Top Banner
Lesotho
43

Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

Jul 31, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

Lesotho

Page 2: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

Acknowledgments

The (I)NDC Content Briefs were produced by the Climate Policy

Team of the World Bank Climate Change Group. The team was led

by Sebastian Wienges and Ana Bucher under the supervision of

Stephen Alan Hammer. Detail analysis of country (I)NDC was

provided by Tom Witt, Jiawei Song, Karan Chouksey (mitigation

components), Yin Qiu, Yunziyi Lang, and Prajwal Baral (adaptation

components). The team is grateful for all comments and

suggestions received from regional and sector specialists

regarding the presentation and synthesis of relevant information.

© 2016 International Bank for Reconstruction and Development/The World Bank 1818 H Street NW Washington DC 20433, U.S.A. Internet: www.worldbank.org

Climate Policy Team | World Bank Group

Page 3: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

Introduction      In response to a growing interest in understanding (Intended) Nationally DeterminedContributions ((I)NDCs) and with regard to the ultimate goal of supporting countries'implementation of their national climate targets, the World Bank Climate Policy Team (WB­CPT) has

reviewed all developing countries (I)NDCs' submitted to the UNFCCC. The (I)NDC Content Brief

aims to provide a summary analysis of existing and instead country mitigation and adaptation

policies and plans, commitments and targets, implementation strategies and sector priorities,

associated costs and conditionalities, and stated gaps and needs, among other issues. 

      The (I)NDC content briefs are created solely on the basis of information from submitted(I)NDCs and makes no inferences about robustness, quality, or viability of intended policiesor actions. 

The (I)NDCs review will help implementing organizations like the World Bank Group (WBG) identify

and familiarize with a range of country priorities in terms of sectoral engagement, and needs in

terms of capacity building, technology transfer, and financing. Based on this comprehensive

mapping exercise, the WBG will develop a useful, easy­to­use, and interactive database and briefs

of all (I)NDCs to inform a wide range of WBG initiatives and client engagement processes, including

the development of Systematic Country Diagnostics (SCDs) and Country Partnership Frameworks

(CPFs), and at a later stage respond to the more specific requests from all WBG Global Practices

(GPs), regions, and country units for the identification of potential development opportunities,

analytical studies and technical assistance to support countries' implementation of planned policies

and actions. In­depth summaries of (I)NDCs by sectors and regions will be prepared at a later stage. 

      In regards to Adaptation, although no global adaptation mechanism is established, the ParisAgreement parties are required to engage in adaptation planning and implementation of actions

which include preparation of adaptation plans. The Adaptation section of a large number of

submitted (I)NDCs, aims to increase development planning and scale the ability of countries to

adapt to the adverse impacts of climate change and foster climate resilience and low greenhouse

gas emissions development, in a manner that does not threaten sustainable development. In

addition to requested finance, the implementation of country commitments is largely tied to

significant amounts of external assistance to support development and execution of adaptation

plans. Although subsequent (I)NDCs are not explicitly required to have an adaptation component,

the process will ensure increased resilience is recognized under the UNFCCC and climate finance

mobilization is enhanced with an aim to achieve a balance between adaptation and mitigation flows.

Climate Policy Team | World Bank Group

Page 4: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

Table of Contents

I Overall Planning and Preparation Process 

II  Mitigation

  Economy­wide Targets

  Economy­wide Policies

  Mitigation Actions and Policies

III  Adaptation

  Adaptation Targets

  Adaptation Context

  Adaptation Actions and Policies

Acronyms

BAU Business as Usual NAMA Nationally Appropriate MitigationActions

CIF­PPCR Climate Investment Funds ­ PilotProgram for Climate Resilience

NAP National Adaptation Plan

DRM Disaster Risk Management NAPA National Adaptation Programmesof Action

INDC Intended Nationally DeterminedContributions

REDD+ Reducing emissions fromdeforestation and forestdegradation and the role ofconservation, sustainablemanagement of forests andenhancement of forest carbonstocks in developing countries

LEDS Low Emission DevelopmentStrategy

LULUCF Land Use and Land Use Changeand Forestry

|

|

|

Climate Policy Team | World Bank Group

Page 5: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

Overall Planning and

Preparation Process

How reliable is the prioritization of the (I)NDC? How serious is thegovernment about implementing policies and actions to achieve the (I)NDCtargets?

Political decision of adoption of INDC at:Head of state level

Interministerial level

Parliament NATIONAL ASSEMBLY

Ministry Level

Technical development of INDC through a participatory processStakeholder involvement YES

Multisector commision

Have development benefits been assessed and considered in the planningprocess?

Are there climate policies and actions already in place/under development?

LEDS

NAMAS

NAPA YES

Climate Policy Team | World Bank Group

$N/A

(in Billion USD)

TOTAL COST OF

IMPLEMENTATION (mitigation and adaptation)

Page 6: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

Existing policies:National Strategic Development Plan (NSDP)(2012-2017)

National Adaptation Programme of Action (NAPA)

Has the INDC development been supported by a development partner?Technical support

Financial support GEF THROUGH UNEP

Implementation Plans and Needs

Specific requests for international provision of means of implementation:

Technology Transfer YES

Financial support YES

Capacity Building YES

Does the INDC intend the private sector to be involved in theimplementation of the NDC?

Are carbon pricing/international market mechanisms intended?YES

Are there any barriers identified?LIMITED TRANSPORT PLANNING AND MANAGEMENTINSTITUTIONAL BARRIERS TO ENERGY EFFICIENCYIMPROVEMENTS

Link list:• Lesotho INDC Factsheet (projected per capita emissions): http://www.climate­energy­college.net/files/site1/factsheets/Lesotho_INDCFactsheet_UoM­PRIMAP_GWPAR4.pdf 

Climate Policy Team | World Bank Group

Page 7: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

-10%

$1.2 billion

additional -15%

$0.6 billion

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

Mitigation

ECONOMY-WIDE TARGETS

Conditionality: INDC page link

Unconditional part of mitigation target:Estimated costs for implementation:

Conditional part of mitigation target:Estimated costs for implementation:

Coverage of Gases: CO , N O, CH

Other Targets:

POLICIES:

TARGET YEAR

2030TARGET TYPE

-35%Relative Emission Reduction

Compared to BAU (%)

N/A(in Billion USD)

COST OFIMPLEMENTATION

2 2 4

Climate Policy Team | World Bank Group

Page 8: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIESWASTE Plans:

Waste-to-Energy

Waste: General   P. 14

Recycling, Reuse, Reduce

Climate Policy Team | World Bank Group

Page 9: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

$0.5 million

n/a

n/a

n/a

Landfill gas recovery and flaring CDM projects

$0.5 million

n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

WASTE-TO-ENERGYActions: INDC page link

Landfill gas recovery and flaring CDM projects P. 15

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 10: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIESENERGY Plans:

Energy: General   P. 12

Clean Cooking and Heating: Efficient Cookstoves   P. 14

Supply-Side Efficiency: Grid/Energy Loss Reduction

Renewable Energy: Wind

Renewable Energy: Hydro

Renewable Energy   P. 14

Energy Efficiency

Clean Cooking and Heating: Cleaner Household Fuels

Renewable Energy: Solar

Mini-Grids   P. 14

Demand-Side Efficiency: Buildings   P. 13

Gas

Climate Policy Team | World Bank Group

Page 11: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/a

n/a

n/a

n/a

n/a

30% penetration rate of efficient stoves in2030

n/a

n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

CLEAN COOKING

AND HEATING:

EFFICIENT

COOKSTOVES

Targets: INDC page link

30% penetration rate of efficient stoves in 2030 P. 13

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 12: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/a

n/a

n/a

n/a

n/a

7.5% (0.5% per annum) reduction intransmission and distribution loses from 2015until 2030

n/a

n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

SUPPLY-SIDE

EFFICIENCY:

GRID/ENERGY LOSS

REDUCTION

Targets: INDC page link

7.5% (0.5% per annum) reduction in transmission and distribution losesfrom 2015 until 2030

P. 12

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 13: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/a

n/a

n/a

n/a

n/a

35 MW wind power (2017)

n/a

n/a

$4 million

n/a

n/a

n/a

Construction of wind farms

$4 million

n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

RENEWABLE

ENERGY: WINDTargets: INDC page link

35 MW wind power (2017) P. 12

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Actions: INDC page link

Construction of wind farms P. 15

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 14: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/a

n/a

n/a

n/a

n/a

125 MW hydro power (2025)

n/a

n/a

$602 million

n/a

n/a

Rehabilitation of 2 MW MantsonyaneHyropower plant;upgrade Semonkong mini-hydro power plant

40MW small hydropower;upgrade MuelaHydropower Station

$602 million

n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

RENEWABLE

ENERGY: HYDROTargets: INDC page link

125 MW hydro power (2025) P. 12

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Actions: INDC page link

Rehabilitation of 2 MW Mantsonyane Hyropower plant; upgradeSemonkong mini-hydro power plant; 40MW small hydropower; upgradeMuela Hydropower Station

P. 14

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 15: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/a

n/a

n/a

n/a

n/a

200 MW renewables by 2020

n/a

n/a

$351.46 million

n/a

n/a

Promote renewable energy technology

$351.46 million

n/a

n/a

n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

RENEWABLE

ENERGYTargets: INDC page link

200 MW renewables by 2020 P. 12

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Plans: INDC page link

Promote renewable energy technology P. 14

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 16: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/a

n/a

n/a

n/a

n/a

20% energy efficiency gains by 2020

n/a

n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

ENERGY

EFFICIENCYTargets: INDC page link

20% energy efficiency gains by 2020 P. 12

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 17: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/a

n/a

n/a

n/a

n/a

25,000 kilolitres paraffin consumption (5434kilolitres reduction from 2014 level) in 2020,

20,000 kilolitres paraffin consumption (5000kilolitres reduction from 2020) in 2030

n/a

0.012 MtCO2e emissions reduction below BAUby 2020, 0.024 MtCO2e emissions reductionbelow BAU by 2030

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

CLEAN COOKING

AND HEATING:

CLEANER

HOUSEHOLD FUELS

Targets: INDC page link

25,000 kilolitres paraffin consumption (5434 kilolitres reduction from 2014level) in 2020, 20,000 kilolitres paraffin consumption (5000 kilolitresreduction from 2020) in 2030

P. 12

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 18: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/a

n/a

n/a

n/a

n/a

40 MW solar power (2017/2018)

n/a

n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

RENEWABLE

ENERGY: SOLARTargets: INDC page link

40 MW solar power (2017/2018) P. 12

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 19: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/a

n/a

n/a

Rural electrification

$10 million

n/a

n/a

n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

MINI-GRIDSPlans: INDC page link

Rural electrification P. 14

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 20: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

GASTargets: INDC page link

10% replacement rate of fuel-wood with LPG from 2020 to 2030 P. 13

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 21: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIESAGRICULTURE Plans:

Agriculture: General   P. 15

Climate Policy Team | World Bank Group

Page 22: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/a

n/a

n/a

n/a

n/a

120,000 ha reforestation from 2015 to 2030

n/a

n/a

$10 million

n/a

n/a

120,000 ha of forests

n/a

n/a

n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

REFORESTATIONTargets: INDC page link

120,000 ha reforestation from 2015 to 2030 P. 14

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Actions: INDC page link

120,000 ha of forests P. 14

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 23: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/a

n/a

n/a

Capacity building

$0.5 million

n/a

n/a

n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

SUSTAINABLE

FOREST

MANAGEMENT

Plans: INDC page link

Capacity building P. 14

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 24: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIESECONOMY-WIDE

Climate Policy Team | World Bank Group

Page 26: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIESINDUSTRIES

Targets: INDC page link

8% (0.8% per annum) reduction in electricity demand in industrial sectorfrom 2020 until 2030 ; 10% (1% per annum) reduction in final energydemand in industrial sector from 2020 to 2030

P. 13

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 27: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

N/A

N/A

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

Adaptation

ADAPTATION TARGETS

ADAPTATION CONTEXT

Existing National Development/Resilience Policies and Plans

National Communications

NAPs

NAPAS YES

CIF-PPCRs

Sectoral Strategies

Cross-cuttingNATIONAL STRATEGICDEVELOPMENT PLAN (NSDP)(2012-

2017)

Conditionality:

Unconditional part of adaptation implementation

Conditional part of adaptation implementation

Conditional upon international provision of meansof implementation

YES

TARGET YEAR

2030N/A

(in Billion USD)

COST OFIMPLEMENTATION

Climate Policy Team | World Bank Group

Page 28: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

gefgef

government, gef|government, gef

usd 1.6 million (un) + usd 1.8 million(con)|usd0.318million (un) + usd 1.735 million(con)

Total Implementation Cost for UnconditionalActions: usd 5.45 million

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

DISASTER RISK

MANAGEMENT (DRM)

EARLY WARNING

SYSTEM

Actions:

UNCONDITIONAL ACTIONS: INDC page link

Improvement of Early Warning System to Reduce Impacts of ClimateChange and Capacity Building to Integrate Climate Change intoDevelopment Plans – Vulnerability MappingImprovement of Early Warning System to Reduce Impacts of ClimateChange – Phase II (2016 - 2020)

P. 7

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 29: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/a

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

LULUCF/FORESTRY

SUSTAINABLE

FOREST

MANAGEMENT

Policy: INDC page link

P. 7

National Forest PolicyMechanism to Implement the Forestry Initiative for Landscape andLivelihood Improvement Program (2015 - 2016)

Actions:

UNCONDITIONAL ACTIONS: INDC page link

Forestry Initiative for Landscape and Livelihoods Improvement (FILLI)Program (Planned)

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 30: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/agef

n/a|government, gef

n/a|usd 263 million(un) + usd 8.4 million (con)

Total Implementation Cost for UnconditionalActions: usd 271.40 million

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:obtain data from satellite/remote sensingcoordinate data pools to establish dataarchiving and sharing protocols

Capacity Building: n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

SUSTAINABLE

LAND

MANAGEMENT

Actions:

UNCONDITIONAL ACTIONS: INDC page link

Land Rehabilitation Program of the Government of LesothoReducing Vulnerability from climate change in the Foothills, Lowlandsand the Lower Senqu River Basin

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 31: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/a

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

WETLANDSActions:

UNCONDITIONAL ACTIONS: INDC page link

Wetlands restoration and rehabilitation project

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 32: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/an/agefn/an/a

n/a|n/a|government, gef|n/a|n/a

n/a|n/a|usd 13 million (un) + usd 4.3 million(con)|n/a|n/a

Total Implementation Cost for UnconditionalActions: usd 17.30 million

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

AGRICULTURE

CLIMATE SMART

AGRICULTURE

Actions:

UNCONDITIONAL ACTIONS: INDC page link

Developing capacity for climate change adaptation capacity in theagricultural sector (2009 - 2011)Conservation advocacy, extension / training, research integration intoformal curriculaLesotho Climate Change Adaptation of Small-Scale AgriculturalProductionIncreasing Capacity for Climate Change Adaptation in the AgricultureSectorIncreasing Capacity for Climate Change Adaptation in the AgricultureSector

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 33: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

gefifad

government, gef|government, ifad

usd 0.973 million(un) + usd 7.773 million(con)|usd0.9997 million(un) + usd 6.557 million(con)

Total Implementation Cost for UnconditionalActions: usd 16.30 million

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

FOOD SECURITYActions:

UNCONDITIONAL ACTIONS: INDC page link

Small Holder Agricultural DevelopmentSmallholder Agricultural Development

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 34: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/a

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

CROPSActions:

UNCONDITIONAL ACTIONS: INDC page link

Sorghum breeding for high yield and drought toleranceSmallholder Agriculture Development Project – Cropping Systems (2011 -2017)

Lesotho Block Farming Initiatives

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 35: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/a

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

IRRIGATIONActions:

UNCONDITIONAL ACTIONS: INDC page link

High efficiency irrigation systems: Gravity & Drip

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 36: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

ifad, opec, asapn/a

government, ifad, opec, asap|n/a

usd 7 million (un) + usd 29 million(con)|n/a

Total Implementation Cost for UnconditionalActions: usd 36.00 million

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

LIVESTOCKActions:

UNCONDITIONAL ACTIONS: INDC page link

Lesotho wool & mohair improvement project (2015 - 2022)

Smallholder Agriculture Development Project – Livestock (2011 - 2017)

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 37: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/a

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

WATER

WATER

MANAGEMENT

Actions:

UNCONDITIONAL ACTIONS: INDC page link

Lesotho Highland Water Development Project II (Planned)

Lesotho Lowlands Water Scheme ILesotho Lowlands Water Scheme II (Planned)

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 38: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/a

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

ENVIRONMENT

ECOSYSTEM AND

BIODIVERSITY

Actions:

UNCONDITIONAL ACTIONS: INDC page link

Eco-system based climate change adaptation in southern Lesotho

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 39: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

gef

government, gef

usd 7.8 million (un) + usd 3.6 million(con)

Total Implementation Cost for UnconditionalActions: usd 11.40 million

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

WATERSHED AND

RIVER BASIN

MANAGEMENT

Actions:

UNCONDITIONAL ACTIONS: INDC page link

Strengthening Capacity for climate change adaptation through support tointegrated watershed management programme in Lesotho

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 40: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/an/a

n/a|n/a

n/a|n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

CROSS-CUTTING AREA

CAPACITY

BUILDING AND

KNOWLEDGE

TRANSFER

Actions:

UNCONDITIONAL ACTIONS: INDC page link

Develop mechanisms to improve access to climate change adaptationtechnologies (2015 - 2020)

Improvement of Capabilities to Cope with Natural Disasters caused byClimate Change

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 41: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

CLIMATE SERVICESActions:

CONDITIONAL ACTIONS: INDC page link

Develop a database for reporting raw data which will take intoconsideration IPCC requirements.Build capacity of experts and stakeholders in the preparation, datacollection to enhance information management, ownership, informationexchange, dissemination and information sharing within and acrosssectors.

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 42: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/an/a

n/a|n/a

n/a|n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Lesotho | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

CLIMATE RISK

MANAGEMENT

Policy: INDC page link

Develop National Adaptation Plans (2015 - 2020)

Develop Climate Change Policy and Strategy (2015 - 2020)

Integrate Climate Change into sectoral policy and strategies (2015 - 2020)

Actions:

UNCONDITIONAL ACTIONS: INDC page link

Africa Adaptation Project (2009 - 2012)

Climate Change Policy Project (2016 - 2017)

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 43: Lesotho - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/LES.pdf · Ò A gÞ5 D ÞÞ_ëA.H .ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯