INDUSTRIAL TRAINING PRESENTATIONBYSEISWARAN PANDEIN06DKM11F2003AT

Lekir Bulk Terminal (Lumut Port)Historical DetailsConsequent to the in-principle indicative approval of the State Government of Perak of the Lekir Coastal Development Project ("Lekir Coastal Project") in 1996, two companies were formed by three partners to promote, develop and implement the Lekir Coastal Project, which comprised two related developments:Desa Kilat Sdn. Bhd.(DKSB)The promotion and development of the Lekir Coastal Project comprising the reclamation of land from the sea in the form of islands and the sale of these islands. Total area available for reclamation was 20,000 acres.Lekir Bulk Terminal Sdn. Bhd.(LBT)

LBT executed a Jetty Terminal Usage Agreement with TNB Janamanjung Sdn. Bhd. in August 1999 for the provision of coal unloading and delivery services to the Power Station, thus securing an anchor customer. LBT commenced the construction of Phase I of the dry bulk terminal in May 2000, comprising berths able to accommodate Capemax and Panamax vessels with water depths alongside of 20m ACD, a 2,000m trestle, 2 grab discharge cranes, mechanised handling equipment and controls and appropriate onshore support facilities.

Maintenance details1) Daily substation inspection ES1 and ES2 (11kV)Purpose : To ensure the substation is in good conditionTo take the readings of the feeder supply from TNBJ To rectify any faults in the substation2) Inspection on Shipunloader Transformer Temperature.Purpose : To ensure the transformer temperature maintains within 40 50 degree celcius.

2) Weekly fire Pump house Inspection

Purpose : To ensure the running condition of the jockey Pump, standby Pump and Fire duty pump in the pump house is on good conditionTo test run the 3 pumps to maintain its working condition and to rectify any faults or failure within the system.

3) Weekly gen set inspection Purpose :To test run on gen set to ensure the gen set is in good condition and the running condition is satisfactory.Type of gen set1) samsoon feeder gen set2) Electrical substation 1 and 2 Gen set3) shipunloader 1 gen set

Info :SUL Gen SetBrand : VIBRO POWERPower : 398 KWVoltage : 500 Volt

Electrical substation 1and 2 gen setBrand : VIBRO POWERPower : 153 KWVoltage : 433 Volt

Samsoon feeder gen setBrand : VIBRO POWERPower : 153 Kw

4) Weekly waste water treatment inspectionPurpose :To ensure the system in WWTP is in good conditionTo ensure any faults and parts failure to be rectified immediately

Info Primary sedimentation pondFunction : first stage of treatment and will transfers water into the primary pond.

Secondary sedimentation pondFunction : second stage of water treatment and transfers in to clarified pond.

Clarified pond Function : transfers water into the Coagulation pipe to be added with chemicals (NAoH and DoA)Aquarius DP 100Function : Controls the quality of water in the coagulation pipe and Clarified pond

5) Wire rope broomingPurpose : To prepare the wire rope for Grab

Info :Wire ropeBrand:Usha Siam Diametre:44mm Grade:EEIPS Type:Galvanized Weight:2600Kgs From:Bangkok Length used for Grab : 18.4 metres

20

5) Changing Grab Wire rope Purpose : The old set of wire rope had broken wires and strands causing the wire rope becomes ineffectiveGrab Wire rope has to be changed when it has reached 45 MT. Info GrabBrand: NemagCapacity :30m^3Dead Weight: 15500KgBulk Cargo :CoalLifting Capacity :40 tonnes

Wire ropeBrand:Usha Siam Diameter:44mm Grade:EEIPS Type:Galvanized Weight:2600Kgs From:Bangkok Length used for Grab : 18.4 metres

6) Dismantle Gear Box 3 at Trestle Conveyor

Purpose : The input shaft has bent due to that the gear box starts shaking thus causing leakage of oil and damaged the pinion shaft.

Info :Info The gear box is a helical gear type. Helical gears are used to provide more torque to drive the conveyor.

MotorBrand : SCHORCHPower : 315 KWVoltage : 415 VoltFrequency : 50 Hz

Gear boxBrand : FLENDEROil used : Shell Omala 460Power : 284 KWVoltage : 415 VoltFrequency : 50 Hz

7) ) To Check and rectify scrapper at Berth conveyor and Trestle conveyor chute.

Purpose

To adjust the distance between the scrapper and the PulleyTo ensure the scrapper is in good condition (wearness)Info ScrapperBrand: XHD MARTIN DURT TRACKERMax Belt Speed : 6.1 M/sMax Service Temperature : 82 degree celciusMin head Pulley Diameter : 400 mmMounting Distance from Pulley : 120mmWear Life : Pre cleaner : 165mm : Secondary Cleaner : Thungsten Carbide : 25mm : Other Blades : 50mm

Info ScrapperBrand: XHD MARTIN DURT TRACKERMax Belt Speed : 6.1 M/sMax Service Temperature : 82 degree celciusMin head Pulley Diameter : 400 mmMounting Distance from Pulley : 120mmWear Life : Pre cleaner : 165mm : Secondary Cleaner : Thungsten Carbide : 25mm : Other Blades : 50mm