Top Banner
LHC Beam instrumentation status LBOC 17 March 2015 E. Bravin BE-BI on behalf of many many people in several groups
22

LHC Beam instrumentation status LBOC 17 March 2015 E. Bravin BE-BI on behalf of many many people in several groups.

Dec 19, 2015

Download

Documents

Marianna Lester
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: LHC Beam instrumentation status LBOC 17 March 2015 E. Bravin BE-BI on behalf of many many people in several groups.

LHC Beam instrumentation status

LBOC 17 March 2015

E. Bravin BE-BI on behalf of many many people in several groups

Page 2: LHC Beam instrumentation status LBOC 17 March 2015 E. Bravin BE-BI on behalf of many many people in several groups.

2

Summary

• BPM• BLM• BBQ• OFB• QFB• BCTDC• BCTF• BPF• BWS

• Expected status• Changes w.r.t. run1• Expected

limitations• Plans for the future

• BTV• BSRA• BSRL• BSRT• DIDT• BRAN• BQS• BGI• BGV

Instruments Details

Page 3: LHC Beam instrumentation status LBOC 17 March 2015 E. Bravin BE-BI on behalf of many many people in several groups.

3

Page 4: LHC Beam instrumentation status LBOC 17 March 2015 E. Bravin BE-BI on behalf of many many people in several groups.

4

BPM

• System fully operational• Added BPMs in IR4, moved BPMs in IR5 & 6• Modif. & renamed interlock BPMs (now BPMSI/X)• Replaced racks for mitigating temperature drifts• FIP controllers renewed• Improved diagonal correction• Migrated FEs to L865 and FESA3 & RDA3• DAB firmware rewritten, but not deployed yet

– Waiting for thorough firmware-FESA validation

• Single range for interlock BPMs possible?

Page 5: LHC Beam instrumentation status LBOC 17 March 2015 E. Bravin BE-BI on behalf of many many people in several groups.

5

BPM DOROS

• System designed and electronics being produced• 1 Box (8 channels) ready and installed on collimator at

IP1• 2nd box being prepared – should be ready for installation

next Monday on another collimator• 2 More boxes to be installed “as soon as ready” on

BPMs around ATLAS• Remaining 12 boxes will be installed in TS1 (on

collimators and around interaction points)

Page 6: LHC Beam instrumentation status LBOC 17 March 2015 E. Bravin BE-BI on behalf of many many people in several groups.

6

BLM (1)

• System fully operational• Changes underground

– Exchanged 40 multiwire cables (ca 240 detectors)– Relocated 816 detectors (between MBs)– Added 30 ICs (TOTEM, MKI, Ions…), 100 SEM ->

LIC– Exchanged all acquisition crate backplanes– Modified all signal distribution boxes – Modified and calibrated all acquisition modules– Diamond BLM almost ready (dedicated DAQ for IP7

and IP4, scopes for other IP’s)

Page 7: LHC Beam instrumentation status LBOC 17 March 2015 E. Bravin BE-BI on behalf of many many people in several groups.

7

BLM (2)

• Changes in surface equipment– Serviced and revalidated all processing modules and

optical receivers– Replaced all racks and added two new crates– Replaced all rear connection cables (survey,

interlocks)– Migrated FEs to L865 still FESA 2

• Updated expert naming convention of detectors• Updated OP application (added system status)• New threshold generation concept (calculation of

threshold in the database). Update of thresholds ongoing

Page 8: LHC Beam instrumentation status LBOC 17 March 2015 E. Bravin BE-BI on behalf of many many people in several groups.

8

BLMDD

• System fully operational• Redesign of the BLMDD acquisition card• Installation of a new signal-box for new connection

scheme • BLMDD installation tested and commissioned• Verification of the 4 Detector signal path and Dump-

signal path with a current source -> Successful• Final commissioning with beam pending

Page 9: LHC Beam instrumentation status LBOC 17 March 2015 E. Bravin BE-BI on behalf of many many people in several groups.

9

BBQ

• System fully operational• Acquisition cards and devices reshuffled

– Devices have now meaningful names: LHC.BQ.ONDEMAND.B1, LHC.BQ.GATED.B1, LHC.BQ.CONT.B1

BPF• System fully operational

Page 10: LHC Beam instrumentation status LBOC 17 March 2015 E. Bravin BE-BI on behalf of many many people in several groups.

10

Orbit and Tune FB

• System fully operational– Main functionalities successfully tested already– Aiming for synchronous orbit, fallback free-running

mode• OFSU (now LHC.BFSU) ported to FESA3• Many fixes to OFSU and OFC• To test:

– Q proxying, upload or resp. matrix by MTG event, upload of Q Q’ ref from OP tools and MTG event

Page 11: LHC Beam instrumentation status LBOC 17 March 2015 E. Bravin BE-BI on behalf of many many people in several groups.

11

Transformers

• DC and Fast transformers fully operational– Both DC systems (A & B) operational (required)– Fast System-B used for R&D and development– TL and Dump line transformers operational

(unchanged) • Both ring systems ported to FESA3 & RDA3 on L865• BCTF-B toroid replaced by BCTI and BCTW

– Reduce sensitivity to beam offset/bunch length• BFCCM (dIdt) electronics installed and connected to BIS

– FESA and Logging should be ready “around” startup

Page 12: LHC Beam instrumentation status LBOC 17 March 2015 E. Bravin BE-BI on behalf of many many people in several groups.

12

Wire scanner

• System available– BWS may be in operational or quasi operational

status at startup depending on the pending firmware upgrade. Procedure for quasi-operational to follow.

• Bellows and comp. springs replaced• PMT base modified (added capacitors)

– Need 30’’ to settle HV (0 to 1500 V), HV ON for 30’• New OP application• Firmware (and FESA) will be upgraded at the first

opportunity if not done before startup.

Page 13: LHC Beam instrumentation status LBOC 17 March 2015 E. Bravin BE-BI on behalf of many many people in several groups.

13

WS limits

• At injection the limit remains 2.7 1013 protons

~ 250 nominal bunches• At 4 TeV the limit was 3.8 1012

~ 30 nominal bunches• At 6.5 TeV there is no value yet (beam loss limited):

“At 6.5 TeV we need to measure the loss of a low intensity beam, compare it with the new loss thresholds and make the intensity extrapolation.”

Page 14: LHC Beam instrumentation status LBOC 17 March 2015 E. Bravin BE-BI on behalf of many many people in several groups.

14

BTV

• System fully operational• Replaced RF fingers on BTV SS/ST/SE (suffered from

Cu-coating induced cold welds)• New video streaming (no more MUX)• Added second camera on BTVDD (now the images are

inverted (T<->B, L<->R) on video stream, (will be) corrected in FESA*

Page 15: LHC Beam instrumentation status LBOC 17 March 2015 E. Bravin BE-BI on behalf of many many people in several groups.

15

BSRA

• System fully operational• Optics layout changed (reduced sensitivity on light

position and increased efficiency)• Ported to FESA3 & RDA3 on L865• Requested interlocking/cleaning feature will be added

after startup

Page 16: LHC Beam instrumentation status LBOC 17 March 2015 E. Bravin BE-BI on behalf of many many people in several groups.

16

BSRL (LDM)

• System ready as Expert tool• Optics changed (same as for BSRA)• Added Hybrid PMT on B1 (better than APD in lab tests)• Improved correction algorithm

– Too heavy for FE CPU, will be done in app for the moment

• FESA class simplified (just raw data collection)• APD of B2 will be replaced by Hybrid PMT at first

opportunity if performance confirmed• “Deamon” server will be added if correction algorithm

prove stable

Page 17: LHC Beam instrumentation status LBOC 17 March 2015 E. Bravin BE-BI on behalf of many many people in several groups.

17

BSRT

• System operational• Extraction mirror redesigned (reduce heating)• Optics design modified to reduce diffraction (400nm &

250nm) (also machine optics modified in IR4)• Added interferometer and Shack-Hartmann on B1• Added/consolidated T probes (not in FESA/DB yet)• Diffraction is still a limitation, tricky corrections• If the interferometer works well a second could be

installed on B2 during YETS• FESA will be rewritten based on experience with the new

system

Page 18: LHC Beam instrumentation status LBOC 17 March 2015 E. Bravin BE-BI on behalf of many many people in several groups.

18

BRAN

• System fully operational• Systems ported to L865, still FESA2• Detectors in IP8 (BRAN-B) replaced (same FESA)

– CdTe->Cherenkov (BRAN-C) (devices doubled)• Detectors in IP2 will be upgraded to BRAN-C in TS1 (no

change for FESA devices)

Page 19: LHC Beam instrumentation status LBOC 17 March 2015 E. Bravin BE-BI on behalf of many many people in several groups.

19

Schottky

• System ready, remains expert tool• Pick-ups substantially overhauled• New RF frontend with fast gate and YIG filter installed for

BQSV.B2– Allows to modify the operation frequency, otherwise

fixed at 4.8 GHz• Application to be developed

Page 20: LHC Beam instrumentation status LBOC 17 March 2015 E. Bravin BE-BI on behalf of many many people in several groups.

20

BGI BGV

• Systems under development• Will not be useable until TS1 at least

Page 21: LHC Beam instrumentation status LBOC 17 March 2015 E. Bravin BE-BI on behalf of many many people in several groups.

21

Conclusions

• Lot of work done during LS1 to improve the systems and add functionalities

• All main systems are ready• Will need some time to fully commission the systems• With every one so busy during LS1 surely many bugs

had the chance to enter and hide in our systems

Page 22: LHC Beam instrumentation status LBOC 17 March 2015 E. Bravin BE-BI on behalf of many many people in several groups.

22

Looking forward for you help to get them out!

THANKS!