Design - Narragansett Bay Research

Rain Gardens/Bioretention

Page 18: LID Site Planning and Design - Narragansett Bay Research
Page 19: LID Site Planning and Design - Narragansett Bay Research

Better Site Design

Guidance for Communities to Implement LID

Page 20: LID Site Planning and Design - Narragansett Bay Research

3. Manage the Impacts

• Vegetated Treatment Systems• Disconnect Impervious Surfaces• Stream Restoration• Reforestation

Structural Controls

Page 21: LID Site Planning and Design - Narragansett Bay Research
Page 22: LID Site Planning and Design - Narragansett Bay Research

Vegetative Treatment SystemsVegetative Treatment Systems

Adjacent to small parking lots and roadwaysAdjacent to small parking lots and roadways

Page 23: LID Site Planning and Design - Narragansett Bay Research

Stillwater Mill – Introduction to the Site

Page 24: LID Site Planning and Design - Narragansett Bay Research

Stillwater Mill –Proposed Redevelopment

Page 25: LID Site Planning and Design - Narragansett Bay Research

Stillwater Mill – Recommended Stormwater Best Management Practices

Rooftop Garden

Bioretention

Green Rooftops

Grid Pavers Stormwater Planters Vegetated Swale

Page 26: LID Site Planning and Design - Narragansett Bay Research
Page 27: LID Site Planning and Design - Narragansett Bay Research

LID Costs

LID (2007 EPA Study):• Project costs reduced 15-80%

Conservation Development (2006 RI Study):• Construction costs reduced : 40%• Home values increased: 17% • Homes sold faster: 47%

Page 28: LID Site Planning and Design - Narragansett Bay Research

LID Site Planning Process

1. Avoid Impacts

2. Reduce Impacts

3. Manage Impacts

Page 29: LID Site Planning and Design - Narragansett Bay Research

For more information

Scott Millar

RIDEM

(401) 222-4700, x 4419

[email protected]