LETTER OF TRANSMITTAL 412 Mount Kemble Ave. | Morristown | NJ | 07962 | USA | Tel +1.973.407.1000 louisberger.com TRANSMITTAL 052 To: Kevin Conaboy, Project Manager The Conti Group 2045 Lincoln Highway Edison, NJ 08817-3334 732.520.5000 Project: NJDEP – Fenimore Partial Landfill Closure Project Re: Submittal Review From: Christopher Corliss, P.E. CC: Paula Walshe, Jesse Robbins, Mike Alexander, Robert Hayton Date: October 1, 2014 CONTI SUBMITTAL NO. REV. COPIES SPEC. SECTION DESCRIPTION STATUS 2.17-001-0 0 1 2.17 Transmittal 063 – 2.17-001-0: RER Topsoil Data Transmittal 072 – 2.17-001-0: RER Topsoil Data - ADDENDUM MCN NET – No Exceptions Taken MCN – Make Corrections Noted AR – Amend & Resubmit R – Rejected TANSS – Take Action Noted on Sub-Consultant Stamp Remarks:
15
Embed
LETTER OF TRANSMITTAL - New Jerseynj.gov/dep/fenimore/docs/2-17-001-0-rer-topsoil-data_10-01-2014.pdfLETTER OF TRANSMITTAL 412 Mount Kemble Ave. | Morristown ... Jesse Robbins, Mike
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
LETTER OF TRANSMITTAL
412 Mount Kemble Ave. | Morristown | NJ | 07962 | USA | Tel +1.973.407.1000
louisberger.com
TRANSMITTAL 052
To: Kevin Conaboy, Project Manager
The Conti Group 2045 Lincoln Highway Edison, NJ 08817-3334 732.520.5000
The Contractor is responsible for determining and verifying all quantities,
dimensions, specified performance criteria, installation requirements, materials, catalog numbers and similar data with respect thereto and reviewing and coordinating each shop drawing or sample with other shop drawings and samples and with the requirements of the work and the contract documents.
This check is for conformance with the design concept of the project in
accordance with the Contract Specifications and Drawings. This check does not relieve the contractor from compliance with the requirements of the Contract Documents.
The Contractor is responsible for the means, methods, techniques, sequences
and procedures of construction and the safety precautions and programs incident thereto and this review does not extend to them.
NO EXCEPTIONS TAKEN
X MAKE CORRECTIONS NOTED
AMEND & RESUBMIT
REJECTED
TAKE ACTION NOTED ON SUB-CONSULTANT STAMP
Date: 10/01/14 By: ___
LOUIS BERGER
Engineer Review Comments
1. The use of organic content testing by dichromate oxidation is an acceptable substitution for the specified organic content testing in accordance with AASHTO T194.
2. This off-site material has 24.3% soils remaining above the #10 screen per Conti’s submittal. The percent of soils remaining above the #10 screen was below 20% per Louis Berger’s audit sample taken on 09/19/2014. Based on Louis Berger’s audit sample results, this material’s gradation is acceptable, however Louis Berger reserves the right to reject any