MATT  Team  LOR  Jan '15  1                                                                                             LETTER OF RECOMMENDATION Colorado Department of Transportation (CDOT) Regional Transportation District (RTD) City and County of Denver (CCD) Urban Drainage & Flood Control District (UDFCD) The purpose of this Letter of Recommendation (LOR) is to describe the Multi-Agency Technical Team’s (MATT) recommended technical solution and improvement sequence/schedule to address the October 2013 Memorandum of Understanding (MOU), which was written to establish an inter-agency collaboration for the development of a coordinated set of infrastructure improvements that efficiently and effectively integrates the drainage needs of the following projects: 1. CDOT’s I-70 East Project from Brighton Boulevard to Colorado Boulevard 2. RTD’s North Metro Rail Line 3. CCD’s North Denver Cornerstone Collaborative (NDCC) The MOU defined two teams to accomplish this collaborative approach: The Management Oversight Team (MOT) and the Technical Working Team (TWT). However, as time progressed the title of the Technical Working Team (TWT) was changed to Multi-Agency Technical Team (MATT). The guiding principle of the TWT, or MATT, is as follows: “The TWT will recommend a technical solution and improvement sequence/schedule. The intent is to develop a plan that meets the goals stated above for the best engineering perspective, which includes consideration of cost, timing, and performance, but does not include consideration of division of financial responsibility between agencies.” The MATT team conducted a series of working technical meetings from October 2013 through February 2014, where hydrology for the off-site tributary drainage basins was established and agreed upon. Hydrology developed by the MATT team was documented in two technical memorandums: I-70 PCL Montclair Drainage Basin Hydrologic Analysis and I-70 PCL Park Hill Drainage Basin Hydrologic Analysis, both dated August 1st, 2014. During the second half of 2014, CDOT and CCD conducted additional meetings to coordinate and develop potential drainage alternatives for both the I-70 PCL project and CCD's Open Channel Concept. The result of these meetings was the development of a recommended technical solution—aka Combined Drainage System--for the MATT team to review and recommend. All projects must comply with the City's Storm Drainage Design & Technical Criteria Manual and Colorado Drainage Law. The minimum design standard is a 5-year storm system and no adverse impact to private properties during the 100-year event. The trench area of CDOT’s I-70 PCL project is a sump and must be design with a drainage system to handle the 100-year event.
8

LETTER OF RECOMMENDATION...2019/04/02  · The purpose of this Letter of Recommendation (LOR) is to describe the Multi-Agency Technical Team’s (MATT) recommended technical solution

Aug 20, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: LETTER OF RECOMMENDATION...2019/04/02  · The purpose of this Letter of Recommendation (LOR) is to describe the Multi-Agency Technical Team’s (MATT) recommended technical solution

MATT  Team  LOR  Jan '15  

1  

                                                                                              

LETTER OF RECOMMENDATION

Colorado Department of Transportation (CDOT) Regional Transportation District (RTD)

City and County of Denver (CCD) Urban Drainage & Flood Control District (UDFCD)

The purpose of this Letter of Recommendation (LOR) is to describe the Multi-Agency Technical Team’s (MATT) recommended technical solution and improvement sequence/schedule to address the October 2013 Memorandum of Understanding (MOU), which was written to establish an inter-agency collaboration for the development of a coordinated set of infrastructure improvements that efficiently and effectively integrates the drainage needs of the following projects:

1. CDOT’s I-70 East Project from Brighton Boulevard to Colorado Boulevard 2. RTD’s North Metro Rail Line 3. CCD’s North Denver Cornerstone Collaborative (NDCC)

The MOU defined two teams to accomplish this collaborative approach: The Management Oversight Team (MOT) and the Technical Working Team (TWT). However, as time progressed the title of the Technical Working Team (TWT) was changed to Multi-Agency Technical Team (MATT). The guiding principle of the TWT, or MATT, is as follows:

“The TWT will recommend a technical solution and improvement sequence/schedule. The intent is to develop a plan that meets the goals stated above for the best engineering perspective, which includes consideration of cost, timing, and performance, but does not include consideration of division of financial responsibility between agencies.”

The MATT team conducted a series of working technical meetings from October 2013 through February 2014, where hydrology for the off-site tributary drainage basins was established and agreed upon. Hydrology developed by the MATT team was documented in two technical memorandums: I-70 PCL Montclair Drainage Basin Hydrologic Analysis and I-70 PCL Park Hill Drainage Basin Hydrologic Analysis, both dated August 1st, 2014.

During the second half of 2014, CDOT and CCD conducted additional meetings to coordinate and develop potential drainage alternatives for both the I-70 PCL project and CCD's Open Channel Concept. The result of these meetings was the development of a recommended technical solution—aka Combined Drainage System--for the MATT team to review and recommend.

All projects must comply with the City's Storm Drainage Design & Technical Criteria Manual and Colorado Drainage Law. The minimum design standard is a 5-year storm system and no adverse impact to private properties during the 100-year event. The trench area of CDOT’s I-70 PCL project is a sump and must be design with a drainage system to handle the 100-year event.

Erik
Highlight
Erik
Highlight
Erik
Highlight
Erik
Highlight
Page 2: LETTER OF RECOMMENDATION...2019/04/02  · The purpose of this Letter of Recommendation (LOR) is to describe the Multi-Agency Technical Team’s (MATT) recommended technical solution

MATT  Team  LOR  Jan '15  

2  

Recommended Technical Solution

The recommended technical solution is a Combined Drainage System that addresses off-site drainage for the 100-year design flows from both the Montclair and Park Hill drainage basins.

(Refer to attached exhibit “Figure 1 CCD I-70 PCL Alternative Drainage Concept”).

The stormwater collection/detention/conveyance systems proposed for each basin are as follows:

Montclair Drainage Basin - This combined drainage system will collect, detain and convey to the South Platte River, the MATT agreed upon 100-year stormwater flows south of I-70.

An open channel/detention/storm sewer component running east/west along East 39th Avenue Storm sewer/detention pond components generally along the south side of the proposed I-70

preliminarily identified preferred alternative, referred to as the Partial Covered Lowered (PCL) Alternative. This second system will handle the runoff from the local tributary area between 40th Avenue/Smith Road and I-70.

Additionally, a Storm sewer from the low point of the above described PCL alternative that will convey the stormwater that falls within the I-70 corridor to the S. Platte River

Park Hill Basin - This combined drainage system will collect, detain and convey to the existing storm sewer facilities near Colorado Boulevard and 48th Avenue, the MATT agreed upon 100-year stormwater flows south of I-70.

Provide and formalize through agreement adequate inadvertent detention for the existing flows with a north-south outfall along Dahlia Street connecting to existing storm sewer facilities within 48th Avenue.

A detention pond at the southeast corner of Colorado Boulevard interchange and a cross culvert under I-70 East of Colorado Boulevard.

This Combined Drainage System will handle the off-site stormwater runoff from both the Montclair and Park Hill drainage basins. It is noted that the design discussed in this memorandum is at a conceptual design level. Additional detailed hydraulic design is necessary to finalize the recommended improvements. The MATT Team agrees to work together to optimize and value engineer the final combined drainage system design. It is anticipated that pipe sizes and proposed improvements will be modified as a result of this process.

A brief description of the drainage concept for each reach of the proposed Combined Drainage System is provided below.

Reach 1

Reach 1 will serve as the primary outfall for the Montclair basin to the South Platte River through Globeville Landing Park. In 2014, Denver completed the High Street Outfall Phase 1 project, which consisted of two 96-inch tunneled pipes under UPRR. Reach 1 proposes at least one additional, and possibly two additional tunneled pipes of similar diameter to adequately convey the 100-year system under the tracks. Further downstream, Reach 1 proposes a 100-year pipe system and/or open channel to convey the flows from the tracks to the River. The final layout and configuration of Reach 1 requires additional engineering, but will be determined in a manner that best achieves full stormwater conveyance along with considerations to water quality, connectivity and surrounding developments, including but not limited to, Pepsi, The Denver Coliseum & Globeville Landing Park. Figure 1 depicts a combined pipe/open channel concept, however it should be noted that more extensive design may favor alternative alignments along this reach.

The system’s total capacity is roughly 2,700 cubic feet per second, including the existing 120-inch Brick pipe in 40th Street. This assumes no bypass flow and the full collection and conveyance of the 100-year flow. The 100-year sizing of the Reach 1 system listed above and shown in Figure 1 is

Erik
Highlight
Erik
Highlight
Erik
Highlight
Erik
Highlight
Page 3: LETTER OF RECOMMENDATION...2019/04/02  · The purpose of this Letter of Recommendation (LOR) is to describe the Multi-Agency Technical Team’s (MATT) recommended technical solution

MATT  Team  LOR  Jan '15  

3  

dependent on the amount of stormwater detention achieved in the upstream Reach 2. In the configuration shown, a detention volume of 188 acre-feet is required in Reach 2. Concepts with more conveyance would reduce/reconfigure this volume.

Reach 2

Reach 2 will collect the surface runoff from the Montclair basin, generally, along 39th Avenue and convey it west to Reach 1. An open channel with an approximate top width of 155 feet is proposed along 40th Street and the south side of 39th Avenue from Blake Street to Race Street. The channel connects regional detention pond between 40th and 39th Avenues from Race Street to Columbine Street. The pond will be bisected by York Street, where a culvert or bridge will be provided as a hydraulic connection. It is anticipated that the proposed channel and pond will hydraulically act as a single facility, allowing water to back-up and flow from one to the other sharing detention volume and conveyance. A total of 188 acre-feet detention volume is required in conjunction with the outfall sizing proposed in Reach 1.

To collect runoff from Montclair’s tributary drainage basin north of 39th Avenue east of Clayton Street, an approximate 96” extension of the existing 40th Avenue storm drain is proposed. The pipe will extend along 40th Avenue from York Street to Clayton Street, then turn north in Clayton to 42nd Avenue. This system will not connect to the proposed detention facility, but will instead convey water to Reach 1 utilizing the existing storm drain in 40th Avenue constructed by RTD as a part of the EAGLE project.

Reach 3

Reach 3 extends along 39th Avenue from York Street to Jackson Street utilizing the east-west portion of the old Market Lead to provide a collection and conveyance system for the westernmost portion of the Montclair basin, connecting to the proposed detention ponds in Reach 2.

A phased approach is anticipated along this stretch. Full stormwater conveyance can initially be achieved with a 48-foot top-width trapezoidal conveyance channel as shown in Figure 1. However, the old Market Lead corridor doubles as a meaningful opportunity for increased connectivity and water quality by implementing a Green Street along this stretch, not shown. To construct a Green Street however, the drainage channel would need to be filled and replaced with an underground system to convey runoff to the detention ponds in Reach 2.

From Steele Street to Jackson Street, reconstruction of the existing 39th Avenue roadway section is needed to provide a formal drainage system including curbs, gutters, inlets, and an approximate 84” storm drain. Reconstruction of the roadway section is required in order to collect surface runoff from the tributary basin to the southeast.

Reach 4

Reach 4 addresses stormwater runoff that reaches the north-south portion of the Market Lead Corridor between 42nd Avenue and Monroe Street. The majority of the runoff that currently drains to the Market Lead will be intercepted by the systems proposed in Reaches 3 and 5. However, a small tributary area roughly bound by Monroe Street, Colorado Boulevard, the UPRR, and 39th Avenue will remain. Most of this area is already served by the new RTD East Corridor Colorado Station site detention pond. To address the remaining nuisance flows that will continue to reach the Market Lead, the culvert under the UPRR will initially be constricted allowing the impoundment of water in the Market Lead trench. Outflows to the north will be very minimal and not have a significant impact on I-70.

Page 4: LETTER OF RECOMMENDATION...2019/04/02  · The purpose of this Letter of Recommendation (LOR) is to describe the Multi-Agency Technical Team’s (MATT) recommended technical solution

MATT  Team  LOR  Jan '15  

4  

Reach 5

Reach 5 addresses stormwater runoff from the Park Hill drainage basin. Inadvertent detention currently exists along the north edge of the golf course, however, to provide full 100-year protection, an inundation easement is proposed for a larger, regional detention pond at this location. Approximately 105 acre-feet of detention volume will be required to reduce the 100 yr flow rates to at or below 400 cubic feet per second.

To achieve the full amount of detention volume in the inundation easement, improvements like a berm (or wall) in a “U” shape around the west-north-east boundary of the site and/or site grading within the inundation easement, will be necessary. The berm concept around the edge of the property will be designed to have minimal disruption to the golf course.

An outlet structure, outfall pipe and construction of Park Hill Phase V's 84-inch storm drain will be required to adequately drainage the pond after a major event.

A new collection system constructed along Smith Road collects and conveys the remaining portion of runoff that naturally bypasses the golf course to the east. It is estimated that the proposed pipe in Smith Road extending from Dahlia to Forest Street will be a 12’x10’ RCBC discharging into the proposed detention pond. This new collection system is expected to include the construction of significant street inlet capacity.

I-70 Corridor

It should be noted that CDOT does not commit to any alternative currently being evaluated in the I-70 East NEPA process, including the PCL Alternative. A final determination regarding the designation of a preferred alternative will not be made until the completion of the NEPA process with the completion of a Final Environmental Impact Statement (FEIS) and the issuance of a Record of Decision (ROD).

The drainage improvements required to protect the proposed I-70 PCL section with the above discussed drainage facilities in place are summarized below. The attached Exhibit B shows the proposed I-70 drainage system and associated watershed.

Reach 1 to York Street: The storm drain system designed to protect I-70 is located in 46th Avenue beginning at Pond 6. The proposed storm drain conveys flow to the west through Pond 7 (24 ac-ft) and Pond 7a (23 ac-ft) and discharges into Reach 1 (discussed above). Reach 1 conveys the combined flow into the South Platte River. This section of proposed storm drain ranges in size from a 7’x6’ RCBC to a 12’x4’ RCBC.

York Street to Colorado Boulevard: The drainage system required to protect this stretch of I-70 in located in 46th Avenue and starts at the Market/Lead low point approximately 1200 feet to the west of Colorado Boulevard. The proposed storm drain conveys the flow impacting 46th Avenue to the west into Pond 6 located at York Street. This storm drain system ranges in size from a 60” RCP to a 12’x4’RCBC.

Colorado Boulevard Interchange: The drainage improvements proposed at the

Colorado Boulevard include detention ponds located in the south east quadrant of the intersection and a 10’x6’ RCBC culvert that drains to the north under I-70 into another proposed detention pond that discharges into the existing CCD storm drain.

Page 5: LETTER OF RECOMMENDATION...2019/04/02  · The purpose of this Letter of Recommendation (LOR) is to describe the Multi-Agency Technical Team’s (MATT) recommended technical solution

MATT  Team  LOR  Jan '15  

5  

North Metro Corridor

A potential exists for partnership between the redevelopment of the National Western Center (NWC) and the construction of the North Metro Corridor for interim drainage improvements prior to the completion of the Combined Drainage System, which would result in efficiencies for the NWC and minimize “throwaway” infrastructure for the North Metro Corridor. The evaluation of this potential partnership is ongoing.

Proposed Timelines

Combined Drainage System—NEPA clearance and preliminary design through 2015, construction commencing early 2016.

CDOT I-70 PCL—NEPA clearance into early 2016, procurement commencing in 2015 and completed in early to mid 2016, and construction commencing in late 2016 or early 2017.

North Metro Rail—Design and early construction commenced, earthwork to be completed in the area of the NWC in 2016.

NWC—Concept design completed in early 2015, construction and redevelopment planned for 2017.

Recommendation Benefits

The recommended technical solution of a combined drainage system would provide benefits for I-70, the local community, NWC, RTD’s EAGLE and North Metro Lines and the Montclair/Park Hill watersheds. Below are some of the potential benefits:

A more robust drainage system for I-70, utilizing two drainage systems in the Montclair Basin potentially providing a higher factor of safety

Additional 100-year storm protection for the area located between the two drainage systems (40th Avenue/Smith Road to I-70)

Enhanced water quality improvements (open channel, green streets, detention/ water quality ponds)

Provide drainage amenity to promote ecological enhancement and economic development Potential recreational amenities for the community Improved mobility/connectivity (vehicular, bicycle, pedestrian) Provides a usable outfall connection for future upstream flood control improvements in both

the Montclair and Park Hill watersheds Increased drainage protection (100 year) for the North Metro Corridor, EAGLE and NWC. Potential cost savings to the North Metro Corridor and NWC depending on timing of the

Combined Drainage Solution Ability to create a multi-agency partnership which provides a common solution that benefits

all, inclusive of the public

Erik
Highlight
Erik
Highlight
Erik
Highlight
Erik
Highlight
Erik
Highlight
Page 6: LETTER OF RECOMMENDATION...2019/04/02  · The purpose of this Letter of Recommendation (LOR) is to describe the Multi-Agency Technical Team’s (MATT) recommended technical solution

MATT  Team  LOR  Jan '15  

6  

Concurrence with Findings/Recommendations of the MATT: Colorado Department of Transportation (CDOT) By: ________________________________ Joshua Laipply, CDOT Chief Engineer

Dated: _____________________________

Regional Transportation District (RTD) By: ________________________________ Rick Clarke, Assistant General Manager, Capital Programs

Dated: _____________________________

City and County of Denver (CCD) By: ________________________________ Jose M. Cornejo, Executive Director of Public Works

Dated: ______________________________

Page 7: LETTER OF RECOMMENDATION...2019/04/02  · The purpose of this Letter of Recommendation (LOR) is to describe the Multi-Agency Technical Team’s (MATT) recommended technical solution

Col

orad

o B

oule

vard

Vasq

u

Sout

h Pl

atte

Riv

er

I-70

Bright

on B

lvdI-70

Smith Road

40th Avenue

Yor

k S

tree

t

Reach 2

Reach 3

Reach 1

Reach 4

Reach 5

I 70

E 35TH AVE

E 29TH AVE

N Y

OR

K S

T

N D

AH

LIA

ST

E 37TH AVE

E 36TH AVE

E 48TH AVE

N S

TEE

LE S

T

E 40TH AVE

N E

LM S

T

E 27TH AVE

BLAKE S

T

WALN

UT ST

E 28TH AVE

N H

IGH

ST

E MARTIN LUTHER KING BLVD

E BRUCE RANDOLPH AVE

E 31ST AVE

N C

OO

K S

T

N W

ILLI

AM

S S

T

N ARKIN

S CT

30TH ST

BRIGHTON B

LVD

N A

SH

ST

CURTIS S

T

N A

DA

MS

ST

28TH ST

N F

RA

NK

LIN

ST

E SMITH RD

LARIM

ER ST

N D

OW

NIN

G S

T

N M

AD

ISO

N S

T

LAW

RENCE ST

38TH ST

E 43RD AVE

32ND ST

CHAMPA ST

ARAPAHOE ST

STOUT ST

N C

LAY

TON

ST

N G

ILP

IN S

T

N C

OLO

RA

DO

BLV

D

RAMP

WYNKOOP S

T

27TH ST

33RD STN

JO

SE

PH

INE

ST

E STAPLETON DR S

31ST ST

34TH ST

E 46TH AVE

36TH ST

E STAPLETON DR N

N D

EX

TER

ST

N C

HE

RR

Y S

T

N W

ASH

ING

TON

ST

E 39TH AVE

35TH ST

E 33RD AVE

E 47TH AVE

E THRILL PL

N H

UM

BO

LDT

ST

N C

OLU

MB

INE

ST

N C

LER

MO

NT

ST

26TH ST

N R

AC

E S

T

CALIFORNIA

ST

E 30TH AVE

N VAS

QUEZ B

LVD

N F

OR

ES

T S

T

WAZEE S

T

E 41ST AVE

WELT

ON ST

N V

INE

ST

29TH ST

E 38TH AVE

N B

IRC

H S

T

N C

LAR

K P

L

N L

OG

AN

ST

N G

RA

NT

ST

N J

AC

KS

ON

ST

DELGANY S

T

N A

LBIO

N S

T

N B

RIG

HTO

N B

LVD

N F

ILLM

OR

E S

T

CHESTNUT PL

N F

AIR

FAX

ST

N E

UD

OR

A S

T

N B

ELL

AIR

E S

T

N H

AR

RIS

ON

ST

40TH ST

N D

EX

TER

CT

E 45TH AVE

N E

LIZA

BE

TH S

T

N M

ILW

AU

KE

E S

T

N P

EA

RL

ST

PR

IVA

TE R

D

N G

AY

LOR

D S

T

N P

EN

NS

YLV

AN

IA S

T

GLENARM P

L

N MARIO

N ST

N B

ALD

WIN

CT

E 34TH AVE

CONNECTING RD

N R

ICH

AR

D A

LLE

N C

T

E ELK PL

N W

ILS

ON

CT

N G

LEN

CO

E S

T

N C

LAU

DE

CT

N M

ON

RO

E S

T

E ELGIN PL

E 44TH AVE

N E

UD

OR

A W

AY

N G

AR

FIE

LD S

T

N T

HO

MP

SO

N C

T

N S

AIN

T P

AU

L S

T

N LAFAYETTE ST

N S

AIN

T P

AU

L C

T

N HADDON RD

N NEIL PL

N C

OLO

RA

DO

BLV

D S

ER

VIC

E R

D

N YO

RK L

ANE

W ALICE PL

31ST AVE

N V

INE

ST

N F

OR

ES

T S

T

N M

AD

ISO

N S

T

E 36TH AVE

N C

OLU

MB

INE

ST

N B

IRC

H S

T

N F

OR

ES

T S

T

E 38TH AVE

E 28TH AVE

N G

AR

FIE

LD S

T

N M

ILW

AU

KE

E S

T

N G

LEN

CO

E S

T

N P

EA

RL

ST

N D

EX

TER

ST

E 47TH AVE

N L

OG

AN

ST

E 39TH AVE

N M

AD

ISO

N S

T

E 33RD AVE

E MARTIN LUTHER KING BLVD

E 30TH AVE

N G

AY

LOR

D S

T

N J

OS

EP

HIN

E S

T

E 31ST AVE

N L

AFA

YE

TTE

ST

N F

RA

NK

LIN

ST

N H

AR

RIS

ON

ST

N F

OR

ES

T S

T

N M

AR

ION

ST

N H

UM

BO

LDT

ST

E 47TH AVE

E 48TH AVE

40TH ST

29TH ST

RAM

P

N F

ILLM

OR

E S

T

N P

EN

NS

YLV

AN

IA S

T

I 70

N M

ILW

AU

KE

E S

T

E 33RD AVE

E 46TH AVE

RAM

P

RAMP

36TH ST

N W

ILLI

AM

S S

T

E 30TH AVE

N G

RA

NT

ST

RAMP

N H

IGH

ST

31ST ST

N H

UM

BO

LDT

ST

N A

DA

MS

ST

N F

AIR

FAX

ST

N G

ILP

IN S

T

N M

ON

RO

E S

T

N B

ELL

AIR

E S

T

N G

AR

FIE

LD S

T

E ELGIN PL

N L

AFA

YE

TTE

ST

N J

AC

KS

ON

ST

E 41ST AVE

RAMP

E 30TH AVE

E 28TH AVE N H

IGH

ST

N E

LIZA

BE

TH S

T

RAM

P

E 47TH AVE

E 30TH AVE

E 38TH AVE

35TH ST

N G

LEN

CO

E S

T

E 27TH AVE

RAMP

E 46TH AVE

E 38TH AVE

N S

AIN

T P

AU

L S

T

N G

AR

FIE

LD S

T

N L

AFA

YE

TTE

ST

N F

OR

ES

T S

T

E 48TH AVE

N J

AC

KS

ON

ST

N C

OO

K S

T

E 46TH AVE

E 31ST AVE

N M

ON

RO

E S

T

E 39TH AVE

N A

LBIO

N S

T

N C

OLO

RA

DO

BLV

D

N C

LAY

TON

ST

N H

UM

BO

LDT

ST

N H

AR

RIS

ON

ST

N C

HE

RR

Y S

T

E 47TH AVE

E 48TH AVE

E 46TH AVE

N R

AC

E S

T

N E

LIZA

BE

TH S

T

RAMP

RAM

P

E 41ST AVE

E 33RD AVE

N E

UD

OR

A S

T

N A

DA

MS

ST

N E

LIZA

BE

TH S

T

Existing Storm Drains

Horiz. Diam. 48 - 60 in.Horiz. Diam. >60 in.

Horiz. Diam. 18 - 30 in.Horiz. Diam. 30 - 48 in.

Horiz. Diam. 0 - 18 in.

0 500 1,000 Feet

FIGURE 1CCD I-70 PCL

ALTERNATIVE DRAINAGE CONCEPTPROPOSED 100-YEAR SYSTEM

MONTCLAIR AND PARK HILL BASINSTechnical Memorandum 2014-12-22

Detention/Conveyance/WQBackbone Drainage System

°

2014

/21/

12 9

:17:

32 P

M R

:\Pro

ject

s\D

enve

r\14-

008

Mon

tcla

ir O

pen

Cha

nnel

\GIS

\Map

s\Fi

g1_m

emo_

2014

-12-

22_A

lt_D

rain

age_

Con

cept

.mxd

Proposed Drainage SystemProposed Pipes

Proposed Detention

ProposedOpen Channel

Open Channel155' Top Width, 2,700 cfsAbandon 39th Ave. & 40th St., Dead End at High St.Bridges at Walnut, Franklin, Williams

ProposedGreen Street

40th Avenue Storm ExtensionConnect to RTD 40th Ave. System96" RCP, 517 cfs

High Street Outfall Ph 2A8'x16' RCBC2,700 cfs Capacity(combined w/ exist.)

Open ChannelOutfall

Open Channel48' Top Width Channel

40th Ave. Detention Ponds188 Acre-Feet, 12' Deep

Smith Road Collection System 12'x10' RCBC, 1590 cfs

Golf Course Detention Pond105 Acre-FeetWall/Berm, no excavation

Existing 120" BrickUtilize

Park Hill Phase V Outfall84" RCP, 400 cfs Capacity

Drain to Market LeadProperty Owned by Denver

39th Ave. Storm Upgrade84" RCP, 393 cfsRoad Reconstruction

Proposed Bridge

Existing 84" RCPPark Hill Phase IV

Residual Tributary BasinMontclair

Residual Tributary BasinPark Hill

Page 8: LETTER OF RECOMMENDATION...2019/04/02  · The purpose of this Letter of Recommendation (LOR) is to describe the Multi-Agency Technical Team’s (MATT) recommended technical solution

Pond 7A(Western Stock Show)

Pond 7(UPRR) Pond 6

(York Street)

Pond (Colorado NE)

Pond (Rebuild Existing Safeway Ponds)

South

Platt

e Rive

r

UNION PACIFIC RAILROAD

£¤85

Connect Existing Storm Drain into Pond 6

10'x6' CBC

60'' RCP

12'x4' CBC

72'' RCP (Bridge)

8'x6' CBC10'x4' CBC

10'x4' CBC

12'x4' CBC

7'x6' CBC

Connect CDOT FacilityTo Denver System(Invert = 5161.6)

78" RCB

3

BNSF

Coliseum to Steele St/Vasquez BlvdEstimate Limits

E 35TH AVE

YORK

ST

STEE

LE S

T

BLAKE ST

WALNUT ST

38TH ST

BRIGHTON BLVD

JOSE

PHIN

E ST

E 48TH AVE

DOW

NING

ST

LARIMER ST

ARKIN

S CT

LAWRENCE ST

MARI

ON S

T

JACK

SON

ST

E 47TH AVE

E 48TH AVE

E 35TH AVE

E 37TH AVE

E 36TH AVE

E 40TH AVE

E 43RD AVE

WALNUT ST

COOK

ST

38TH ST

CLA

YTON

ST

E 47TH AVE

WYNKOOP ST

HIGH

ST

JOSE

PHIN

E ST

COLU

MBIN

E ST

GILP

IN S

T

WASH

INGT

ON S

T

FRAN

KLIN

ST

36TH STE 39TH AVE

RACE

ST

34TH ST

35TH ST

COLO

RADO

BLVD

E 46TH AVE

E 49TH AVE

JACK

SON

ST

44TH ST

WAZEE ST

VINE S

T

E 38TH AVE

FILLM

ORE S

T

DELGANY ST

MILW

AUKE

E ST

33RD ST

ALBI

ON S

T

SMITH RD

E 45TH AVE

CHESTNUT PL

GAYL

ORD

ST

BALD

WIN

CT

RINGS

BY C

T

CLAU

DE C

T

GARF

IELD

ST

E 44TH AVE

HUMB

OLDT

ST

39TH ST

SAIN

T PAU

L ST

LAFAYETTE ST

E 49TH AVE

N CO

OK S

TCO

OK ST

MONR

OE ST

N ADA

MS ST

MADI

SON

ST

E 41ST AVE

40TH ST

36TH ST

SAIN

T PAU

L ST

E 38TH AVE

LAFA

YETT

E ST

THOM

PSON

CT

E 39TH AVE

WILL

IAMS

ST

E 48TH AVE

N ST

EELE

ST

N MO

NROE

ST

E 42ND AVE

35TH ST

HIGH

ST

Exhibit BDraft I-70 Denver Offsite

SystemMATT Letter of Recommendation

0 500 1,000 1,500 2,000Feet

LegendRoadway Improvements

Off Site Outfall Drainage System

Denver Drainage System

Storm Drain Master Plan

Sub Basin

Denver Ponds Proposed Ponds

Proposed Drainage Improvements

Drainage Facilities (York - Colorado)Colorado Interchange Drainage SystemOn Site Drainage System

#

# # #

#

Flow Direction

The enclosed draft is considered preliminary for internal review onlyand shall not be shared with any person outside of your agency. Since this document is considered a working draft and it maycontain preliminary conclusions not necessarily reflected in the finaldecision, all requests for any portion of this material should bedenied under Exemption 5 of the Freedom of Information Act (FOIA) and the Department of Transportation implementing regulation (49CFR). Any requests for materials from outside of your agencyshould be forwarded to FHWA.

The I-70 East Corridor Denver Drainage Option reflects theanticipated preliminary proposed 100-year system assumingseparate completed improvements by City and County of Denver per PDF exhibit received on 01/05/2015 for Montclair and Park HillBasins.

01/16/2015