Lessons learnt from Selected Projects to Promote Transfer of Mitigation Technologies. Asia and the pacific Regional Workshop on Transfer of Technology as referred to Decision 4/CP.4 17th January 2000 Tadahisa Miyasaka Electric Power Development CO.,Ltd. Optimal Configuration of power sources. - PowerPoint PPT Presentation
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
ELECTRIC POWER DEVELOPMENT CO.
Lessons learnt from Selected Projects to Promote Transfer of Mitigation
Technologies Asia and the pacific Regional Workshop on Transfer
Heat recovery from river water, waste incineration facilities
ELECTRIC POWER DEVELOPMENT CO.
4
Activities concerning power sector supported by NEDO in 1998
Totally 37 projects among 9 countries 20 Power sector projects included
Natural gas pipeline system optimization in Russia PCF power plants reconstruction to natural gas in Russia Power plants reconstruction to gas combined cycle system in
Russia and Poland PCF power plants renovation and reconstruction in Russia Gas-fired power plants reconstruction to combined cycle
system in Russia and Myanmar PCF power plants renovation and reconstruction in Russia
ELECTRIC POWER DEVELOPMENT CO.
Projects
Feasibility Studies for CO2 Reduction from coal-fired thermal power plants in RussiaRussia..
Feasibility Studies for CO2 Reduction from coal-fired thermal Power Plants in ChinaChina..
ELECTRIC POWER DEVELOPMENT CO.
Finding the most economical and effective measure to reduce CO2 emission from coal-fired power plants.
Considering electric power system and energy demand and supply structure.
Finding promising projects related to coal-fired power stations which are appropriate for Joint Implementation between RussiaRussia and Japan in the future
Finding a feasible program to be carried out through Japan’s CDM with ChinaChina.
Purpose
ELECTRIC POWER DEVELOPMENT CO.
Issues to be studied in RussiaRussia.
[1] General Study of profile of object country.
[2] Macro analysis of power system in the Far Eastern regions of Russia and Siberia.
[3] Case Studies for 9 individual coal-fired thermal Power stations.
ELECTRIC POWER DEVELOPMENT CO.
Issues to be studied in ChinaChina.
[1] General Study of profile of object country.
[2] General Study of existing 300MW coal-fired power plant units.
[3] On Site Study of 3 PCF power plants.
ELECTRIC POWER DEVELOPMENT CO.
[2] Macro analysis of Power System in the Far Eastern Regions of Russia and Siberia
Identify the cost cost effectiveness.
Macro analysis of the power-system has been carried out to study the effect of the CO2 emission reduction projects targeting all coal-fired thermal power plants connected to the grid.
ELECTRIC POWER DEVELOPMENT CO.
[2] Prospective Power StationsFor Case Studies.
Far Eastern Regions
Amrusk CCP-1
Khabalovsk CCP-1
Blgagove-schensk CCP
Partizansk CCP
Siberian Region
Irkutsk CCP-6
Krasnoyarsk CCP-1
Novo-Kemerovo CCP
Irkutsk CCP-10
Irkutsk CCP-11
ELECTRIC POWER DEVELOPMENT CO.
[3] Case Studies for 9 Individual Coal-fired Thermal Power Stations
Serving as preliminary F.S. for 9 power stations to be considered as candidate for promising project(s) for future Joint Implementation.
ELECTRIC POWER DEVELOPMENT CO.
[3] Case Studies for 9 Individual Coal-fired Thermal Power Stations
Study through site-visit and questionnaire (1) Dorogobuzh PS
(2) Reftinskaya
(3) Troitskaya
(4) Novo-Irkutsk
(5) Petropavlovsk Kamchatsky
Study through questionaire (6) Cherepetskaya (7) Ulan-ude (8) Verkhnetagilska (9) Bogoslovskaya
ELECTRIC POWER DEVELOPMENT CO.
[3]Efficiency Improvement Measures
Replace - Replace-1; Replace coal-fired plants to GTCC plants.
- Replace-2; Replace units to USC-PCF. Convert -Convert ;Convert the boilers to use natural gas. Evaluation of cost effectiveness was done by 30yeras on replace and